From: Burhans, Terry <Terry.Burhans@mbakerintl.com>
Sent: Wednesday, October 10, 2018 10:50 AM
To: Steenhuis, Joanne; Rerko, James J
Subject: [External] RE: EXTERNAL: I-95 project field dates
Joanne,
Those dates seem correct for stream review. We also met on July 17 to look at some of
the expanded areas for I-5877 and I-5878 on July 17, 2018.
Hope this helps,
Cheers
Terry Burhans, PWS, CPSS � Environmental Scientist � Michael Baker International
8000 Regency Parkway, Suite 600 � Cary, NC 27518 �[O] 919-481-5775 �[M] 858-243-
9900
terrv.burhansC�mbakerintl.com I www.mbakerintl.com
� ,o, mm„ o�,00�s o,�ry.o�oouo,�„�o�,�,o.��,oF�,o��,.Fom�..���u.
From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Sent: Tuesday, October 09, 2018 3:57 PM
To: Rerko, James J<jjrerko@ncdot.gov>; Burhans, Terry
<Terry.Burhans@mbakerintl.com>
Subject: EXTERNAL: I-95 project field dates
J i m/Te r ry,
I have in my notes that we met in the field to do the stream calls for the I-95 project on
the following dates:
For I-5986 — 8/21/18
For I-5883 — 11/21/17
For I-5878 — 11/21/17
I-5877 — 11/21/17
Please let me know if there are dates I missed.
i
Jim, In my notes for a meeting we had on 8/7/18, I referenced a stream call letter as
`5383' with no I or R in front of it and I cannot find such a letter. It apparently overlaps
some of the stream calls for the I-5986-B project. Do you have a copy you can send
me?
J�a � �t�� uis
Environmental Senior Specialist
Transportation Permitting Branch
Department of Environmental Quality
(910) 796�7306 (office)
(910) 30��4021 (rnobile)
jr��u�u��.�t��u�Ihui�C�u��d�u�ir.qr�u
• �• +�
�
� � � 4� �!
x?:
x�e.
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.