Loading...
HomeMy WebLinkAboutFast Track Storm Applicaiton Page Revision_20181214.pdf❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed Major modifications must be submitted by the original permitfee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon Issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA 2. Applicable state stormwater program(s) (check all that apply): ❑ Coastal SA-HQW ❑ Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non -Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal — Other 3. Other Permits (as applicable; write "NA" for those permit types that are not applicable): Project Name PermitiAppl Issue Date Other Information No. CAMA Major NA Erosion & Sedimentation Control Nesbitt Subdivision - Phase 2 HENDE Under Disturbed Area 3.7 2018-014 Review acre NPDES Industrial NA Stormwater 404/401 Permit Proposed Impacts Iflac 4. Local jurisdiction for building permits: Town of Mills River Point of Contact:Brian Bur ess Phone #: (828 } 890-2901 D. CONTACT INFORMATION Applicant/Financially Responsible Party (may be an Organization): The Farm at Mills River, LLC Signing Official Name & Title: Billy Taylor Street Address: 1005 Cane Creek Rd. City: Fletcher State: NC Zip: 28732 Mailing Address (if different): City: State: Zip: Phone: 828 778-6705 Fax: ( ] Email: btaylor@beverly-hanks.com 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent:The Farm at Mills River LLC Mailing Address:1005 Cane Creek Rd. City:Fletcher State:NC Zip:28732 Phone: (828) 77M705 Fax: Email: Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018