Loading...
HomeMy WebLinkAbout20140333 Ver 1_Year 2 Monitoring Report 2017_20171206MONITORING YEAR 2 HOLMAN MILL MITIGATION SITE Alamance County, NC ANNUAL REPORT NCDEQ Contract 005795 Draft DMS ID No. 96316 Data Collection Period: January - October 2017 Draft Submission Date: November 14, 2017 Final Submission Date: PREPARED FOR: I 7k NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 7 as 143 MONITORING YEAR 2 HOLMAN MILL MITIGATION SITE Alamance County, NC ANNUAL REPORT NCDEQ Contract 005795 Draft DMS ID No. 96316 Data Collection Period: January - October 2017 Draft Submission Date: November 14, 2017 Final Submission Date: PREPARED FOR: I 7k NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED BY: WILDLANDS ENGINEERING 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Jason Lorch jlorch@wildlandseng.com Phone: 919.851.9986 EXECUTIVE SUMMARY Wildlands Engineering, Inc. (Wildlands) completed a full delivery project at the Holman Mill Mitigation Site (Site) for the North Carolina Department of Environmental Quality Division of Mitigation Services (DMS) to restore and enhance a total of 8,717 linear feet (LF) of perennial and intermittent stream in Alamance County, NC. It is anticipated that the Site will generate 3,884 Stream Mitigation Units (SMUs) through the restoration and enhancement of six unnamed tributaries (UT to Pine Hill Branch, UTI, UT1A, UT2, UT2A, and UT213). The project is located in the Cape Fear River Basin Hydrologic Unit Code (HUC) 03030002 (Cape Fear 02) near Snow Camp, NC (Figure 1) and is within the Cane Creek Targeted Local Watershed (TLW) (HUC 03030002050050). On-site streams flow into Cane Creek and eventually into the Haw River. The Site is located within the Jordan Lake Water Supply Watershed, which has been designated as a Nutrient Sensitive Water. The TLW was identified in DMS's Cape Fear River Basin Restoration Priorities 2009 (RBRP) report. This RBRP plan identifies agricultural operations and degraded water quality based on "fair" and "good -fair" benthic ratings as the impairments in the Cane Creek watershed. The RBRP report also identifies the successful completion of a number of stream and wetland projects within the Cane Creek watershed. The Site fully supports the Cataloging Unit (CU) -wide functional objectives stated in the 2011 Request for Proposals to reduce and control nutrient inputs, reduce and control sediment inputs, and protect and augment Significant Natural Heritage Areas in the Cape Fear 02 River Basin. The mitigation project is intended to provide numerous ecological benefits within the Cape Fear River Basin. While many of these benefits are limited to the Holman Mill Mitigation Site project area; others, such as pollutant removal and improved aquatic and terrestrial habitat, have more far-reaching effects. Expected improvements to water quality and ecological processes are outlined below as project goals and objectives. These project goals were established with careful consideration of the goals and objectives described in the RBRP and to meet the DMS's mitigation needs, while maximizing the ecological and water quality uplift within the watershed. The following project specific goals established in the mitigation plan (Wildlands, 2015) are to: • Reduce fecal coliform, nitrogen, and phosphorous inputs by removing cattle from streams and establishing and augmenting a forested riparian corridor to intercept and process sediment and nutrients before they reach the channel during storm events; • Reduce sediment loads by stabilizing eroding stream banks; • Return a network of streams to a stable form that is capable of supporting biological functions; • Install instream structures to improve bed and bank stability, create fish and macroinvertebrate habitat, and help oxygenate streamflows; and • Protect existing high quality streams and forested buffers. The project is helping meet the goals for the watershed and providing numerous ecological benefits within the Cape Fear River Basin. While many of these benefits are limited to the project area, others, such as pollutant removal and reduced sediment loading have farther -reaching effects. In addition, protected parcels downstream of this site promote cumulative project benefits within the watershed. The Site construction and as -built surveys were completed between January and April 2016. A conservation easement is in place on 32.4 acres of the riparian corridors to protect them in perpetuity. Monitoring Year 2 (MY2) assessments and site visits were completed between January and October 2017 to assess the conditions of the project. Overall, the Site has met the required vegetation and stream success criteria for MY2. The overall average stem density for the Site is 472 stems per acre and is therefore on track to meet the MY3 requirement of 320 stems per acre. All restored and enhanced WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT streams are stable and functioning as designed. Hydrologic monitoring stations with crest gages and pressure transducers were installed on the Site to document bankfull events on the restoration reaches. Multiple bankfull events were recorded on all restoration reaches during MY2 and two bankfull events were recorded on each reach during MY1, resulting in attainment of the MY7 stream hydrology success criteria. WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT HOLMAN MILL MITIGATION SITE Monitoring Year 2 Annual Report TABLE OF CONTENTS Section 1: PROJECT OVERVIEW.......................................................................................................1-1 Figure 1 1.1 Project Goals and Objectives.....................................................................................................1-1 Project Component / Asset Map 1.2 Monitoring Year 2 Data Assessment..........................................................................................1-2 Table 2 1.2.1 Vegetative Assessment......................................................................................................1-2 Project Contact Table 1.2.2 Vegetation Areas of Concern.............................................................................................1-2 Table 12a -d 1.2.3 Stream Assessment............................................................................................................1-3 Cross Section Plots 1.2.4 Stream Areas of Concern...................................................................................................1-3 1.2.5 Hydrology Assessment.......................................................................................................1-3 1.2.6 Maintenance Plan..............................................................................................................1-3 1.3 Monitoring Year 2 Summary......................................................................................................1-3 Section2: METHODOLOGY.............................................................................................................2-1 Section3: REFERENCES...................................................................................................................3-1 APPENDICES Appendix 1 General Figures and Tables Figure 1 Project Vicinity Map Figure 2 Project Component / Asset Map Table 1 Project Components and Mitigation Credits Table 2 Project Activity and Reporting History Table 3 Project Contact Table Table 4 Project Information and Attributes Appendix 2 Visual Assessment Data Figure 3.0-3.2 Integrated Current Condition Plan View Table 5a -f Visual Stream Morphology Stability Assessment Table Table 6 Vegetation Condition Assessment Table Appendix 4 Stream Photographs Table 10a -c Vegetation Photographs Appendix 3 Vegetation Plot Data Table 7 Vegetation Plot Criteria Attainment Table Table 8 CVS Vegetation Tables - Metadata Table 9 Planted and Total Stem Counts Appendix 4 Morphological Summary Data and Plots Table 10a -c Baseline Stream Data Summary Table 11 Morphology and Hydraulic Summary (Dimensional Parameters — Cross Section) Table 12a -d Monitoring Data — Stream Reach Data Summary Cross Section Plots Reachwide and Cross Section Pebble Count Plots Appendix 5 Hydrology Summary Data Table 13 Verification of Bankfull Events Monthly Rainfall Data WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT iii Section 1: PROJECT OVERVIEW The Holman Mill Mitigation Site (Site) is located in the southern portion of Alamance County, southeast of Snow Camp off of Holman Mill Road (Figure 1). The Site is located within the Jordan Lake Water Supply Watershed (HUC 03030002050050) which has been designated as a Nutrient Sensitive Water. The Site is in in the Carolina Slate Belt of the Piedmont Physiographic Province (USGS, 1998). The project watershed consists primarily of agricultural and wooded land. The drainage area for project site is 1,077 acres (1.68 square miles). The project streams consist of six unnamed tributaries to Pine Hill Branch. Stream restoration reaches included UT1 (Reach 1 and 3), UT2 (Reach 3 and 4) and UT2A. Stream enhancement I (EI) and enhancement 11 (Ell) reaches included UTI (Reach 2 and 4), Ell; UT2 (Reach 1), Ell; UT2 (Reach 2), E1; UT213, Ell; UT1A, Ell; and UT to Pine Hill Branch, Ell. Mitigation work within the Site included restoration and enhancement of 8,717 linear feet (LF) of perennial and intermittent stream channels. The riparian areas were planted with native vegetation to improve habitat and protect water quality. The final mitigation plan was submitted and accepted by the DMS in May 2015. Construction activities were completed by Land Mechanic Designs, Inc. in March 2016. Planting and seeding activities were completed by Bruton Natural Systems, Inc. in March 2016. Baseline monitoring (MYO) was conducted between January 2016 and April 2016. Annual monitoring will occur for seven years with the close-out anticipated to commence in 2023 given the success criteria are met. Appendix 1 provides more detailed project activity, history, contact information, and watershed/site background information for the Site. A conservation easement (32.4 ac; Deed Book 3472, Page 968; Deed Book 3472, Page 951) has been recorded and is in place along the stream riparian corridors to protect them in perpetuity within two tracts; a tract owned by the Russell B. Hadley Revocable Trust and a tract owned by the M. Darryl Lindley Revocable Trust, respectively. The project is expected to provide 3,884 SMU's by closeout. A project vicinity map and directions are provided in Figure 1 and project components are illustrated in Figure 2. 1.1 Project Goals and Objectives Prior to construction activities, the streams and vegetative communities on the Site had been severely impacted due to direct livestock access to the streams and riparian zones. Table 4 in Appendix 1 and Tables 10a through 10c in Appendix 4 present the pre -restoration conditions in detail. This Site is intended to provide numerous ecological benefits within the Cape Fear River Basin. While many of these benefits are limited to the Holman Mill Site area, others such as pollutant removal and reduced sediment loading have more far-reaching effects. Expected improvements to water quality and ecological processes are outlined below as project goals and objectives. These project goals were established with careful consideration of goals and objectives that were described in the RBRP and to meet the DMS mitigation needs while maximizing the ecological and water quality uplift within the watershed. The following project goals and related objectives established in the mitigation plan (Wildlands, 2015) included: The primary project goals will be: • Reduce fecal coliform, nitrogen, and phosphorous inputs by removing cattle from streams and establishing and augmenting a forested riparian corridor to intercept and process sediment and nutrients before they reach the channel during storm events; • Reduce sediment loads by stabilizing eroding stream banks; WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT 1-1 • Return a network of streams to a stable form that is capable of supporting biological functions; • Install instream structures to improve bed and bank stability, create fish and macroinvertibrate habitat, and help oxygenate streamflows; and • Protect existing high quality streams and forested buffers. Secondary project objectives are expected to include: • Improving instream nutrient cycling by incorporating woody debris into constructed riffles and bank stabilization measures; • Reducing thermal loadings through establishment of riparian shading; • Reconnecting channels with floodplains to raise the local water table; and • Create and implement a stream and riparian area restoration design that is both natural and aesthetically pleasing. 1.2 Monitoring Year 2 Data Assessment Annual monitoring and quarterly site visits were conducted during MY2 to assess the condition of the project. The vegetation and stream success criteria for the Site follows the approved success criteria presented in the Holman Mill Mitigation Project Mitigation Plan (Wildlands, 2015). 1.2.1 Vegetative Assessment Planted woody vegetation is being monitored in accordance with the guidelines and procedures developed by the Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008). A total of 12 standard 10 -meter by 10 -meter vegetation plots were established during the baseline monitoring within the project easement area. The final vegetative success criteria will be the survival of 210 planted stems per acre at the end of the seven-year monitoring period (MY7). The interim measure of vegetative success will be the survival of at least 320 planted stems per acre at the end of year three of the monitoring period (MY3) and at least 260 stems per acre at the end of the fifth year of monitoring (MY5). Planted vegetation must average 10 feet in height at the end of the seventh year of monitoring. If this performance standard is met by MY5 and stem density is trending towards success (i.e., no less than 260 five-year-old stems per acre), monitoring of vegetation on the Site may be terminated provided written approval is provided by the United States Army Corps of Engineers in consultation with the NC Interagency Review Team. The MY2 vegetative survey was completed in August 2017. The 2017 vegetation monitoring resulted in an average stem density of 472 stems per acre which is well above the interim requirement of 320 stems per acre required at MY3 and approximately 25% less than the baseline density recorded (634 stems per acre). When including volunteer stems, the average stems per acre is 620. This is well above the MY3 interim requirement of 320 stems per acre. There is an average of 11 stems per plot as compared to 15 stems per plot in MYO. Eleven of the twelve vegetation plots are on track to meet the success criteria required for MY7 (Table 9, Appendix 3). Vegetation plot 12 did not meet the interim success criteria of 320 planted stems per acre. However, when counting volunteer trees vegetation plot 12 meets the interim success criteria. Refer to Appendix 2 for vegetation plot photographs and the vegetation condition assessment table and Appendix 3 for vegetation data tables. 1.2.2 Vegetation Areas of Concern Vegetation plot 12 will not meet the MY3 interim success criteria of 320 planted stems per acre. The primary reason for this plot not meeting is due to the poor survival rates of tulip poplar (Liriodendron tulipifera) of which comprised five of the fifteen trees planted in this plot. All five tulip poplars were either dead or missing during MY2. Additionally, there was significant competition from herbaceous WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT 1-2 vegetation within the plot which out competed some of the planted trees. However, with inclusion of volunteer species there are 486 stems per acre which is well above the MY3 interim success criteria of 320 stems per acre. This area will be monitored in subsequent years and corrective actions will be taken if deemed necessary. 1.2.3 Stream Assessment Morphological surveys for MY2 were conducted in March 2017 and all streams within the Site are stable. Cross sections at the Site show little to no change in the bankfull area, maximum depth ratio, or width -to -depth ratio. Bank height ratios fall within the appropriate Rosgen stream type parameters. Substrate materials in the restoration and enhancement reaches indicated maintenance of coarser materials in the riffle reaches and finer particles in the pools. Longitudinal profile surveys are not required on the project unless visual inspection indicates reach wide vertical instability. Refer to Appendix 2 for the visual stability assessment table, Current Condition Plan View (CCPV) map, and stream photographs. Refer to Appendix 4 for the morphological data and plots. 1.2.4 Stream Areas of Concern No stream areas of concern were identified during MY2. 1.2.5 Hydrology Assessment At the end of the seven-year monitoring period, two or more bankfull events must have occurred in separate years within the restoration reaches. Multiple bankfull events were recorded on all restoration reaches during MY2 and two bankfull events were recorded on each reach during MY1, resulting in attainment of the stream hydrology assessment criteria. Refer to Appendix 5 for hydrologic data. 1.2.6 Maintenance Plan No maintenance plan is necessary at this time. 1.3 Monitoring Year 2 Summary Eleven of the 12 vegetation plots are on track to meet the MY3 interim requirement of 320 planted stems per acre as noted in CCPV. When including volunteer species all 12 vegetation plots meet the MY3 interim requirement. All streams within the Site are stable and functioning as designed. Multiple bankfull events in separate years have been documented on all restored stream reaches at the Site, resulting in fulfillment of the hydrologic success criteria. Summary information and data related to the performance of various project and monitoring elements can be found in the tables and figures in the report appendices. Narrative background and supporting information formerly found in these reports can be found in the Mitigation Plan documents available on DMS's website. All raw data supporting the tables and figures in the appendices are available from DMS upon request. WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT 1-3 Section 2: METHODOLOGY Geomorphic data was collected following the standards outlined in The Stream Channel Reference Site: An Illustrated Guide to Field Techniques (Harrelson et al., 1994) and in the Stream Restoration: A Natural Channel Design Handbook (Doll et al., 2003). All Integrated Current Condition Mapping was recorded using a Trimble handheld GPS with sub -meter accuracy and processed using Pathfinder and ArcGIS. Crest gages and pressure transducers were installed in surveyed riffle cross sections and monitored quarterly. Hydrologic monitoring instrument installation and monitoring methods are in accordance with the United States Army Corps of Engineers (USACE, 2003) standards. Vegetation monitoring protocols followed the Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008). WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT 2-1 Section 3: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration A Natural Channel Design Handbook. Harrelson, C.C., Rawlins, C.L., Potyondy, J.P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM -245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. 61 p. Lee, M.T., Peet, R.K., S.D., Wentworth, T.R. 2008. CVS-EEP Protocol for Recording Vegetation Version 4.2. Retrieved from http://cvs.bio.unc.edu/protocol/cvs-eep-protocol-v4.2-lev1-5.pdf. Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. Rosgen, D.L. 1997. A Geomorphological Approach to Restoration of Incised Rivers. Proceedings of the Conference on Management of Landscapes Disturbed by Channel Incision. Center For Computational Hydroscience and Bioengineering, Oxford Campus, University of Mississippi, Pages 12-22. United States Army Corps of Engineers. 2003. Stream Mitigation Guidelines. USACE, NCDENR-DWQ, USEPA, NCWRC. United States Geological Survey. 1998. North Carolina Geology. http://www.geology.enr.state.nc.us/usgs/carolina.htm Wildlands Engineering, Inc. 2016. Holman Mill Mitigation Site Baseline Monitoring Document and As - Built Baseline Report. DMS, Raleigh, NC. Wildlands Engineering, Inc. 2015. Holman Mill Mitigation Project Mitigation Plan. DMS, Raleigh, NC. WHolman Mill Mitigation Site Monitoring Year 2 Annual Report - DRAFT 3-1 APPENDIX 1. General Figures and Tables C c11T11=` 03030002050050 Hydrologic Unit Code (14) DMS Targeted Local Watersheds - Project Area oo 3 J i.l T CID •', 'ate U CL `Audi �! 03030003070010 ;, H -i The subject project site is an environmental restoration site of the NCDEQ Division of Mitigation Services (DMS) and is encompassed by a recorded conservation easement, but is bordered by land under private ownership. Accessing the site may require traversing areas near or along the easement boundary and therefore access by the general public is not permitted. Access by authorized personnel of state and federal agencies or their designees/contractors involved in the development, oversight, and stewardship of the restoration site is permitted within the terms and timeframes of their defined roles. Any intended site visitation or activity by any person outside of these previously sanctioned roles and activites requires prior coordination with DMS. �IVWILDLANDS ENGINEERING rk� _ter nen �nnn nn cnn�n C����' %7 Directions: From Raleigh, NC, take 1-40 West towards Durham. Take exit 273A for NC -54 West toward Chapel Hill. 1^` ` Travel approximately three miles and turn right to follow NC -54 West. Travel approximately 3.9 miles, take the Jones Ferry Road exit towards Carrboro. At the end of the ramp, turn left onto Jones Ferry Road and continue 0.9 miles. Turn right onto Old Greensboro Road. Travel 17.9 miles and turn left onto Holman Mill Road. Travel approximately 3.3 miles; the entrance to the Site is located on the left before reaching Clark Road. Figure 1 Project Vicinity Map Holman Mill Mitigation Site 0 0.5 1 Miles DMS Project No. 96316 1 1 1 Monitoring Year 2 - 2017 Alamance County, NC ! T!W 4J. ;,„ �Kr� r, .. , ol i' ♦•� each? � 7 r29 UT2 Reach 4 1 UT2 Reach 3 j � � 1 � m j � m 1 IZ 1 1 r 1 1 ° I 1 J 1 1 j j Table 1. Project Components and Mitigation Credits Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Stream RiparianWetland MITIGATIONr parian Non -Riparian Wetland Buffer Nitrogen Nutrient Phosphorous Nutrient Offset p Offset Type R RE R RE R RE HEMENNEEMEMM Totals 3,884 N/A N/A N/A N/A N/A N/A N/A N/A PROJECT• •• As -Built Stationing/ Existing Footage/ Credits Reach ID Location Acreage Approach Restoration or Restoration Equivalent Restoration Footage / Acreage Mitigation Ratio (SMU / WMU) STREAMS UTto Pine Hill Branch 600+00-635+26 3,526 Ell Restoration 3,526 5 705 UT1 Reach 1 100+00-102+08 215 P1 Restoration 208 1 208 UT1 Reach 2 102+08 -106+31 433 Ell Restoration 423 2.5 169 UT1 Reach 3 106+31-109+40 331 Pi Restoration 309 1 309 UT1 Reach 4 109+40 -125+98 1,687 Ell Restoration 1,658 2.5 663 UT1A 400+00-400+94 84 Ell Restoration 94 2.5 38 UT2A 300+00-305+40 468 P1 Restoration 540 1 540 UT2 Reach 200+00-205+88 588 Ell Restoration 588 2.5 235 UT2 Reachl 205+88-208+81 298 E1 Restoration 293 1.5 195 UT2 Reach 208+81-213+63 396 Pi Restoration 482 1 482 UT2 Reach 213+63-215+30 242 Pi Restoration 167 1 167 UT2B 500+00-504+29 429 Ell Restoration 429 2.5 172 Restoration Level Stream (LF) Riparian Wetland (acres) Non -Riparian Wetland (acres) Buffer (acres) Upland (acres) Riverine Non-Riverine Restoration 1,706 - - - - - Enhancement - - - - - Enhancementl 293 Enhancement II 6,718 ----------------------------- Creation - - - Preservation - - - - - HighQualityPreservation - - - - - Table 2. Project Activity and Reporting History Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Activity or Report Date Collection Complete Completion or Scheduled Delivery Mitigation Plan April 2014 -April 2015 May 2015 Final Design - Construction Plans May 2015 - October 2015 October 2015 Construction January 2016 - March 2016 March 2016 Temporary S&E mix applied to entire project area' March 2016 March 2016 Permanent seed mix applied to reach/segments' March 2016 March 2016 Bare root and live stake plantings for reach/segments March 2016 March 2016 Baseline Monitoring Document (Year 0) Stream Survey Vegetation Survey March 2016 May 2016 March 2016 Year 1 Monitoring Stream Survey Vegetation Survey September 2016 December 2016 September 2016 Year 2 Monitoring Stream Survey Vegetation Survey March 2017 December 2017 August 2017 Year 3 Monitoring Stream Survey Vegetation Survey 2018 December 2018 2018 Year 4 Monitoring Stream Survey Vegetation Survey 2019 December 2019 2019 Year 5 Monitoring Stream Survey Vegetation Survey 2020 December 2020 2020 Year 6 Monitoring Stream Survey Vegetation Survey 2021 December 2021 2021 Year 7 Monitoring Stream Survey Vegetation Survey 2022 December 2022 2022 'Seed and mulch is added as each section of construction is completed. Table 3. Project Contact Table Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Wildlands Engineering, Inc. Designer 312 West Millbrook Road, Suite 225 Angela Allen, PE Raleigh, NC 27609 919.851.9986, ext. 106 Land Mechanic Designs, Inc. Construction Contractor 126 Circle G Lane Willow Spring, NC 27592 Bruton Natural Systems, Inc Planting Contractor P.O. Box 1197 Fremont, NC 27830 Land Mechanic Designs, Inc. Seeding Contractor 126 Circle G Lane Willow Spring, NC 27592 Seed Mix Sources Green Resource, LLC Nursery Stock Suppliers Bare Roots Dykes and Son Nursery Live Stakes Bruton Natural Systems, Inc Monitoring Performers Wildlands Engineering, Inc. Monitoring, POC Jason Lorch 919.851.9986, ext. 107 Table 4. Project Information and Attributes Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 PROJECT• • Project Name Holman Mill Mitigation Site County Alamance County Project Area (acres) 32.4 Acres Project Coordinates (latitude and longitude) 35°51'310.12"N, 79°23'16.00"W PROJECT• Physiographic Province SUMMARY INFORMATION Carolina Slate Belt of the Piedmont Physiographic Province River Basin Cape Fear River USGS Hydrologic Unit 8 -digit 03030002 USGS Hydrologic Unit 14 -digit 03030002050050 DWR Sub -basin 03-06-04 Project Drainage Area (acres) 1,077 Project Drainage Area Percentage of Impervious Area 3% CGIA Land Use Classification 49% Forested/Scrubland, 42%Agriculture/Managed Herbaceous, 4% Pasture, 3% Watershed Impervious Cover, 2% Residential, <1% Open Water Parameters UT to Pine UT1 UT1A UT2 UT2A UT26 Hill Branch Length of reach (linear feet) - Post -Restoration 3,526 2,598 94 1,530 540 429 Drainage area (acres) 1,077 102 20 130 47 18 NCDWR stream identification score 44.5 33.5/30.5 25.5 35 36.75 26.5 NCDWR Water Quality Classification N/A Morphological Desription (stream type) P P I P P I Evolutionary trend (Simon's Model) - Pre- Restoration 1 II NA III/IV III/IV I NA Underlying mapped soils Georgeville silty clay loam, Local alluvial land, Herndon silt loam, Goldston Channery silt loam Drainage class --- --- --- --- Soil Hydric status --- --- Slope --- --- --- --- --- ;E�j FEMA classification AE I --- I AE AE --- Native vegetation community Piedmont bottomland forest, Bottomland hardwood forest Percent composition exotic invasive vegetation - Post -Restoration REGULATORY• Regulation 0% 1 • Applicable.3,. Resolved? Supporting Documentation Waters of the United States - Section 404 Yes Yes USACE Nationwide Permit No.27 and DWQ 401 Water Quality Certification No. 3885. Waters of the United States - Section 401 Yes Yes Division of Land Quality (Dam Safety) No N/A N/A Endangered Species Act Yes Yes Holman Mill Mitigation Plan (2015); Wildlands determined "no effect" on Alamance County listed endangered species. Historic Preservation Act Yes Yes No historic resources were found to be impacted (letter from SHPO dated 3/24/14). Coastal Zone Management Act (CZMA)/Coastal Area Management Act (LAMA) No N/A N/A FEMA Floodplain Compliance Yes Yes UT to Pine Hill Branch and portions of UT2 and UT2A are located within the floodway and flood fringe (FEMA Zone AE, FIRM panel 8786). Essential Fisheries Habitat I No I N/A N/A APPENDIX 2. Visual Assessment Data ,1 .i WWII 2016 Aerial Photography _._._.-.-------._._ ._*_ �heet 2 &PZ �*AMU each 4 Ch 0000 _ s . t'!� _ - _ �� *��•i •�•UT2 Reach 3w•w.w. *. 1 • ••• * � I / , w• e 1 ¢A. 1 10 w,Re •�• •.e,+ch 3 CD i w•w•w. * _ w •w• r ; i ------•---------•--- --- --- ---• tea•—-�r-—•——--------------.i w.w•w• * •�•w each •� *� / i � i , OWN•PP 3,k,�•�(/`�` each •�•o._._.__._._._._.�•�•�'�T1 (leach 3 PPS PP 9 ...r.. t •, •UT1 Reach 2• i ` * * PP 10 PP 11 'e•�•�•���' �. i PP A' - PP 5, PP 13 _ i -�� , f * \ * •tea._•_•_•_•_•_._. _.�.i ���*3q ji;. _ i`,� �, �( *� I'.�•�•�.�•`• * PP1,2 _ •1. *� PP 14 1 �' J�4�•` ��.o•''• •�. _ UTI Reach 4 ------------------- J' t { _ 2016 Aerial Photography 4 ♦ �7 u•'* 1 NPP 2 A* 6Aerial Photography • r-tia ... r. PP 6 r� U7,1 Reach3'�•_.. PP 7 A i PP 8 C7 PP 9 C3 PP 11 12 - PP 42 PP 33 PP 34- ReaCh ��O ♦�- PP. 29 PP 44 UT2 Reach 4 *� j `e PP 32 .e * .. _ _ ._ PP 35 PP 36 _. -�q •• '� , I PP 40 A i ! I �.` PP 45 *�-� PP 41 1� 1 P�28 i•d� i .e e * * Rea C h +ee UTZ PP 3$PP,439\ PP 27 1 PP 31 e' �•.. Reach * ? ���'�. 4 eye• �.e•�•�'�'...w,`♦ 1 _ _ _ �• PP 26 e•+- 6 AAA Al 1 1 1 I j I 1 ( I PP 25 j 1 * 1 . 1 1 1 1 1 I 1 1 PP 11 12 - Table 5a. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UTI 'Excludes constructed riffles since they are evaluated in section 1. -Category Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III Stabiiz� in_ V Woody egetationi lo.ta.e-ilh Stabilizing Wood Vegetation Adjust % Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation 0 0 100% 2. Riffle Condition Texture/Substrate 14 14 100% 3. Meander Pool Depth Sufficient 13 13 100% Condition Length Appropriate 13 13 100% Thalweg centering at upstream of meander bend Run 12 12 100% 4. Thalweg Position Thalweg centering at downstream of meander bend Glide 13 13 100% 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 0 100% n/a n/a n/a 3. Engineered Structures Structures physically intact with no 1. Overall Integrity dislodged boulders or logs. 10 10 100% Grade control structures exhibiting 2. Grade Control maintenance of grade across the sill. 10 10 100% Structures lacking any substantial flow 2a Piping underneath sills or arms. 30 30 100% Bank erosion within the structures 3. Bank Protection extent of influence does not exceed 10 10 100% 15%. Pool forming structures maintaining -Max Pool Depth : Bankfull Depth >_ 1.6 4. Habitat Rootwads/logs providing some cover at 30 30 100% baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 5b. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT1A 'Excludes constructed riffles since they are evaluated in section 1. -Category Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III n_ Stabiiz� V Woody egetationi lo.t..e-ilh Stabilizing Wood Vegetation Adjust % Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation o 0 100% 2. Riffle Condition Texture/Substrate 3 3 100% 3. Meander Pool Depth Sufficient n/a n/a n/a Condition Length Appropriate n/a n/a n/a Thalweg centering at upstream of n/a n/a n/a 4. Thalweg Position meanderbend Run Thalweg centering at downstream of n/a nla n/a meander bend Glide 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 1 0 100% 1 /a n/a n/a 3. Engineered Structures' Structures physically intact with no 1. Overall Integrity dislodged boulders or logs. n/a n/a n/a Grade control structures exhibiting 2. Grade Control maintenance of grade across the sill. n/a n/a n/a Structures lacking any substantial flow 2a. Piping underneath sills or arms. n/a n/a n/a Bank erosion within the structures 3. Bank Protection extent of influence does not exceed n/a n/a n/a 15%. Pool forming structures maintaining -Max Pool Depth : Bankfull Depth 2 1.6 4. Habitat Rootwads/logs providing some cover at n/a n/a n/a baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 5c. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT2 'Excludes constructed riffles since they are evaluated in section 1. -Category Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III m_ Stabiiz� V Woody egetationi IF..t..e-I1h Stabilizing Wood Vegetation Adjust % Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation o 0 100% 2. Riffle Condition Texture/Substrate 14 14 100% 3. Meander Pool Depth Sufficient 10 10 100% Condition Length Appropriate 10 10 100% Thalweg centering at upstream of meander bend Run 13 13 100% 4. Thalweg Position Thalweg centering at downstream of meander bend Glide 13 13 100% 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 1 0 100% n/a n/a n/a 3. Engineered Structures' Structures physically intact with no 1. Overall Integrity dislodged boulders or logs. 3 3 100% Grade control structures exhibiting 2. Grade Control maintenance of grade across the sill. 3 3 100% Structures lacking any substantial flow 2a. Piping underneath sills or arms. 3 3 100% Bank erosion within the structures 3. Bank Protection extent of influence does not exceed 3 3 100% 15%. Pool forming structures maintaining -Max Pool Depth : Bankfull Depth 2 1.6 4. Habitat Rootwads/logs providing some cover at 3 3 100% baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 5d. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT2A 'Excludes constructed riffles since they are evaluated in section 1. -Category Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III n_ stabiiz� V Woody egetationi lo.t..e-ilh Stabilizing Wood Vegetation Adjust % Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation o 0 100% 2. Riffle Condition Texture/Substrate 11 11 100% 3. Meander Pool Depth Sufficient 10 10 100% Condition Length Appropriate 10 10 100% Thalweg centering at upstream of meander bend Run 11 11 100% 4. Thalweg Position Thalweg centering at downstream of meander bend Glide 10 10 100% 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 1 0 100% n/a n/a n/a 3. Engineered Structures' Structures physically intact with no 1. Overall Integrity dislodged boulders or logs. 2 2 100% Grade control structures exhibiting 2. Grade Control maintenance of grade across the sill. 2 2 100% Structures lacking any substantial flow 2a. Piping underneath sills or arms. 2 2 100% Bank erosion within the structures 3. Bank Protection extent of influence does not exceed 2 2 100% 15%. Pool forming structures maintaining -Max Pool Depth : Bankfull Depth 2 1.6 4. Habitat Rootwads/logs providing some cover at 2 2 100% baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 5e. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT2B 'Excludes constructed riffles since they are evaluated in section 1. -Category Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III n_ stabiiz� V Woody egetationi IF..t..e-I1h Stabilizing Wood Vegetation Adjust % 1,01 Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation 0 0 100% 2. Riffle Condition Texture/Substrate n/a n/a n/a 3. Meander Pool Depth Sufficient n/a n/a n/a Condition Length Appropriate n/a n/a n/a Thalweg centering at upstream of n/a n/a n/a 4. Thalweg Position meanderbend Run Thalweg centering at downstream of n/a nla n/a meander bend Glide 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 1 0 100% 1 /a n/a n/a 3. Engineered Structures' Structures physically intact with no 1. Overall Integrity dislodged boulders or logs. n/a n/a n/a Grade control structures exhibiting 2. Grade Control maintenance of grade across the sill. n/a n/a n/a Structures lacking any substantial flow 2a. Piping underneath sills or arms. n/a n/a n/a Bank erosion within the structures 3. Bank Protection extent of influence does not exceed n/a n/a n/a 15%. Pool forming structures maintaining -Max Pool Depth : Bankfull Depth 2 1.6 4. Habitat Rootwads/logs providing some cover at n/a n/a n/a baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 5f. Visual Stream Morphology Stability Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT to Pine Hill Branch M"M Metric Number Stable, Performing as Intended Total Number in As -Built Number o Unstable table Segmen 'Its Amount of Unstable Footage % Stabi , Performing as Intended Number III n_ Stabiiz� V Woody egetationi lo.t..e-ilh Stabilizing Wood Vegetation Adjust % 41 Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability Aggradation 0 0 100% (Riffle and Run Units) Degradation 0 0 100% 2. Riffle Condition Texture/Substrate n/a n/a n/a Depth Sufficient n/a n/a n/a 3. Meander Pool Condition Length Appropriate n/a n/a n/a Thalweg centering at upstream of meanderbend Run Thalweg centering at downstream of meander bend Glide n/a n/a n/a nla n/a n/a 4. Thalweg Position 2. Bank Bank lacking vegetative cover resulting 1. Scoured/Eroded simply from poor growth and/or scour 0 0 100% n/a n/a n/a and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. 2. Undercut Does NOT include undercuts that are 0 0 100% n/a n/a n/a modest, appear sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% n/a n/a n/a Totals 0 1 0 100% 1 /a n/a n/a 3. Engineered Structures' 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. n/a n/a n/a 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. n/a n/a n/a 2a. Piping Structures lacking any substantial flow underneath sills or arms. n/a n/a n/a Bank erosion within the structures 3. Bank Protection extent of influence does not exceed n/a n/a n/a 15%. Pool forming structures maintaining 4. Habitat -Max Pool Depth : Bankfull Depth 2 1.6 Rootwads/logs providing some cover at n/a n/a n/a baseflow. 'Excludes constructed riffles since they are evaluated in section 1. Table 6. Vegetation Condition Assessment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Planted Acreage 14 Vegetation Category Definitions Mapping Threshold (Ac) Mho 0 0 Acreage 0% Bare Areas Very limited cover of both woody and herbaceous material 0.1 Woody stem densities clearly below target levels based on MY3, 4, or 5 stem count Low Stem Density Areas 0.1 0 0 0% criteria. Total 0 0 0% Areas with woody stems of a size class that are obviously small given the monitoring Areas of Poor Growth Rates or Vigor 0.25 Ac 0 0 0% year. Cumulative Total 0 0.0 0% Easement Acreaee 32.4 Invasive Areas of Concern JAreas of points (if too small to render as polygons at map scale). 1 1,000 1 0 1 0 1 0% Easement Encroachment Areas JAreas of points (if too small to render as polygons at map scale). I none 1 0 1 0 1 0% Stream Photographs PHOTO POINT 1— looking upstream (03/07/2017) I PHOTO POINT 1— looking downstream (03/07/2017) PHOTO POINT 2 — looking upstream (03/07/2017) PHOTO POINT 2 — looking downstream (03/07/2017) PHOTO POINT 3 — looking upstream (03/07/2017) PHOTO POINT 3 — looking downstream (03/07/2017) PHOTO POINT 4 — looking upstream (03/07/2017) PHOTO POINT 4 — looking downstream (03/07/2017) PHOTO POINT 5 — looking upstream (03/07/2017) 1 PHOTO POINT 5 — looking downstream (03/07/2017) PHOTO POINT 6 — looking upstream (03/07/2017) PHOTO POINT 6 — looking downstream (03/07/2017) PHOTO POINT 7 — looking upstream (03/07/2017) PHOTO POINT 7 — looking downstream (03/07/2017) PHOTO POINT 8 — looking upstream (03/07/2017) 14 PHOTO POINT 8 — looking downstream (03/07/2017) PHOTO POINT 9 — looking upstream (03/07/2017) PHOTO POINT 9 — looking downstream (03/07/2017) PHOTO POINT 10 — looking upstream (03/07/2017) 1 PHOTO POINT 10 — looking downstream (03/07/2017) PHOTO POINT 11— looking upstream (03/07/2017) PHOTO POINT 11— looking downstream (03/07/2017) PHOTO POINT 12 — looking upstream (03/07/2017) PHOTO POINT 12 — looking downstream (03/07/2017) PHOTO POINT 13 — looking upstream (03/07/2017) PHOTO POINT 13 — looking downstream (03/07/2017) PHOTO POINT 14 — looking upstream (03/07/2017) 1 PHOTO POINT 14 — looking downstream (03/07/2017) PHOTO POINT 15 — looking upstream (03/07/2017) PHOTO POINT 15 — looking downstream (03/07/2017) PHOTO POINT 16 — looking upstream (03/07/2017) 1 PHOTO POINT 16 — looking downstream (03/07/2017) PHOTO POINT 17 — looking upstream (03/07/2017) PHOTO POINT 17 — looking downstream (03/07/2017) PHOTO POINT 18 — looking upstream (03/07/2017) ;lk 127, t 5 Y✓� X I{}��. moi+.' yy,Y `y , ��. -i" • • • . 1 1 1 • • • • • 1 1 1 f i �n y � 4,44 S r� �P F, �l is ' ' y' ZA r� �P F, �l is ' ' PHOTO POINT 22 — looking upstream (03/07/2017) 1 PHOTO POINT 22 — looking downstream (03/07/2017) PHOTO POINT 23 — looking downstream (03/07/2017) PHOTO POINT 25 — looking upstream (03/07/2017) 1 PHOTO POINT 25 — looking downstream (03/07/2017) PHOTO POINT 26 — looking upstream (03/07/2017) 1 PHOTO POINT 26 — looking downstream (03/07/2017) PHOTO POINT 27 — looking upstream (03/07/2017) PHOTO POINT 27 — looking downstream (03/07/2017) PHOTO POINT 28 — looking upstream (03/07/2017) 1 PHOTO POINT 28 — looking downstream (03/07/2017) PHOTO POINT 29 — looking upstream (03/07/2017) 1 PHOTO POINT 29 — looking downstream (03/07/2017) PHOTO POINT 30 — looking upstream (03/07/2017) PHOTO POINT 30 — looking downstream (03/07/2017) r y yg� YG � C C y 7 '' ; adv l� "a g K � ,� - �� i f �:. 4 : 1• ISy ��',la � ' y � ��. ,�' � � '� +. � � �� � ��� U � Wk i 'S C Y 8 Y � •iP' • " ,� r l - 4 N • ••law3mrone . 1 1 1 • ••10 1 &J IM Lois]1 1 1 'w �r� r C`':.- `ems" �� .�, .✓.� �� Y- �; ,. _..> �'. .. � r a - 't'3 1# t�'>si� �yJ.� -�, m, i -0e• .p;r ; j� 'aa,.� � ,,�� ��� �' � -_ Yom- $-° ,, ��; ♦ � 'rr � _ 5 �? y �f F' r �' J Ia s a � PHOTO POINT 34 — looking upstream (03/07/2017) 1 PHOTO POINT 34 — looking downstream (03/07/2017) PHOTO POINT 35 — looking downstream (03/07/2017) PHOTO POINT 36 — looking upstream (03/07/2017) PHOTO POINT 36 — looking downstream (03/07/2017) PHOTO POINT 37 — looking upstream (03/07/2017) PHOTO POINT 37 — looking downstream (03/07/2017) PHOTO POINT 38 — looking upstream (03/07/2017) 1 PHOTO POINT 38 — looking downstream (03/07/2017) PHOTO POINT 39 — looking upstream (03/07/2017) PHOTO POINT 39 — looking downstream (03/07/2017) PHOTO POINT 40 — looking upstream (03/07/2017) 1 PHOTO POINT 40 — looking downstream (03/07/2017) PHOTO POINT 41— looking upstream (03/07/2017) PHOTO POINT 41— looking downstream (03/07/2017) PHOTO POINT 42 — looking upstream (03/07/2017) PHOTO POINT 42 — looking downstream (03/07/2017) PHOTO POINT 43 — looking upstream (03/07/2017) 1 PHOTO POINT 43 — looking downstream (03/07/2017) PHOTO POINT 44 — looking upstream (03/07/2017) PHOTO POINT 44 — looking downstream (03/07/2017) PHOTO POINT 45 — looking upstream (03/07/2017) PHOTO POINT 45 — looking downstream (03/07/2017) Vegetation Photographs i sT 3 1 Y `1f.' x�' i sT 3 1 Y `1f.' x�' Vegetation Plot 7 (08/03/2017) 1 Vegetation Plot 8 (08/03/2017) 1 Vegetation Plot 9 (08/03/2017) 1 Vegetation Plot 10 (08/03/2017) Vegetation Plot 11(08/03/2017) 1 Vegetation Plot 12 (08/03/2017) APPENDIX 3. Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Table Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Plot Success Criteria Met (Y/N) Tract Mean 1 Y 2 Y 3 Y 4 Y 5 Y 6 Y 92% 7 Y 8 Y 9 Y 10 Y 11 Y 12 N Table 8. CVS Vegetation Tables - Metadata Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Report Prepared By Jason Lorch Date Prepared 8/18/2017 12:54 Database Name Holman Mill MY2- cvs-eep-entrytool-v2.5.0.mdb Database Location F:\Projects\005-02146 Holman Mill\Monitoring\Monitoring Year 2\Vegetation Assessment Computer Name JASON -PC File Size 82616320 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT------------ Metadata Description of database file, the report worksheets, and a summary of project(s) and project data. Project Planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Project Total Stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor by Spp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and Spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. PROJECT SUMMARY ------------------------------------- Project Code 96316 Project Name Holman Mill Description Stream Restoration Project Sampled Plots 12 Table 9. Planted and Total Stem Counts Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MY2 2017) Scientific Name Common Name Species Type 96316-WEI-0001 96316-WEI-0002 96316-WEI-0003 96316-WEI-0004 96316-WEI-0005 PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch Tree 6 6 6 4 4 4 3 3 3 3 3 3 Fraxinus pennsylvanica Green Ash Tree 6 6 6 4 4 4 4 4 4 7 7 7 5 5 5 Juniperus virginiana Eastern Red Cedar Tree 1 Liquidambar styraciflua Sweet Gum Tree Liriodendron tulipifera Tulip Poplar Tree 1 1 1 4 4 4 3 3 3 4 4 4 Platanus occidentalis Sycamore, American Tree 1 1 1 Quercus palustris Pin Oak Tree 2 2 2 2 2 2 1 1 1 1 1 1 Quercus phellos Willow Oak Tree 1 1 1 1 1 1 1 1 1 Salix nigra Black Willow Tree Ulmus alata Winged Elm Tree Stem count size (ares) size (ACRES) Species count Stems per ACRE 14 14 14 11 11 11 14 14 14 11 11 11 14 14 15 1 1 1 1 1 0.02 0.02 0.02 0.02 0.02 4 4 44 4 4 5 5 5 3 3 3 5 5 6 566.6 566.6 566.6 445.2 445.2 445.2 566.6 1 566.61 566.6 1445.2 1 445.2 445.2 566.6 1566.6 607 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Table 9. Planted and Total Stem Counts Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MY2 2017) Scientific Name Common Name Species Type 96316-WEI-0006 96316-WEI-0007 96316-WEI-0008 96316-WEI-0009 96316-WEI-0010 PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch Tree 1 1 1 5 5 5 Fraxinus pennsylvanica Green Ash Tree 8 8 9 3 3 3 5 5 5 Juniperus virginiana Eastern Red Cedar Tree Liquidambar styraciflua Sweet Gum Tree 6 13 1 1 Liriodendron tulipifera Tulip Poplar Tree 1 1 3 1 Platanus occidentalis Sycamore, American Tree 1 1 1 4 4 4 9 9 9 2 2 2 Quercus palustris Pin Oak Tree 3 3 3 2 2 2 1 1 1 1 1 1 Quercus phellos Willow Oak Tree 5 5 5 4 4 4 2 2 2 2 2 2 Salix nigra Black Willow ITree 3 Ulmus alata Winged Elm ITree 3 7 Stem count size (ares) size (ACRES) Species count Stems per ACREI 12 12 21 11 11 14 13 13 33 13 13 14 10 1 10 14 1 1 1 1 1 0.02 0.02 0.02 0.02 0.02 3 3 4 1 4 4 1 5 3 3 5 4 4 5 4 1 4 6 485.6 1485.6 1849.81445.2 1445.2 1566.61526.11526.11 1335 526.1 526.1 566.6 404.7 404.7 566.6 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Table 9. Planted and Total Stem Counts Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MY2 2017) Annual Means Scientific Name Common Name Species Type 96316-WEI-0011 96316-WEI-0012 MY2 (2017) MYl (2016) MYO (2016) PnoLSFP-all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch Tree 4 4 4 1 1 1 27 27 27 28 28 28 31 31 31 Fraxinus pennsylvanica Green Ash Tree 1 42 42 44 39 39 39 39 39 39 Juniperus virginiana Eastern Red Cedar Tree 1 Liquidambar styraciflua Sweet Gum Tree 5 26 Liriodendron tulipifera Tulip Poplar Tree 1 1 1 14 14 16 33 33 33 35 35 35 Platanus occidentalis Sycamore, American Tree 2 2 2 3 3 3 22 22 22 41 41 41 45 45 45 Quercus palustris Pin Oak Tree 1 1 1 1 1 1 15 15 15 18 18 18 18 18 18 Quercus phellos Willow Oak Tree 3 3 3 1 1 1 20 20 20 20 20 20 20 20 20 Salix nigra Black Willow ITree 3 Ulmus alata Winged Elm ITree 10 Stem count size (ares) size (ACRES) Species counti Stems per ACREI 11 1 11 1 11 6 6 12 140 140 184 179 179 179 188 188 188 1 1 12 12 12 0.02 0.02 0.30 0.30 0.30 5 1 5 1 5 1 4 4 1 6 6 6 10 6 1 6 6 6 6 6 445.2 1445.2 1445.2 1242.8 1242.8 1485.6 472.1 472.1 620.5 603.7 1603.7 1603.71 634 1 634 1 634 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems APPENDIX 4. Morphological Summary Data and Plots Table 10a. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 UTI ( --- ): Data was not provided N/A: Not Applicable Parameter Gage UT1 -Reach 1/3 Agony Acres Reach UT1A- 1 UT to Polecat Creek UT to Varnals Creek UTI - Reach 1/3 UTI - Reach 1/3 Min Max Min Max Min I Max Min I Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) N/A 5.7 9.1 10.4 5.3 10.9 9.3 10.5 7.8 7.5 7.9 Floodprone Width (ft) 12 >36 25 65 20 64 15 1 65 23 24 Bankfull Mean Depth 0.7 1.0 1 1.2 1.0 1.1 1.1 1.2 0.6 0.6 Bankfull Max Depth 1.0 1.8 1.4 1.7 1.5 1.7 0.8 1.0 0.9 Bankfull Cross Sectional Area (ft) 4.3 10.7 11.3 5.4 12.4 10.3 12.3 4.3 4.3 4.6 Width/Depth Ratio 8.1 7.3 10.1 5.2 9.6 8.1 9.3 14.1 13.1 13.6 1 Entrenchment Ratio 2.0 >3.9 3.2 8.3 1.9 6.1 1.9 8.3 3.0 3.1 Bank Height Ratio 2.2 1.0 1.0 1.1 0.9 1.0 0.9 1.1 1.0 D50(mm) 33.1 --- --- --- --- 28.8 32.0 Profile Riffle Length (ft) N/A -- --- --- --- --- 12.5 31.4 Riffle Slope (ft/ft) --- N/A 0.0040 0.0470 0.0240 0.0570 0.0158 0.0661 0.0200 0.0690 Pool Length (ft) --- --- --- --- --- 6.0 23.6 Pool Max Depth (ft) --- 2.5 1.8 2.5 2.6 0.9 1.7 1.5 3.4 Pool Spacing (ft) --- N/A 34 1 52 8 82 2 44 20 53 Pool Volume (ft) -- -- --- Pattern Channel Beltwidth(ft) N/A 62 1 82 21 1 93 1 28 1 SO 1 15 1 45 12 1 69 1 11 1 4S Radius of Curvature (ft)l I S6 1 90 1 14 1 60 1 19 1 50 1 8 1 47 1 10 1 45 1 9 1 37 Rc:Bankfull Width (ft/ft) 6.2 9.9 1.5 5.8 2.0 5.3 0.6 3.2 1.3 5.8 1.2 4.7 Meander Length (ft) 209 300 N/A -- -- -- -- 25 128 31 75 Meander Width Ratio 6.8 9.0 2.3 1 8.9 3.0 5.3 1.0 3.0 1.6 8.9 1.5 5.7 Substrate, Bed and Transport Parameters Ri%/Ru%/P%/G%/S% --- --- - - --- --- SC%/Sa%/G%/C%/B%/Be% --- --- --- --- --- --- d16/d35/d50/d84/d95/d100 N/A 0.18/8.66/33.11/ 128/2655/>2048 0.22/2.97/6.6/38.7/ 69.7/128 Reach Shear Stress (Competency) Ib/ft2 1.6 --- --- --- 0.9 0.7 Max part size (mm) mobilized at bankfull --- --- --- --- --- --- Stream Power (Capacity) W/m2 --- --- -- -- --- Additional Reach Parameters Drainage Area (SM) N/A 0.16 0.30 0.41 0.41 0.16 0.16 Watershed Impervious Cover Estimate (%) 2% --- --- --- 2% 2% Rosgen Classification B4 E4 E4 E4 C4 C4 Bankfull Velocity (fps) 3.0 2.2 2.4 2.2 7 3.5 4.4 1 5.2 3.2 3.5 3.6 Bankfull Discharge (cfs) 14.0 25.3 20.3 54.0 14.0 15.0 16.7 Q-NFF regression --- --- --- Q-USGS extrapolation --- --- --- Q-Mannings --- --- --- Valley Length (ft) --- --- --- --- 468 468 Channel Thalweg Length (ft) 2,648 --- --- --- 519 517 Sinuosity 1.12 1.35 1.40 1.20 1.15 T 1.20 1.10 Water Surface Slope(ft/ft)2 --- --- --- --- --- 0.0246 Bankfull Slope (ft/ft) 0.025 0.004 0.028 0.012 0.017 0.015 0.03 0.0203 ( --- ): Data was not provided N/A: Not Applicable Table 10b. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 L•1N *: Alignment change during—Aunction created steeper rif0es (---): Data was not provided N/A: Not Applicable ®®®®®®®®®® PRE -RESTORATION CONDITION REFERENCE REACH DATA DESIGN AS-BUILT/BASELINE EFT Ml EFT Ml Floodprone Width (ft) Bankfull Mean Depth Bankfull Max Depth Bankfull Cross Sectional Area (ft') Width/Depth Ratio ®®gym®omoo©mmmmm mmmmmmmmmmmmm�m®0 mmmmmmmmommm®mmm� Rosgen Classification 0®0000000 Bankfull Velocity (fps) Q-USGS extrapolation Water Surface Slope (ft/ft)' Bankfull Slope (ft/ft) *: Alignment change during—Aunction created steeper rif0es (---): Data was not provided N/A: Not Applicable Table 10c. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 UT2A (---): Data was not provided N/A: Not Applicable RESTORATION PRE- REFERENCE REACH DATA DESIGN Parameter 71 Gage UT2A Agony Acres UT1A- Reach 1 UT to Polecat Creek UT to Varnals Creek UT2A UT2A Min Max Min Max Min I Max Min I Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) N/A 5.1 9.1 10.4 5.3 10.9 9.3 10.5 6.4 6.6 Floodprone Width (ft) 11.5 >36 25 65 20 64 14 180 100 Bankfull Mean Depth 0.4 1.0 T 1.2 1.0 1.1 1.1 1.2 0.5 0.5 Bankfull Max Depth 0.9 1.8 1.4 1.7 1.5 1.7 0.7 F 0.9 0.7 Bankfull Cross Sectional Area (ft) 2.1 10.7 11.3 5.4 12.4 10.3 12.3 3.3 3.2 Width/Depth Ratio 12 7.3 10.1 5.2 9.6 8.1 9.3 13.0 13.5 Entrenchment Ratio 2.3 >3.9 3.2 8.3 1.9 6.1 2.2 12.5 15.1 Bank Height Ratio 3.4 1.0 1.0 1.1 0.9 1.0 0.9 1 1.1 3.2 --- --- --- --- 1.0 18.3 D50 (mm) Profile Riffle Length (ft) --- --- --- --- --- 17.9 38.2 Riffle Slope (ft/ft) --- N/A 0.0040 0.0470 0.0240 0.0570 0.018 1 0.08 0.0007 0.0520 Pool Length (ft) --- --- --- --- --- 16.3 33.0 Pool Max Depth (ft) N/A 2.4 2.5 1.8 2.5 2.6 0.8 1.6 1.5 3.3 Pool Spacing (ft) --- N/A 34 52 8 1 82 2 36 29 62 Pool Volume (ft) -- -- -- Pattern Channel Beltwidth(ft) 15 30 21 93 28 50 15 45 10 57 25 40 Radius of Curvature (ft) 5.8 33 14 60 19 50 8 47 8 37 11 31 Rc:Bankfull Width (ft/ft) N/A 1.1 6.5 1.5 5.8 2.0 5.3 0.6 3.2 1.3 5.8 1.7 4.7 Meander Length (ft) 27 69 N/A - - - - 20 105 41 61 Meander Width Ratio 2.9 9.0 2.3 T 8.9 3.0 5.3 1.0 3.0 1.6 8.6 3.8 6.1 Substrate, Bed and Transport Parameters Ri%/Ru%/P%/G%/S% ___ ___ ___ ___ ___ SC%/Sa%/G%/C%/B%/Be% ___ ___ ___ ___ ___ ___ d16/d35/d50/d84/d95/d100 N/A 0.18/8.66/33.11/ 128/2655/>2048 --- --- --- --- 3.15/11.86/18.3/ 43.5/101.2/362 Reach Shear Stress (Competency) Ib/ftz 1.85 -- -- -- 0.52 0.45 Max part size (mm) mobilized at bankfull --- --- --- --- Stream Power (Capacity) W/mz --- I-- -- -- --- -- Additional Reach Parameters Drainage Area (SM) N/A 0.08 0.30 0.41 0.41 0.08 0.08 Watershed Impervious Cover Estimate (%) 2% --- --- --- 2% 2% Rosgen Classification C4b E4 E4 E4 C4 C4 Bankfull Velocity (fps) 2.5 2.2 2.4 2.2 3.5 4.4 5.2 3.1 2.9 Bankfull Discharge (cfs) 9.0 25.3 20.3 54.0 9.0 8.6 Q-NFF regression --- --- Q-USGS extrapolation --- --- Q-Mannings --- --- Valley Length (ft) --- --- --- --- 480 480 Channel Thalweg Length (ft) 468 --- --- --- 540 540 Sinuosity 1.15 1.35 1.40 1.20 1.15 1.25 1.13 Water Surface Slope (ft/ft)' --- --- --- --- 0.0129 Bankfull Slope (ft/ft) 0.023 0.0040 0.028 0.012 0.0170 0.007 0.018 0.0143 (---): Data was not provided N/A: Not Applicable Table 11. Morphology and Hydraulic Summary (Dimensional Parameters - Cross Section) Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 N/A: Not Applicable Cross Section 1 (Riffle) . Cross Section 2 (Pool) Cross Section 3 (Pool) r Cross Section 4 (Riffle) Dimension and Substrate Base MYl MY2 MY3 MY4 MY5 MY6 MY7 Base MYl MY2 MY3 MY4 MYS MY6 MY7 Base MY1 MY2 MY3 MY4 MYS MY6 MY7 Base MYl MY2 MY3 MY4 MY5 MY6 MY7 based on fixed bankfull elevation 570.5 570.5 570.5 569.8 569.8 569.8 554.1 554.1 554.1 553.9 553.9 553.9 Bankfull Width (ft) 7.9 7.7 7.2 8.4 7.3 7.1 9.6 8.9 8.5 7.5 6.8 6.4 Floodprone Width (ft) 23.6 21.6 21.6 N/A N/A N/A N/A N/A N/A 23.4 17.0 17.0 Bankfull Mean Depth (ft) 0.6 0.5 0.5 0.9 0.9 0.8 0.9 0.9 0.9 0.6 0.4 0.4 Bankfull Max Depth (ft) 0.9 0.8 0.8 1.6 1.5 1.4 1.8 1.9 1.7 0.9 0.8 0.7 Bankfull Cross Sectional Area (fe) 4.6 3.8 3.6 7.4 6.5 5.8 8.2 8.1 7.9 4.3 3.0 2.8 Bankfull Width/Depth Ratio 13.6 15.8 14.4 9.5 8.3 8.7 11.3 9.8 9.2 13.1 15.4 15.0 Bankfull Entrenchment Ratio 3.0 2.8 3.0 N/A N/A N/A N/A N/A N/A 3.1 2.5 2.6 Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.o 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Cross Section 5 (Riffle) Cross Section 6 (Pool) Cross Section 7 (Riffle) Cross Section 8 (Pool) Dimension and Substrate Base MYl MY2 MY3 MY4 MYS MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MYl MY2 MY3 MY4 MYS MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 based on fixed bankfull elevation 520.1 520.1 520.1 519.5 519.5 519.5 520.5 520.5 520.5 520.2 520.2 520.2 Bankfull Width (ft) 9.7 9.8 9.2 9.9 10.7 10.6 6.6 7.5 7.4 9.7 8.6 9.8 Floodprone Width (ft) 100.0 100.0 100.0 N/A N/A N/A 100.0 100.0 100.0 N/A N/A N/A Bankfull Mean Depth (ft) 0.5 0.4 0.4 0.9 0.8 0.8 0.5 0.4 0.4 0.9 0.8 0.9 Bankfull Max Depth (ft) 0.8 0.9 0.9 1.6 1.7 1.6 0.7 0.7 0.7 1.5 1.6 1.6 Bankfull Cross Sectional Area (fe) 4.5 4.4 3.9 8.9 9.0 8.4 3.2 2.7 2.7 9.1 8.6 9.1 Bankfull Width/Depth Ratio 20.5 21.9 21.1 11.0 12.7 13.4 13.5 20.7 20.6 10.4 12.3 10.5 Bankfull Entrenchment Ratio 10.4 10.2 10.8 N/A N/A N/A 15.1 13.3 13.4 N/A Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 N/A: Not Applicable Table 12a. Monitoring Data - Stream Reach Data Summary Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT1 Reach 1 (---): Data was not provided Min Max Min Max YS Min Max Min Max Min Max Min Max Min Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) 7.9 7.7 7.2 Floodprone Width (ft) 24 22 22 Bankfull Mean Depth 0.6 0.5 0.5 Bankfull Max Depth 0.9 0.8 0.8 Bankfull Cross Sectional Area (fe) 4.6 3.8 3.6 Width/Depth Ratio 13.6 15.8 14.4 Entrenchment Ratio 3.0 2.8 3 Bank Height Ratio 1.0 1.0 1.0 D50 (mm) 32.0 43.7 7.1 Profile Riffle Length (ft) 12.5 31.4 Riffle Slope (ft/ft) 0.0200 0.0690 Pool Length (ft) 6.0 23.6 Pool Max Depth (ft) 1.5 3.4 Pool Spacing (k) 20 53 Pool Volume (fta) Pattern Channel Beltwidth (ft) 11 45 Radius of Curvature (ft) 9 37 Rc:Bankfull Width (ft/ft) 1.1 4.7 Meander Wave Length (ft) 31 75 Meander Width Ratio 1.4 5.7 Additional Reach Parameters Rosgen Classification C4 Channel Thalweg Length (ft) 208 Sinuosity (ft) 1.1 Water Surface Slope (ft/ft) 0.0246 Bankfull Slope (ft/ft) 0.0203 Ri%/Ru%/P%/G%/S% SC%/Sa%/G%/C%/B%/Be% 0.22/2.97/6.6/38.7/ SC/1.19/9.1/57.4/ SC/SC/4.9/61.0/ d16/d35/d50/d84/d95/d100 69.7/128 107.3/256 163.2/362 %of Reach with Eroding Banks 0% 1 0% 1 0% (---): Data was not provided Table 12b. Monitoring Data - Stream Reach Data Summary Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT1 Reach 3 (---): Data was not provided Min I Max Min I Max Min I Max Min Max Min Max Min Max Min Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) 7.5 6.8 6.4 Floodprone Width (ft) 23 17 17 Bankfull Mean Depth 0.6 0.4 0.4 Bankfull Max Depth 0.9 0.8 0.7 Bankfull Cross Sectional Area (ft) 4.3 3.0 2.8 Width/Depth Ratio 13.1 15.4 15.0 Entrenchment Ratio 3.1 2.5 2.6 Bank Height Ratio 1.0 1.0 1.0 D50 (mm) 28.8 22.6 23.6 Profile Riffle Length (ft) 12.5 31.4 Riffle Slope (ft/ft) 0.0200 0.0690 Pool Length (ft) 6.0 23.6 Pool Max Depth (ft) 1.5 3.4 Pool Spacing (ft) 20 53 Pool Volume F7 Pattern Channel Beltwidth (ft) 11 45 Radius of Curvature (ft) 9 37 Rc:Bankfull Width (ft/ft) 1.2 4.9 Meander Wave Length (ft) 31 75 Meander Width Ratio 1.5 6.0 Additional Reach Parameters Rosgen Classification C4 Channel Thalweg Length (ft) 309 Sinuosity (ft) 1.1 Water Surface Slope (ft/ft) 0.0246 Bankfull Slope (ft/ft) 0.0203 Ri%/Ru%/P%/G%/S% SC%/Sa%/G%/C%/B%/Be% 0.22/2.97/6.6/38.7/ SC/1.19/9.1/57.4/ 0.75/13.14/23.6/63.4/ d16/d35/d50/d84/d95/d100 69.7/128 107.3/256 138.2/256 %of Reach with Eroding Banks 0% 1 0% 0% (---): Data was not provided Table 12c. Monitoring Data - Stream Reach Data Summary Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT2 Reaches 3. 4 (---): Data was not provided Min Max Min Max YS Min Max Min Max Min Max Min Max Min Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) 9.7 9.8 9.2 Floodprone Width (ft) 100 100 100 Bankfull Mean Depth 0.5 0.4 0.4 Bankfull Max Depth 0.8 0.9 0.9 Bankfull Cross Sectional Area (ft) 4.5 4.4 3.9 Width/Depth Ratio 20.5 21.9 21.7 Entrenchment Ratio 10.4 10.2 10.8 Bank Height Ratio 1.0 1.0 1.0 D50 (mm) 11.4 35.0 41.3 Profile Riffle Length (ft) 15 46 Riffle Slope (ft/ft) 0.0135 0.0592 Pool Length (ft) 11 60 Pool Max Depth (ft) 1.5 3.1 Pool Spacing (ft) 33 61 Pool Volume (ft ) Pattern Channel Beltwidth (ft) 20 52 Radius of Curvature (ft) 18 45 Rc:Bankfull Width (ft/ft) 1.9 4.6 Meander Wave Length (ft) 56 130 Meander Width Ratio 2.1 3.2 Additional Reach Parameters Rosgen Classificationj C4 Channel Thalweg Length (ft)l 649 Sinuosity (ft) 1.15 Water Surface Slope (ft/ft) 0.0119 0.0237 Bankfull Slope (ft/ft) 0.0120 0.0176 Ri%/Ru%/P%/G%/S% SC%/Sa%/G%/C%/B%/Be% SC/2.18/5.6/ 1.0/9.17/24.5/53.7/ 19.15/31.72/41.3/84.3/ d16/d35/d50/d84/d95/d100 34.0/56.9/362.0 77.8/128 123.1/256 %of Reach with Eroding Banks 0% 1 0% 0% (---): Data was not provided Table 12d. Monitoring Data - Stream Reach Data Summary Holman Mill Mitigation Project DMS Project No. 96316 Monitoring Year 2 - 2017 UT2A (---): Data was not provided Min I Max Min I Max Min I Max Min Max Min Max Min Max Min Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) 6.6 7.5 7.4 Floodprone Width (ft) 100 100 100 Bankfull Mean Depth 0.5 0.4 0.4 Bankfull Max Depth 0.7 0.7 0.7 Bankfull Cross Sectional Area (ft) 3.2 2.7 2.7 Width/Depth Ratio 13.5 20.7 20.6 Entrenchment Ratio 15.1 13.3 13.4 Bank Height Ratio 1.0 1.0 1.0 D50 (mm) 18.3 29.7 7.1 Profile Riffle Length (ft) 17.9 38.2 Riffle Slope (ft/ft) 0.0007 0.0520 Pool Length (ft) 16.3 33.0 go Pool Max Depth (ft) 1.5 3.3 Pool Spacing (ft) 29 62 Pool Volume F7 �� Pattern Channel Beltwidth (ft) 25 40 Radius of Curvature (ft) 11 31 Rc:Bankfull Width (ft/ft) 1.7 4.7 Meander Wave Length (ft) 41 61 Meander Width Ratio 3.8 6.1 Additional Reach Parameters Rosgen Classificationj C4 Channel Thalweg Length (ft)l 540 Sinuosity (ft) 1.10 Water Surface Slope (ft/ft) 0.0129 Bankfull Slope (ft/ft) 0.0143 Ri%/Ru%/P%/G%/S% SC%/Sa%/G%/C%/B%/Be% 3.15/11.86/18.3/43.5/.21/6.69/20.1/53.1/ SC/0.87/1.9/32.0/ d16/d35/d50/d84/d95/d100 101.2/362 75.9/128 75.9/128 %of Reach with Eroding Banks 0% 1 0% 0% (---): Data was not provided Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 1 -UTI 100+65 Riffle 574 572 c 0 FloodproneArea v w 570 568 0 10 20 30 40 Width (ft) +MYO(03/2016) �MY1(9/2016) �MY2(03/2017) -Bankfull- Bankfull Dimensions s 3.6 x -section area (ft.sq.) 7.2 width (ft) 0.5 mean depth (ft) 0.8 max depth (ft) 7.4 wetted perimeter (ft) 4` 0.5 hydraulic radius (ft) 14.4 width -depth ratio 21.6 W flood prone area (ft) 3.0 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2017 Field Crew: Wildlands Engineering View Downstream FloodproneArea Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 2 -UTI 100+80 Pool c 574 v 572 566 0 570 � +MYO (3/2016) +MY1 (9/2016) MY2 (3/2017) -Bankfull 568 Bankfull Dimensions 5.8 x -section area (ft.sq.). 7.1 width (ft)_ x < 0.8 mean depth (ft) w 1.4 max depth (ft) 7.9 wetted perimeter (ft) �s + 0.7 hydraulic radius (ft)� 8.7 width -depth ratio $` Survey Date: 3/2017 Field Crew: Wildlands Engineering 'X> View Downstream c v 566 0 10 20 30 40 Width (ft) � +MYO (3/2016) +MY1 (9/2016) MY2 (3/2017) -Bankfull Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 3 -UTI 108+95 Pool 558 556 0 554 ) +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) —Bankfull v 552 S50 0 10 20 30 40 50 Width (ft Bankfull Dimensions , 7.9 x -section area (ft.sq.) 8.5 width (ft) rr, 0.9 mean depth (ft) 1.7 max depth (ft) 9.7 wetted perimeter (ft),.� 0.8 hydraulic radius (ft) ,v 9.2 width -depth ratioNOM ` Survey Date: 3/2017 Field Crew: Wildlands Engineering View Downstream ) +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) —Bankfull Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 4 -UTI 109+10 Riffle 558 556 c 0 v 554 w 552 0 10 20 30 40 50 Width (ft) +MYO(03/2016) �MY1(9/2016) �MY2(03/2017) —Bankfull—FloodproneArea Bankfull Dimensions 2.8 x -section area (ft.sq.) 6.4 width (ft) 0.4 mean depth (ft) 0.7 max depth (ft) 6.7 wetted perimeter (ft) 0.4 hydraulic radius (ft) 15.0 width -depth ratio 17.0 W flood prone area (ft) 2.6 entrenchment ratio 1.0 low bank height ratio - 9 Survey Date: 3/2017 i Field Crew: Wildlands Engineering View Downstream c 0 v 554 w 552 0 10 20 30 40 50 Width (ft) +MYO(03/2016) �MY1(9/2016) �MY2(03/2017) —Bankfull—FloodproneArea Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 5-UT2 212+00 Riffle 522 � 0 v w 520 FloodproneArea sls 0 10 20 30 40 50 60 70 Width (ft) +MYO(03/2016) �MY1(9/2016) �MY2(03/2017) —Bankfull— Bankfull Dimensions 3.9 x -section area (ft.sq.) 9.2 width (ft) 0.4 mean depth (ft) 0.9 max depth (ft) 9.6 wetted perimeter (ft) 0.4 hydraulic radius (ft) 21.7 width -depth ratio 100.0 W flood prone area (ft) 10.8 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2017 Field Crew: Wildlands Engineering View Downstream FloodproneArea Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 6-UT2 212+25 Pool szz szo 0 > v w 518 +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) -Bankfull 516 0 10 20 30 40 50 60 70 Width (ft Bankfull Dimensions 8.4 x -section area (ft.sq.) � n NN N�1L K s : " 10.6 width (ft)' AIS7V t, t" !9' 0.8 mean depth (ft)�` 1.6 max depth (ft) 11.4 wetted perimeter (ft):. 0.7 hydraulic radius (ft) 13.4 width -depth ratio N MF I �E Survey Date: 3/2017 Field Crew: Wildlands Engineering s, 7 View Downstream ) +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) -Bankfull Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 7-UT2A 304+85 Riffle 522 � 0 v w 520 FloodproneArea sls 0 10 20 30 40 50 60 70 80 Width (ft) +MYO(03/2016) �MY1(9/2016) �MY2(03/2017) —Bankfull — Bankfull Dimensions 2.7 x -section area (ft.sq.) 7.4 width (ft) 0.4 mean depth (ft) 0.7 max depth (ft) 7.7 wetted perimeter (ft) 0.4 hydraulic radius (ft) 20.6 width -depth ratio 100.0 W flood prone area (ft) 13.4 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2017 Field Crew: Wildlands Engineering �e View Downstream FloodproneArea Cross Section Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 Cross Section 8-UT2A 305+10 Pool 522 c v w 0 520 0 10 20 30 40 50 60 70 80 Width (ft) +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) -Bankfull Bankfull Dimensions 9.1 x -section area (ft.sq.) 9.8 width (ft) 0.9 mean depth (ft) 1.6 max depth (ft) 11.2 wetted perimeter (ft) 0.8 hydraulic radius (ft) 10.5 width -depth ratio Survey Date: 3/2017 Field Crew: Wildlands Engineering View Downstream c v w 518 0 10 20 30 40 50 60 70 80 Width (ft) +MYO (3/2016) +MY1 (9/2016) �MY2 (3/2017) -Bankfull Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UTI, Reachwide UT1, Reachwide Individual Class Percent 100 90 80 Diameter (mm) Particle Count Reach Summary Particle Class Class Percent min max Riffle Pool Total Percentage Cumulative UTI, Reachwide Silt/Clay 0.000 0.062 4 38 42 41 41 Pebble Count Particle Distribution Very fine 0.062 0.125 2 -5 2 2 43 100 Fine 0.125 0.250 60 43 90 SIIUCIay Sand vel We Medium 0.25 0.50 43 80 a ro Coarse 0.5 1.0 43 0 70 Very Coarse 1.0 2.0 2 2 4 4 47 60 Very Fine 2.0 2.8 1 1 1 48 3 50 Very Fine 2.8 4.0 48 Fine 4.0 5.6 3 1 4 4 51 �? 40 128 1 Fine 5.6 8.0 2 2 4 4 55 30 w 4 4 Medium 8.0 11.0 2 180 2 2 57 a 20 2 98 €€ Medium 11.0 16.0 5 1 6 6 63 100 Small 362 512 100 10 512 —19 Coarse 16.0 22.6 6 3 9 9 72 2048 Coarse 22.6 32 Bedrock 2048 >2048 72 0 100 0.01 0.1 1 10 100 1000 10000 Very Coarse 32 45 3 3 3 75 Particle Class Size (mm) Very Coarse 45 64 10 1 11 11 85 Small 64 90 5 1 6 6 91 MY -/2016 --1-12 Mv003/x016 1] UT1, Reachwide Individual Class Percent 100 90 80 -5 70 60 50 Sma I I 90 128 1 1 1 92 Large 128 180 4 4 4 96 Large 180 256 1 1 2 2 98 €€ Small 256 362 2 2 2 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 Bedrock 2048 >2048 100 Reachwide Channel materials (mm) D16 = Silt/Clay Di5 = Silt/Clay Dso = 4.9 D� = 61.0 D95 = 163.2 Total 53 50 103 100 100 Total 53 50 103 100 100 -5 70 60 50 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UTI, Cross Section 1 Individual Class Percent 70 Diameter (mm) Summary Particle Class Riffle 100- Class Percent Count 90 UTI, Cross Section 1 Silt/Clay min max 0.000 0.062 10 Percentage 10 Cumulative 10 80 Pebble Count Particle Distribution Very fine 0.062 0.125 10 100 Fine 0.125 0.250 4 4 14 90 silt clay a d avel bble r Medium 0.25 0.50 2 2 16 80 pqu a ro Coarse 0.5 1.0 m 16 70 u Very Coarse 1.0 2.0 4 4 20 60 Very Fine 2.0 2.8 2 2 22 50 20 Very Fine 2.8 4.0 4 4 26 E Fine 4.0 5.6 16 16 42 �? 40 Fine 5.6 8.0 12 12 54 30 100 Small Medium 8.0 11.0 10 10 64 U a 20 Large 512 1024 1024 2048 Medium 11.0 16.0 10 10 74 2048 >2048 100 Total 10 100 100 Coarse 16.0 22.6 6 6 80 Coarse 22.6 32 2 2 82 0 0.01 0.1 1 10 100 1000 10000 Very Coarse 32 45 4 4 86 Particle Class Size (mm) Very Coarse 45 64 4 4 90 Small 64 90 4 4 94 wrou3noe rywo, jos Mn-03non Small 90 128 94 Large 128 180 94 Large 180 256 6 6 100 UTI, Cross Section 1 Individual Class Percent 70 100 90 80 � w 60 a 50 m u 40 m 30 20 c Small 256 362 100 Small 362 512 'Lyp 3b'L y'L ,lh a0 90 100 ;Medium — — — — — ;Large/Very ....................... Large 512 1024 1024 2048 100 100 Bedrock 2048 >2048 100 Total 100 100 100 Cross Section 1 Channel materials (mm) Des = 0.50 Das = 4.83 Dso = 7.1 D80. = 37.9 Dss = 190.9 Doo = 256.0 100 90 80 � w 60 a 50 m u 40 m 30 20 c 10 0 ,th 6'L 15 Oh p0 p1 p� 'Lyp 3b'L y'L ,lh a0 90 ticle Class Size (mm) ParMY149/2M6 —2-12017 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UTI, Cross Section 4 Individual Class Percent 100 90 80 70 Diameter (mm) Riffle 100- Summary Particle Class Class Percent min max Count Percentage Cumulative UTI, Cross Section 4 Silt/Clay 0.000 0.062 10 10 10 Pebble Count Particle Distribution Very fine 0.062 0.125 10 100 Fine 0.125 0.250 2 2 12 90 SIIVClay a d avel bble r Medium 0.25 0.50 2 2 14 80 a ro Coarse 0.5 1.0 4 4 18 70 u Very Coarse 1.0 2.0 18 60 Very Fine 2.0 2.8 2 2 20 50 20 Very Fine 2.8 4.0 20 E c Fine 4.0 5.6 2 2 22 �? 40 Fine 5.6 8.0 2 2 24 30 100 Small Medium 8.0 11.0 6 6 29 U a 20 Large 512 1024 1024 2048 Medium 11.0 16.0 12 12 41 2048 >2048 100 Total 10 100 100 Coarse 16.0 22.6 8 8 49 Coarse 22.6 32 8 8 57 0 0.01 0.1 1 10 100 1000 10000 Very Coarse 32 45 16 16 73 Particle Class Size (mm) Very Coarse 45 64 12 12 84 Small 64 90 4 4 88 �wrou3noe rywo, os �Mn-03non Small 90 128 6 6 94 Large 128 180 4 4 98 Large 180 256 2 2 100 UTI, Cross Section 4 Individual Class Percent 100 90 80 70 � w 60 a 50 m u 40 m 30 20 c 10 0 Small 256 362 6'L p DO 01 p -yti 1 1 'L 3 5 ,y0 ,y0 �O 100 Small 362 512 100 ;Medium — — — — — ;Large/Very ....................... Large 512 1024 1024 2048 100 100 Bedrock 2048 >2048 100 Total 102 100 100 Cross Section 4 Channel materials (mm) D1fi = 0.75 Di5 = 13.14 Dso = 23.6 D84 = 63.4 D95 = 138.2 Dioo = 256.0 � w 60 a 50 m u 40 m 30 20 c 10 0 6'L p DO 01 p -yti 1 1 'L 3 5 ,y0 ,y0 �O Particle Class Size (mm) Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UT2, Reachwide UT2, Reachwide Individual Class Percent 100 90 80 Diameter (mm) Particle Count Reach Summary Particle Class Class Percent min max Riffle Pool Total Percentage Cumulative UT2, Reachwide Silt/Clay 0.000 0.062 18 18 17 17 Pebble Count Particle Distribution Very fine 0.062 0.125 1 1 1 18 100 Fine 0.125 0.250 1 1 2 2 20 90 SIItlCIay Sand avel bble r 8.0 Medium 0.25 0.50 1 2 3 3 23 80 11.0 a ro 3 Coarse 0.5 1.0 2 1 3 3 26 0 70 3 4 7 Very Coarse 1.0 2.0 Coarse 22.6 32 26 60 9 9 62 Very Fine 2.0 2.8 1 1 1 27 3 50 72 Very Coarse Very Fine 2.8 4.0 1 3 4 4 31 Small 64 90 Fine 4.0 5.6 4 4 4 35 �? 40 128 3 1 Fine 5.6 8.0 1 2 3 3 38 30 w 3 3 100 Large 180 256 a 20 100 €€ Small 256 362 100 Small 362 512 100 10 512 1024 100 Large/Very Large 1024 2048 TTFin 100 Bedrock 2048 >2048 0 100 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) Mv00w-, MY -/21016 --1/21] 31 UT2, Reachwide Individual Class Percent 100 90 80 -5 70 60 Medium 8.0 11.0 1 2 3 3 41 Medium 11.0 16.0 3 3 6 6 47 Coarse 16.0 22.6 3 4 7 7 53 Coarse 22.6 32 7 2 9 9 62 Very Coarse 32 45 8 2 10 10 72 Very Coarse 45 64 11 2 13 13 84 Small 64 90 6 3 9 9 93 Small 90 128 3 1 4 4 97 Large 128 180 3 3 3 100 Large 180 256 100 €€ Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 Bedrock 2048 >2048 100 Reachwide Channel materials (mm) D16 = Silt/Clay Das = 5.63 Dso = 19.0 D� = 63.2 D95= 105.9 X96 Dioo = 180.0 Total 51 52 103 100 100 Total 51 52 103 100 100 -5 70 60 50 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UT2, Cross Section 5 Cross Section 5 Diameter (mm) Riffle 100- 19.15 Summary 31.72 Dso = 41.3 Particle Class D95 = 123.1 Class Percent min max Count Percentage Cumulative UT2, Cross Section 5 Silt/Clay 0.000 0.062 5 5 5 80 Pebble Count Particle Distribution Very fine 0.062 0.125 5 100 Fine 0.125 0.250 1 1 6 90 silt/Clay a d avel bble r Medium 0.25 0.50 a 50 6 80 a ro Coarse 0.5 1.0 m 6 70 u Very Coarse 1.0 2.0 6 60 Very Fine 2.0 2.8 2 2 8 50 20 Very Fine 2.8 4.0 8 E Fine 4.0 5.6 c 8 �? 40 Fine 5.6 8.0 8 30 0 Medium 8.0 11.0 6'L ,th 15 Oh S 'L ,y4 DO 01 p� 8 U a 20 1 V Particle Class Size (mm) Medium 11.0 16.0 8 2048 >2048 100 Total 10 100 100 Coarse 16.0 22.6 16 16 24 -0- Coarse 22.6 32 12 12 35 0 0.01 0.1 1 10 100 1000 10000 Very Coarse 32 45 20 20 55 Particle Class Size (mm) Very Coarse 45 64 20 20 75 Small 64 90 12 12 86 �wrou3noe rywo, os �Mn-03non Small 90 128 10 10 96 Large 128 180 2 2 98 Large 180 256 2 2 100 Small 256 362 100 Small 362 512 100 ;Medium 512 1024 100 - - - - - ;Large/Very ISSUES. Large 1024 2048 100 Cross Section 5 Channel materials (mm) D16 = 19.15 Das = 31.72 Dso = 41.3 D84 = 84.3 D95 = 123.1 Dioo = 256.0 90 80 70 � w 60 a 50 m u 40 m 30 20 c 10 0 6'L ,th 15 Oh S 'L ,y4 DO 01 p� b 56 4 .s'v y6 6 ,6'L Py �b �O ,10 $O y0 b'L y'L ,lh a0 90 -yti 1 1 'L 3 5 ,y0 ,y0 �O ....................... Particle Class Size (mm) Bedrock 2048 >2048 100 Total 102 100 100 Cross Section 5 Channel materials (mm) D16 = 19.15 Das = 31.72 Dso = 41.3 D84 = 84.3 D95 = 123.1 Dioo = 256.0 UT2, Cross Section 5 Individual Class Percent 100 90 80 70 � w 60 a 50 m u 40 m 30 20 c 10 0 6'L ,th 15 Oh S 'L ,y4 DO 01 p� b 56 4 .s'v y6 6 ,6'L Py �b �O ,10 $O y0 b'L y'L ,lh a0 90 -yti 1 1 'L 3 5 ,y0 ,y0 �O Particle Class Size (mm) Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UT2A, Reachwide UT2A, Reachwide Individual Class Percent 100 90 80 Diameter (mm) Particle Count Reach Summary Particle Class Class Percent min max Riffle Pool Total Percentage Cumulative UT2A, Reachwide Silt/Clay 0.000 0.062 1 25 26 26 26 Pebble Count Particle Distribution Very fine 0.062 0.125 -5 70 26 100 Fine 0.125 0.250 1 60 1 1 27 90 Slltfclay a d avel Wer Medium 8.0 Medium 0.25 0.50 4 4 4 31 80 11.0 a ro 3 Coarse 0.5 1.0 5 5 5 36 0 70 4 2 6 Very Coarse 1.0 2.0 7 8 15 15 51 60 5 5 84 Very Fine 2.0 2.8 45 4 1 51 3 50 89 Very Coarse Very Fine 2.8 4.0 2 1 3 3 54 Small 64 90 Fine 4.0 5.6 5 4 S 5 59 �? 40 128 3 Fine 5.6 8.0 7 2 9 9 68 w 3031 100 Large 180 256 a 20 100 €€ Small 256 362 100 Small 362 512 100 10 512 1024 100 Large/Very Large 1024 2048 100 Bedrock 2048 >2048 0 100 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) �Mro w-, MY—/2016 —Mrs 1/2— UT2A, Reachwide Individual Class Percent 100 90 80 -5 70 60 Medium 8.0 11.0 2 50 2 2 70 Medium 11.0 16.0 3 3 3 73 Coarse 16.0 22.6 4 2 6 6 79 Coarse 22.6 32 3 2 5 5 84 Very Coarse 32 45 4 1 5 5 89 Very Coarse 45 64 4 4 4 93 Small 64 90 4 4 4 97 Small 90 128 3 3 3 100 Large 128 180 100 Large 180 256 100 €€ Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 Bedrock 2048 >2048 100 Reachwide Channel materials (mm) D16 = Silt/Clay Das = 0.87 Dso = 1.9 D� = 32.0 D9s = 75.9 Dioo = 128.0 Total 50 50 100 100 100 Total 50 50 100 100 100 -5 70 60 50 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site (DMS Project No. 96316) Monitoring Year 2 - 2017 UT2A, Cross Section 7 UT2A, Cross Section 7 Individual Class Percent 100 90 80 70 Diameter (mm) Summary Particle Class Riffle 100- Class Percent min max Count Percentage Cumulative UT2A, Cross Section 7 Silt/Clay 0.000 0.062 4 4 4 Pebble Count Particle Distribution Very fine 0.062 0.125 4 100 w Fine 0.125 0.250 4 4 8 90 silt/Clay a d avel bble r Medium 0.25 0.50 2 2 10 80 m a ro Coarse 0.5 1.0 4 4 14 70 64 1 1 Very Coarse 1.0 2.0 8 8 22 a 60 100 Small Very Fine 2.0 2.8 8 8 30 50 128 180 Very Fine 2.8 4.0 8 8 38 E 100 Fine 4.0 5.6 6 6 44 �? 40 Small 362 512 Fine 5.6 8.0 10 10 53 30 u 100 100 Medium 8.0 11.0 6 6 59 a 20 Medium 11.0 16.0 8 8 67 10 Coarse 16.0 22.6 8 8 75 Coarse 22.6 32 12 12 87 0 0.01 0.1 1 10 100 1000 10000 Very Coarse 32 45 12 12 99 Particle Class Size (mm) Very �wrou3noe rywo, os �Mn-03non UT2A, Cross Section 7 Individual Class Percent 100 90 80 70 � w 60 a 50 m u m 40 Coarse 45 64 1 1 100 Small 64 90 100 Small 90 128 100 Large 128 180 100 10 Large 180 256 100 Small 256 362 100 0 Small 362 512 6'L p 15 Oh S 'L ,y4 p0 p1 p b 56 4 .�'v y6 6 ,6'L Py pb �O ,10 $O yp b'L y'L ,lh a0 90 -yti 1 1 'L 3 5 ,y0 ,y0 �O 100 ;Medium - - - - - ;Large/Very ....................... Large 512 1024 1024 2048 100 100 Bedrock 2048 >2048 100 Total 101 100 100 Cross Section 7 Channel materials (mm) D1fi = 1.21 Das = 3.55 Dso = 7.1 D84 = 29.2 D95 = 40.1 Dioo = 64.0 � w 60 a 50 m u m 40 30 20 c 10 0 6'L p 15 Oh S 'L ,y4 p0 p1 p b 56 4 .�'v y6 6 ,6'L Py pb �O ,10 $O yp b'L y'L ,lh a0 90 -yti 1 1 'L 3 5 ,y0 ,y0 �O Particle Class Size (mm) APPENDIX 5. Hydrology Summary Data Table 13. Verification of Bankfull Events Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Monthly Rainfall Data Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Holman Mill 30-70 Percentile Graph for Rainfall in 2017 Siler City, NC 10 Date of Data Date of Reach Collection Occurrence Method 3/8/2017 4/24/2017 UT1 Crest Gage/ 10/17/2017 6/20/2017 3/8/2017 4/24/2017 UT2 Pressure Transducer 10/17/2017 6/20/2017 3/8/2017 4/24/2017 UT2A 10/17/2017 1 6/20/2017 Monthly Rainfall Data Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 2 - 2017 Holman Mill 30-70 Percentile Graph for Rainfall in 2017 Siler City, NC 10 9 8 7 T 6 L O m S a a 4 3 2 1 4. 1 0 Jan -17 Feb -17 Mar -17 Apr -17 May -17 Jun -17 Jul -17 Aug -17 Sep -17 Date 2017 Rainfall Data 30th Percentile -70th Percentile ' 2017 monthly rainfall from USDA Station SILER CITY (317924) 2 30th and 70th percentile rainfall data collected from weather station Siler City 2 S, NC7924 (USDA, 2002).