Loading...
HomeMy WebLinkAbout20201514_Email_20181010Carpenter,Kristi From: Burhans, Terry <Terry.Burhans@mbakerintl.com> Sent: Wednesday, October 10, 2018 10:50 AM To: Steenhuis, Joanne; Rerko, James J Subject: [External] RE: EXTERNAL: I-95 project field dates Joanne, Those dates seem correct for stream review. We also met on July 17 to look at some of the expanded areas for I-5877 and I-5878 on July 17, 2018. Hope this helps, Cheers Terry Burhans, PWS, CPSS � Environmental Scientist � Michael Baker International 8000 Regency Parkway, Suite 600 � Cary, NC 27518 �[O] 919-481-5775 �[M] 858-243- 9900 terrv.burhansC�mbakerintl.com I www.mbakerintl.com � ,o, mm„ o�,00�s o,�ry.o�oouo,�„�o�,�,o.��,oF�,o��,.Fom�..���u. From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Sent: Tuesday, October 09, 2018 3:57 PM To: Rerko, James J<jjrerko@ncdot.gov>; Burhans, Terry <Terry.Burhans@mbakerintl.com> Subject: EXTERNAL: I-95 project field dates J i m/Te r ry, I have in my notes that we met in the field to do the stream calls for the I-95 project on the following dates: For I-5986 — 8/21/18 For I-5883 — 11/21/17 For I-5878 — 11/21/17 I-5877 — 11/21/17 Please let me know if there are dates I missed. i Jim, In my notes for a meeting we had on 8/7/18, I referenced a stream call letter as `5383' with no I or R in front of it and I cannot find such a letter. It apparently overlaps some of the stream calls for the I-5986-B project. Do you have a copy you can send me? J�a � �t�� uis Environmental Senior Specialist Transportation Permitting Branch Department of Environmental Quality (910) 796�7306 (office) (910) 30��4021 (rnobile) jr��u�u��.�t��u�Ihui�C�u��d�u�ir.qr�u • �• +� � � � � 4� �! x?: x�e. a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.