Loading...
HomeMy WebLinkAbout20080499 Ver 3_More Info Received_20181231 Homewood, Sue From:Brad Luckey <bluckey@pilotenviro.com> Sent:Friday, December 28, 2018 4:04 PM To:Homewood, Sue; David.E.Bailey2@usace.army.mil Cc:Bret Berger; Loyd Johnson; Brian Hall; Bryan Hedgecock Subject:RE: \[External\] RE: TBP Stream Restoration Attachments:SAMET_TDO_ Fourth Amendment to Declaration.DOCX; 70528 _ConservationAreas_Preliminary_2018-12-17.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> David, Please find the attached amendment to recorded conservation and accompanying survey maps. If you have any concerns, then please let us know. Thanks and hope you have a good weekend. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckey@pilotenviro.com -----Original Message----- From: Brad Luckey Sent: Friday, November 30, 2018 1:20 PM To: 'Homewood, Sue' <sue.homewood@ncdenr.gov>; David.E.Bailey2@usace.army.mil Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration David and Sue, The wetland restoration activities at TBP, including planting woody species has been completed in full. As I have discussed with each of you separately, I intend to complete annual monitoring of the stream and wetland restoration areas simultaneously (i.e. together) vs. two separate events. Likely, we will split the difference of the stream and wetland restoration completion dates, which would mean the annual field monitoring would occur sometime in and around September 2019. If this will be a problem, then let me know. Additionally, the applicant is aware of further obligations to close out the NOV, including annual monitoring and providing the draft revised conservation easement to the USACE for review within the next 30 days. Thank you for your assistance. 1 Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckey@pilotenviro.com -----Original Message----- From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\] Sent: Thursday, November 15, 2018 12:45 PM To: David.E.Bailey2@usace.army.mil; Brad Luckey <bluckey@pilotenviro.com> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration DWR agrees Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, November 14, 2018 7:54 AM To: Brad Luckey <bluckey@pilotenviro.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Another reasonable request, Brad. The Corps agrees to extend the completion deadline to December 1, 2018. Thanks. -Dave Bailey 2 --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Tuesday, November 13, 2018 4:42 PM To: Homewood, Sue <sue.homewood@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: \[Non-DoD Source\] RE: \[External\] RE: TBP Stream Restoration David and Sue-- The wetland restoration areas have been restored to pre-con grades and seeded with herbaceous wetland mix. However, it is entirely too wet to attempt planting container plants. Planting contractor is planning to be on-site beginning of next week. So, we request another extension until December 1, 2018. Let me know if that will be a problem. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 Blockedwww.pilotenviro.com bluckey@pilotenviro.com -----Original Message----- From: Brad Luckey Sent: Wednesday, October 31, 2018 8:38 AM To: 'Homewood, Sue' <sue.homewood@ncdenr.gov>; David.E.Bailey2@usace.army.mil Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration David and Sue, The sediment basins have been closed by DENR and wetland restoration activities to restore wetland grade has been in process for approximately 2 weeks. The up-gradient wetland has been restored to grade (PVC pipe removed) and is 3 ready for planting and the down-gradient wetland is expected to be returned to grade by EOD or tomorrow. Tentative schedule for herbaceous seed mix planting is Thursday and container plants Monday, 11/5. Planting is contractor schedule dependent, but the applicant is aware of the urgency to get the plantings completed as quickly as possible. I will follow up upon completion of final grade restoration of down-gradient wetland, herbaceous and container plantings; however, we request an extension of 2 weeks to get these activities completed as it cannot be completed within previously requested schedule. Please confirm that both agencies are amendable to this request or please let me know if either have any concerns. Thank you for your assistance. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 Blockedwww.pilotenviro.com bluckey@pilotenviro.com -----Original Message----- From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\] Sent: Monday, September 10, 2018 8:03 AM To: David.E.Bailey2@usace.army.mil; Brad Luckey <bluckey@pilotenviro.com> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration The Division is in agreement with the new timeline proposed. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent: Tuesday, September 4, 2018 1:25 PM To: Brad Luckey <bluckey@pilotenviro.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration 4 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Thanks as always for the coordination and update, Brad. The Corps is amenable to your request. As such, the following items must be completed by September 30, 2018: 1) The portions of the sediment basins on the up and downstream side of the road within the originally delineated wetland areas still must be removed, graded, prepared, and seeded per Plan Sheets C1.2 and C1.3 of the approved restoration plan; 2) Previously graded wetland restoration areas on the upstream side of the road will require additional grading/seeding where a pvc pipe currently dewaters the sediment basin. 3) Previously graded wetland restoration areas on the downstream side of the road will require additional grading to ensure appropriate hydrology concurrently with item 1) above. This area appears to be too high and elevation. To ensure restoration success, I suggest that you use a reference elevation in the existing wetland forest adjacent to this area. Brad Luckey (Pilot Environmental) can provide specific guidance on this topic. Further, the sump within the wetland area should be removed and restored for compliance and safety purposes; Any requests to alter the completion timeframes for the stream and wetland restoration activities are subject to approval from U.S. Army Corps of Engineers, Wilmington District, Raleigh Regulatory Field Office (Corps); such requests must be sent in writing including justification that meeting such timeframes is not practicable. Please also recall the October 31, 2018 deadline for planting woody species in wetland restoration areas, as well as the requirement to amend the recorded Conservation Areas (see item v on our December 19, 2017 letter). Please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Tuesday, September 4, 2018 7:46 AM To: Homewood, Sue <sue.homewood@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> 5 Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com>; Bryan Hedgecock <bhedgecock@SametCorp.com> Subject: \[Non-DoD Source\] RE: \[External\] RE: TBP Stream Restoration David and Sue, I hope you both are well and had an enjoyable long holiday weekend. The work at TBP road crossing is nearing completion; however, is still on-going and the sediment basins have still not been closed out by DEMLR. As such, the applicant requests an extension to September 30, 2018 to complete the wetland restoration. Please let me know if this will be a problem. Additionally, I have included a picture of the field conditions of the rip-rap beneath the culvert following maintenance to ensure aquatic passage as requested previously. This was the only picture that I was able to recover from my phone, but if you need more then let me know and we can oblige. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 BlockedBlockedwww.pilotenviro.com bluckey@pilotenviro.com -----Original Message----- From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\] Sent: Tuesday, July 31, 2018 11:47 AM To: David.E.Bailey2@usace.army.mil; Brad Luckey <bluckey@pilotenviro.com> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration DWR agrees with the request for the extended completion date. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 6 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Tuesday, July 31, 2018 7:52 AM To: Brad Luckey <bluckey@pilotenviro.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com> Subject: RE: \[External\] RE: TBP Stream Restoration CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Thanks for the update, Brad. Could you send pictures of the re-worked rip rap pad? The Corps is amenable to your request. As such, the following items must be completed by August 31, 2018: 1) Sediment basins on the up and downstream side of the road are still in place. The portions of these basins within the originally delineated wetland areas still must be removed, graded, prepared, and seeded per Plan Sheets C1.2 and C1.3 of the approved restoration plan; 2) Previously graded wetland restoration areas on the upstream side of the road will require additional grading/seeding where a pvc pipe currently dewaters the sediment basin. 3) Previously graded wetland restoration areas on the downstream side of the road will require additional grading to ensure appropriate hydrology concurrently with item 1) above. This area appears to be too high and elevation. To ensure restoration success, I suggest that you use a reference elevation in the existing wetland forest adjacent to this area. Brad Luckey (Pilot Environmental) can provide specific guidance on this topic. Further, the sump within the wetland area should be removed and restored for compliance and safety purposes; Any requests to alter the completion timeframes for the stream and wetland restoration activities are subject to approval from U.S. Army Corps of Engineers, Wilmington District, Raleigh Regulatory Field Office (Corps); such requests must be sent in writing including justification that meeting such timeframes is not practicable. Please also recall the October 31, 2018 deadline for planting woody species in wetland restoration areas, as well as the requirement to amend the recorded Conservation Areas (see item v on our December 19, 2017 letter). Please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 7 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Tuesday, July 31, 2018 6:23 AM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Bret Berger <bberger@sametcorp.com>; Loyd Johnson <ljohnson@sametcorp.com>; Brian Hall <bhall@SametCorp.com> Subject: \[Non-DoD Source\] RE: \[External\] RE: TBP Stream Restoration Good Morning David and Sue, I wanted to provide you a status update of the restoration activities at TBP. The rip-rap dissipater has been re-worked in the field to provide aquatic passage by burial of rip-rap to allow for aquatic passage. The sediment basins within the wetland restoration area have not yet been closed out with NCDEQ-DEMLR. As such, restoration of grade of the wetland area cannot be completed yet and we request an extension to August 31, 2018 for restoration of grades within the wetlands. Please let me know if this will be an issue. Thank you for your assistance. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 BlockedBlockedwww.pilotenviro.com <BlockedBlockedBlockedhttp://www.pilotenviro.com/> bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Friday, June 29, 2018 10:14 AM To: Brad Luckey <bluckey@pilotenviro.com>; Bret Berger <bberger@sametcorp.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: \[External\] RE: TBP Stream Restoration 8 Brad, Thank you for meeting me and Sue Homewood (NCDWR) on site yesterday to review the stream/wetland restoration progress at Triad Business Park. Based on the site visit, the stream restoration sections are complete, including structures, matting, and planting. The stream restoration looks good, including the additional log vein structure on the upstream end of the culvert, and live stakes appear to be growing well. Wetland grading and seeding has taken place in a portion of the restoration area. As discussed, the rip rap pad on the downstream end of the culvert requires work, given that the stream flows below the rip rap and does not allow for aquatic life passage. I have included a list of items to complete below: 1) Sediment basins on the up and downstream side of the road are still in place. The portions of these basins within the originally delineated wetland areas still must be removed, graded, prepared, and seeded per Plan Sheets C1.2 and C1.3 of the approved restoration plan no later than July 31, 2018. Any requests to alter the completion timeframes for the stream and wetland restoration activities are subject to approval from U.S. Army Corps of Engineers, Wilmington District, Raleigh Regulatory Field Office (Corps); such requests must be sent in writing including justification that meeting such timeframes is not practicable; 2) Previously graded wetland restoration areas on the upstream side of the road will require additional grading/seeding where a pvc pipe currently dewaters the sediment basin. 3) Previously graded wetland restoration areas on the downstream side of the road will require additional grading to ensure appropriate hydrology concurrently with item 1) above. This area appears to be too high and elevation. To ensure restoration success, I suggest that you use a reference elevation in the existing wetland forest adjacent to this area. Brad Luckey (Pilot Environmental) can provide specific guidance on this topic. Further, the sump within the wetland area should be removed and restored for compliance and safety purposes; 4) The rip rap pad placed downstream of the culvert uses rocks that are too large and above grade to allow aquatic life passage through this area. A thalweg should be established through the rip rap pad area for low flow of the stream channel. In order to allow aquatic life passage, rip rap within the thalweg should be imbedded in the sediment. These activities must be complete no later than July 31, 2018 as referenced above. Please also recall the October 31, 2018 deadline for planting woody species in wetland restoration areas, as well as the requirement to amend the recorded Conservation Areas (see item v on our December 19, 2017 letter). Please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS 9 Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) Sent: Wednesday, March 28, 2018 10:57 AM To: 'Brad Luckey' <bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> > Cc: Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com> >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov> > Subject: RE: \[External\] RE: TBP Stream Restoration Brad, You request for a time extension to complete the wetland restoration component of work required at Triad Business Park is grated. Specifically, based on the justification you provided: 1) stream restoration grading, structure installation, stabilization, and planting must be complete no later than May 2, 2018; 2) all components of the wetland restoration (i.e. grading/soil amendments/temporary seeding, etc.), with the exception of planting woody species, must be completed no later than July 31st; 10 3) planting of woody species in wetlands must be completed no later than October 31st. As such, item ii) on our December 19, 2017 letter is revised to state: "Stream restoration grading, structure installation, stabilization, and planting must be complete no later than May 2, 2018. Wetland restoration grading, stabilization, and temporary seeding must be complete no later than July 31, 2018. Planting of woody wetland species must be complete no later than October 31, 2018. Any requests to alter the completion timeframes for the stream and wetland restoration activities are subject to approval from U.S. Army Corps of Engineers, Wilmington District, Raleigh Regulatory Field Office (Corps); such requests must be sent in writing including justification that meeting such timeframes is not practicable;" Please let me know if you have any questions. ‐Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. 11 -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Thursday, March 22, 2018 2:03 PM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov> > Cc: Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com> > Subject: \[Non-DoD Source\] RE: \[External\] RE: TBP Stream Restoration David and Sue, I just spoke to Bret and wanted to provide a more detailed time line and understanding of the stream and wetlands restoration. Riverworks was supposed to begin the stream restoration on March 12, but has been pushing the schedule back due to personnel being tied up on a restoration in SC that is being slowed by rainfall. Riverworks has said that they tentatively think that the stream restoration activities will being on 4/2. Understand this may still get delayed if it continues raining 3-4 days a week and Riverworks cannot finish their SC restoration. However, if it is delayed again, we would think that it would only be a week or two more before they begin the stream restoration. We are anticipating the stream restoration to take 1-2 weeks to complete. Once the stream restoration is completed and flow re-directed into the culvert, then grading and backfilling of the culvert can occur. As referenced by Bret's earlier email, they are actively moving dirt now in areas that they can and are very eager to have the crossing functioning for upcoming Phase II occupants. We anticipate backfill and final grading to be completed sometime in May to maybe June. It will take a couple of weeks for permanent vegetation to get established to close out the grading permit and S&EC devices. We are thinking that once all this occurs (likely sometime as early as May to as late as July), then the wetlands restoration would commence and then planting woodies would be in the fall. Initial restoration efforts would include restoring pre-disturbance grade (i.e. hydrologic function) and herbaceous seeding. Planting containerized plants would be at a better time of year for plant mortality and would be conducted likely in mid to late October. I think that there was some earlier confusion (and likely rightly so) about why the initial wetland restoration date (i.e. end of October) was referenced. I was really only considering when the last part of the restoration (planting woodies) would be finished and that was the reasoning for the proposed final wetlands restoration date. I hope that this clears up any miss understanding. 12 Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 BlockedBlockedBlockedBlockedwww.pilotenviro.com bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> -----Original Message----- From: Brad Luckey Sent: Thursday, March 22, 2018 8:41 AM To: 'Bailey, David E CIV USARMY CESAW (US)' <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov> > Cc: Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com> > Subject: RE: \[External\] RE: TBP Stream Restoration David and Sue, Please refer to restoration sequence of the agency approved restoration plan. Due to the location of the wetland restoration area, the culvert must be backfilled and stabilized to close out sediment basins located in the wetland restoration area. If the wetland restoration was staged such that the areas outside of the sediment basins within the wetland restoration area were graded and seeded prior to closing the sediment basins, then machinery would be working in the restored/seeded wetland to remove the sediment basins. This would likely result in greater restoration efforts/soil amendments/tillage, etc. to remove the sediment basins and could jeopardize the overall success of the wetland restoration. The wetland restoration was staged like this to specifically limit the amount of machinery in the wetland restoration area. Let me know if this does resolve your concerns. Sincerely, 13 Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 BlockedBlockedBlockedBlockedwww.pilotenviro.com bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Wednesday, March 21, 2018 2:21 PM To: Brad Luckey <bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov> > Cc: Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com> > Subject: RE: \[External\] RE: TBP Stream Restoration Brad, Sue makes a good point. Even if planting of woody wetland species must be delayed until the Fall, couldn't grading and seeding for the wetland restoration be accomplished sooner than that? Once you determine the specifics, please include both Sue and myself on the response. Thanks. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers 14 CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Wednesday, March 21, 2018 1:11 PM To: Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov> > Cc: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> >; Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com> > Subject: \[Non-DoD Source\] Re: \[External\] RE: TBP Stream Restoration Sue-it is my understanding that grading has to be done to close out sediment basins in the area of wetland restoration. I believe that was part of the restoration sequencing but will need to look to confirm. Sent from my iPhone 15 On Mar 21, 2018, at 12:49 PM, Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov%20%3cmailto:sue.homewood@ncdenr.gov> > > wrote: While I understand the delay due to weather and the preferred contrator's schedule, it does not seem that a delay in grading for the crossing would be something should create a delay of the restoration. Restoration completion and compliance is a factor that the Division uses to determine whether to assess civil penalties (fines) for violations. At this point the Division has not determined whether there will be continued action regarding this violation. If you would like to provide a more detailed justification for the requested extension, please do so as soon as possible. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov <mailto:Sue.Homewood@ncdenr.gov> <mailto:Sue.Homewood@ncdenr.gov> 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the 16 North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Wednesday, March 21, 2018 9:05 AM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil%20%3cmailto:David.E.Bailey2@usace.army.mil> > >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov%20%3cmailto:sue.homewood@ncdenr.gov> > > Cc: 'Bret Berger' <bberger@sametcorp.com <mailto:bberger@sametcorp.com <mailto:bberger@sametcorp.com%20%3cmailto:bberger@sametcorp.com> > > Subject: \[External\] RE: TBP Stream Restoration CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Wetland restoration cannot be completed until stream restoration is completed, stream flow directed through culvert, final grading of crossing is stabilized with vegetation and closure of sediment and erosion control devices with NCDEQ (in that order). There have also been other issues outside of weather, including encountering unexpected rock which could likely continue to delay grading for the crossing. I do not anticipate that the above items will be completed until sometime into or maybe even after the summer. I anticipate that the wetland restoration activities will not begin until the fall or after to be in a window of conducive planting timing. I know you will need an exact date, so if we have to provide a date (which is essentially a best guess at this time), then I would say by 10/31/18. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 17 BlockedBlockedBlockedBlockedBlockedwww.pilotenviro.com <BlockedBlockedBlockedBlockedBlockedhttp://www.pilotenviro.com> bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> <mailto:bluckey@pilotenviro.com> -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Wednesday, March 21, 2018 8:53 AM To: Brad Luckey <bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com%20%3cmailto:bluckey@pilotenviro.com> > >; 'Homewood, Sue' <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov%20%3cmailto:sue.homewood@ncdenr.gov> > > Cc: 'Bret Berger' <bberger@sametcorp.com <mailto:bberger@sametcorp.com <mailto:bberger@sametcorp.com%20%3cmailto:bberger@sametcorp.com> > > Subject: RE: TBP Stream Restoration Thank you for the update, Brad. I appreciate the hiring of a contractor with stream restoration experience, and the Corps is willing to delay completion as you requested due to the increased chance of restoration success. That said, our previous time extension approval listed stream restoration completion as today, and wetland restoration completion as 4/30/2018. Will wetland restoration still be completed and planted by 4/30/2018. If not please advise as to a new wetland restoration completion date, including justification for the time extension. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 18 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> <mailto:David.E.Bailey2@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedBlockedBlockedBlockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Brad Luckey \[mailto:bluckey@pilotenviro.com\] Sent: Wednesday, March 21, 2018 8:08 AM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil%20%3cmailto:David.E.Bailey2@usace.army.mil> > >; 'Homewood, Sue' <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov%20%3cmailto:sue.homewood@ncdenr.gov> > > Cc: 'Bret Berger' <bberger@sametcorp.com <mailto:bberger@sametcorp.com <mailto:bberger@sametcorp.com%20%3cmailto:bberger@sametcorp.com> > > Subject: \[Non-DoD Source\] RE: TBP Stream Restoration David and Sue, The applicant has hired Riverworks to complete the stream restoration. However, due to their schedule and the recent weather conditions, Riverworks has not yet been able to start the restoration. It appears that they may start the stream restoration within the next month. As such, the applicant would like to request an extension of 6 weeks to May 2, 2018 to complete the stream restoration activities. Please let me know if this will be a problem. Thanks. 19 Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 BlockedBlockedBlockedBlockedBlockedwww.pilotenviro.com <BlockedBlockedBlockedBlockedBlockedhttp://www.pilotenviro.com> <BlockedBlockedBlockedBlockedBlockedBlockedhttp://www.pilotenviro.com/> bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> <mailto:bluckey@pilotenviro.com> <mailto:bluckey@pilotenviro.com> From: Brad Luckey Sent: Monday, January 29, 2018 1:44 PM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil%20%3cmailto:David.E.Bailey2@usace.army.mil> > >; Homewood, Sue <sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov <mailto:sue.homewood@ncdenr.gov%20%3cmailto:sue.homewood@ncdenr.gov> > > 20 Cc: Bret Berger <bberger@sametcorp.com <mailto:bberger@sametcorp.com <mailto:bberger@sametcorp.com%20%3cmailto:bberger@sametcorp.com> > > Subject: TBP Stream Restoration David and Sue, With the holidays and recent weather, I would like to request a 30 day extension for the stream restoration work to be completed at TBP. This would be a date of March 21, 2018 to complete stream restoration. Please let me know if this is acceptable. Thank you. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 21 BlockedBlockedBlockedBlockedBlockedwww.pilotenviro.com <BlockedBlockedBlockedBlockedBlockedhttp://www.pilotenviro.com> <BlockedBlockedBlockedBlockedBlockedBlockedhttp://www.pilotenviro.com/> bluckey@pilotenviro.com <mailto:bluckey@pilotenviro.com> <mailto:bluckey@pilotenviro.com> <mailto:bluckey@pilotenviro.com> 22 I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. PRELIMINARY NOT FOR RECORD TION, CON VEYAN Com, LIIWLt ftt 'THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TI TLE: DATE: <ERNERSVILLE TOWN LIMITS w o N N 00 w N 0 I' �P N� �O EAST MOUNT o Aw sr OLD GREENS ORO RD SR 1846 SITE SSU 5 R � D W O Al CAI z USACE ACTION ID NO.: 1 / V ?_ z 1-40 eUsiNfSS K o z ir 0 O= o 0 U SHEET 5 I 2 ClJp T OLD EENSBOR ROAD W N K U o VICINITY MAP D G I cN,! (SCALE 1 2000) SHEET 2 r H 1 / NC GRID/NAD83 (CORS96.2002) SHEET 5 I OLD EENSBOR ROAD `I (l SHEET 7 SHEET 6 SHEET 2 SHEET 3 / 1 Z_ I SHEET 4 r J � � x la INT SrTE 40 I I I C7 I m LEGEND • COMPUTED POINT IRON PIPE SET 0 IRON PIPE FOUND A REBAR FOUND ® AXLE FOUND ® STONE FOUND Q CONCRETE MONUMENT FOUND I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE - RIGH T_ OF-WAY INERIGHT-OF-WAY LINE - - BUFFER LINE CONSERVATION AREA LINE -------- N OTE: SHEETS 8 THROUGH 14 ARE LINE AND CURVE TABLES KEY MAP CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 1 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 Ing.. J REVISED CONSERVATION AREAS FOR F, T, AND S; ADDED 2 STREAM RESTORATION LF EASTI N G: 1,692,946.01' LEGEND • COMPUTED POINT OO IRON PIPE SET 0 IRON PIPE FOUND REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND r -----I I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE RIGHT—OF—WAY LINE — — BUFFER LINE CONSERVATION AREA LINE-------- MATCHLINE SHEET 7 MATCHLINE SHEET 2 I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. PRELIMINARY NOT FOR RE, � CONVEYANCES, OR SALES ► ► ► CONSERVATION ARE, A L21,\� AREA: 1.644 ACRES OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED < (71,608 SF) PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE SA TIES TO SAC ► w 10 M v) O �o N Z00 L36 SAA AREA `--7 Lam/ L 4 DATE: r _ </� >� vI-_ SA AREA L72 SAB AREA L \ L51J L49 NORTHING: 858,865.11' \ —i L50 EASTI N G: 1,692,946.01' LEGEND • COMPUTED POINT OO IRON PIPE SET 0 IRON PIPE FOUND REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND r -----I I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE RIGHT—OF—WAY LINE — — BUFFER LINE CONSERVATION AREA LINE-------- MATCHLINE SHEET 7 MATCHLINE SHEET 2 I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. PRELIMINARY NOT FOR RE, � CONVEYANCES, OR SALES N�4\ 8pg 4 PUBS C �\ 40 V,%Es N7. Cq M w w w w V) V) w w z z J J 2 2 U U Q Q 2 m USACE ACTION ID NO.: NC GRID/NAD83 (CORS96.2002) CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 2 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 I Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 ,,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF w ENGINEERS WETLANDS DELINEATION MANUAL." M v) O N Z00 REGULATORY OFFICIAL: TITLE: DATE: N�4\ 8pg 4 PUBS C �\ 40 V,%Es N7. Cq M w w w w V) V) w w z z J J 2 2 U U Q Q 2 m USACE ACTION ID NO.: NC GRID/NAD83 (CORS96.2002) CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 2 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 I Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CV M I— I— W W W W W W z z J J H H Q Q NC GRID/NAD83 (CORS96.2002) L100 CONSERVATION AREA H L174 AREA: 0.121 ACRES (5,280 SF) N27°48'58"E L170� 128.16' L166--\ , LEGEND L175 N69'50'33"W_j 91.94' N 70°20'27"W _J 132.46' WG -6 AREA • COMPUTED POINT !�O IRON PIPE SET O IRON PIPE FOUND REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND r----� I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE RIGHT—OF—WAY LINE — — BUFFER LINE CONSERVATION AREA LINE-------- - WGA AREA -L609 L613 owe �w@ w- offism '-L772 N70°20'27"W 224.54' CONSERVATION AREA J AREA: 4.953 ACRES (215,767 SF) CONSERVATION AREA G AREA: 4.073 ACRES (177,419 SF) WG -4 AREA 1_628 WG -5 AREA SG AREA r -J L1012 - 1012- 1015 o \ FFA �L760 L646s,/ _ SG AREA X16 ��-_ L729 1_73 L1009 1_743 '---- W 04'� 0 BUFFER I 1 L736 \\ SF AREA p / t\ 1 Inch = 200 Feet � 0 AREA PB a cr\ Lp 66�\ 1_67 L684 3 \ L68; ✓ L708 1_687 L68E L709------ - --- - L210 N) L209 ��0 �L211 1_1018 �/p� 1_208 i 1_201--j ( L1020 1_575 L196 AREA WC -1 ' J L1006 1_195 / 100 1_582 L175 N69'50'33"W_j 91.94' N 70°20'27"W _J 132.46' WG -6 AREA • COMPUTED POINT !�O IRON PIPE SET O IRON PIPE FOUND REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND r----� I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE RIGHT—OF—WAY LINE — — BUFFER LINE CONSERVATION AREA LINE-------- - WGA AREA -L609 L613 owe �w@ w- offism '-L772 N70°20'27"W 224.54' CONSERVATION AREA J AREA: 4.953 ACRES (215,767 SF) CONSERVATION AREA G AREA: 4.073 ACRES (177,419 SF) WG -4 AREA 1_628 WG -5 AREA SG AREA r -J L1012 - 1012- 1015 GRAPHIC SCALE W L1011 Ll 011 �L760 L646s,/ _ SG AREA X16 ��-_ L729 1_73 L1009 1_743 '---- W 04'� 0 K L736 NO2`29'36"W 139.90' WG -2 AREA L717 10 1,,34 r �7L1013 / L71E> L715 �-- LW 2 3 AREA WG -1 AREA L728 CONSERVATION AREA L L1010 AREA: 0.072 ACRES L733 (3,120 SF) -L734 CONSERVATION AREA K 35 AREA: 0.0002 ACRES (7 SF) N6S I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. PRELIMINARY NOT FOR, QDyLST L - N2 CONVEYANCES, OR SALES ,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TITLE: DATE: USACE ACTION ID NO.: L05 G�oo� �- �� \``-co -L1016 L707 SGA AREA 1_690 SGA AREA 1015 GRAPHIC SCALE W W W W (0.357 SF) in m W W K z J J N 1 Inch = 200 Feet 0 0 a a SG AREA 66�\ 1_67 L684 3 L6 _ 1_680 _ L683 L68; ✓ L708 1_687 L68E L709------ - --- - r �7L1013 / L71E> L715 �-- LW 2 3 AREA WG -1 AREA L728 CONSERVATION AREA L L1010 AREA: 0.072 ACRES L733 (3,120 SF) -L734 CONSERVATION AREA K 35 AREA: 0.0002 ACRES (7 SF) N6S I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. PRELIMINARY NOT FOR, QDyLST L - N2 CONVEYANCES, OR SALES ,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TITLE: DATE: USACE ACTION ID NO.: L05 G�oo� �- �� \``-co -L1016 L707 SGA AREA 1_690 SGA AREA 1015 GRAPHIC SCALE 1-6 710 CONSERVATION AREA AREA: 15,534 ACRES 200 0 100 200 (0.357 SF) 3 CONSERVATION AREA M -AREA: 0.140 ACRES IN FEET ( ) (6,109 SF) N 1 Inch = 200 Feet I3 CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK o ^ SHEET 3 OF 14 0 N DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA 327. N.C. License No. C-1362 I Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 �l �1 CONSERVATION AREA S AREA: 2.329 ACRES (101,461 SF) l � \ WA -4 AREA WA -3 AREA L880� WA -2 AREA �\ \ WA -1 AREA S\ I CONz- , ��8 �L855 L AREA: O.00b (283 SF) ?A ISC AREA L863�J SA AREA MATCHLINE SHEET 5 MATCHLINE SHEET 4 I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. lul"L01011 lKSIOLVAM M Ilk [a 02-11.0-1-1 ,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 i JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." i i j REGULATORY OFFICIAL: i j TITLE: i DATE: USACE ACTION ID NO.: GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 4 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 L684 373—"_ ' L680 L683 L685 -- �L687 L686 — L101 <j�O- --- _­\ --� LEGEND I Q I } l L690 SGA AREA 1 • COMPUTED POINT O 3 SGA AREA I 1 QO IRON PIPE SET pC l 1 Q 0 IRON PIPE FOUND I^ O I Q I REBAR FOUND I * IN = I ® AXLE FOUND I U 1 I I I� ® STONE FOUND W) U — 0 CONCRETE MONUMENT FOUND m 0L Z r----� LINE LEGEND o NN L---- J CONSERVATION AREA BOUNDARY LINE I I NOTE: CONSERVATION AREAS ARE BASED ADJOINING PROPERTY UNE— INE ON A 30' BUFFER OFFSET FROM THE TOP ON RIGHT—OF—WAY LINE — — OF BANK FOR STREAMS AND PONDS AND BUFFER LINE — — — — — — — I FOLLOWING THE EDGE OF DELINEATED CONSERVATION AREA LINE------- I � Ip WETLAND AREAS. I I I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. lul"L01011 lKSIOLVAM M Ilk [a 02-11.0-1-1 ,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 i JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." i i j REGULATORY OFFICIAL: i j TITLE: i DATE: USACE ACTION ID NO.: GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 4 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 SCA AREA sU"44' 2 L961 "y WC -7 AREA �--L966 `n ^ OF THE CLEAN WATER ACT AS DETERMINED BY THE N �L970 � THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION 0 �1py9 L905���9 `s9~�L8 \ AREA PA 1 I� jo I l AREA WA -2(B) ESTORATION AREA T L78 AREA: 0.142 ACRES— L1078- (6,177 SF) L1072--\ (0 L0 I— I— w w w w V w w Z Z J J 2 2 Q Q A SA -1(B) p., i AREA NORTHING: 859,608.54' EASTI N G: 1,695,976.90' CONSERVATION AREA U AREA: 2.930 ACRES (127,619 SF) N 0 CA v; 0 o CONSERVATION AREA T m o AREA: 0.724 ACRES rt; (31,542 SF) L1072� L1075 I L1071 i� L1076 L1059 Ll 07 �1p6O� -1 WAA-2 AREA Ll 064 , L1081 �� WAA-3 AREA L1080 L1079 L905 L1057 L1061 WAA-4 AREA L1058 WAA-5 AREA WAA-7 AREASTREAM WAA-6 AREA L916 RESTORATION 84 LF L1063 RESTORATION AREA S AREA: 0.005 ACRES DETAIL "A" (213 SF) SCALE 1 ":100' Sts/"19'37"E S10`19'41"E CONSERVATION AREA R 199.84' 141.00' AREA: 0.131 ACRES WB AREA SA -2 AREA (5,705 SF) L986 L796 L1034 L1035 L922 L1037 \q�o/^<8�7 L802 L795� 788 F /M 7 �0 2/2S92,F ' L1031 Ji WAA-9 AREA L809 WAA-1 AREA WAA-2 AREA 3°47'11' 2�7l I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING PRELIMINARY NOT FOR RFCORDATION, CONVEYANCES, LILIORLS SAITS "y WAA-3 AREA DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE 9 5 L90 — THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION p22 �1py9 L905���9 `s9~�L8 PERIOD NOT TOEXCEED FIVE( ) YEARS FROM THIS DATE. THE I UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE L1057 WAA-4 AREA !9 119 CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." CONSERVATION AREA V I L1058 WAA-5 AREA EASTING: 1,699,436.58' REGULATORY OFFICIAL: L916 \-7 X933 (17,991 SF) TITLE: WAA-6 AREA SEE DETAIL "A" t89s,� i ll L, CONSERVATION AREA S AREA: 2.329 ACRES STREAM � (101,461 SF) RESTORATION \� 84 LF l886" \ _ C9 WA -4 AREA RESTORATION AREAS WA -3 AREA AREA: 0.005 ACRES �� �\ (213 SF) L88­0__�'\� WA -2 AREA WAA-7 AREA �� \ WA -1 AREA CONSERVATION AREA W 55 ��\?3 AREA: 0.006 ACRES (283 SF) L870, I ?A SA AREA ISC AREA L863_ 3°47'11' 2�7l I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING PRELIMINARY NOT FOR RFCORDATION, CONVEYANCES, LILIORLS SAITS L1003 I L1000 L1001 N83.17'27"E 4'38'23"E L1002 �_L987 313.64' 305.88' /� _ —L988 L999J \\ \ \ �L990 L998—/ <9- U / SB -1 AREA mJ M� NC GRID/NAD83 (CORS96.2002) LEGEND • COMPUTED POINT QO IRON PIPE SET 0 IRON PIPE FOUND A REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND II CONSERVATION AREA L ----J NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE MATCH LINE SHEET 5 RIGHT-OF-WAY LINE - - BUFFER LINE - — — — — — — - MATCHLINE SHEET 4 CONSERVATION AREA LINE - - - - - - - - DATE: USACE ACTION ID NO.: GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 5 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 I Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 ,THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN — THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION ROAD OF SECTION 4JURISDICTION A BE RELIED UPON FOR A SHERY SRE8D r PERIOD NOT TOEXCEED FIVE( ) YEARS FROM THIS DATE. THE I UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE I APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." CONSERVATION AREA V I NORTHING: 860,482.15' EASTING: 1,699,436.58' REGULATORY OFFICIAL: AREA: 0.413 ACRES I (17,991 SF) TITLE: L1003 I L1000 L1001 N83.17'27"E 4'38'23"E L1002 �_L987 313.64' 305.88' /� _ —L988 L999J \\ \ \ �L990 L998—/ <9- U / SB -1 AREA mJ M� NC GRID/NAD83 (CORS96.2002) LEGEND • COMPUTED POINT QO IRON PIPE SET 0 IRON PIPE FOUND A REBAR FOUND ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND II CONSERVATION AREA L ----J NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE MATCH LINE SHEET 5 RIGHT-OF-WAY LINE - - BUFFER LINE - — — — — — — - MATCHLINE SHEET 4 CONSERVATION AREA LINE - - - - - - - - DATE: USACE ACTION ID NO.: GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 5 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 I Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 LEGEND LINE LEGEND • COMPUTED POINT BOUNDARY LINE QO IRON PIPE SET ADJOINING PROPERTY LINE 0 IRON PIPE FOUND RIGHT—OF—WAY LINE — — 03 O BUFFER LINE — — — — — — — — A REBAR FOUND CONSERVATION AREA LINE-------- ® AXLE FOUND ® STONE FOUND 0 CONCRETE MONUMENT FOUND II CONSERVATION AREA L — — — — J NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. W W V) V) W W z z J J Q Q W�(pRO�IZo j,,/ �� ,4p�ew j �TKER ,OF'WAY / \GN R / 3 MN O M Z L960 TOMB% H H w w w w C7 N w w z z J J H H Q Q SCA AREA I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVIUS. I < ( � WC -7 AREA !^. / car SL AREA 3 �--L966 L0000) V - N CV 03 O M Nilz y0/ J I milk, WC -6 AREA / I� \N� \� SFA AREA L269�L285 � L L2828 WDB AREA w o z O Ln 00 M � O M O V) 0..1911wmla2F_l SFC AREA I /v L344- \ L2K NC GRID/NAD83 (CORS96.2002) OLD GREENSBORO ROAD 80' PUBLIC RIGHT-OF-WAY CONSERVATION AREA D AREA: 5.277 ACRES (229,856 SF) ISD AREA Cl <3g.;> L396� Alb Z NORTHING: 859,608.54�\ CA -1 AREA EASTING: 1,695,976.90' 11_345 <3(9 \ MATCHLINE SHEET 6 �\ \\ MATCHLINE SHEET 3 \--i (, l \ of RESTORATION AREA F AREA: 0.138 ACRES - (6,018 SF) CONSERVATION AREA F AREA: 0.866 ACRES - (37,710 SF) ISCA AREA CONSERVATION AREA E AREA: 0.080 ACRES (3,488 SF) L46, L463 1_1024-, L458-,,� WA -2(A) AREA ---_ SA -1(A) AREA WC -1 AREA Oi WCA-1 AREA -\ rJ � O. Bu FER \ AREA PA 1 �to 100 10 � I I � l + 0 \ AREA WA -2(B) STORATION AREA T L78 AREA: 0.142 ACRES- L1078 (6,177 SF) L1072-\ 37 L1071 \, L103fi � SA -1(B) -L465 rL473 YU �: �67 C12 / L1056 \/ 1_1046 C8 pEzFP1 L1048 1_461 3�P L460 oy\ r _459 \ /� L500 WC -1 AREA W Cn O O 0 cn cl O WB AREA _986 L922 O2 jlil L1081 z -L1L1080A L1U/9; 1047%2 PRELIMINARY NOT FOR RECORDATION, CON VEYANCES,""CRLS Ss4L6ES NORTHING: 859,608.54' EASTI N G: 1,695,976.90 ' CONSERVATION AREA U AREA: 2.930 ACRES (127,619 SF) GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TITLE: DATE: USACE ACTION ID NO.: STREAM CONSERVATION AREA DELINEATION -RESTORATION TRIAD BUSINESS PARK 37 LF WAA-8 AREA SHEET 6 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA �$. 4o _ Dc1�6� �5A L N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 J3 jJ��S16 L325 �L326 car SFC AREA I /v L344- \ L2K NC GRID/NAD83 (CORS96.2002) OLD GREENSBORO ROAD 80' PUBLIC RIGHT-OF-WAY CONSERVATION AREA D AREA: 5.277 ACRES (229,856 SF) ISD AREA Cl <3g.;> L396� Alb Z NORTHING: 859,608.54�\ CA -1 AREA EASTING: 1,695,976.90' 11_345 <3(9 \ MATCHLINE SHEET 6 �\ \\ MATCHLINE SHEET 3 \--i (, l \ of RESTORATION AREA F AREA: 0.138 ACRES - (6,018 SF) CONSERVATION AREA F AREA: 0.866 ACRES - (37,710 SF) ISCA AREA CONSERVATION AREA E AREA: 0.080 ACRES (3,488 SF) L46, L463 1_1024-, L458-,,� WA -2(A) AREA ---_ SA -1(A) AREA WC -1 AREA Oi WCA-1 AREA -\ rJ � O. Bu FER \ AREA PA 1 �to 100 10 � I I � l + 0 \ AREA WA -2(B) STORATION AREA T L78 AREA: 0.142 ACRES- L1078 (6,177 SF) L1072-\ 37 L1071 \, L103fi � SA -1(B) -L465 rL473 YU �: �67 C12 / L1056 \/ 1_1046 C8 pEzFP1 L1048 1_461 3�P L460 oy\ r _459 \ /� L500 WC -1 AREA W Cn O O 0 cn cl O WB AREA _986 L922 O2 jlil L1081 z -L1L1080A L1U/9; 1047%2 PRELIMINARY NOT FOR RECORDATION, CON VEYANCES,""CRLS Ss4L6ES NORTHING: 859,608.54' EASTI N G: 1,695,976.90 ' CONSERVATION AREA U AREA: 2.930 ACRES (127,619 SF) GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TITLE: DATE: USACE ACTION ID NO.: STREAM CONSERVATION AREA DELINEATION -RESTORATION TRIAD BUSINESS PARK 37 LF WAA-8 AREA SHEET 6 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA �$. 4o _ Dc1�6� �5A L N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 LEGEND • COMPUTED POINT QO IRON PIPE SET Q IRON PIPE FOUND REBAR FOUND ® AXLE FOUND ® STONE FOUND Q CONCRETE MONUMENT FOUND I I CONSERVATION AREA NOTE: CONSERVATION AREAS ARE BASED ON A 30' BUFFER OFFSET FROM THE TOP OF BANK FOR STREAMS AND PONDS AND FOLLOWING THE EDGE OF DELINEATED WETLAND AREAS. LINE LEGEND BOUNDARY LINE ADJOINING PROPERTY LINE RIGHT-OF-WAY LINE - - BUFFER LINE CONSERVATION AREA LINE -------- NC GRID/NAD83 (CORS96.2002) GRA c RB�R0 riwP� MATCHLINE SHEET 7 MATCHLINE SHEET 2 0 CONSERVATION AREA C AREA: 3.660 ACRES (159,451 SF) SF -1 AREA z. <� \N L270��.., WDB-1 AREA L269 � Y lr'0o1 1 I HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY SUPERVISION AND THAT THE WETLANDS SHOWN HEREON REFLECT THE DELINEATION EVIDENCE PROVIDED BY ENGINEERING CONSULTING SERVICES. MINIMUM% mLall "ffil NOT FOR L L L L— 1 CONVEYANCES, OR SALES 'THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THE DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE (5) YEARS FROM THIS DATE. THE UNDERSIGNED COMPLETED THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL." REGULATORY OFFICIAL: TITLE: DATE: ��1~Y��7�«�NP►�U7�N>RI GRAPHIC SCALE 200 0 100 200 ( IN FEET ) 1 Inch = 200 Feet CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 7 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA A AREA: 1.644 ACRES (71,608 SF) LINE TABLE LINE BEARING LENGTH L1 N59'12'25"E 62.11' L2 N13'04'23"E 28.14' L3 N73'31'48"E 33.58' L4 N33'33'08"E 18.87' L5 N67'19'14"E 41.14' L6 N47'17'25"W 60.43' L7 N25'47'38"E 51.75' L8 N56'15'36"E 16.06' L9 N07'07'13"E 4.31' L10 N10'43'51"W 4.87' L11 N71'40'22"W 10.67' L12 N22'31'28"W 22.10' L13 S34'15'37"W 1.26' L14 S60'00'27"W 45.05' L15 N48'42'29"W 51.70' L16 N09'42'56"E 18.70' L17 N39'37'28"W 49.31' L18 N50'22'32"E 65.00' L19 S39'37'28"E 41.68' L20 N61'57'42"E 11.81' L21 S82'24'38"E 59.43' L22 S21 *52'59"E 42.71' L23 S22'31'28"E 2.20' L24 S71 *40'22"E 19.37' L25 S10'43'S1 "E 56.99' L26 S07'07'13"W 12.56' L27 S85'01'56"E 8.91' L28 S47'54'03"E 4.69' L29 N48'52'31"E 4.24' L30 N87'48'46"E 42.69' L31 S17'S7'04"E 44.55' L32 S25'17'19"E 9.19' L33 N88'46'20"E 32.10' L34 S41 '27'38"E 32.89' L35 N71'30'39"E 6.60' L36 S87'58'52"E 66.39' L37 S24'30'45"W 51.19' L38 S59'29'53"E 1.08' L39 N88'17'44"E 34.05' L40 S54'24'30"E 3.13' L41 N17'51'21"E 12.73' LINE TABLE LINE BEARING LENGTH L42 S72'08'39"E 63.94' L43 S15'48'13"W 38.81' L44 S79'15'07"E 23.97' L45 S46'03'46"E 41.70' L46 S08'42'04"E 20.76' L47 S66'33'29"E 28.85' L48 S12*48'11 "E 35.62' L49 S74'58'01 "E 73.57' L50 S01 *20'55"W 28.61' L51 N66'33'29"W 23.19' L52 N08'42'04"W 33.97' L53 N79'15'07"W 78.91' L54 N16'04'47"E 27.95' L55 S53'25'38"W 23.53' L56 N60'17'44"W 42.66' L57 N23'07'07"W 15.68' L58 N59'29'53"W 44.96' L59 N24'30'45"E 11.07' L60 N78'31'46"W 3.68' L61 N41'27'38"W 17.26' L62 S77'37'33"W 42.36' L63 N25'17'19"W 25.54' L64 S49'29'04"W 35.61' L65 S80'18'27"W 9.87' L66 S42'33'20"W 11.36' L67 S79'09'02"W 23.52' L68 S67'19'14"W 19.10' L69 S33'33'08"W 20.86' L70 S73'31'48"W 18.63' L71 S13'04'23"W 21.55' L72 S66'01'57"W 33.48' L73 N72'16'05"W 82.32' L74 N72'16'05"W 60.63' L75 S01 *20'55"W 66.29' LINE TABLE LINE BEARING LENGTH L76 NOT USED L77 NOT USED L78 NOT USED L79 NOT USED L80 NOT USED L81 NOT USED L82 NOT USED L83 NOT USED L84 NOT USED L85 NOT USED L86 NOT USED L87 NOT USED L88 NOT USED L89 NOT USED L90 NOT USED L91 NOT USED L92 NOT USED L93 NOT USED L94 NOT USED L95 NOT USED L96 NOT USED L97 NOT USED L98 NOT USED L99 NOT USED L100 NOT USED L101 NOT USED L102 NOT USED L103 NOT USED L104 NOT USED L105 NOT USED L106 NOT USED L107 NOT USED L108 NOT USED L109 NOT USED L110 NOT USED L111 NOT USED L112 NOT USED L113 NOT USED L114 NOT USED L115 NOT USED L116 NOT USED LINE TABLE LINE BEARING LENGTH L117 NOT USED L118 NOT USED 1-119 NOT USED L120 NOT USED L121 NOT USED L122 NOT USED L123 NOT USED L124 NOT USED L125 NOT USED L126 NOT USED L127 NOT USED L128 NOT USED L129 NOT USED L130 NOT USED L131 NOT USED L132 NOT USED L133 NOT USED L134 NOT USED L135 NOT USED L136 NOT USED L137 NOT USED L138 NOT USED L139 NOT USED L140 NOT USED L141 NOT USED L142 NOT USED L143 NOT USED L144 NOT USED L145 NOT USED L146 NOT USED L147 NOT USED L148 NOT USED L149 NOT USED L150 NOT USED L151 NOT USED L152 NOT USED L153 NOT USED L154 NOT USED L155 NOT USED L156 NOT USED 1-157 NOT USED LINE TABLE LINE BEARING LENGTH L158 NOT USED L159 NOT USED L160 NOT USED L161 NOT USED L162 NOT USED L163 NOT USED L164 NOT USED L165 NOT USED PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 8 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA Surveyors, N.C. License No. C-1362 Regional Land Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA C AREA: 3.660 ACRES (159,451 SF) LINE TABLE LINE BEARING LENGTH L211 S82'53'42"W 117.49' L212 N23'21'17"E 50.03' L213 N14'48'47"W 37.22' L214 N31'22'17"W 50.94' L215 N16'46'45"W 68.67' L216 N07'17'14"W 51.25' L217 N12'11'59"W 52.42' L218 NO2'18'49"W 23.63' L219 N22'01'27"W 30.72' L220 S53'42'00"W 2.72' L221 N20'21'58"W 45.73' L222 N66'40'16"W 9.28' L223 N57'09'41"W 28.41' L224 N38'32'09"W 33.20' L225 N41'17'48"W 14.07' L226 N58'08'58"W 27.56' L227 N45'29'00"W 24.56' L228 N58'13'08"W 23.07' L229 N67'51'07"W 21.81' L230 N86'37'55"W 45.09' L231 N39'14'27"W 45.31' L232 N46'17'58"W 120.41' L233 S79'21'54"E 79.73' L234 N20'11'32"W 10.04' L235 N44'51'28"W 16.99' L236 N77'30'55"W 34.78' L237 N71'40'02"W 18.85' L238 N46'42'19"W 29.27' L239 N13'30'28"W 17.57' L240 N42'16'08"W 14.13' L241 N22'12'28"E 18.15' L242 N80'06'43"W 20.35' L243 N47'05'53"E 12.38' L244 N10'22'26"W 24.70' L245 N56'18'41"W 7.25' L246 N50'14'47"W 36.37' L247 N36'13'51"W 8.10' L248 N22'12'55"W 43.81' L249 N30'21'52"W 33.69' L250 N33'42'02"W 22.32' L251 N05'35'33"W 11.00' LINE TABLE LINE BEARING LENGTH L252 N63'38'14"W 4.76' L253 N45'59'22"W 29.41' L254 N29'12'31"W 9.43' L255 N12'25'41"W 2.31' L256 N59'52'04"W 9.20' L257 N30'32'04"W 45.08' L258 N01'13'16"E 9.45' L259 N35'21'27"W 11.79' L260 N34'09'14"W 40.92' L261 N30'13'53"W 18.03' L262 N13'06'28"W 11.50' L263 N37'03'44"W 16.45' L264 N55'57'25"W 10.66' L265 N47'02'54"W 18.55' L266 N43'52'51"W 19.00' L267 N40'21'36"W 12.60' L268 N78'24'55"W 2.06' L269 S53'16'51 "W 2.79' L270 N53'15'41"E 2.19' L271 NO2'30'41"W 2.11' L272 N28'29'06"E 9.16' L273 N21'23'57"W 1.97' L274 S87'45'13"W 13.33' L275 N15'10'23"W 53.89' L276 N74'49'37"E 70.33' L277 S20'23'45"E 80.63' L278 S41 *01'23"E 32.19' L279 S43'53'28"E 13.58' L280 S54'35'09"E 16.71' L281 S37'57'58"E 5.93' L282 S55'12'56"E 7.36' L283 S37'16'16"E 39.10' L284 S14'08'28"E 16.14' L285 S30'38'27"E 5.87' L286 S37'03'58"E 39.56' L287 S30'02'10"E 31.56' L288 S00'14'37"W 11.27' L289 S30'33'38"E 11.43' L290 S60'23'23"E 12.21' L291 S37'10'45"E 13.11' L292 S13'S7'S9"E 9.22' LINE TABLE LINE BEARING LENGTH L293 S46'23'31 "E 1.22' L294 S82'48'45"E 1.80' L295 S64'07'42"E 10.51' L296 S45'26'07"E 21.29' L297 S25'40'15"E 11.13' L298 S05'54'29"E 16.50' L299 S34'06'47"E 8.26' L300 S31 *55'36"E 39.89' L301 S22'15'52"E 37.20' L302 S52'21'24"E 23.82' L303 S73'46'39"E 15.89' L304 S89'41'39"E 3.23' L305 N80'45'34"E 13.76' L306 S29'10'54"E 19.61' L307 S53'17'01 "E 11.86' L308 N29'52'36"E 13.33' L309 N35'54'29"E 9.67' L310 N04'12'17"E 35.26' L311 S79'54'39"E 22.21' L312 N29'59'41"E 6.79' L313 N79'59'02"E 18.06' L314 N17'18'54"E 17.02' L315 N59'37'48"E 51.19' L316 S59'37'48"W 27.30' L317 S17'39'57"W 30.60' L318 S79'48'32"W 28.09' L319 S34'13'57"W 18.66' L320 N84'44'53"W 2.96' L321 S32'22'36"W 9.71' L322 S34'23'56"W 22.44' L323 S21 *39'24"W 1.57' L324 S02'04'42"E 6.07' L325 S26'50'55"E 3.39' L326 S46'11'00"E 4.61' L327 S71'33'14"E 20.44' L328 S22'09'27"W 8.38' L329 S44'52'42"E 13.62' L330 N61'16'29"E 13.37' L331 N51'32'44"E 11.65' L332 N24'13'55"E 48.11' L333 N29'06'13"E 24.96' LINE TABLE LINE BEARING LENGTH L334 S33'54'44"W 20.46' L335 S24'12'26"W 46.42' L336 S26'35'18"W 51.31' L337 S38'29'39"E 8.47' L338 S84'03'10"E 16.95' L339 N49'19'54"E 19.31' L340 S74'23'00"E 61.99' L341 S75'00'19"E 23.69' L342 S71 *47'00"E 57.17' L343 S81'34'41 "E 58.59' L344 S54'48'07"E 30.32' CURVE TABLE CURVE BEARING CHORD RADIUS Cl N89'33'54"E 41.23' 32.00' C2 S36'14'48"E 62.00' 31.00' C3 N40'08'35"W 13.54' 32.00' C4 N30'22'12"W 62.00' 31.00' C5 N00'11'19"W 28.72' 32.00' C6 N57'51'00"W 63.91' 32.00' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 9 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA Surveyors, N.C. License No. C-1362 Regional Land Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA D AREA: 5.277 ACRES (229,856 SF) LINE TABLE LINE BEARING LENGTH L208 N44'29'29"E 12.54' L209 S70'34'50"W 9.21' L210 S82'53'42"W 1.21' L345 S54'48'07"E 11.84' L346 S31 *47'59"E 39.67' L347 S25'37'12"E 28.33' L348 S33'07'41 "E 7.16' L349 S47'41'07"E 18.56' L350 S42'17'39"E 28.08' L351 S52'59'41 "E 37.06' L352 S30'43'27"E 43.52' L353 S33'58'03"E 74.69' L354 S33'06'39"E 68.22' L355 S40'14'15"E 45.39' L356 S55'48'05"E 26.06' L357 S22'33'41 "E 29.64' L358 S67'45'50"E 17.56' L359 S19'31'47"E 41.83' L360 S13*19'07"W 36.16' L361 S08'54'35"W 13.31' L362 SO4'18'05"E 16.93' L363 N46'49'13"E 18.23' L364 N71'50'31"E 15.53' L365 N39'55'04"E 27.40' L366 N38'46'09"E 10.90' L367 N52'58'48"E 32.90' L368 N57'08'08"E 60.14' L369 N61'45'11"E 16.01' L370 N42'17'03"E 53.45' L371 N59'20'31"E 7.13' L372 N25'04'31"E 40.94' L373 N67'16'07"E 21.27' L374 N58'04'55"E 12.73' L375 N16'17'39"E 15.48' L376 N38'09'58"E 65.76' L377 N17'20'05"E 16.55' L378 N63'20'35"E 11.42' L379 N25'40'50"W 41.27' L380 NO3'39'48"E 29.44' L381 N37'08'08"W 21.74' L382 N17'07'49"E 26.99' LINE TABLE LINE BEARING LENGTH L383 S84'24'42"W 15.46' L384 N23'15'34"W 35.25' L385 N49'24'58"W 15.33' L386 N24'55'40"W 20.04' L387 N48'21'28"W 7.59' L388 N63'02'35"W 150.13' L389 N78'55'07"E 39.51' L390 N06'57'18"W 12.85' L391 N41'55'11"W 10.51' L392 N19'59'47"W 21.74' L393 N25'35'49"W 30.00' L394 N15'57'48"E 13.69' L395 N23'39'09"W 23.74' L396 N33'05'50"E 6.04' L397 S66'34'45"E 58.33' L398 S36'59'45"W 41.89' L399 S25'58'24"E 12.11' L400 S16'36'15"W 12.39' L401 S25'59'32"E 9.65' L402 S16'32'46"E 12.79' L403 S41 *47'09"E 14.20' L404 S16'S7'31 "E 8.29' L405 S50'44'11 "E 19.20' L406 S37'20'11 "E 34.69' L407 S65'29'28"E 40.47' L408 S45'13'07"E 29.63' L409 S24'49'42"E 18.55' L410 S49'23'59"E 15.66' L411 S25'21'51 "E 4.73' L412 N87'08'52"E 4.22' L413 S58'06'55"E 36.16' L414 S29'05'12"E 38.32' L415 S31 *21'38"W 31.28' L416 S17'26'02"W 0.75' L417 S34'23'50"E 16.63' L418 S07'59'26"W 20.08' L419 S03'48'17"W 11.75' L420 S26'38'41 "E 34.03' L421 N26'04'36"E 9.83' L422 N00'56'25"W 24.19' L423 N53'30'00"E 36.21' LINE TABLE LINE BEARING LENGTH L424 N40'02'03"E 8.86' L425 N01'13'51"E 14.57' L426 N21'44'59"W 26.86' L427 N00'26'14"W 51.77' L428 N21'17'58"W 1.96' L429 N36'13'13"E 16.58' L430 S79'03'29"E 2.43' L431 N40'02'13"E 8.93' L432 N38'52'59"E 22.98' L433 N45'45'59"E 65.86' L434 N49'07'50"E 45.56' L435 N07'23'48"W 3.22' L436 N29'35'59"E 21.52' L437 N13'30'12"E 18.78' L438 N11'20'04"E 23.72' L439 N77'46'23"E 20.14' L440 N80'04'55"E 19.46' L441 S85'45'28"E 18.88' L442 N74'30'04"E 23.18' L443 S80'49'47"E 39.46' L444 S58'25'35"E 22.40' L445 N79'02'14"E 35.77' L446 N66'05'59"E 15.27' L447 N06'50'12"E 31.74' L448 N74'01'54"E 34.16' L449 N11'44'58"W 18.87' L450 N71'55'09"E 30.60' L451 N47'43'48"E 37.84' L452 N77'48'27"E 14.98' L453 N65'33'11"E 12.29' L454 N31'48'35"E 11.73' L455 N76'10'15"E 10.12' L456 N20'50'42"E 16.96' L457 N59'43'43"E 9.59' L458 N49'51'33"E 9.13' L1019 S10'51'07"E 112.86' L1020 N90'00'00"W 96.66' L1023 S00'04'16"W 100.03' CURVE TABLE CURVE BEARING CHORD RADIUS C7 S41'57'59"W 60.68' 32.00' CONSERVATION AREA E AREA: 0.080 ACRES (3,488 SF) LINE TABLE LINE BEARING LENGTH L462 N10'59'13"W 16.98' L463 NO2'09'17"E 20.36' L464 N06'56'28"W 30.84' L1024 S00'04'16"W 33.38' L1025 S00'04'16"W 127.51' L1026 S00'04'16"W 189.21' CURVE TABLE CURVE BEARING CHORD RADIUS C9 S46'49'37"E 36.89' 31.50' C10 S43'49'44"W 48.03' 31.00' CONSERVATION AREA AREA: 0.866 ACRES (37,710 SF) RESTORATION AREA F AREA: 0.138 ACRES (6,018 SF) LINE TABLE LINE TABLE BEARING LENGTH LINE BEARING LENGTH L459 N49'51'33"E 7.96' L460 N05'00'28"E 11.53' L461 N07'34'59"E 17.09' L465 S06'56'28"E 34.89' L466 S00'49'42"E 18.36' L467 S11 *15'56"E 10.17' L468 N66'00'50"E 28.01' L469 N52'40'59"E 17.79' L470 N73'33'51"E 31.75' L471 N73'40'43"E 35.30' L472 N69'54'53"E 31.92' L473 N54'22'25"E 31.56' L474 NOT USED 12.57' L475 NOT USED 7.91' L476 NOT USED 19.00' L477 NOT USED 23.38' L478 NOT USED 34.25' L479 NOT USED 17.21' L480 NOT USED L481 NOT USED L1036 N69'32'33"E 13.43' L1056 S66'06'01 "E 17.21' L1055 S37'12'40"E 34.25' L1054 S40'42'05"E 23.38' L1053 S32'43'42"E 19.00' L1052 S73'02'58"E 7.91' L1051 S81 *19'00"E 12.57' L1050 N36'40'24"E 14.70' L1049 N53'36'46"E 12.24' L1048 N11'14'40"E 2.67' L1047 S26'46'36"E 21.27' L1021 S61'44'13"W 361.79' L1022 S61'44'13"W 102.83' L1023 S00'04'16"W 100.03' L1025 S00'04'16"W 127.51' L1027 N56'11'01"W 422.54' L1029 S61'44'13"W 90.54' CURVE TABLE CURVE BEARING CHORD RADIUS C8 N88'50'19"E 9.31' 31.50' C11 N46'10'16"W 39.21' 31.00' C12 N06'33'54"W 5.16' 31.50' RESTORATION AREA F AREA: 0.138 ACRES (6,018 SF) LINE TABLE LINE BEARING LENGTH L1037 N70'25'32"E 38.70' L1038 N06'13'53"E 28.17' L1039 S57'29'21 "E 78.13' L1040 S16'07'17"W 6.58' L1041 S14*41'11 "W 21.40' L1042 S48'25'50"E 6.80' L1043 S28'20'S2"W 2.81' L1044 S35'29'58"E 7.43' L1045 S60'50'08"W 4.18' L1046 S11 *14'40"W 7.52' L1048 S11 *14'40"W 2.67' L1049 N53'36'46"E 12.24' L1050 S36'40'24"W 14.70' L1051 N81'19'00"W 12.57' L1052 N73'02'58"W 7.91' L1053 N32'43'42"W 19.00' L1054 N40'42'05"W 23.38' L1055 N37'12'40"W 34.25' L1056 N66'06'01"W 17.21' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 10 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA AREA: 4.073 ACRES (177,419 SF) LINE TABLE LINE BEARING LENGTH L196 N16'05'25"E 7.37' L197 N27'43'26"E 24.20' L198 N52'49'20"E 31.52' L199 N40'09'14"W 5.95' L200 N04'56'57"W 33.93' L201 N14'59'01"E 31.91' L202 N18'16'55"W 31.66' L203 N48'02'17"E 61.16' L204 N85'26'11"E 24.08' L205 N46'46'06"E 6.82' L206 N48'51'32"E 20.31' L207 N48'51'32"E 20.31' L482 S26'46'36"E 15.08' L483 S53'02'07"W 3.62' L484 S40'02'31 "W 26.04' L485 S75'18'30"W 0.30' L486 SO4'06'50"E 24.22' L487 S67'18'26"W 44.15' L488 N82'53'02"W 26.59' L489 S08'06'14"W 5.49' L490 S54'20'31 "W 41.55' L491 S60'12'12"W 14.41' L492 S29'03'51 "W 17.61' L493 S71'35'12"W 67.34' L494 S34'04'39"W 27.52' L495 S28'12'19"W 28.20' L496 S43'28'45"W 25.73' L497 S73'48'59"W 26.20' L498 N40'16'07"W 14.19' L499 S64'59'21 "W 25.18' L500 S26'44'29"W 26.84' L501 S73'28'00"E 17.09' L502 S10'S6'02"E 17.31' L503 S84'56'55"W 19.85' L504 S31'51'12"W 23.11' L505 S88'14'33"E 4.10' L506 S40'36'23"E 36.37' L507 S33'08'03"E 7.00' L508 S73'25'32"E 16.82' L509 S43'19'03"E 32.33' L510 S57'31'13"E 16.35' LINE TABLE LINE BEARING LENGTH L511 N89'01'14"E 23.23' L512 S21'23'19"E 30.44' L513 S56'01'23"E 40.84' L514 S54'17'48"E 23.96' L515 S74'27'45"E 25.01' L516 S70'10'21 "E 27.84' L517 S58'13'16"E 51.90' L518 S29'32'17"E 27.29' L519 S07'54'25"E 2.48' L520 S70'37'44"E 1.15' L521 S64'30'54"E 21.58' L522 S59'01'07"E 25.25' L523 S50'03'06"E 16.67' L524 N50'03'06"W 11.81' L525 N59'01'07"W 17.41' L526 N64'30'54"W 15.30' L527 N70'37'44"W 35.62' L528 N07'54'25"W 28.17' L529 N58'13'16"W 29.37' L530 N70'10'21"W 19.03' L531 N74'27'45"W 33.71' L532 N54'17'48"W 34.05' L533 N56'01'23"W 59.24' L534 N21'23'19"W 7.83' L535 N57'31'13"W 40.78' L536 N43'19'03"W 22.63' L537 N75'58'53"W 23.23' L538 N33'24'09"W 26.13' L539 N43'33'42"W 4.00' L540 N88'14'33"W 75.60' L541 S77'09'48"W 8.13' L542 S49'40'25"W 20.51' L543 S66'22'27"W 18.45' L544 S32'37'20"W 20.83' L545 S61'27'14"W 14.43' L546 S32'30'45"W 27.74' L547 S54'25'52"W 20.63' L548 S68'44'54"W 16.83' L549 S15'32'55"W 14.34' L550 N88'52'26"W 17.83' L551 S28.38'41 "W 17.50' LINE TABLE LINE BEARING LENGTH L552 S79'38'16"W 33.55' L553 S57'32'36"W 25.70' L554 S64'27'11 "W 24.63' L555 S50'13'10"W 44.92' L556 S41 *29'30"W 30.91' L557 S23'02'07"W 27.54' L558 S23'36'18"W 34.92' L559 S15'32'56"W 25.11' L560 N87'29'45"W 20.69' L561 S33'35'25"W 44.46' L562 S28'35'07"W 45.18' L563 S51 *12'28"W 36.31' L564 S37'20'08"W 46.85' L565 S29'51'42"W 69.30' L566 S35'10'11 "W 49.87' L567 S67'00'21 "W 30.68' L568 S83'51'44"W 24.50' L569 S41'34'21 "W 39.49' L570 S24'46'51 "W 37.77' L571 S55'22'41 "W 26.31' L572 S64'37'02"W 18.99' L573 S35'13'40"W 49.10' L574 S18'24'46"W 23.19' L575 S78'16'55"W 36.85' L576 S61 *07'39"W 28.75' L577 S82'55'32"W 27.58' L578 S30'32'17"W 33.48' L579 N73'01'48"W 31.24' L580 S41 *57'36"W 77.84' L581 S48'47'11 "W 39.89' L582 S44'11'28"W 18.85' L1006 N76'17'30"W 156.39' L1007 N76'17'30"W 192.58' L1008 N76'17'30"W 198.96' L1018 S10'S1'07"E 5.84' L1019 S10'51'07"E 112.86' L1020 N90'00'00"W 96.66' L1021 S61'44'13"W 361.79' L1022 S61'44'13"W 102.83' L1029 S61 *44'12 90.54' CURVE TABLE CURVE BEARING CHORD RADIUS C13 N39'56'54"E 62.00' 31.00' CONSERVATION AREA AREA: 0.121 ACRES (5,280 SF) LINE TABLE LINE BEARING LENGTH L166 N08'22'12"E 8.32' L167 N23'06'23"E 10.80' L168 N12'13'01"E 19.36' L169 N50'01'21"E 21.38' L170 N16'46'00"E 45.83' L171 N67'28'25"E 22.69' L172 N46'56'04"E 17.28' L173 N29'31'59"E 15.96' L174 N20'11'33"E 40.02' L1004 S02'07'15"W 62.10' L1005 S02'07'15"W 75.90' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 11 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA J CONSERVATION AREA K CONSERVATION AREA M AREA: 4.953 ACRES AREA: 0.0002 ACRES AREA: 0.140 ACRES (215,767 SF) (7 SF) (6,109 SF) LINE TABLE LINE BEARING LENGTH L175 N20'11'33"E 33.14' L176 N46'24'46"E 24.40' L177 N31'34'00"E 11.46' L178 N06'00'04"E 18.01' L179 N28'40'47"E 49.89' L180 N13'58'57"E 5.68' L181 N35'33'50"E 26.04' L182 N09'29'14"E 10.99' L183 N34'25'22"E 58.16' L184 N24'54'35"E 37.50' L185 N01'56'33"E 69.23' L186 N17'21'13"E 58.30' L187 N75'41'41"E 10.22' L188 N01'03'31"W 12.07' L189 N53'32'54"E 22.08' L190 N13'25'04"W 8.40' L191 N13'05'57"E 21.70' L192 NO2'17'55"E 4.33' L193 N41'37'54"W 43.01' L194 N29'35'01"E 36.99' L195 N16'05'25"E 13.78' L583 S44'11'28"W 11.04' L584 S18'53'44"W 33.00' L585 S10'51'55"W 34.55' L586 S13'38'27"E 28.21' L587 S17'34'20"W 37.77' L588 S21 *06'32"W 38.91' L589 S32'40'52"W 41.36' L590 S28'45'04"W 46.48' L591 S33'31'55"W 33.46' L592 S27'45'53"W 30.40' L593 S10'52'40"W 45.08' L594 S27'20'17"W 37.43' L595 S36'53'36"W 31.32' L596 S57'50'03"W 32.15' L597 S48'49'58"W 31.53' L598 S45'04'01 "W 42.01' L599 S86'42'07"W 21.58' L600 S36'39'10"W 33.57' L601 S44'53'41 "W 27.09' L602 S18 -10'15"W 27.94' LINE TABLE LINE BEARING LENGTH L603 S16'43'59"W 32.19' L604 S09'37'17"W 28.69' L605 S89'50'49"E 2.36' L606 N54'13'00"E 16.91' L607 N72'59'15"E 10.14' L608 S14'09'05"W 12.78' L609 N81'12'04"E 34.83' L610 S41 *09'54"E 19.54' L611 N82'02'15"E 10.39' L612 N70'23'09"E 25.57' L613 S87'08'01 "E 51.37' L614 S63'49'46"E 30.81' L615 S51 *44'53"E 26.11' L616 S44'41'47"E 16.52' L617 S84'08'04"E 10.89' L618 S63'32'02"E 12.95' L619 N82'59'51"E 18.28' L620 S63'12'44"E 15.90' L621 N87'56'49"E 9.33' L622 S81 *14'16"E 4.07' L623 NO2'24'48"W 5.00' L624 N42'34'36"E 25.27' L625 N12'31'28"E 37.12' L626 N88'06'13"E 42.60' L627 N27'37'34"E 31.20' L628 N84'20'25"E 42.27' L629 N86'09'00"E 30.08' L630 S49'48'24"E 57.38' L631 S19'22'35"E 0.16' L632 S54'51'51 "E 12.20' L633 S78'54'48"E 17.66' L634 S47'19'36"E 19.67' L635 S71 *43'32"E 13.63' L636 S89'14'14"E 37.57' L637 S15*17'52"E 15.25' L638 S61'44'17"E 28.28' L639 S81 *05'22"E 51.22' L640 S69'24'31 "E 69.56' L641 N85'51'14"E 1.55' L642 S78'12'47"E 8.50' L643 I N41'39'41"E 1 13.03' LINE TABLE LINE BEARING LENGTH L644 S41 *52'48"E 19.07' L645 S78'12'47"E 16.26' L646 S85'25'49"E 62.74' L647 NO2'23'14"E 5.65' L648 N65'10'05"E 29.16' L649 N21'31'27"W 0.87' L650 N32'33'07"E 51.36' L651 N66'04'09"E 13.82' L652 N26'28'10"E 32.31' L653 S69'50'19"E 25.88' L654 N56'26'27"E 52.39' L655 NO3'25'18"W 27.26' L656 N81'27'52"E 56.77' L657 N89'42'56"E 59.34' L658 N72'24'13"E 85.32' L659 S88'13'47"E 45.57' L660 S1014'42"E 15.29' L661 N88'59'51"E 38.19' L662 S80'02'43"E 73.84' L663 N23'45'29"E 34.68' L664 S56'00'46"E 20.62' L665 N33'49'31"E 10.70' L666 N39'09'17"E 58.74' L667 N86'24'33"E 42.84' L668 S47'06'59"E 47.01' L669 S70'10'50"E 12.41' L670 S88'01'06"E 13.23' L671 N81'00'59"E 15.21' L672 N81'44'51"E 30.44' L673 S83'37'19"E 18.96' L674 S84'17'25"E 28.16' L675 S66'01'59"E 36.55' L676 N70'24'08"E 19.24' L677 S73'39'57"E 31.46' L678 S86'29'41 "E 2.58' L679 N64'25'02"E 15.59' L680 N83'11'05"E 27.79' L681 N87'40'10"E 17.67' L682 S77'11'15"E 18.20' L683 S81 *01'32"E 38.93' L684 I S14'30'13" E 1 20.25' LINE TABLE LINE BEARING LENGTH L685 N89'22'20"E 29.49' L708 N43'40'58"W 9.95' L709 S39'09'17"W 13.12' L710 S39'09'17"W 5.18' L717 S89'08'47"W 14.34' L718 N10'14'42"W 12.39' L719 S72'24'13"W 68.46' L720 N89'21'35"W 60.30' L721 S42'28'34"W 25.02' L722 S56'26'27"W 12.18' L729 S49'47'12"W 4.98' L730 S65'10'05"W 4.96' L731 N75'42'26"W 2.45' L732 N45'04'40"W 9.14' L735 N82'07'02"W 1.13' L736 N82'07'02"W 11.84' L737 S02'51'26"W 13.69' L738 N64'27'51"W 6.58' L739 S02'23'14"W 22.19' L740 N78'00'40"W 56.61' L741 N86'12'12"W 76.22' L742 N76'58'15"W 43.92' L743 N89'14'22"W 43.63' L744 N08'28'17"W 15.23' L745 N70'02'36"W 32.46' L746 N81'39'49"W 55.45' L747 N61'43'55"W 33.47' L748 N74'41'00"W 40.52' L749 S71 *28'42"W 8.94' L750 N73'05'29"W 52.51' L751 N23'40'20"W 15.87' L752 N68'46'56"W 12.60' L753 N25'39'30"W 11.35' L754 N86'18'55"W 10.57' L755 N62'59'16"W 18.20' L756 S00'04'27"W 20.69' L757 S81'08'21 "W 49.11' L758 N63'36'21"W 1.66' L759 S42'34'36"W 11.94' L760 S02'24'48"E 10.88' L761 I S38'59'20"W 1 24.90' LINE TABLE LINE BEARING LENGTH L762 S57'36'02"W 33.93' L763 N81'14'16"W 28.03' L764 S87'56'49"W 19.57' L765 N63'12'44"W 12.97' L766 S82'59'51 "W 5.78' L767 S79'08'15"W 26.69' L768 N72'06'50"W 38.76' L769 N25'17'34"W 20.95' L770 S89'54'16"W 13.96' L771 S38'57'42"W 18.14' L772 S87'45'00"W 21.77' L1004 S02'07'15"W 62.10' L1005 S02'07'15"W 75.90' L1006 N76'17'30"W 156.39' L1007 N76'17'30"W 192.58' L1008 N76'17'30"W 198.96' L1009 NO2'29'36"W 5.46' L1010 NO2'29'36"W 12.37' L1011 NO2'29'36"W 69.58' L1012 N78'52'58"E 111.87' L1014 N78'52'58"E 244.65' L1015 N78'52'58"E 15.45' L1016 N78'52'58"E 19.38' LINE TABLE LINE BEARING LENGTH L733 S45'04'40"E 2.43' L734 S05'19'53"W 3.91' L735 N82'07'02"W 1.13' L1010 NO2'29'36"W 12.37' L1011 NO2'29'36"W 69.58' CONSERVATION AREA L AREA: 0.072 ACRES (3,120 SF) LINE TABLE LINE BEARING LENGTH L723 S56'26'27"W 85.90' L724 N69'50'19"W 2.68' L725 S66'04'09"W 15.48' L726 S32'33'07"W 0.24' L727 S21 *31'27"E 18.15' L728 S49'47'12"W 32.77' L1010 NO2'29'36"W 12.37' L1011 NO2'29'36"W 69.58' L1012 N78'52'58"E 111.87' L1013 N78'52'58"E 172.38' LINE TABLE LINE BEARING LENGTH L710 S39'09'17"W 5.18' L711 S33'49'31 "W 25.26' L712 S33'49'31 "W 45.69' L713 N56'00'46"W 8.41' L714 S23'45'29"W 8.70' L715 N80'01'19"W 116.16' L716 S89'08'47"W 72.41' L1013 N78'52'58"E 172.38' L1014 N78'52'58"E 244.65' L1015 N78'52'58"E 15.45' L1016 N78'52'58" E 1 19.38' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 12 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA N AREA: 15,534 ACRES (0.357 SF) LINE TABLE LINE BEARING LENGTH L685 N89'22'20"E 29.49' L686 SO4'03'13"W 8.01' L687 N14'30'13"W 6.24' L688 N86'36'09"W 27.41' L689 SO4'03'13"W 66.00' L690 N86'36'09"W 60.21' L691 N40'59'47"W 30.89' L692 N14'30'13"W 8.21' L693 N77'11'15"W 9.43' L694 S87'40'10"W 6.31' L695 S83'11'05"W 14.29' L696 S64'25'02"W 21.80' L697 N86'29'41"W 27.13' L698 N73'39'57"W 17.48' L699 S70'24'08"W 24.21' L700 N66'01'59"W 52.32' L701 N84'17'25"W 17.94' L702 N83'37'19"W 10.87' L703 S81'44'51 "W 21.55' L705 N88'01'06"W 29.92' L706 N70'10'50"W 35.95' L707 N43'40'58"W 15.03' L1014 N78'52'58"E 244.65' L1015 N78'52'58"E 15.45' L1016 N78'52'58"E 19.38' L1017 N89'22'20"E 347.95' LINE TABLE LINE BEARING LENGTH L917 NOT USED 13.86' L918 NOT USED 10.19' L919 NOT USED 2.67' L920 NOT USED 23.47' L921 NOT USED 40.52' CONSERVATION AREA R AREA: 0.131 ACRES (5,705 SF) LINE TABLE LINE BEARING LENGTH L796 N89'26'14"E 13.86' L797 N89'26'14"E 10.19' L798 S65'12'45"E 2.67' L799 N43'55'01"E 23.47' L800 N27'09'42"E 40.52' L801 S62'01'13"E 75.54' L1031 S24'57'49"E 25.84' L1032 S25'21'10"E 34.79' L1033 N55'00'47"E 124.70' L1034 N55'00'47"E 38.93' L1035 S25'21'10"E 41.85' CONSERVATION AREA W AREA: 0.006 ACRES (283 SF) LINE TABLE LINE BEARING LENGTH L1058 S61'44'13"W 20.46' L1079 N54'32'34"W 16.90' L1080 N09'28'30"W 3.40' L1081 N66'43'29"E 4.47' L1065 S84'27'56"W 9.96' L1064 S71 *18'42"E 19.34' CONSERVATION AREA S AREA: 2.329 ACRES (101,461 SF) LINE TABLE LINE BEARING LENGTH L802 S62'01'1 YE 9.28' L803 S27'58'47"W 64.00' L804 N62'01'13"W 13.72' L805 S37'33'15"W 46.97' L806 N83'32'06"W 25.28' L807 N83'32'06"W 14.62' L808 SO4'24'55"W 33.12' L809 N82'58'44"W 51.10' L810 S58'41'34"W 14.61' L811 S70'56'12"W 35.87' L812 S44'23'48"W 30.77' L813 N89'25'00"E 21.11' L814 S02'18'27"E 30.65' L815 S72'00'34"E 15.23' L816 S72'00'34"E 52.03' L817 S38'46'14"E 27.49' L818 S79'55'51 "E 4.74' L819 N78'32'00"E 13.39' L820 S48'00'32"E 29.64' L821 S60'54'35"E 1.09' L822 N71'55'17"E 17.86' L823 S46'59'25"E 53.10' L824 S53'32'27"E 26.11' L825 S40'20'14"E 22.47' L826 S79'13'23"E 17.88' L827 S41 *24'53"E 27.34' L828 S83'01'08"E 23.78' L829 S72'57'58"E 27.19' L830 S11'59'21 "E 53.40' L831 S35'08'06"W 0.19' L832 S82'44'52"E 7.06' L833 S55'53'53"E 46.31' L834 S29'11'05"E 32.97' L835 S08'08'21 "W 11.63' L836 S54'23'10"E 21.80' L837 S08'33'43"W 21.75' L838 S87'04'35"E 19.55' L839 S28'31'32"E 35.76' L840 S88'36'11 "E 12.39' L841 S19*40'02"E 43.75' L842 S59'02'38" E 1 20.92' LINE TABLE LINE BEARING LENGTH L843 S25'24'32"E 54.02' L844 S31 *43'54"E 6.01' L845 S88'14'56"E 1.80' L846 N88'17'29"E 29.84' L847 S55'18'46"E 45.00' L848 S31 *50'56"E 19.78' L849 S31 *50'56"E 39.42' L850 S51'58'17"E 33.84' L851 S59'29'58"E 27.79' L852 S66'24'44"E 21.87' L853 S60'15'36"E 47.10' L854 S12'53'36"E 19.75' L855 S82'13'57"E 43.66' L856 S39'40'35"E 36.51' L857 S12'04'26"E 4.94' L858 S69'31'25"E 9.42' L859 S19'34'49"E 7.89' L860 N78'34'55"E 1.42' L861 S69'33'39"E 28.75' L862 S63'42'54"E 14.20' L863 N59'09'29"W 9.71' L864 N69'22'27"W 7.22' L865 S82'48'26"W 24.76' L866 N41'24'03"W 33.66' L867 N73'50'57"W 15.34' L868 N13'00'02"W 22.29' L869 N84'24'03"W 16.55' L870 N81'12'23"W 41.08' L871 N18'43'17"W 33.77' L872 N12'09'45"W 4.30' L873 N60'39'38"W 14.93' L874 N66'24'44"W 21.75' L875 N61'19'04"W 35.85' L876 N53'15'49"W 49.71' L877 N34'47'28"W 56.98' L878 N55'20'33"W 14.10' L879 N74'14'51"W 8.99' L880 S89'45'11 "W 34.38' L881 N30'07'26"W 44.86' L882 N26'39'20"W 37.50' L883 N59 -02'38"W 17.74' LINE TABLE LINE BEARING LENGTH L884 N39'49'35"W 27.45' L885 S76'44'08"W 40.44' L886 N45'31'13"W 43.37' L887 NO3'39'30"W 29.81' L888 N37'16'10"E 4.61' L889 N40'00'02"W 2.78' L890 N08'33'43"E 34.20' L891 N48'29'45"W 22.79' L892 N08'08'21"E 25.23' L893 N54'01'58"W 6.55' L894 S49'36'39"W 15.26' L895 N60'52'51"W 90.78' L896 N35'08'06"E 39.28' L897 N84'43'53"W 13.10' L898 N41'24'53"W 31.39' L899 N76'03'02"W 18.23' L900 N40'20'14"W 36.21' L901 N55'54'17"W 22.37' L902 N46'59'25"W 18.61' L903 S71'55'17"W 8.76' L904 N57'55'18"W 36.45' L905 N51'26'25"W 7.81' L906 N79'55'51"W 32.94' L907 N36'52'19"W 32.62' L908 N72'55'15"W 48.97' L909 N84'23'11"W 62.42' L910 N20'20'38"E 28.99' L911 N68'32'12"W 15.63' L912 S58'10'37"W 17.07' L913 N83'24'58"W 29.32' L914 S10'35'40"W 34.68' L915 S62'25'09"W 44.34' L916 N54'32'34"W 48.13' L1029 S61'44'13"W 90.54' L1030 NOT USED L1058 N61'44'13"E 20.46' L1063 N71'18'42"W 10.91' L1062 N60'41'47"E 20.78' L1061 N08'36'28"E 9.50' L1060 N61'44'13"E 304.10' L1033 N55'00'47"E 124.70' L1034 N55'00'47"E 38.93' CURVE TABLE CURVE BEARING CHORD RADIUS C14 N28'33'49"E 64.95' 32.50' RESTORATION AREA S AREA: 0.005 ACRES (213 SF) LINE TABLE LINE BEARING LENGTH L1059 N61'44'13"E 33.93' L1061 S08'36'28"W 9.50' L1062 S60'41'47"W 20.78' L1063 N71'18'42"W 10.91' RESTORATION AREA T AREA: 0.142 ACRES (6,177 SF) LINE TABLE LINE BEARING LENGTH L1059 S61'44'13"W 33.93' L1064 N71'18'42"W 19.34' L1065 S84'27'56"W 9.96' L1066 N21'32'46"W 3.96' L1067 N21'18'13"E 14.38' L1068 N62'57'19"W 13.33' L1069 N57'44'25"W 71.64' L1070 N72'09'51"E 12.60' L1071 N37'10'57"E 32.50' L1072 N47'53'21"E 33.92' L1073 S22'13'39"E 58.23' L1074 S58'54'00"E 30.35' L1075 S57'23'27"E 22.50' L1076 S29'23'11 "E 10.08' L1077 S08'36'28"W 12.71' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA T AREA: 0.724 ACRES (31,542 SF) LINE TABLE LINE BEARING LENGTH L773 NOT USED 32.37' L774 NOT USED 6.25' L775 NOT USED 30.11' L776 NOT USED 28.86' L777 NOT USED 464.93' L778 NOT USED 90.54' L779 NOT USED L780 NOT USED 34.79' L781 N31'35'19"E 45.49' L782 S46'52'57"E 21.26' L783 S87'25'20"E 14.51' L784 N71'48'12"E 25.05' L785 N67'14'10"E 27.37' L786 N67'20'16"E 21.27' L787 N81'32'54"E 35.70' L788 S83'15'51 "E 26.34' L789 S64'58'24"E 23.94' L790 S22'16'37"E 11.19' L791 N66'36'56"E 3.17' LINE TABLE LINE BEARING LENGTH L792 N58'41'34"E 32.37' L793 S80'58'22"E 6.25' L794 N12'45'26"E 30.11' L795 N89'26'14"E 28.86' L1028 N56'11'01"W 464.93' L1029 S61'44'13"W 90.54' L1030 NOT USED L1032 S25'21'10"E 34.79' L1031 S24'57'49"E 25.84' L1060 S61'44'13"W 304.10' L1077 N08'36'28"E 12.71' L1076 N29'23'11"W 10.08' L1075 N57'23'27"W 22.50' L1074 N58'54'00"W 30.35' L1073 N22'13'39"W 58.23' L1078 N60'04'23"E 34.50' L1033 N55'00'47"E 124.70' L1035 S25'21'10"E 41.85' CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 13 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 CONSERVATION AREA AREA: 2.930 ACRES (127,619 SF) LINE TABLE LINE BEARING LENGTH L922 S54'55'39"W 20.81' L923 N74'37'22"W 19.31' L924 S89'21'09"W 15.20' L925 S83'58'49"W 32.99' L926 S86'01'09"W 16.75' L927 S41'30'15"E 2.20' L928 S53'18'44"W 65.14' L929 S76'51'15"W 49.25' L930 S86'51'48"W 56.17' L931 S88'10'41 "W 76.85' L932 N60'43'08"W 57.76' L933 N12'21'33"W 43.99' L934 N13'48'55"W 68.61' L935 N13'29'14"E 71.73' L936 N15'16'39"E 37.62' L937 N22'03'31"E 37.53' L938 N16'59'33"E 58.26' L939 N18'11'47"E 34.79' L940 N27'16'53"E 49.45' L941 N05'30'53"W 23.81' L942 N20'29'30"E 44.60' L943 N30'53'48"E 34.06' L944 N26'02'47"W 15.31' L945 N05'51'51"E 40.51' L946 N08'00'32"E 0.33' L947 N34'15'19"W 12.93' L948 N04'50'43"E 10.43' L949 N31'49'24"W 55.09' L950 N54'35'02"E 16.01' L951 N27'00'30"W 1.73' L952 N48'19'09"W 37.98' L953 N25'32'37"E 35.74' L954 N38'08'15"E 35.83' L955 N66'38'21"E 13.49' L956 N41'47'12"E 13.84' L957 N71'33'44"E 42.20' L958 S84'54'57"E 5.50' L959 N12'24'12"E 16.04' L960 S88'52'40"E 44.02' L961 S23'57'57"W 6.45' L962 S69'41'47"W 31.26' LINE TABLE LINE BEARING LENGTH L963 N85'02'49"W 16.05' L964 S72'06'38"W 10.88' L965 S23'08'06"W 22.48' L966 S25'08'42"E 28.57' L967 SO4'07'02"E 27.89' L968 S33'01'28"E 15.02' L969 S01 *09'20"E 8.52' L970 S48'29'01 "E 12.85' L971 S02'31'03"W 29.06' L972 S05'51'51 "W 24.89' L973 N72'41'44"E 26.87' L974 S00'27'23"W 123.02' L975 S11'06'25"E 26.60' L976 S18'41'16"E 52.85' L977 S19*11'22"E 72.85' L978 S15'31'10"E 45.40' L979 S10'41'23"E 48.48' L980 S06'54'00"E 52.91' L981 S01 *38'28"E 39.66' L982 S41'30'15"E 22.15' L983 N89'24'52"E 28.56' L984 N81'11'49"E 44.87' L985 N79'29'38"E 25.07' L986 S48'16'47"E 17.39' CURVE TABLE CURVE BEARING CHORD RADIUS C15 NO2'08'49"W 62.90' 31.50' CONSERVATION AREA V AREA: 0.413 ACRES (17,991 SF) LINE TABLE LINE BEARING LENGTH L987 S59'52'10"E 80.51' L988 S68'19'40"E 58.51' L989 S26'03'46"E 17.21' L990 S62'20'17"E 17.52' L991 N62'20'17"W 38.48' L992 N26'03'46"W 13.44' L993 N68'19'40"W 30.03' L994 N79'14'02"W 33.73' L995 N43'29'04"W 14.26' L996 N63'31'55"W 42.20' L997 S89'05'30"W 6.55' L998 N73'20'46"W 40.55' L999 N49'51'42"W 68.46' L1000 S70'10'36"E 38.06' L1001 N85'36'49"E 3.44' L1002 N85'36'49"E 122.74' L1003 N83'17'27"E 6.65' CURVE TABLE CURVE BEARING CHORD RADIUS C16 N27'39'43"E 64.00' 32.00' PRELIMINARY NOT FOR RECORDATION, CONVEYANCES, OR SALES CONSERVATION AREA DELINEATION TRIAD BUSINESS PARK SHEET 14 OF 14 DEEP RIVER TOWNSHIP GUILFORD COUNTY KERNERSVILLE, NORTH CAROLINA N.C. License No. C-1362 Regional Land Surveyors, Inc. 8642 WEST MARKET STREET, SUITE 100 GREENSBORO, NORTH CAROLINA 27409 TELEPHONE (336) 665-8155 AFTER RECORDING, RETURN TO: Nexsen Pruet, PLLC c/o Brian T. Pearce PO Box 3463 Greensboro, NC 27402 FOURTH AMENDMENT TO THE DECLARATION OF PROTECTIVE COVENANTS, CONDITIONS, RESTRICTIONS AND RESERVATIONS This Fourth Amendment (this “Amendment”) to the DECLARATION OF PROTECTIVE COVENANTS, CONDITIONS, RESTRICTIONS AND RESERVATIONS is made as of the ____ day of _________, _________ by TDO LAND HOLDING LLC, a North Carolina limited liability company, (“Declarant”). RECITALS WHEREAS, TDO Land Holding LLC, NB Johnson II, LLC and SB Johnson II, LLC subjected certain property owned by such entities, which property is known as Triad Business Park Phase I and shown on the plat recorded in Plat Book 175, Page 97 and 98 of the Guilford County Registry (the “Business Park Property”) to that certain Declaration of Protective Covenants, Conditions, Restrictions and Reservations (the “Original Declaration”), which Declaration was recorded on September 30, 2008 in Book 6939, Page 2897 of the Guilford County Registry, and was amended by the terms of that Amendment to Declaration of Protective Covenants, Conditions, Restrictions and Reservations (the “First Amendment”), which First Amendment was recorded on December 31, 2008 in Book 6963, Page 452 of the Guilford County Registry; and by the terms of that Restated Second Amendment to Declaration of Protective Covenants, Conditions, Restrictions and Reservations (the “Second Amendment”), which Second Amendment was recorded on August 22, 2016 in Book 7846, Page 2945 of the Guilford County Registry; and was amended by the terms of that Third Amendment to Declaration of Protective Covenants, Conditions, Restrictions and Reservations (the “Third Amendment”), which Third Amendment was recorded on June 18, 2018 in Book NPGBO1:2897963.1 8059, Page 59 of the Guilford County Registry. The Original Declaration, First Amendment and Second Amendment are collectively referred to herein as the “Declaration.” Capitalized terms used but not defined herein will have the meanings given to them in the Declaration; and NOW, THEREFORE, the Declarant, as permitted by the Declaration, does hereby amend the Declaration as more fully set forth herein: 1. Article 12 of the Declaration is hereby deleted in its entirety and replaced with the following: ARTICLE 12: Conservation Area 12.0 The areas shown on the Wetland Delineation Plat as Conservation Areas as shown on Exhibit A and as described on Exhibit A-1 attached shall be maintained in perpetuity in their natural or mitigated condition. No person or entity shall perform any of the following activities on such conservation area: a. fill, grade, excavate or perform any other land disturbing activities; b. cut, mow, burn, remove, or harm any vegetation; c. construct or place any road, trails, walkways, buildings, mobile homes, signs, utility poles or towers, or any other permanent or temporary structures; d. drain or otherwise disrupt any hydrology or drainage ways of the conservation area; e. dump or store soil, trash, or other waste; f. graze or water animals, or use for any agricultural or horticulture purpose. This covenant in Section 12.0 is intended to ensure continued compliance with the mitigation condition of a Clean Water Act authorization issued by the United States of America, U.A. Army Corps of Engineers, Wilmington District, action ID SAW-2008-02029, and therefore may be enforced by the United States of America. This covenant in Section 12.0 is to run with the land, and shall be binding on the Declarant and all Lot Owners, and all parties claiming under it. Nothwithstanding the provisions of Section 9.1 of this Declaration, this Section 12.0 of the Declaration may not be amended without the express written consent of the U.S. Army Corps of Engineers, Wilmington District. 2. Miscellaneous. Except as expressly amended hereby, the Declaration remains unaltered and in full force and effect and is hereby ratified, adopted and confirmed in all respects. This Amendment will govern in the event of any conflict between the terms of the Declaration and the terms of this Amendment. This Amendment will be binding upon, and inure to the benefit of, and will be enforceable by the Declarant, Association, Owner and Tenant, and their respective successors and permitted assigns. In the event that a paragraph, section, sentence, clause or phrase contained in this Amendment becomes or is held by any court of competent jurisdiction to be illegal, null or void or against public policy, the remaining paragraphs, sections, sentences, clauses or phrases contained in this Amendment will not be affected thereby. This Amendment may be executed in any number of counterparts, each of which will be deemed NPGBO1:2897963.1 an original and all of which counterparts together constitutes one agreement with the same effect as if the parties had signed the same signature page. The foregoing Amendment was executed this __ day of ___________, _____________ TDO LAND HOLDING, LLC A North Carolina limited liability company By: ________________________ Name: Arthur L. Samet Title: Manager STATE OF _____________________) . COUNTY OF ___________________) I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she signed the foregoing document: Arthur L. Samet as Manager of TDO Land Holding LLC. GIVEN UNDER MY HAND AND OFFICIAL SEAL this ____ day of ____________ 20___. Printed Name NOTARY PUBLIC in and for the State of _________________________, My commission expires Exhibit A (Map of Conservation Areas) NPGBO1:2897963.1 EXHIBIT A-1 NPGBO1:2897963.1 (Legal Description of Conservation Areas) NPGBO1:2897963.1