HomeMy WebLinkAbout19900260 Ver 1_COMPLETE FILE_20010406S DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concernYng an application for State Federal CAMA Permit(s) from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. hi /office has no objection to the issuance of the permit(s) for the proposed ect with the following conditions: That the activity be conducted in such a manner as to prevent significant 11 increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10-NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT . DIVISION OF ENVIRONMENTAL MANAGEI-EENT MEMORANDUM MEMORANDUM Date: February 2, 1990 To: Bill Mills FED is Planning Branch C'j From: James H. Gregson\? C ?pl,-,?; Wilmington Regional Office , v ? ee2 II o'. Through: Preston Howard a Wilmington Regional Offic l Subject: Regional Office Review and Recommendations Application for Permit for Excavation and/or Fill Project 0 9002-B Onslow Inn Motel/Carlow Development Co., Inc. Onslow County PROJECT DESCRIPTION: The applicant proposes to construct an extension to an existing pier. ADJACENT ['CATER BODY: Chaney Creek CLASSIFICATION: SC STATUS: CLOSED The project has been reviewed to determine impacts to water quality. The following comments have been provided. 1. The project will not require a 401 Water Quality Certification. 2. The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed 25 NTU. This office has no objection to the project as proposed. JHG:9002-B.FEB cc: DCM - James L. Mercer WiRO, CF Jim Gregson DIVISION OF COASTAL MANAGEMENT * Lat:34145'20"N FIELD INVESTIGATION REPORT Long:7712515211?P 1. 2. APPLICANT'S NAME Onslow Inn Motel/Carlow Development Co. E. Reid Flinchum LOCATION OF PROJECT SITE 201 Marine Blvd Jacksonville off New River, above H . 17 Brid e Onslow Count 11 *NO PHOTO COVERAGE AVAILABLE Inc. Chaney Ck AERIAL 3. INVESTIGATION TYPE: DREDGE & FILL CAMA X (ONLY) 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 2-89 1-26-90 •(B) WAS APPLICANT PRESENT YES NO 5. PROCESSING PROCEDURE: APPLICATION RECEIVED January 24, 1990 6 OFFICE Morehead City . SITE DESCRIPTION: _ .(A) LOCAL LAND USE PLAN City of Jacksonville Update March 1987 LAND CLASSIFICATION FROM LUP Developed/Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE COASTAL WETLANDS PUBLIC TRUST WATERS X ESTUARINE WATERS OTHER (C) WATER DEPENDENT: YES X NO (D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X (E) TYPE OF WASTE WATER TREATMENT: EXISTING City water & sewer PLANNED NONE (F) TYPE OF STRUCTURES: EXISTING motel & conference center w/ pier PLANNED 70' pier extension (G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE wooded swam 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS NONE DRLOGED FILLED OTHER (B) NON-VEGETATED WETLANDS: pier extension - Chaney Ck (C) OTHER: NONE (FOOTPRINT) 612 sq.ft. (D) TOTAL AREA DISTURBED: Approximately 612 sg.ft 8. PROJECT SUMMARY: The applicant proposes to construct an extension to the existing pier that will measure 64' long x 6' wide with a T -head platform 38' x_61; water depth is -1.8' on NWL. *USGS 7.5 MIN. TOPO 'JACKSONVILLE' 1978 r . FIELD INVESTIGATION REPORT - ONSLOW INN MOTEL/CARLOW DEVELOPMENT CO., INC., E. REID FLINCHUM PAGE #2 9. NARRATIVE DESCRIPTION: Mr. E. Reid Flinchum is the General Manager of the Onslow Inn Motel, located at 201 Marine Boulevard in Jacksonville, NC. Mr. Flinchum has submitted a CAMA application on behalf of the Inn and the property owners, Carlow Development Co., Inc. The project site is situated in Jacksonville, on Chaney Creek, a small tributary of the New River, about 1000' above the Highway 17 Bridge, in Onslow County. The 'Jacksonville North' topographic quadrangle can help orient the 5 acre project site with its 2300 ln. ft. of privately owned shoreline. A border of wooded swamp wetlands measuring 200' wide characterizes the project shoreline between Chaney Creek and the true highground property. The applicant proposes to construct an extension to the existing recreational pier. The extension will measure 64' long x 6' wide with a T-head platform 38' x 61. The water depth at the offshore end of the new pier approximates -1.8' on NWL. The proposes structure will extend an additional 70' into Chaney Creek for a total projection over the surface waters of 801. The extension will generate a footprint value of 612 sq. ft. As the workplat drawing shows, construction of the extension will begin at the waterward end of the existing pier and T-head platform. The existing T-head platform will remain in place at the end of the 150' pier. The purpose of the proposed pier will be to provide and improve water access for the visiting guests of the motel. Activities on the new pier will include fishing, crabbing, and occasionally small boat dockage. It is noted from the workplat drawings that Chaney Creek is approximately 320' wide and the water depth ranges from -1.8' near the pier to -2.3' in the center of the channel. All water depths shown are relative to the NWL. An onsite inspection revealed that no other private or commercial piers exist within Chaney Creek. The proposed project involves no excavation or filling. There are no plans to provide individual boat slips or mooring piles. The 'SC' surface waters of the New River and Chaney Creek are closed to the harvesting of shellfish. The waters of Chaney Creek are classified as inland waters of the State where a fresh water fishing licenses is required. There are no known archeological sites in the immediate vicinity of the project. FIELD INVESTIGATION REPORT - ONSLOW INN MOTEL/CARLOW DEVELOPMENT CO., INC., E. REID FLINCHUM PAGE #3 10. ANTICIPATED IMPACTS: The pier extension will create a footprint impact of 612 sq. ft. on the Public Trust Surface Waters of Chaney Creek. The overall length of the new structure is less than one-third the width of Chaney Creek and will not obstruct the traditional channel near the middle of the creek. There are no known commercial fishery uses in Chaney Creel: that the project might interrupt or otherwise limit. -------------- PREPARED BY: JAMES L. MERCER DATE: JANUARY 30, 1990 I.TINIf Il??'rl! Il DEC 0 6 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Onslow Inn Hotel Address 201 Marine Blvd. City Jacksonville :L,; Li '_?_ If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? i?'ew added to existing project c. Will the project be for community, private, or commercial use? Private/Commercial d. Describe the planned use of the project. Hotel Guests Relaxation State North Carolina Zip 2,8540 Day phone 347-3151 R.Flinchhu Landowner or Authorized agent b. Project name (if any) Onslow Inn Dock Extension c. If the applicant is not the landowner, also give the owner's name and address. Carlow Development Co., Inc. 201 Marine Blvd. Jacksonville, N.C. 28 540 Attn: Tom Phillips 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number 201 liarine Blvd. b. City, town, community, or landmark Jacksonville c. County Onslow d. Is proposed work within city limits or planning jurisdiction? yes e. Name of body of water nearest project liew River 3 DESCRIPTION AND PLANNED USE 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract 5 acres b. Size of individual lot(s) VA c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 5 feet d. Soil type(s) and texture(s) of tract Sandv-Loam e. Vegetation on tract Cypress and Oak Trees some PIarsh. f. Man-made features now on tract flotel & 6 x 150' walkway ending at edge of water. g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) X Public Trust estuary waters. Conservation Transitional Developed Community Rural Other h. How is the tract zoned by local government? Commercial OF PROPOSED PROJECT i. How are ad'acent waters la ified? a. Describe all development activities you propose Tok Ia a professional archaeological survey been example, building a home, motel, marina, bul ad med _ for the tract? No If so, by whom? or pier). 6 x 64 pier with a fff_tP 1) 6 x 38 Fi ??2 41- I i t l ej..1 - fit i 5 UPL'AND' DEVELOPMENT Complete this section if the project includes any land development. None a. Type and number of buildings, facilities, or structuresproposed 6 x 64 pier with 6 x 33 "T" b. Number of lots or parcels 11 A c. Density (Give the number f residential units and the units per acre.). N/A d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? e m. Water supply source N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. None g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. None h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j, Have these facilities reNe}Aed state or local approval? k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commerci ffuent, "wash down"). NaA n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N /A o. If the project is on the oceanfront, what will be the elevation above mean scAa level of the first habitable floor? 6 EXCAVATION AND FILL INFORMATION None a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas 300' 2.3' Pier 64' Pier -6' "T" 380 T" 6' None None None None Forie None b. Amount of material to be excavated from below water level in cubic yards N/A c. Type of material N/A d. Does the area to be excavated include marshland, swamps, or other wetlands? None e. High ground excavation, in cubic yards N /A F?D C 0 8 19 89 1 f. Dimensions of spoil dispos hrea " c. Shoreline erosion during preceding 12 months, in feet Jane g. Location of spoil disposal area ?A h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. - i. Will a disposal area be available for future maintenance?_ N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? /A k. Will the fill material be placed below mean high water? N/A 1. Amount of fill in cubic yards N/A m. Type of fill material N/A n. Source of fill material N/A o. Will fill material be placed on marsh or other wetlands?N/A p. Dimensions of the wetland to be filled N/A q. How will excavated or fill material be kept on site and erosion controllEd9 r. What type of construction equipment will be used (for example, dragline backhoe, or hydraulic dredge)?_ N/A s. Will wetlands be crossed in transporting equipment to project site? : No If yes, explain steps that will be taken to lessen environmental impacts. over existing wooden walkway 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap N/A b. Average distance waterward of mean high water or normal waterleve164 I- -to A "T"_ of 6 ' d. Type of bulkhead material ]'1/A e. Amount of fill, in cubic yards, to be placed below mean high water 14 /A f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. V/ An accurate Nvork plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 1 l white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the ad- jacent waterfront (riparian) landowners. These in- dividuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Manage- ment and should be advised by the applicant of that op- portunity. No Adjacent owners, 1/4 mile riverfront N.E. approx. 2/10 mile of waterfront Sl' closest prop6rty owner , State of N.C., Hwy. 17 Bridge. i Name Onslow Inn, Reid Flinchu-., ?• 9 CERTIFICATION AND PERMISSION Address 201 l=ine Blvd. Jacksonville, l;.C. 28540 TO ENTER'ON LAND Date of Ur ginal Permit-6-2-4-82 Name Address Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. #3AVC0-78-1v-019-0056 April 1, 1988 f A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 8 day of December , 19-L9. X r cam. cT?C?ct,, .?, General i•;anager Landowner or Authorized agent REVISED JAfd 2 4 1990 i u.- "r OWSLOW INN' 201 Boulevard Jaclaonville, i\;ortli Carolina 28540 January 23, 1990 "Ir. Jim ;ercer Division of Coastal Vanagement 11. C. Department of Natural Resources and Community Development Post Office 769 Morehead City, North Carolina 24557 Dear Nor. Mercer: --------------- Enclosed is the completed application and work plat drawings. This should complete the CAP1A requirements for application. The following information is provided: 1. The water depths relative to the mean high water (if?iw) level in and around the existing pier structure, as well as the proposed extension ; please see on Blue Line workplat. 2. loo, the existing T-head platform will remain on the exist- ing pier structure. 3. The water depths leading from the designated channel to the proposed structure is shown on workplat. 4. 1?/A 5. The purpose of the new pier if for our guest access as well as their own watercraft. 6: Delete. 7. The opposite shore line is outline NW of existing pier and appears to be approximately 300 feet from the existing pier of the opposite shore line. I am enclosing 20 copies of the blue Line workplat drawings. It also shows a crosswalk section as well as a vicinity map. I have sign and dated the application on page 4. nin nn-7')1r- i 1 Qnn_AQ2Qr7A i,;r. James L. Mercer Field Representative January 23, 1990 Page # 2 1 appreciate your cooperation and if you need additional information and material, please let 7;e know. Thank you very much. ` Sincerely, r ?. Reid Flinchum General Manager Onslow Inn ERF/psw Enclosures 't M Nw E z , GN PNEY 0 z 0 A S / NEW iPROJECT RIVER ? ?SITE ? CIRCL DR MURRIL \6 EEK U.S. HWY. 17 INN AV CH Y X\ 6 OC D BR?OGf r H fly 9 ny n 9R y? 9y 2 ? ? /OCf ?' X c g r 23 X ' 1 ? X 23 VICINITY SKETCH NOT TO SCALE X 2.3 I Fr.Ftin• NOTE: ALL NAILS SHALL BE ANNULAR RING SHANK TYPE, HOT DIPPED GALVANIZED.USE 16a SIZE FOR DECKING a 20a SIZE FOR RAILING, FRAMING 8 BRACING x,20 M.H.W.L. -MEAN HIGH WATER LINE 3g \© \g SEp OOGK X-2.3 =SPOT ELEVATION \g P© P90 P -ELECTRICAL LINE P.P = POWER POLE ?=EXISTING BUILDING y =EXISTING ASPHALT F M• \L ° '• °' EXISTING CONCRETE G< P P.K q 6O pOOEN =SWAMP 2"x6"CAPx 12' ??p jam/ E? EX\5Z\0GP ER-x-+ =CHAIN LINK FENCE / STAGGER END OG\( JOINTS O ? NOTE: BENCHMARK ELEVATION RELATIVE TO U.S.C.8G. BENCHMARK DATA. ?O 4" x 4" RAIL o . / POST n 2"x 4"x 12 RAIL STAGGER END JOINTS { \ GP ?OO OF SWgM r2" x 6" DECKING 5' p" GONC. NOTCH TOP OF PO rLl?\SZKNG / _ Q• _? I" FOR 2"x6" BEAM WA\- 4 OT O'P _ r 2"x6" TIE --- / 1 K GALV 2"x 6"x 16' CENTER QQ. / BOLTS JOISTS 6"x6 ' PROVIDE 2"z6"TIE Q ! RM.300-316 POST BOTH SIDES OF POS FOR BEARING OIF QQ CENTER JOISTS AT% I I END JOINT 2°x 4°x BRACING AT EA. PAIR OF PO S r ? 4'- 4" w o o WALK CROSS SECTION o N (SECTIONS SET ON B'CENTER) o N. T. S. c i .AtQQ ..? RM.500 - 519 Q Q ??k ?- CNFERENC QQ CENTER RM.100-124 PROPOSED PIER EXTENSION ONSLOW INN TRACT OFFICE SHOWING PROPERTY OF: ONSLOW INN r. CARLOW DEVELOPMENT, INC. , RESTAURANT JACKSONVILLE TWP,ONSLOW CO.,N.C. L L J BARDEN LANIER & ASSOCIATES -`"'- LAND SURVEYING- LANDPLANNING -COMPUTER MAPPING 239 BRIDGE STREET JACKSONVILLE , N.C., 28540 PHONE(919)455-3889 U. $. HWY. 17 .DATE: JAN.5,1990 SCALE: I"=100' 0 50 0 100 200 300 SCALE IN FEET ' JAm 2 4 1990