Loading...
HomeMy WebLinkAbout20110821 Ver 1_Post Closeout Contingency_20180208Lyle Creek Post Closeout Contingency Update Full Delivery Site DMS ID (IMS) # 94643 Catawba County Stream &Wetland Mitigation Site The Lye Creek closeout site visit was completed with the Interagency Review Team (IRT) on 6/20/2017. The IRT considered a total of 5,571 SMUs and 7.1 WMUs for closure during the site visit. The site was not approved for closure in June 2017, the following plan of action was approved: 1. Monitor wetland hydrology for one additional year (MY6-2017). 2. Monitor stream reaches UTI (upstream reach) and UT 1 b (upstream reach) visually for one additional year. 3. Continue beaver management as necessary for one additional year. 4. Fixed plot vegetation height data to be submitted to the IRT (wetlands only). 5. Eliminate and replant minor landowner encroachments in a few locations. Resnlntion- 1. All groundwater gages within the Site met the project success criteria (14 consecutive days, 7.0% of growing season) for Year 6. Please see attached summary gage table and plots for Year 6 results. 2. Stream reaches UTI (upstream reach) and UTIB (upstream reach) were visually monitored during Year 6 between June and November 2017. Both reaches appear stable and are not showing signs of instability. Please refer to the attached Current Condition Plan View Map and site photographs. 3. Wildlands has continued to monitor the Lyle Creek Site for additional signs of beaver activity. At this time, beaver are not present within the lower reaches of UTI. 4. Fixed plot vegetation height data has shown a large improvement from the MY5 and MY6 assessments. The MY6 (2017) average wetland plot height is 7.8 ft compared to MY5, which was 6.04 ft. The planted vegetation is healthy and continuing to grow. It is anticipated that the average planted stem height will continue to improve and exceed the 8 ft height requirement in 2018. Please refer to the attached vegetation summary data for MY6. Wildlands added additional posts and signs to demarcate the easement boundary (Please refer to attached photographs. Additional plants were installed in 2016 to replace stem loss from encroachment. In addition, herbaceous vegetation and natural recruitment have flourished in MY6. These landowner encroachments have been resolved and are no longer an area of concern. Recommendation: DMS recommends closing the Lyle Creek site with 5,571 SMUs and 7.1 WMUs. Wetland Gage Attainment Summary Lyle Creek Mitigation Site DMS Project No. 94643 Monitoring Year 6 - 2017 Wetlands RW1 and RW2 1111111111111 1111111 !1 Jill Jill III 11111111111111111111111111 111111111111111111111111111 '111 1 1 IL Success Criteria Achieved/Max Consecutive Days During Growing Season (%) Gage Year 1 (2012) Year 2 (2013) Year 3 (2014) Year 4 (2015) Year 5 (2016) Year 6 (2017) No/5 Days Yes/49 Days Yes/47 Days Yes/59 Days Yes/42 Days Yes/41 Days 1 (2.5%) (24.0%) (23.0%) (25.4%) (18.1%) (20.3%) No/0 Days Yes/93 Days Yes/113.5 Days Yes/99.5 Days Yes/108 Days Yes/86 Days 2 (0.0%) (46.0%) (56.0%) (42.9%) (46.6%) (42.6%) Yes/29 Days Yes/49 Days Yes/52.5 Days Yes/101.5 Days Yes/84 Days Yes/99 Days 3 (14.0%) (24.0%) 26.0%) (43.8%) (36.2%) (49.0%) Yes/27 Days Yes/54.5 Days Yes/47 Days Yes/65.5 Days Yes/48 Days Yes/41 Days 4 (13.0%) (27.0%) (23.0%) (28.2%) (20.7%) (20.3%) No/11 Days Yes/41.5 Days Yes/52.5 Days Yes/75.5 Days Yes/233 Days Yes/130 Days 5 (5.0%) (20.3%) (26.0%) (32.5%) (100.0%) (64.4%) 6 No/5 Days Yes/16 Days No/10 Days Yes/35.5 Days No/9 Days (3.9%) Yes/34 Days (2.5%) (7.8%) (5.0%) (15.3%) (16.8%) Yes/22 Days Yes/179 Days Yes/49.5 Days Yes/79.5 Days Yes/43 Days Yes/117 Days 7 (11.0%) (88.0%) (25.0%) (34.3%) (18.5%) (57.9%) No/12 Days Yes/53 Days Yes/44.5 Days Yes/63 Days Yes/42 Days Yes/54 Days 8 (6.0%) (26.0%) (22.0%) (27.2%) (18.1%) (26.7%) 9 N/A N/A N/A Yes/17 Days No/9 Days (3.9%) Yes/34 Days (7.3%) (16.8%) 10 N/A Yes/180 Days Yes/45.5 Days Yes/85 Days Yes/45 Days Yes/99 Days (88.0%) (23.0%) (36.6%) (19.4%) (49.0%) 11 N/A Yes/80 Days Yes/50.5 Days Yes/73.5 Days Yes/84 Days Yes/74 Days (39.0%) (25.0%) (31.7%) (36.2%) (36.6%) Yes/74.5 Days Yes/204 Days Yes/35 Days Yes/52.5 Days No/13 Days No/13.5 Days Reference (36.5%) (100%) (17.3%) (22.6%) (5.4%) (6.7%) Wetland success criteria is 7% of growing season (14 consecutive days). Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #1 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75Up Q - > U i Q cn O O 2:> D Q Z Rainfall Reference Gage Depth Gage #2 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #3 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #4 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #5 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW2 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #6 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW2 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #7 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW2 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #8 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW2 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U i Q O O 2:> Q Ln D Z Rainfall Reference Gage Depth Gage #9 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW1 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - T C 75 W Q - > U LlQ Vl [) O 0 � > Q Z Rainfall Reference Gage Depth Gage #10 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland RW2 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - ? C W Q +-' > U Ll Q 7 N O O 0 � � Q Z Rainfall Reference Gage Depth Gage #11 — — Criteria Level 6.0 5.0 4.0 c 3.0 m c m 2.0 1.0 0.0 Groundwater Gage Plots Lyle Creek Mitigation Site (DMS Project No. 94643) Monitoring Year 6 - 2017 Wetland Number 20 10 0 -10 v -20 v m 3 -30 -40 -50 -60 C - ? C 75> v UQ Vl [) O 0 � > Q Z Rainfall Reference Gage Depth — — Criteria Level 6.0 5.0 4.0 c 3.0 m c M 2.0 1.0 0.0 Monthly Rainfall Data Lyle Creek Mitigation Site DMS Project No. 94643 Monitoring Year 6 - 2017 Lyle Creek 30-70 Percentile Graph for Rainfall in 2017 Catawba, NC 13 11 9 S r7 0 M Q �5 a` 3 1 1 Jan -17 Feb -17 Mar -17 Apr 17 May -17 Jun -17 Jul -17 Aug -17 Sep -17 Oct -17 Nov -17 Dec -17 Date USGS Station 354616081085145 -30th Percentile -70th Percentile 2017 rainfall collected by onsite rainfall gage and USGS station 354616081085145 Z 30th and 70th percentile rainfall data collected from weather station Catawba 3 NNW, NC1579 (USDA, 2002) Sheet 3 r j PP 20 I �I I I I 4 OPP 18 .,.,.,...,. I..,.,..,.,. ti ,J PP '1\ UT1 D i i .'� `R- i.. F . P 17 PP 32\ - PP 33, �'�•_._ _r r _ ��. UT1 Pp�_ .,.I _._.—•_ PP 37 PPI �. pp 10 ppil �. I PP 12 /. PP 15 ' _ _ _ _ _ _'_ � _,�.�.�'.. ..� � .� ► ,/ --- �. it -� 1 1 mPP 30 PP 35 1 ��� / y 16 1 1P 27®' PP 23 / p4 — i RW 1 PP 28 1 - PP 25 o—UT1A% ;4. j pp UT1 i - 1c 1 _ r - i PP 21 _ UT1B�4 Sheet1 Fh :--. -'- - :,.,Sweet.,.!.,.,.,.,.,.!.!.,.,.,.,.,.,.,.,.,.,.!.,,.!..,.!.!.!.!.,..!.,.!..,.!.!.,.!..,.!..,.!.!.,...,.;.,,.,.!.,.. i; 3d ];a, i ,TO, >, '4 41 2014 Aerial Figure 3.1 Integrated Current Condition Plan View (Sheet 1 of 3) Lyle Creek Mitigation Site k WILDLANDS [ DMS Project Number 94643 ENGINEERING rkq o Zoo 20o It 1 1 1 1 1 Monitoring Year 6 Catawba County, NC Figure 3.2 Integrated Current Condition Plan View (Sheet 2 of 3) Lyle Creek Mitigation Site A WILDLANDS � I�� 2��t ILL DMS Project Number 94643 ENGINEERING rk I i i i I t Monitoring Year 6 Catawba County, NC Figure 3.3 Integrated Current Condition Plan View (Sheet 3 of 3) Lyle Creek Mitigation Site A WILD LANDS o Zoo Zoo It [ DMS Project Number 94643 ENGINEERING , 1 1 1 1 1 Monitoring Year 6 Catawba County, NC Lyle Creek - Wetland Vegetation Plot Height Data MY6 (2017) VP # Height in ft Average Ht (ft) 3 8.27 4.07 9.35 2.56 1.77 1.77 6.53 7.74 2.03 2.10 0.39 4.2 12 5.64 3.12 7.45 2.36 7.25 4.69 4.66 3.15 4.8 13 8.56 8.63 9.35 4.36 7.61 21.03 11.35 13.58 21.49 7.22 7.25 18.37 18.64 14.96 10.30 12.2 15 6.30 11.19 8.40 14.21 7.84 2.82 0.00 2.03 11.94 2.17 5.84 10.27 6.9 16 7.45 11.02 11.94 4.53 7.94 9.88 0.00 4.17 7.81 7.09 5.61 10.01 9.74 4.56 11.58 7.6 23 3.41 2.79 1 7.35 4.66 8.53 4.33 5.31 27.99 18.83 9.2 24 16.40 13.02 16.80 9.58 3.35 6.92 7.32 3.18 5.87 5.09 5.48 7.94 5.54 4.79 5.74 7.8 25 18.41 8.01 12.14 6.89 17.81 11.68 17.91 19.00 17.55 15.75 6.86 13.8 26 5.45 2.40 5.41 6.30 2.59 4.89 7.05 11.75 8.30 4.40 2.10 5.5 27 4.00 4.69 9.19 2.49 13.65 4.40 9.12 5.68 6.30 3.02 10.53 8.10 2.92 6.5 28 14.70 15.68 8.20 12.34 10.37 7.68 4.79 1.57 12.80 6.50 4.72 1 4.72 1 8.7 29 10.01 4.76 1 10.86 10.60 7.84 4.56 5.84 10.43 8.1 30 8.99 10.47 12.89 10.96 5.35 4.30 8.89 7.41 5.18 8.3 31 6.10 3.64 8.99 8.27 10.99 3.31 15.45 6.56 4.95 5.91 7.4 32 7.71 7.25 2.59 3.97 6.76 1.35 7.84 7.68 5.6 33 15.45 10.04 8.86 4.33 12.37 9.55 10.07 11.88 20.24 10.60 11.3 34 5.74 6.96 1.84 5.51 9.84 9.02 3.35 7.71 6.96 10.66 5.71 5.71 6.6 35 5.68 1 4.56 1 6.73 1 11.61 1 4.07 4.89 1 4.56 2.36 3.22 5.31 5.77 3.35 3.41 5.0 Site Average Planted Height (ft)1 7.8 Site Photographs 46 ls� -Zi ..... ..... r. r4 Additional Easement Markers and Vegetation Re-established (11106117) UT1B Upstream Reach Photo Point 25 — view upstream (11106117) 1 Photo Point 25 — view downstream (11106117) I UT1B —view upstream (11106117) UT1B — view downstream (11106117) 1