Loading...
HomeMy WebLinkAbout19900255 Ver 1_COMPLETE FILE_20010406DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concernYng an application for State Federal CAMA Permit(s) from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. !Yh/ office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: tThat the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in by more than 10 NTU's as a result of the proposed able opportunity for dilution and mixture. -shall not be increased activity after a reason- B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has - been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT To: Bill Mills Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW PROJECT NAME: Hydra Sports COUNTY: Onslow Project #: 9011-F STREAM OR ADJACENT WATER BODY: Goose Creek CLASS: SA ORW OPEN OR CLOSED: Open STORMWATER PLAN REQ'D: Yes IF YES, DATE APPROVED: 90/11/30 PROJECT DESCRIPTION: The applicant proposes to expand an existing boat fabrication plant by constructing a new access road, parking lot, and two story office building. REVIEWER: Gregson JOINT NOTICE: No DATE APP. RECD: 90/11/19 RECOMMENDATION: Issue RETURNED: (ISSUE/DENY/OTHER) RESUBMITTED: INITIAL REPORT n FINAL REPORT: 90/11/30 ?7 WATER QUALITY CERT. (401) CERT. REQ'D: No IF YES, TYPE: SEWAGE DISPOSAL c,. TYPE OF DISPOSAL PROPOSED: County water and sewer `??• 'a EXISTING, PROPOSED, SEPTIC TANK ETC. TO BE PERMITTED BY: N/A (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FILL AREA OF FILL: WATER: N/A WETLAND: N/A IS FILL ELIMINATING A SIGNIFICANT USE? N/A DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? N/A IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? N/A MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A (ATTACH A MARINA USE ATTAINABILITY EVAL.) 9011-F.Nov Page Two RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. JHG:9011-F.NOV cc: Central Files Wilmington Regional Office Files DCM-James L. Mercer Jim Gregson c DIVISION OF COASTAL MANAGEMENT * Lat:34138150"N FIELD INVESTIGATION REPORT Long:77110148"W 1. APPLICANT'S NAME Hydra-Sports 2. LOCATION OF PROJECT SITE SR 1507, near the community of Bear Creek on Goose Creek, Onslow County; *SEE 1989 AERIAL PHOTOS STRIP #165, FRAME #6 @ G-10. 3. 4. INVESTIGATION TYPE: DREDGE & FILL_ INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 10-31-90 (B) WAS APPLICANT PRESENT NO CAMA X (ONLY 5. PROCESSING PROCEDURE: APPLICATION RECEIVED November 2, 1990 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Onslow County LUP 1986 LAND CLASSIFICATION FROM LUP High Density Transition/Conserv. DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE -X COASTAL WETLANDS PUBLIC TRUST WATERS_ ESTUARINE WATERS OTHER ORW (C) WATER DEPENDENT: YES NO X (D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X (E) TYPE OF WASTE WATER TREATMENT: EXISTING County water & sewer PLANNED extension of systems to new buildings (F) TYPE OF STRUCTURES: EXISTING building - fabrication plant PLANNED expansion of fabrication plant & new office building (G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE new bulkhead 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS DREDGED NONE (B) NON-VEGETATED WETLANDS: NONE (C) OTHER: highground: inside ORW highground: outside ORW FILLED OTHER (building site) sq. 59,000 ft. 124,900 sq. ft. (D) TOTAL AREA DISTURBED: Approximately 4.22 ac. 8. PROJECT SUMMARY: The applicant proposes to expand the existing fabrication plant; a new access road, parking lot and 2-story office building will be constructed within the 575' ORW. U.S.G.S. 7.5 MIN. TOPO 'HUBERT' PR. 1971 FIELD INVESTIGATION REPORT - HYDRA-SPORTS, ONSLOW COUNTY PAGE #2 9. NARRATIVE DESCRIPTION: Mr. Paul Stevens, President of Landmark Builders of Winston-Salem, NC, has submitted a CAMA application on behalf of Hydra-Sports, a Division of Outboard Marine Corporation (OMC), as signed by Mr. Henry H. Hegel, Vice-President. Basically, the application proposal seeks authorization to expand the existing fabrication plant at the site formerly owned by Chris-Craft Yachts, Inc. OMC recently purchased the 63 acre site which is located near the community of Bear Creek, at the end of SR 1507, just off the AIWW, on Goose Creek, in Onslow County, NC. The referenced 1989 aerial photography clearly shows the project vicinity and can easily orient the reader to the existing conditions and workplat drawings. The existing facility has been used over the past several years by manufacturers of fiberglass boats. The Uniflight Corporation originally developed the property several years ago. Although the project vicinity is rather rural in nature, the Onslow County Land Use Plan classifies this un-zoned section of the County as 'High Density Transition'. A CAMA only permit is required because the applicant proposes construction of an access road, parking lot and office building within the Estuarine Shoreline Area of Environmental Concern (AEC) as defined by the 575' Outstanding Resource Waters (ORW) designation of Bear Island. The workplat drawing demonstrates the ORW striking the northeast mouth of Goose Creek at the AIWW. The highground permit jurisdiction radiates north as the designated boundary proceeds east along the mainland towards Queens Creek. The combined land-disturbing activities within the AEC are greater than 1 acre which necessitates the major (rather than the minor) CAMA review process. In addition to the proposed development within the AEC, Hydra-Sports plans to expand the main fabrication building located outside of the CAMA permit boundary. On a closer inspection, the applicant's development plans outside of the AEC include the following items: 1. A new addition to the fabrication building will be constructed measuring approximately 220' wide x 240' long. The associated land disturbing activities will increase the footprint to 75,000 sq. ft., or 250' x 3001. The new building will be attached to the north end of the existing main building; 2. A new storage area for chemicals will be located on the west side of the new addition. This area will measure about 50' wide x 150' long and will occupy a part of i FIELD INVESTIGATION REPORT - HYDRA-SPORTS, ONSLOW COUNTY PAGE #3 the dirt driveway around this side of the building. The sedimentation plan calls for the deployment of a silt fence around the outer boundary of the construction site in this northwest quadrant. It is noted that the upper reaches of Goose Creek come to within 100' of the proposed construction; 3. Hydra-Sports must redesign and remodel the interior of the main building. All renovation in the main fabrication area will take place under enclosed conditions; and, 4. On the south end of the main building, the applicant proposes to construct a series of boat storage racks on either side of the asphalt runway. The boat racks will act as storage shelves for the new fiberglass boats. The combined footprint value of the storage racks is 32,575 sq. ft. The designated storage area will be surfaced with gravel. Inside the AEC, the proposed construction and land disturbing activities on the highground property will occupy approximately 59,000 sq. ft. of property. The applicant proposes no development within Coastal Wetlands or the Estuarine Surface Waters. The various elements of construction within the AEC are as follows: 1. The storage yard on the south end of the fabrication building will be enlarged. The workplat drawing shows an existing chain link fence relocated some 180' south. A 20,000 sq. ft. section of the existing storage yard will not be utilized and the area will be restored vegetation. 2. A new gravel driveway connecting the storage yard with the plant access road will generate 5,625 sq. ft. of impervious surfaces. Only half of the proposed driveway falls within the CAMA 575' AEC. 3. In order to gain access to the nearby office building, the applicant proposes construction of a road 650' long x 40' wide. The paved surface of the new road will be limited to 25' wide. Approximately half of the proposed road falls within the CAMA AEC. 4. The paved access road will terminate in a new parking lot measuring 140' long x 90' wide. The parking lot will provide 26 spaces which will be available for management employees and visitors. FIELD INVESTIGATION REPORT - HYDRA-SPORTS, ONSLOW COUNTY PAGE 44 5. The proposed 2-story office building is the focal point of construction scheduled within the AEC. The new building with its associated land clearing will measure approximately 120' x 1201. The building will be located 120-140' from the bulkheaded boat basin in Goose Creek and some 450' from the MHW level of the ORW bordering the AIWW. The sedimentation plan shows the deployment of a silt fence around the office building construction site. 10. ANTICIPATED IMPACTS: The applicant has calculated the total amount of impervious surfaces to be approximately 21.370 of the total 63 acre site. In order to meet production needs, the applicant plans to initiate immediately construction of those items outside of the CAMA permit jurisdiction. The project plans express the applicant's concern to control sedimentation and runoff. Construction activities within the AEC appear consistent with the CAMA Use Standards for Development within the extended Estuarine Shoreline AEC. Of importance is the 1001+ buffer zone that will be maintained between the surface waters of Goose Creek and the new development. Although the topography within the project site is relatively flat and the soils permeable, the 59,000 sq. ft. of land-disturbing activities can be accomplished with assurance that sediment runoff will not be a significant factor. PREPARED BY: JAMES L. 14ERCER DATE: NOVEMBER 15, 1990 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Hydra-Sports Address 100 Oceanside Drive City Nashville, State Zip 37204 Day phone TN 615-385-3652 Landowner or Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR 1507 , 11 1 N rip i ., 1 'C.n If you plan to build a marina, ATELMect,a?d-?j attach FormDCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? New work c. Will the project be for community, private, or commercial use? Commercial d. Describe the planned use of the project. Expansion of existing fiberglass boat manufacturing facility 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract Approximately 63 acres b. Size of individual lot(s) same c. Elevation of tract above mean sea level or National Geodetic Vertical Datum From 0 to 17.0' d. Soil type(s) and texture(s) of tract Fine to medium san s e. Vegetation on tract Pines, brush, marsh, grass b. City, town, community, or landmark f. Man-made features now on tract Buildings & Goose Creek - Onslow County accessories c. County Onslow d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Goose Creek @ Intercoastal Waterwa, 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) SA ORW Conservation Transitional X Developed Community Rural Other h. How is the tract zoned by local government? Industrial i. How are adjacent waters classified? SA & ORW a. Describe all development activities you propose (for j, Hasa professional archaeological survey been example, building a home, motel, marina, bulkhead, carried out for the tract? yes If so, by whom? Addition to existing boat manu- Approximately 1972 by North Carolina or pier). facturing plant and new office building History & Archives 12/89 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed 2 - 1 addition to manufacturing; 1 office building b. Number of lots or parcels 1 c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed Less than 1 acre e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. None g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. Asphalt and marl or paver stone h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. Existing septic tank and drain field designed for 300 employes is adequate in. Water supply source Onslow County n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW j. Have these facilities received state or local approval? Upland fill yes areas k. Describe existing treatment facilities. Septic tanks and drain field 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). Surface run off only b. Amount of material to be excavated from below water level in cubic yams 0 c. Type of material None d. Does the area to be excavated include marshland, swamps, or other wetlands? No e. High ground excavation, in cubic yards 1000 cy max. 2 12/89 f. Dimensions of spoil disposal area None g. Location of spoil disposal area None h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Willa disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? N/A k. Will the fill material be placed below mean high water? No 1. Amount of fill in cubic yards none M. Type of fill material N/A n. Source of fill material N/A o. Will fill material be placed on marsh or other wetlands? none p. Dimensions of the wetland to be filled none q. How will excavated or fill material be kept on site and erosion controlled? N/A r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Backhoe s. Will wetlands be crossed in transporting equipment to project site? NO If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap none c. Shoreline erosion during preceding 12 months, in feet none d. Typeofbulkheadmaterial existing e. Amount of fill, in cubic yards, to be placed below mean high water none f. Type of fill material none 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. b. Average distance waterward of mean high water or normal water level 455' from ORW line 122' from SA water Office 35' from SA water Mfg. Bldg. 1289 3 F F?n7 O ? ? ±I F Name N. F. Hurst Address Swansboro, NC Name Address Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Environment , Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 4 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the L3 ay of/0C_77?/jIe- Z , 19. 0. X Landowner or Authorized a t 12/89