Loading...
HomeMy WebLinkAbout20181739 Ver 1_Riparian Buffer Authorization Application_20181228 (2)Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 12/28/2018 9:24:21 AM (Start) Approve by Montalvo, Sheri A 12/28/2018 11:14:23 AM (NON DOT - Initial Review) • The task was assigned to Montalvo, Sheri A 12/28/2018 9:25 AM Original Submittal 12/28/2018 A. Owner/Applicant Information General Information Primary Contact Email: * ken@malpassandassociates.com Reese list the contact person's errail for questions or payrrent on this project if needed. Who is submitting the application?* r- Owner W Applicant other than Owner ❑ Agent Is there an agent working on this application C3 Yes but not submitting it?* M No 1. Property Owner Information: ............................................................................................. 1a. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* 2523555805 Bill Clark Fomes of Greenville LLC Lance Clark (for Corporations) Street Address 200 East Arlington Boulevard Address Line 2 Suite A City State / Province / Region Greenville NC Rbstal / Zip Code Country 27858 us 2. Applicant's Information (if different from owner): ......................................................................................................................................................................................................... 2a. Name:* Ken Malpass 2b. Company Affiliation: 2c. Mailing Address:* 1e. Email Address:* lance@billclarkhomes.com Malpass & Associates Street Address 1645 East Arlington Boulevard Address Line 2 Suite D qty Greenville Fbstal / Zip Code 27858 2d. Telephone:* 2527561780 State / Province / Region NC Country us ErvvWater Resources iION m111ALQU-11 A 2e. Email Address:* ken@malpassandassociates.com 2f. Attach a signed and dated copy of the authorization granting the applicant owner approval. An agent authorization form is acceptable. Click the upload button or drag and drop files here to attach docurrent DWRBUFF ERAL THORIZATIONSIGENDBYLANCECL... 230.95KB 12.21.2018. pdf PDF only B. Project Information and Prior Project History 1. Project Information 1a. Name of Project:* Paramore Farms Phases 4 and 5 (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1d. Subdivision Name: Paramore Farms 1e. Nearest Municipality: 1f. Property Size City of Greenville NC 19.28 acres 1g. County (or Counties) where the project is located:* Pitt 1h. Property ID# Date of Purchase PN 70417 6/13/2005 Tax RN or Parcel id 1 i. Deed Information -11 Type of Book Book#11 Page# Deed F 141-143 Map 64 138 144 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent MB64Pagel38-144.pdf 1006.14KB DB1926PAGE141.pdf 115.71 KB RDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Latitude * 35.557884 Longitude -77.381018 11. Is the project located in any of North Carolina's twenty coastal counties?* f Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Fork Swamp Canal 2b. Water Quality Classification of nearest receiving water:* C, Sw, NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 2,600 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Vacant field and wooded area 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docurrent p603con-northern-cluster_USGS-7-5 MINUT E -Q UAD- 352.93KB GREENVILLE-NC-2016. pdf FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docurrent p603con-northern-cluster_SOILS- MAP. pdf 3.65MB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Excavator to remove existing trees and brush and excavator to construct proposed swale. Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach docunent p603con-northern-cl u ste r- TOTALSETFORBUFF ERAUTHORIZATIONSUBMITT... 17AMB 12.27.2018.pdf p603con-northern-cluster- BUFF ER- IMPACT- MAP. pdf 118.13KB FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* r Yes f No 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known 11 Date Attach Corps Traci Wheeler 08/23/2009 (Naas if known) pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans 7a. Is this project a phased project?* r Yes r No 7b. If yes, explain* Paramore Farms Phases 1-3 have been completed and phases 4 and 5 as attached will be the final phases for the project. C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* C Neuse River Basin (15A NCAC 02B.0233) C Catawba River Basin (15A NCAC 02B.0243) C Randleman Lake Watershed (15A NCAC 0213.0250) C Tar -Pamlico River Basin (15A NCAC 0213.0259) r Jordan Lake Watershed (15A NCAC 0213.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type * Zone 1 Zone 2 Buffer Impact#1 Fork Permanent Allowable 2,693. 1,830. Nbp label (e.g. RDad Swamp (P) 00 00 Crossing 1) Canal F2rmorTerrp Square Square Feet Feet Total Zone 1 Impacts: 2,693.00 Total Zone 2 Impacts: 1,830.00 Total Buffer Impacts: 4,523.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization Ia. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Construction of wet detention pond. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Swale will be stabalized within 14 days of construction. Faircloth skimmer will be used to minimize any offsite sediment from the site during construction. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) 17 Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30% nitrogen 1c. Diffuse Flow Documentation* Clickthe upload button ordrag and drop files here toattach docurrent P60 3 F L O W RAT E S F O RO UT L ET PO ND VAR I O USST ... 3 38.72 K B FDF only F. Supplementary Information ......................................................................................................................................... Environmental Documentation ............ 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B.0200)? C' 2b. Is this an after -the -fact buffer authorization application? C Yes r No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* William K. Malpass Signature * lfrra�ox ��i 'a!{xzrr� Submission Date: (Auto populated field) Initial Review Is this accepted into the review process? Is this a public -funded transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes b No a Yes r No 20181739 1 David May:eads\dlmay Washington Regional Office - (252) 946-6481 F No Payment Needed r Fee Received r Need Fee - send electronic notification