HomeMy WebLinkAbout20052116 Ver 4_Exhibit B, USACE JD_20181213Exhibit B - US Army Corps Notification of
Jurisdictional Determination
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2015-01697 County: Forsyth U.S.G.S. Quad: NC-KERNERSVILLE
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Property Owner: Boma North Carolina, LLC
Mark Brown
Address: 1668 Ridge Point Drive
Bountiful, UT, 84010
Telephone Number:
Size (acres) 875
Nearest Waterway Abbotts Creek
USGS HUC 03040103
Copy
Nearest Town
Kernersville
River Basin
Lower Yadkin
Coordinates
Latitude: 36.062387
Longitude: -80.091225
Location description: Boma North Carolina, LLC property known as the proposed Caleb's Creek development located off of
the intersection of Teague Lane and Ogden School Road, adjacent to Abbots Creek, south of Kemersville, in Forsyth County,
North Carolina.
Indicate Which of the Following Apply:
A. Preliminary Determination
Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area
. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA)
jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33
CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district
for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the
JD.
B. Approved Determination
_ There are Navigable Waters of the United States within the above described project area subject to the permit requirements
of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law
or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of
this notification.
X There are waters of the U.S. including wetlands on theabove described project area subject to the permit requirements of
Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
_ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the
size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a
timely manner. For a more timely delineation, you may wish to obtain a consultant To be considered final, any
delineation must be verified by the Corps.
X The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been
verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be
relied upon for a period not to exceed five years.
Page 1 of 2
_ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat
signed by the Corps Regulatory Official identified below on _ Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
_ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the.
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
_ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to
determine their requirements.
Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this
determination and/or the Corps regulatory program, please contact Jahn Thomas at 919-554-4884 x25 or
John.T.Thomas.JR4a usace.armv.mil.
C. Basis For Determination: Site includes tributaries ofAbbolts Creek wbick flows to rhe Yadkin River and onto
the Atlantic Ocean.
D. Remarks:
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the
particular site identified in this request. The delineation/determination may not be valid for the wetland conservation
provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation
in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources
Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in
B. above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA orm, it must be received at the above address by 10/04/2015.
**It is not necessary to submit an A form to the )�rvision O ice if you do not object to the determination in this
correspondence.**
Corps Regulatory Official:
Date: 8/042015
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
LIU—/ uulatow usacesuwev cowl/.
CC: Chris Huysman, Huysman & Brandy, Inc., 170 Dew Drop Road, Sparta, NC 28675
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Mark Brown
Boma North Carolina LLC
File Number: SAW -2015-01697 Date: August 4, 2015
Attached is: See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of emission)
A
❑
PROFFERED PERMIT (Standard Permit or Letter ofpermission)
B
PERMIT DENIAL
C
❑
APPROVED JURISDICTIONAL DETERMINATION
D
®
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regardingan administrative appeal of the above decision.
Additional information may be found at http,�,www sace a my niil/Missions/Civil Works/RegulatorvProgramatidPeinits.upx or
Cors regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terns and conditions therein, you may request
that the permit be modified accordingly. You must complete Section Il of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terns and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section B of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved 1D. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved 1D in its entirety, and waive all rights to appeal the approved 1D.
• APPEAL: If you disagree with the approved JD, you may appeal the. approved 1D under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary 1D is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the 1D.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provideadditional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division,
Mr, Jason Steele, Administrative Appeal Review Officer
Attn: John Thomas
CESAD-PDO
U.S. Arany Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room IOM 15
Atlanta, Georgia 30303-8801
Phone: 404)562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opporturat to artici ate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, John Thomas,
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room IOM1S, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
USAGE AID#:
SAW -2015-0169'.
Section 404/401 Jurisdictic
Seasonal RPW's 30,833 LF
(depicted with light blue lines)
Perennial RPW's 13,989 LF
(depicted with dark blue lines)
Open Waters (Ponds)
(depicted as dark blue polygons)
Jurisdictional Wetlands
(depicted with green polygons)
tN
`Wetland Sketch provided for illustrative purposes for preliminary planning use only. Not intended
to be relied upon for exact location, dimensions, cr orientation. All Findings and assessments made
1,a0fl ft by wetland consultants regarding limits of jurisdiction or permitting requirements are subject to
verification by the US Army Corps of Engineers, the NC DWR, and other appropriate local authorities.
WETLANDS
sc WATERS
Project Name:
Owner/ Developer:
City / County:
Tax PIN(s):
Caleb's Creek
BOMA NC, LLC
Kernersville, Forsyth
(see attached parcel information)
Figure 1: Approximate Depiction Coordinates: Scale:
of Waters and Wetlands Lat: 36,062387 Long: -80.091225 graphic
01/23/17