Loading...
HomeMy WebLinkAboutNCG140467_Application_20181231Division of Energy, Mineral and Land Resources Stormwater Program National Pollutant Discharge Elimination System Environmental Quality NCG140000 NOTICE OF INTENT FOR AGENCY USE ONLY Date Received Year Month Da Certificate of Coverage Check # Amount 1 If2- di top Permit Assigned to National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities N$� Ready Mixed Concrete This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent limitations. An exceedance of any of these limitations will result in a violation of the permit conditions. For questions, contact the DEMLR Central Office or Regional Office in your area. (See page 8) (Please print or type) EI ED 1) Mailing address of owner/operator (official address to which all permit correspondence will b NE ' �/ mailed: Legal Company Name The Lane Construction Corporation r���, r 2Q�8 (Please attach the most recent Annual Report to the NC Secretary of State showing the current legal namjiL fiP-tpt!VDIUALITY this permit can be given to an individual.) STORMWATER PERMITTING Signee's Name (as signed for in question 28 below) Thomas Meador Street Address 6125 Tyvola Centre Drive City Charlotte State NC ZIP Code 28217 Telephone No. 704-614-4965 Email TCMeador(a)laneconstruct.com Alternate ContactName Christopher M. Ange Email (if different) CMAnge('Olaneconstruct.com Alternate Contact Telephone (if different) 336-406-9060 2) Location of facility producing discharge: Facility Name Lane Temporary Concrete Batch Plant - Lawndale Street Address 4860 Lawndale Drive (approximate address) City Greensboro State NC ZIP Code 27455 County Facility Guilford Contact Christopher M. Ange Telephone No. 336 406-9060 Email CMAn2e(&Ianeconstruct.com 3) Physical location information: Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From I840, get off at Battleground-> R -> L onto Lake Brandt -> R onto Lawndale Dr -> plant site is —0.9 mi on the left after passing under bridge over Lawndale (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) 4) Latitude 36" 8'29.63"N Longitude 79°49'37.17"W (deg., min, sec or decimal) Page 1 of 8 SWU-NCG14-NOI Last revised 9/01/2017 NCG140000 N.O.I. 5) This NPDES Permit Application applies to the following (check all that apply): ® New or Proposed Facility Date operation is to begin 4/15/2019 ❑ Existing Facility Date operation began 6) Consultant's application information: Consultant: Consulting Firm: Mailing Address: City: State: Phone:( ) Email: Zip Code: (Optional) Staple Business Card Here: 7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagram showing the process areas present at this facility.) This is a Temporary Portable Central Mix Concrete Batch Plant which will be used to produce concrete for the NCDOT Greensboro Western Loop project (C203792/TIP 2524-D) Stormwater Discharge, Wastewater Treatment & Discharge and Permitting Information 9) Discharge points / Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges will end up in? Richland Creek To find the waterbody, please see the NC Surface Waterbody Classifications map at https://deq.nc.gov/about/divisions/water-resources/water-resources-science-data Receiving water classifications) for the waters: WS-III, NSW If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Page 2 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. List discharge points (outfalls) that convey discharge from the site (both on -site and off -site) and location coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan. Be sure to indicate a type for each outfall listed below as Stormwater only, Wastewater only or Wastewater Commingled with Stormwater Outfall No. 1 Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater X Latitude (degrees/minutes/seconds): 360 8'31.25" N Longitude (degrees/minutes/seconds): 79049'40.02" W Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): Outfall No. Stormwater only Latitude (degrees/minutes/seconds): Longitude (degrees/minutes/seconds): ❑ Wastewater only ❑ Wastewater only ❑ Wastewater only ❑ Wastewater only ❑ Wastewater only ❑ Wastewater only T W _ N W _ N W N W _ N W N n Wastewater Commingled with Stormwater Wastewater Commingled with Stormwater Wastewater Commingled with Stormwater Wastewater Commingled with Stormwater Wastewater Commingled with Stormwater Wastewater Commingled with Stormwater Will this facility discharge wastewater to SA (Shellfish) waters? ❑ Yes X No Note: Discharge of process wastewater to receiving waters classified as Critical Area (CA) must be reviewed by the N.C. Division of Water Resources, Public Water Supply Section ahead of approval. No new discharges of process wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. You must show all discharge points clearly on the submitted site plan. Be advised that NCDEQ may require you to apply for an individual permit, based on proposed discharge rates and receiving stream conditions (low flows, impairments, etc.) Page 3 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. 10) Each applicant shall provide the following information (attach additional sheets as necessary): • Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed): o Outline of drainage areas with topographical lines and features o Stormwater/wastewater treatment structures o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) o Runoff conveyance structures o Areas and acreage where materials are stored o Impervious area acreages o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers o Site property lines, North Arrow, and bar scale o If applicable, the 100-year floodplain line o Acreage of each stormwater and wastewater topographical area o Each of the facilities' wastewater or stormwater source and discharge structures and each of its hazardous waste treatment, storage, or disposal facilities o Site location (insert) Site plans shall be 24" x 36" in size. • Line drawing and description: Aline drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. • A narrative description and identification of each type of process, operation, or production area which contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash silo"). 11) Does the applicant have any unresolved Notice of Violations (NOVs)? ® No ❑ Yes Wastewater: 12) What types of wastewater does your facility generate or discharge? Type of Authorized Wastewater Generate Discharge Sent to WW Treatment S stem Vehicle and equipment cleaning VE Wetting of raw material stockpiles RM ® ® IN Mixing drum cleaning MD Further explanation, if necessary: It is possible that some of the runoff from wetting of aggregate stockpiles will co -mingle with storm water runoff. 13) Will your facility spray -down or actively wet aggregate piles? ❑ No M Yes 14) Does the facility use any of the following on site? ❑ Phosphorus -containing Detergents ❑ Non -Phosphorus -containing Detergents ❑ Brighteners ❑ Other Cleaning Agents ❑ Other: Page 4 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. 15) Are wastewater treatment facilities planned in the 100-year flood plain? IT No ❑ Yes wKa16) Will your facility build a closed -loop recycle system (CLRSs) that meets design requirements in 15A fI NCAC 02T .1000 and hold your facilities' working volume'? ❑ Yes ® No If Yes, STOP COMPLETION of this permit. Contact DWR Non -Discharge Permitting Program for permitting requirements. 17) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? M VE R RM N MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... ® Yes m No .................. (1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑ Yes ® No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Whv or why not?* due to concerns over solids content pH and distance from connection point c) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? ....................1K Yes ❑ No Why or Why not? Surface discharge of treated wastewater is technologically feasible. ii) Is a surface or subsurface disposal system feasible to implement?* ........................... El Yes IX No Why or Why not? There is no available area within the facility for a potential surface disposal system. The volume of the discharge will require a large system installed in a large area that is not available. In addition, the temporary nature of this facility makes the installation of such a system not feasible. iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* Due to the temporary nature of this facility, direct surface water discharge of treated waste water is significantly more economically and environmentally d) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?* ... IN Yes ❑ No i) If No, contact DEMLR's Land Application Unit to determine permitting requirements. e) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? .............. ❑ Yes X No * You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. Page 5 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. Stormwater: 18) Does this facility employ any best management practices for Stormwater control? ❑ No ® Yes If yes, please briefly describe: This site will use multiple BMPs for controlling erosion storm water, and waste water runoff as detailed in the site plan and revised as necessary per site conditions 19) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No IN Yes If yes, when was it implemented? It will be implemented upon approval of this application 20) Are vehicle maintenance activities (VMA) occurring or planned at this facility? JS No ❑Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permitting: 21) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? ® No ❑ Yes If yes, list the permit numbers for all current E&SC permits for this facility: 22) Is your facility subject to Phase II Post -Construction Area? ® No ❑ Yes If yes, who is the permitting authority? 23) Is your facility located in one of the 20 Coastal Counties? ❑ Yes ® No Is your facility adding more than 10,000 ft2 of built -upon area or CAMA Major Permit? ❑ Yes ❑ No 24) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum rinse -out, or vehicle and equipment cleaning to a stormwater BMP? Is No ❑ Yes If yes, please attach your approval from the permitting authority to do so. 25) Does this facility have any other NPDES permits? ® No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 26) Does this facility have any Non -Discharge permits (ex: recycle permits)? ® No [-]Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 27) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? ® No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? IT No ❑Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? ® No ❑ Yes d) Type(s) of waste: N/A How is material stored: _ Where is material stored: Page 6 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for $100 made payable to NCDEQ. ❑ This completed application and all supporting documentation. See Question 10. 1 ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). �t ❑ Two (2) site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater 1 outfalls. See Question 10. ❑ A county map or USGS quad sheet with location of facility clearly marked. 28) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: I ®rtAl Add hoe - Title: - �'oS£r-i btG6c."lbQ �ro�ifS 4`+" 114e'llp (Signature of Applicant) (Date Signed) Page 7 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDEQ Mail the entire package to: DEMLR - Stormwater Program Dept. of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office .... Fayetteville Office Mooresville Office . Raleigh Office ...... Washington Office Wilmington Office. Winston-Salem .... Central Office ...... (828) 296-4500 (910) 433-3300 (704) 663-1699 (919)791-4200 ...(252) 946-6481 (910) 796-7215 (336) 771-5000 ...(919) 807-6300 Page 8 of 8 SWU-NCG14-NOI Last revised 8/01/2017