Loading...
HomeMy WebLinkAbout20181723 Ver 1_Construction Drawings_20181219It M X N N r) 65 Z Q Cherokee Murphy cD 0 0 O N � N N Lf ) C) a� co _o � z J rr 0 00 0 N � Y 00 rr o 0 N � Oo Y C) Z � W r� OC') o� U-1 o L� co J (n W H Q U =w ry �z a �E Cn CZ -1LL Printed on —% Post -Consumer Recycled Content Paper Sparta Eden Roxboro Boone • Winston-Salem Greensboro • Durham Lenoir Clemmons High Point Raleil Asheville • Hickory Salisbury Forest City Franklin • Gastonia Charlotte 1- Sanford Rockingham VICINITY MAP Faye ttville Fairmont PROJECT SITE Ahoskie Hen on • Elizabeth City• Rocky Mount f"*NV Plymouth Greenville • Washington Goldsboro ' Kinston Clinton New Beriik�/ Morehead City Jacksonville i _• '04 Willmington Z,/Long Beach LOCATION MAP SCALE: NONE Kill Devil Hills WILDERS GROVE STREAM RESTORATION FOR CITY OF RALEIGH DRAWING INDEX SHEET NO. SHEET TITLE C1 EXISTING CONDITIONS WITH PHOTOS AND DESCRIPTIONS C2 EXISTING CONDITIONS AND DEMOLITION PLAN C3 OVERVIEW AND SHEET LOCATION C4 PLAN AND PROFILE C5 PLAN AND PROFILE C6 PLAN AND PROFILE PROJECT SITE C7 TYPICAL CROSS SECTIONS C8 GRADING SECTIONS C9 GRADING SECTIONS C10 EROSION AND SEDIMENT CONTROL PLAN C11 EROSION AND SEDIMENT CONTROL DETAILS C12 EROSION AND SEDIMENT CONTROL DETAILS C13 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES C14 PLANTING PLAN C15 STANDARD DETAILS C16 STANDARD DETAILS C17 STANDARD DETAILS C18 CONSTRUCTION NOTES FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 1 2018-12-18 1 PERMIT SUBMITTAL I/R1 DATE I DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 FILE NUMBER C 1-32-16 X N N r) U) z Q A� ti � N Oco —co CD N z N Q ory a. o �o T J d) ryY rn0 N � 6> oItN Q�M N J O co co �U Lu ofry �z a� coE �M J LL sip itiSL OTO- moi. ' — I _ — 23062 ON W 77 - PHOTO -4 "000000< PHOTO -5 PHOTO -6 L%� - — — — w / / / _ �� ii f 1�-i `6: --�� -/ i 7 / Z — — �� �� / ��/ / — 240 \ / ��/��j r 220 246, o> =215 / 210 - \ 205 j� 41PHOTO-7 I / /zzzloo / // // PHOTO -8 PHOTO HO 0 - 1 13 �/� / j// �� �p �/ 9, //' //// =___ PHOTO -9 1. 7'x6' CONCRETE BOX CULVERT. 2. 60" CORRUGATED METAL PIPE, REVERSE GRADE. 3. RIR-RAP LINED CHANNEL, SLIGHTLY INCISED AND UNSTABLE. 4. HIGHLY INCISED AND UNSTABLE CHANNEL. 5. TOP OF HEADCUT 6. BASE OF HEADCUT. 15'-20' NEAR VERTICAL HEADCUT IN CHANNEL. /7. 20'-25' NEAR VERTICAL LEFT BANK OF CHANNEL. 40'-50' WIDE RAVINE. / / I �� �// f PHOTO -10 8. SEVERELY INCISED AND UNSTABLE CHANNEL. 9. SEVERELY INCISED AND UNSTABLE CHANNEL. 10. HIGHLY INCISED AND UNSTABLE CHANNEL. / / / / � y •it` UU�� II WJ��® IIS 11. MONITORING WELL #3 (NO PHOTO). � / // /// - � � `i` ,� - :�,, ..;,rte'.,* 'y".w • _ JI J I I I/�// �� =- y 12. SLIGHTLY INCISED AND UNSTABLE CHANNEL. I �/ //� t` 13. 48" HDPE PIPE. �(� PHOTO -12 f wLEGEND: PHOTO -13 EXISTING STORM PIPE E z �m 0 U M 0 D / ItE o TREE LINE I PLAN L_A V^ A I z EXISTING CONTOUR (MAJOR) 210 EXISTING CONTOUR (MINOR) 205 I 0 50' 100, DIRT ROAD PAVED ROAD FOR AGENCY REVIEW GRAPHIC SCALE THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION Printed on _% Post -Consumer A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION -1 1 LU I0 -]Z-_1 0 1 `.1U% JUbIVII I I AL ■n KI�na1�ENJR IMK4I W 0 M 0 KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EXISTING CONDITIONS WITH PHOTOS SHEET NUMBER C1 X N N r) U) z Q Aj ti � N Lo �� —U) OU N z N Q ory �o T J d) Y G0 N � O 6> oF_ N �M N J O co co �U LY ofry �z a� 6 coE �M J LL /4 % / � /\ q&P / \� 6'x7' CONCRETE BOX CULVERT OUT=229.50 GSL MI // / \ / SECONDARY �D_A'=RY— HEADGUT 1V 60„ � CMP / IN=228.4 5 OUT=228.9 A”, 8 � (TO BE REPLACED) HIGH POINT / 1100, /�-� \✓ LOW POINT ✓/ / � 200 \_EXISTING MONITORING WELL PRIMARY HEUT_ 240 (TO BE REMOVED) 2 Z /7" \ 25 \\ \ oo- / / — / / /ji i \ \ \ —220 "0" // �/ _ J ��� _ –�/// �/ –// / / � 215 // APPROXIMATE // EXISTING STREAM q1p CENTERLINE, 210 �/// i/�— 205 0. /// //��/ 0000 0A, / i�;�.00� / /rn// // ,// .0000' / o /// /--o" / /� /00 Oz" oe"O., ii /i// //ii / / / /� / /�/ / / / // / /� / >000 >X_ "oo/ / , DEMOLITION NOTES. j// �� �p/'L, // i�////// // // 1. CLEARING AND GRADING SHALL BE LIMITED TO THE AREAS / '// _ // /// �/ / NECESSARY TO FACILITATE STREAM o / jai/ %/� // // // /� /�/// / // /// / � / RESTORATION AND RELOCATION. // / / 2. BOULDERS ENCOUNTERED DURING CLEARING AND GRADING TO BE �// .001 STOCKPILED STOCKPILED FOR LATER USE. /� j/j // // ////� / / // /�/ 1 3. SEE CONSTRUCTION NOTES AND SPECIFICATIONS FOR DETAILS // / /// RELATED TO DEMOLITION AND CLEARING. 48" HDPE / IN=191.61 /or OUT= 191 .53 "o/j / I I (TO BE REPLACED) �� I 111 1 1 � LEGEND: / I I / = EXISTING STORM PIPE C ::1 \ I o TREE LINE / PLAN z EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) 205 I 0 50' 100, DIRT ROAD PAVED ROAD FOR AGENCY REVIEW GRAPHIC SCALE THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION Printed on % Post -Consumer A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 I 2U18-12-18 1 YU"/o SUBMl I I AL I/KI UA I t I UE,'3U KIF' 1 IUN KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EXISTING CONDITIONS AND DEMOLITION PLAN SHEET NUMBER C2 N Q LO J O cn ccow °° c>Ecu J II ZOO ji%///�/� pA / = �� — — — �j ✓ _ CULVERT REPLACEMENT S j j // / 230 — I Z11011 .0oo 00o '� % / _ — - / / / / I\ — _/..✓ / ', ter' (� / //I_//_ _225 _ —J �// // ��� �� PROPOSED STREAM CENTERLINE i 0000 .00 —220 /// / \ / — J /—���i/��// // // /////ii 248 \ //— \. _ ✓ _ — /� �% / /f %// ///// / 210 / //�// //jj//�/ _-- — 01 / -_ /`�//�// % /////// / / �� / / / �// //jz//j//// / //// / /e / ���// //// /✓/,�///�/i//i j// // // ///�/ -\, / -/ � ��/�/// -' 0//� / r_ / co/�101 i//i iii�% / Printed on _% Post -Consumer Y cr0 C � \ .10 01 CULVERT REPLACEMENT / ����G �-Qj,�, l• � � � LEGEND: PLAN 0 50, 100, GRAPHIC SCALE = EXISTING STORM PIPE TREE LINE O z EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) DIRT ROAD PAVED ROAD PROPOSED THALWEG PROPOSED STORM PIPE FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION l 1 ZU 1 b-_1 Z-_1 0 1 yU%o JUbIVII I I AL KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE OVERVIEW AND SHEET LOCATION SHEET NUMBER C3 X N N z Q U 004 �U N r � C _ r O(h N N LO O N � . co O 0 d z_ in J ry 0 �o cm Y 00 ry �O o� O� Y � zj r� O� 0 LO Lu CD U_(0 J W W H =w U� �z c'6 E cu _j J IL Printed on _% Post -Consumer 229_, \��� \ — — — — — — GENERAL�QU�I DIRECTION \ 2, 231— _230— CV -4 2 (SEE SHEET CI6) Q ��226 / 224 y \ \ \ \ 2� � N I I '00> 22� 1 224'223 24 `>> \ \ A,� \ � ^7 V 22 125\ � _ \ _pe) CV -2 M .�. I ( N ^ / �_� SEE SHEET C16 + \ `�� \ \ `�.� V_1 = / / / / / \ ( ) I \?3 � (SEE SHEET C16\ 00 II (SEE SHEET C16) — — / 13+00 ^22 23\ \ \ / /- - _ \ 2\\ \ / US INVERT = 229.95 / ti _ N ti� / ` �/ // \� ,� ` _ DS INVERT 228.50 _ _ US INVERT = 228.45 +50 36' —� DS INVERT = 228.00 00. 226 228 13 66 45 _ \ US INVERT = 229.95 a \�`�� � \ ` � � / 230 �F 60" � _ \ ���� `'r� CRAP 1 _ DS INVERT 228.50 _—� —225-- 226— 226- --227— — — — N X � ;ti4 _ ?4 X CAA/ r ---- _. CV -11 (SEE SHEET C16) 7 / � / Q / �ocly PLAN 0 20' 40' GRAPHIC SCALE LEGEND: NEW CORRUGATED ALUMINUM ALLOY (CAA) PIPE TREE LINE EXISTING CONTOUR (MAJOR) — —210— EXISTING CONTOUR (MINOR) — 208 - NEW CONTOUR (MAJOR) 21� NEW CONTOUR (MINOR) 208 DIRT ROAD - PROPOSED THALWEG ROCK CROSS VANE FLOW _ ROCK VANE FLOW — �A —���:7•l� • �Td:7�1�1� ���I NL • I`7 MA RiI•L7r�� `f Ick tit �'f.�.`f I_f Ur �G1• 9+50 10+00 10+50 11+00 11+50 12+00 PROFILE SCALE: HOR.: 1"=20 - VERT.: "=20'VERT.: 1 "=10' 12+50 13+00 13+50 13+75 FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION CAROB AECOM TECHNICAL z SERVICES, INC. No. 1473 XTI OF A ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE PLAN AND PROFILE SHEET NUMBER C4 X N N 0 z Q U 004 �U N r � C _ r O N N 11") O N � . co 00 d z_ in J ry �o rn Y IY `° o o�N , O� Y w zLUj ry o� oLO wo �(0 J cn W H =w U� �z coE cu _j J tl Printed on _% Post -Consumer 0 LEGEND: 4 C;FNFRAI FI`C)w f11RF(TI(1N \. ROCK GRADE CONTROL STRUCTURE (SEE SHEET C17) \ f:Z•T•1:4W 1:9M16Ti7I _ � � ? 6- �\ / � \ /cv ,nom �� � \_�_\ � –cv ��� �\ \\�_►• to 7=� -221 EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) NEW CONTOUR (MAJOR) NEW CONTOUR (MINOR) DIRT ROAD PROPOSED THALWEG GRADE CONTROL STEP—POOL 210 FLOW I—II—II—I FLOW 0 20' 40' GRAPHIC SCALE � --j r �l�J 1�1►71 �i�] ►��1 �J � _18T61 A&M 11 :M 16T•I 111110 • •• • •• • •• • •• • FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION L=com PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION CAROB%9;: AECOM TECHNICAL z r' SERVICES, INC. o= No. 1473 : OF A ISSUE/REVISION l 1 ZU 1 b-_1 Z-_1 0 1 `JU% JUbIVI I I I AL ■IIG���I�\��■�J�►Z�JG�Ir�I�J\ KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE PLAN AND PROFILE SHEET NUMBER C5 X N N 0 z Q U 004 �U N r � 0 _ r o(h N N LO C:) N . co O 0 d z co J � 0 �o cmN Y 0 �O o� 0 C Y w zj r� O� oLO U_(0 w� =w U� �z coE cu _j J IL G RAS FLOW C QECTION, INNER FLOOD BENCH Lo\ ,\ \ \\ \\ ��� ��"�\ \\\ \\ _ - \ (SEE SHEET C7) \ DS INVERT= 194.25V \\ \ -� �� ��\ \ \` �_ `� LLI I / DS INVERT = 192.75 J_DS INVERT = 194.25 I / / '�-� \ - 1 \ \ \ 210 d' \ `21 —209— 208 _ ,2 20 9 07 INNER FLOOD BENCH los\ \ (SEE SHEET C7) �1 1,9 206_ 205 sp ��°� \� 1g,= 9 :::-200 �� '_ \ \ \ _ \ 20 203 x\98 �/ ' —�\ \ \ X20 204 0 6p C r 195 �� �� _ 1+50, \� 202 201 - 202 �\ - •0+ - ;9 / \\s' - \\\ �\ \ 200 201 � � / egg - \ 19� 1\196• / / \ \ \ 'o, _ CV-54+00- US- - �NVERT 194.60 SEE SHEET C16 - / / 2 0 - / 200 US_ INVERT 193.10 9y ( ) Zoe/ �- 20 / 201202 US INVERT = 194.60 _ `� ' 20� /Z°�� — _ 20 203 205 203 204 � 204 206 _j/ZO°� -206 205 � � �207 I 2 = — — — _ �� - - - _- - INNER FLOOD BENCH / / - / � -INNER FLOOD BENCH (SEE SHEET C7)-",-' (SEE SHEET C7)- 1-01 — PLAN 0 20' 40' GRAPHIC SCALE NEW CORRUGATED ALUMINUM ALLOY (CAA) PIPE TREE LINE EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) NEW CONTOUR (MAJOR) NEW CONTOUR (MINOR) DIRT ROAD PROPOSED THALWEG ROCK CROSS VANE FLOW —210- 208- — 21� 208— 22 20 210 10 FASTINIG GRADE 200 00 MCI z 190 - 90 STA 1 +05 CONSTRUCTED RIFFLE ONSTRULL7ED RIFFLE SEA 9*10 STA 3+00 STA 4+00 18 80 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+46 Printed on —% Post -Consumer PROFILE SCALE: HOR.:1 "=20' VERT.: 1 "=10' FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION CAROB%9;: AECOM TECHNICAL z SERVICES, INC. o= No. 1473 OF A ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE PLAN AND PROFILE SHEET NUMBER C6 X N N Z Q TIE-IN TO EXISTING GRADE EXISTING GROUND TIE-IN TO EXISTING GRADE EXISTING GROUND 3H:1 V TIE-IN TO EXISTING GRADE EXISTING GROUND I GRADE 70 EXISTING 0 0� �U N eD oco N N Ln �o U) _o U �z in3: J ry 0 00 0 N Y 00 ry �O o� Oo Y � zLuj r O� oLn CD LL LLo J (n W H =w U� �z co E cu _j J LL r& Printed on % Post -Consumer 3H:1 V 15.0' 6.0' 15.0' THALWEG (TYP.) RIFFLE CROSS-SECTION NOT TO SCALE THALWEG (TYP.) RIFFLE CROSS-SECTION (INNER BENCH NOT TO SCALE I 36.0' 12.0' BANKFULL STAGE ,00000 THALWEG (TYP.) POOL CROSS-SECTION NOT TO SCALE BANKFULL STAGE 3H�.1v 16.0' BANKFULL STAGE `TIE-IN TO EXISTING GRADE EXISTING GROUND / TIE-IN TO EXISTING GRADE EXISTING GROUND NOTES: 1. POOL TYPICAL FOR LEFT MEANDER SHOWN. MIRROR SECTION FOR LEFT MEANDERS. 2. RIFFLE CROSS-SECTION TYPICALLY OCCURS AT MID -RIFFLE AND POOL CROSS-SECTION AT THE MID -POOL. CHANNEL DEPTH AND SIDE SLOPES WILL VARY ALONG TRANSITION FROM POOL CROSS-SECTION TO RIFFLE CROSS-SECTION. `TIE-IN TO EXISTING GRADE EXISTING GROUND FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION L=com PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-1: I/R DATI KEY PLAN 90% SUBMITTAL DESCRIPTION PROJECT NUMBER 60523147 SHEET TITLE TYPICAL CROSS SECTIONS SHEET NUMBER C7 X N N Z Q cD 0 U 00c� C) C6 C� oCN N N L0 �C:) o (D az co J ry r) r, ZZ N Y ry �O o� O� Y � Zj r O� oL0 U-1 o LL J (n W H =w U� �z coE cu _j J LL 250 50 250 50 250 50 24 240 24 240 2 240 23G 30 23G 230 230-- 230 \ \02W1 - 22 220 22G 220 22 220 21 L21 0 21 L21 0 21 210 40.00 20.00 0.00 -20.00 -40.00 40.00 20.00 0.00 -20.00 -40.00 40.00 20.00 0.00 -20.00 -40.00 -60.00 STA 13+43 STA 12+93 STA 12+37 SCALE: HOR.: 1"=20' SCALE: HOR.: 1"=20' SCALE: HOR.: 1"=20' VERT.: 1 "=10' VERT.: 1 "=10' VERT.: 1 "=10' 24 I 240 23G 230 23 230 I 1 23 ' 230 22 220 22G 220 22 / 220 21 G 10 21 210 / 21 I I I 210 20 200 20 200 20 205 19 195 19 195 120.00 100.00 80.00 60.00 40.00 20.00 0.00 -20.00 -40.00 100.00 80.00 60.00 40.00 20.00 0.00 -20.00 60.00 40.00 20.00 0.00 -20.00 -40.00 STA 10+92 STA 9+70 STA 8+62 SCALE: HOR.: 1"=20' SCALE: HOR.: 1"=20' SCALE: HOR.: 1"=20' VERT.: 1 "=10' VERT.: 1 "=10' VERT.: 1 "=10' LEGEND: EXISTING GRADE --------- PROPOSED GRADE FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION Printed on _% Post -Consumer A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE GRADING SECTIONS SHEET NUMBER C8 X N N Z Q 40.00 20.00 0.00 —20.00 —40.00 STA 5+42 SCALE: HOR.: 1 "=20' VERT.: 1 "=10' cD 0 00U 00 C) C6 N r � C _ r O (h N N LO O N . co O (D d Z co J ry r, ZZ dm N Y '0 ry �O o� O� Y � ZLuj r O� oLO Lu CD LL J (n W H =w U� �z coE cu _j J LL r& Printed on % Post -Consumer 20 10 90 85 40.00 20.00 0.00 —20.00 —40.00 STA 4+41 SCALE: HOR.: 1"=20' VERT.: 1 "=10' 40.00 20.00 0.00 —20.00 —40.00 STA 2+42 SCALE: HOR.: 1"=20' VERT.: 1 "=10' 101-91 iI97 1191 80 40.00 20.00 0.00 —20.00 —40.00 STA 0+97 SCALE: HOR.: 1"=20 - VERT.: "=20'VERT.: 1 "=10' LEGEND: EXISTING GRADE --------- PROPOSED GRADE FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION L=com PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-1: I/R DATI KEY PLAN 90% SUBMITTAL DESCRIPTION PROJECT NUMBER 60523147 SHEET TITLE GRADING SECTIONS SHEET NUMBER C9 M X N N 0 Z5 Z Q V n U 00 �U N ao � O M N N O N U) o U az J ry 0 00 O N Y 00 o�N , o� Y rn zrl- w,It 0M 0 LO wo L� C.0 J W w H =w U0 2°W CL �z >E �M U� J LL nnnru1n10=n DiDDnD iii nee n Q\ SLOPE VARIES rHrsKi� (i rt -till) CROSS SECTION 0 e OC 90( 00 MACHINED RIPRAP (CLASS A-3) STONE RAMP WOOD MAT STREAM CHANNEL NOTE: 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 2. HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 4. LINE STREAMBANK AND ACCESS RAMP AREA WITH NON -WOVEN FILTER FABRIC. 5. INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW. 6. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL BY INSTALLING SILT FENCE ON ALL FOUR CORNERS ADJACENT TO THE STREAM. SEE SILT FENCE DETAIL. 7. STABILIZE AN ACCESS RAMP OF MACHINED RIPRAP (CLASS A-3) TO THE EDGE OF THE MUD MAT. 8. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND WIDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL. 9. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, RECOMMENDED ATA 5:1 SLOPE. DETAIL TEMPORARY STREAM CROSSING -WOOD MAT NOT TO SCALE 2' EXISTING TREES TO REMAIN 1-1/2" DIAMOND MESH HIGH DENSITY POLYETHYLENE FENCE (ORANGE) NOTES: 1. LOCATE FENCING AS NECESSARY AND AS DIRECTED BY ENGINEER. 2. FENCING SHOULD BE PLACED AT 1.5X DRIP LINE RADIUS FROM TRUNK. 3. NO MATERIAL OR EQUIPMENT SHALL BE STORED OR STOCKPILED WITHIN THE AREA SURROUNDED BY TREE PROTECTION FENCING. DETAIL TREE PROTECTION/CONSTRUCTION SAFETY Printed on % Post -Consumer NOT TO SCALE 1-3/4" x 1", 13 GA. U CHANNEL STEEL POSTS W/ CLIPS @ 6" O.C. VERT., TYP. PLAN NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING 12' MIN OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. EXISTING ROADWAY NEW CONSTRUCTION 35' MIN. 15' MIN. p0 O p Op p O p 000000 0 00 0 0 o 0p 0 0Opp 000 00 0 OOp0p0p0 0 0O 0O 0 00o0 oC) 00000 0p0OpO0O oOopp pOo 000 III 12" MIN 00o000 p000o0ooo6 MIN. o°°pO000 008 00 00 00 o° 000 000000 00 ''II IIII- ''►II III= '��I IIII III_ 'III IIII NON -WOVEN GEOTEXTILE FABRIC (TYPE III) CROSS SECTION DETAIL CONSTRUCTION ENTRANCE NOT TO SCALE NOTES: 1. MAXIMUM SINGLE LENGTH OF MATTING/MESH IS 100'. 2. TOP AND BOTTOM EDGES OF MATTING/MESH SHALL BE KEYED IN. 3. COIR MATTING DETAIL SHOWN IS FOR PERMANENT INSTALLATION. TEMPORARY INSTALLATION FOR EROSION CONTROL PROTECTION AS STIPULATED SHALL BE TO THE EXTENT THAT THE PROJECT SITE NEEDS TO BE PROTECTED FOR EROSION AND SEDIMENT CONTROL DURING NON -WORKING HOURS. TC STREAM cf. LL a TOI 2.5' COIR MATTIN( OVERLAPS 5' HARDWOOD STAKE VERLAP UPSTREAM FABRIC OVER DOWNSTREAM FABRIC AT SEAMS I—II III I 5' MIN. Z to CHANNEL BOTTO .--5- FLOW DWOOD STAKES I CAL KEYED IN COIR FABRIC (TYP.) z AT TOE OF SLOPE DETAIL EROSION CONTROL BLANKET NOT TO SCALE N STAKE DETAIL x 2" (NOMINAL) VOODEN STAKE OIR MATTING FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EROSION AND SEDIMENT CONTROL DETAILS SHEET NUMBER C11 50' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE p00000000000000 00 0 0o0000po00oo0 00 O po 0 00 O O000 00 pp O 00pp00 00 p p0O 0ocO O Op0 C� O Oo p OC OOC Op 2" - 3" STONE TO BE USED p OO Op w 0p 000 O 00 pm pp� 0000 000 0 0 Op �O p 00 O O p 00�0 000 O000 O OpO000 O ppp0pC 0pp O 00 00000000 0000c PLAN NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING 12' MIN OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. EXISTING ROADWAY NEW CONSTRUCTION 35' MIN. 15' MIN. p0 O p Op p O p 000000 0 00 0 0 o 0p 0 0Opp 000 00 0 OOp0p0p0 0 0O 0O 0 00o0 oC) 00000 0p0OpO0O oOopp pOo 000 III 12" MIN 00o000 p000o0ooo6 MIN. o°°pO000 008 00 00 00 o° 000 000000 00 ''II IIII- ''►II III= '��I IIII III_ 'III IIII NON -WOVEN GEOTEXTILE FABRIC (TYPE III) CROSS SECTION DETAIL CONSTRUCTION ENTRANCE NOT TO SCALE NOTES: 1. MAXIMUM SINGLE LENGTH OF MATTING/MESH IS 100'. 2. TOP AND BOTTOM EDGES OF MATTING/MESH SHALL BE KEYED IN. 3. COIR MATTING DETAIL SHOWN IS FOR PERMANENT INSTALLATION. TEMPORARY INSTALLATION FOR EROSION CONTROL PROTECTION AS STIPULATED SHALL BE TO THE EXTENT THAT THE PROJECT SITE NEEDS TO BE PROTECTED FOR EROSION AND SEDIMENT CONTROL DURING NON -WORKING HOURS. TC STREAM cf. LL a TOI 2.5' COIR MATTIN( OVERLAPS 5' HARDWOOD STAKE VERLAP UPSTREAM FABRIC OVER DOWNSTREAM FABRIC AT SEAMS I—II III I 5' MIN. Z to CHANNEL BOTTO .--5- FLOW DWOOD STAKES I CAL KEYED IN COIR FABRIC (TYP.) z AT TOE OF SLOPE DETAIL EROSION CONTROL BLANKET NOT TO SCALE N STAKE DETAIL x 2" (NOMINAL) VOODEN STAKE OIR MATTING FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EROSION AND SEDIMENT CONTROL DETAILS SHEET NUMBER C11 X N N z Q 0� �U N C6 oCN N N LO �o o 0 az in3: J ry r) � O d) N Y '0 ry �o o� O � Y w z; r� oco co oLO wo (0 U) J (n w�_ =w U� �z c'6 E cu _j J LL TOP OF BANK #57 STONE 1' MIN. 2 1� FLOW BASE OF STREAM STONE IMPERVIOUS DIKE PLAN VIEW 2' MIN. POLYETHYLENE SHEETING (6 MIL. MINIMUM) STONE IMPERVIOUS DIKE PROFILE 3' MIN. MACHINED RIPRAP (CLASS A-1) NO 57 STONE 3' MIN. FLOW V MIN MACHINED RIPRAP (CLASS A-1) TOP OF BANK STREAM BED STONE IMPERVIOUS DIKE CROSS SECTION POYLETHELENE SHEETING (6 MIL. MINIMUM) NOTE: 1. THE STRUCTURE SHALL BE USED FOR DIVERTING AND PUMPING ONLY. THE STRUCTURE SHALL BE RELOCATED OR REMOVED ONCE PUMPING/DIVERTING IS COMPLETE. 2. EITHER TYPE OF IMPERVIOUS DIKE (SANDBAG OR STONE) MAY BE USED. SECURE IMPERVIOUS FABRIC UNDER TOP LAYER OF SANDBAGS 2' MIN. MACHINE RIPRAP (CLASS A-1) FLOW 3' MIN. SANDBAGS SECURE POLYETHYLENE SHEETING WITH CHANNEL BOTTOM MACHINE RIPRAP (CLASS A-1) Printed on % Post -Consumer CHANNEL SANDBAG IMPERVIOUS DIKE PROFILE SANDBAG IMPERVIOUS DIKE CROSS SECTION DETAIL IMPERVIOUS DIKE NOT TO SCALE 3' MIN. PROPOSED CHANNEL EXISTING GROI PUS NON -WOVEN GEOTEXTILE FABRIC (TYPE III) "I"\CHINED RIPRAP (CLASS A-1) SPECIAL STILLING BASIN inno�o�iini is DIKE (SAND BAG TYPE SHOWN) ED 24" CPP CHANNEL PIPE DIVERSION CROSS SECTION IMPERVIOUS DIKE SEE DETAIL - MAIN PUMP (BASEFLOW) 250' MAX. FLOW CHANNEL BOTTOM PIPE DIVERSION PROFILE VARIES CONSTRUCTION AREA (250' MAX) (LOCATION VARIES WITHIN THE PUMP AROUND AREA) IMPERVIOUS P"� FLOOD PLAIN STREAM //",— NOTE: 1. CHANNEL SHALL BE MATTED WITH COIR FIBER MATTING PRIOR TO THE CLOSE OF EACH WORK DAY. 2. IF FINAL CHANNEL GRADING HAS NOT BEEN PERFORMED, TEMPORARILY SECURE COIR MATTING WITH STAKES OR ROCK PROPOSED 24" CPP NOTE: 1. PIPE MUST HAVE POSITIVE DRAINAGE WHEN USING DIVERSION (0.3% TO 2.0% PIPE SLOPE IS RECOMMENDED) d SEDIMENT PUMP AS REQUIRED PUMP—AROUND DIVERSION PLANVIEW DETAIL PUMP-AROUND/PIPE DIVERSION NOT TO SCALE SEE DETAIL THIS SHEET OUT FALL ONTO MACHINED RIPRAP (CLASS A-1) FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EROSION AND SEDIMENT CONTROL DETAILS SHEET NUMBER C12 MINIMUM 10 GAUGE LINE WIRES c� 0 AN 00 c�ti 00 o� N N Ln -6o � � o �z in3: J ry 0 00 0 N Y 00 ry �O o3: O� Y � z- r� O 0 V) Iwi o w� =w U---) �z > co E cu _j J U_ Printed on io rost-�onsumei IIII IIIA I IIII�.�,�■■■■■■■■■ _ .11111 , I 1 MENNEN ,•�i I I II�,►ic�i�i�►�i�il 010101011", ....►.....�������.� MOB►.pplWe�.EE�.��i _ ♦�►��i�i' u4I II(=.1 SII u * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC 3'-0" ~ o FILL SLOPE 26" 3: z N GRADE 6" MINIMUM COVER 2'-0OVER SKIRT " '" I� I \ ANCHOR SKIRT AS I DIRECTED BY ENGINEER cines WIMA/ MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES f- GRADE 77 NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. REMOVE SEDIMENT DEEPER THAN 12" AND REPAIR ANY UNDERMINING IMMEDIATELY. 4. FOR REPAIR OF SILT FENCE FAILURES, USE NO. 57 WASHED STONE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 5. CONTRACTOR SHALL BE RESPONSIBILE FOR PLACEMENT AND REMOVAL OF FENCE. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING DISTURBED AREAS TO PRE -CONSTRUCTION CONDITION. 7. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. DETAIL TEMPORARY SILT FENCING NOT TO SCALE I. RESPONSIBLE PARTIES: 1. OWNER (PRIMARY PERMITTEE): COMPANY: CITY OF RALEIGH II. PROJECT NARRATIVE: 1. EXISTING SITE CONDITIONS: SEE CONSTRUCTION PLANS STORMWATER MANAGEMENT AND SEDIMENT CONTROLS 1. ARE THERE ANY STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY OTHER THAN FOR CONSTRUCTION ACTIVITIES? NO. 2. PERIMETER CONTROLS: PERIMETER CONTROLS ARE CRUCIAL TO THE SWPPP. THESE BMPS SHALL BE INSTALLED PRIOR TO DEMOLITION, CLEARING, OR GRADING ACTIVITIES ON THE SITE. IF MINOR DEMOLITION IS REQUIRED FOR THE INSTALLATION OF THESE PERIMETER CONTROLS, THE DEMOLITION SHOULD BE LIMITED ONLY TO THE PORTIONS OF THE SITE REQUIRED FOR INSTALLATION OF THESE MEASURES. 2.1. SILT FENCE - SILT FENCE CONSISTS OF GEOTEXTILE FABRIC STRETCHED ACROSS STEEL POSTS. THE LOWER EDGE OF THE FENCE IS VERTICALLY TRENCHED INTO THE GROUND AND COVERED BY COMPACTED BACKFILL. STANDARD DETAIL FOR SILT FENCE CAN BE FOUND IN THE APPROVED CONSTRUCTION PLAN. ALL MATERIALS MUST CONFORM TO PROJECT SPECIFICATIONS. LOCATION: AS INDICATED ON THE APPROVED CONSTRUCTION PLANS. SILT FENCE SHALL BE CONSTRUCTED PERPENDICULAR TO FLOW DIRECTION. A DOUBLE ROW OF SILT FENCE IS REQUIRED IN DISTURBED AREAS THAT ARE WITHIN 50' OF A WETLAND. SILT FENCE MUST BE LOCATED AT LEAST TEN (10) FEET FROM ANY WETLANDS OR BODIES OF WATER. SILT FENCE PROTECTING WETLANDS SHALL BE WIRE BACKED. INSTALLATION SCHEDULE: PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING, OR DEMOLITION ACTIVITIES COMMENCE ON THE SITE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES l/ -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: REPAIRS SHALL BE MADE IMMEDIATELY IF ANY TEARS, GAPS, OR DECOMPOSED AREAS ARE NOTED DURING INSPECTION. SEDIMENTS SHALL BE REMOVED WHEN ACCUMULATION HEIGHTS REACH ONE-THIRD (1/3) THE FENCE HEIGHT. 3. SEDIMENT TRACKING DEPOSITING OF SOILS ONTO ADJACENT ROADWAYS SHALL BE REDUCED BY THE USE OF PERIMETER CONTROLS. 3.1. CONSTRUCTION ENTRANCE AND EXIT - A STABILIZED CONSTRUCTION ENTRANCE IS A TEMPORARY STONE -STABILIZED PAD OR STEEL SHAKER PLATES. LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD, DIRT, AND ROCKS TRANSPORTED ONTO PUBLIC ROADS BY MOTOR VEHICLES, EQUIPMENT, AND RUNOFF. LOCATION: AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC WILL BE ENTERING AND EXITING THE PROJECT SITE. INSTALLATION SCHEDULE: PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING, OR DEMOLITION ACTIVITIES COMMENCE ON THE SITE. INSPECTION: DAILY AND AFTER EACH RAINFALL MAINTENANCE: RESHAPE THE STONE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. RINSE OR REPLACE STONES AS NEEDED WHENEVER THE ENTRANCE FAILS TO REDUCE MUD BEING CARRIED OFF SITE BY VEHICLES. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. FREQUENT RINSING WILL EXTEND THE USEFUL LIFE OF STONE. IMMEDIATELY REMOVE ANY MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY. 4. STOCKPILED SEDIMENT, MATERIALS OR DEMOLITION DEBRIS ALL STOCKPILES SHALL BE PROTECTED FROM EROSION WITH TEMPORARY STABILIZATION AND PERIMETER SILT FENCING PER THE APPROVED CONSTRUCTION PLANS. LOCATION: AS DIRECTED BY THE ENGINEER AND THE CLIENT. SELECT STOCKPILE LOCATION TO AVOID SLOPES, NATURAL DRAINAGE WAYS, AND TRAFFIC ROUTES. INSTALLATION SCHEDULE: MATERIAL STOCKPILES MAY NOT BE INITIATED UNTIL AFTER ALL PERIMETER CONTROLS AND SEDIMENT TRAPS/BASINS ARE IN PLACE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES '/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: IF RILLS APPEAR, RE -GRADE AND RE -STABILIZE IMMEDIATELY. STOCKPILES MAY BE COVERED WITH MATTING, SHEETING, OR OTHER MATERIALS TO MINIMIZE EROSION. MAINTAIN SILT FENCE IN ACCORDANCE WITH STANDARD NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND DETAILS FROM CONSTRUCTION PLANS. 5. MINIMIZE DUST DUST CONTROL WILL BE IMPLEMENTED BY APPLYING WATER AS NEEDED ONCE SITE GRADING HAS BEGUN AND DURING WINDY CONDITIONS (FORECASTED OR ACTUAL WIND CONDITIONS OF 20 MPH OR GREATER) WHILE SITE GRADING IS OCCURRING, AND IN AREAS OF EXPOSED SOIL. 5.1. DUST CONTROL - LOCATION: ON DISTURBED AREAS THAT HAVE NOT BEEN STABILIZED WITH VEGETATION. INSTALLATION SCHEDULE: AS REQUIRED BY WEATHER CONDITIONS. DUST CONTROL SHALL BE CONTINUED UNTIL FINAL STABILIZATION IS ACHIEVED. INSPECTION: DAILY OBSERVATION OF CONDITIONS. 6. DISTURBANCE OF STEEP SLOPES STEEP SLOPES ARE ANY SLOPE EXCEEDING 2:1. STABILIZATION MEASURES MUST BE INITIATED ON ANY EXPOSED STEEP SLOPE AREA WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 14 CALENDAR DAYS. 6.1. EROSION CONTROL BLANKETS - TEMPORARY EROSION CONTROL BLANKETS (ECBS) ARE PRODUCTS COMPOSED PRIMARILY OF BIOLOGICALLY, PHOTOCHEMICALLY OR OTHERWISE DEGRADABLE CONSTITUENTS SUCH AS WHEAT STRAW, COCONUT FIBER, OR AGED CURLED EXCELSIOR WOOD PRODUCT WITH LONGEVITY OF APPROXIMATELY 1- TO 3 -YEARS. REFER TO APPROVED TECHNICAL SPECIFICATION AND CONSTRUCTION PLANS FOR INFORMATION ON MATERIALS. MATERIALS SHOULD COMPLY WITH LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. LOCATION: AS NEEDED. INSTALLATION SCHEDULE: USE ECBS FOR TEMPORARY STABILIZATION OF SOIL IMMEDIATELY FOLLOWING SEEDING UNTIL THE VEGETATIVE COVER HAS GROWN AND BECOMES ESTABLISHED. INSTALL IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES %-INCHES OR MORE OF PRECIPITATION. MAINTENANCE: IF WASHOUT OR BREAKAGE OCCURS, REPAIR ALL DAMAGED AREAS IMMEDIATELY BY RESTORING THE SOIL ON SLOPES OR CHANNELS TO ITS FINISHED GRADE, REAPPLY SEED, AND REPLACING THE APPROPRIATE ECB MATERIAL AS NEEDED. VERIFY MATTING MAINTAINS GOOD CONTACT WITH THE SLOPE SURFACE. EROSION SHOULD NOT BE OCCURRING BELOW THE MATTING. IF CONTACT IS LOST BETWEEN MAT AND SLOPE, THE AREA SHOULD BE REPAIRED AND RESTAPLED. 7. TOPSOIL PRESERVING AND USING TOPSOIL TO ENHANCE FINAL SITE STABILIZATION WITH VEGETATION. LOCATION: STRIP TOPSOIL ONLY FROM DISTURBED AREAS OUTSIDE OF THE STREAM CHANNEL. A 4-6 INCH STRIPPING DEPTH IS COMMON, BUT DEPTH VARIES DEPENDING ON THE SITE. ALL TOPSOIL STOCKPILES MUST BE PROTECTED FROM EROSION AS DETAILED IN THE STANDARD STOCKPILE DETAIL INCLUDED IN THE APPROVED CONSTRUCTION PLANS. INSTALLATION SCHEDULE: TOPSOILING MUST BEGIN ONLY AFTER PERIMETER CONTROLS, DIVERSION SWALES, AND SEDIMENT TRAPS ARE IN PLACE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/ -INCHES OR MORE OF PRECIPITATION MAINTENANCE: INSPECT STOCKPILE FOR SIGNS OF EROSION. STOCKPILE MAY BE COVERED IF STORM EVENTS ARE ANTICIPATED. 8. SOIL COMPACTION CONTRACTOR SHALL MINIMIZE THE COMPACTION OF SOILS IN AREAS NOT DESIGNATED FOR COMPACTION ON THE CONSTRUCTION PLANS. 9. ROCK DITCH CHECK A ROCK DITCH CHECK IS A TEMPORARY ROCK FILL DAM CONSTRUCTED ACROSS A DRAINAGE DITCH, SWALES, OR CHANNEL TO LOWER THE SPEED OF CONCENTRATED FLOW AND REMOVE SUSPENDED SOLIDS. REFER TO THE TECHNICAL SPECIFICATIONS AND CONSTRUCTION PLANS FOR INFORMATION ON MATERIALS. MATERIALS SHOULD COMPLY WITH LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. LOCATION: AS INDICATED IN THE APPROVED CONSTRUCTION PLANS. INSTALLATION: INSTALL PRIOR TO LAND DISTURBING ACTIVITI ES. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: SEDIMENTS SHALL BE REMOVED WHEN ACCUMULATION HEIGHTS REACH ONE-HALF THE STOEB1EE2N CLOGGED NORDD SLODIGED SAM HEGHT. H LE BE AT HAVE REPLACED IMMEDIATELY. 10. DEWATERING PRACTICES CONSTRUCTION DEWATERING INVOLVES THE PUMPING OF THE WATER TO AN APPROPRIATE RECEIVING AREA. PUMP AROUND SYSTEM SHOULD ALLOW FOR STREAM WORK IN THE DRY. LOCATION: AT ALL EXCAVATIONS OR COFFERDAM IMPOUNDMENTS THAT REQUIRE DEWATERING. INSTALLATION SCHEDULE: AS REQUIRED, BUT NOT PRIOR TO INSTALLATION OF PERIMETER CONTROLS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: ENSURE THAT EROSION DOES NOT OCCUR AT THE OUTLET OF THE HOSE FROM THE PUMP DUE TO HIGH CONCENTRATED FLOWS • IN AREAS WHERE DISTURBANCE RESULTS IN SUBSOIL BEING THE FINAL GRADE SURFACE, TOPSOIL WILL BE SPREAD OVER THE FINISHED AREA AT MINIMUM DEPTH OF 2 TO 6 INCHES. • THE SEEDBED WILL BE FREE OF LARGE CLODS, ROCKS, WOODY DEBRIS AND OTHER OBJECTIONABLE MATERIALS. • THE TOP LAYER OF SOIL WILL BE LOOSENED. • GRASS SELECTION SHALL COMPLY WITH THE APPROVED PLANS AND SPECIFICATIONS. • APPLY EROSION CONTROL BLANKET ON CHANNEL SLOPES AND ALL SLOPES GREATER THAN 3:1 . • HYDROMULCH SHALL BE APPLIED IMMEDIATELY FOLLOWING SEEDING AT THE PUBLISHED APPLICATION RATE. • IF VEGETATIVE COVER IS NOT ATTAINED, THE AREA SHALL BE RESEEDED, AND MULCHED IMMEDIATELY. IV. CONSTRUCTION -RELATED POLLUTANTS: 11. SITE STABILIZATION SITE STABILIZATION CAN BE EITHER TEMPORARY OR PERMANENT DEPENDING ON THE NEED FOR FURTHER CONSTRUCTION ACTIVITIES WITHIN THE AREA. SELECTION OF STABILIZATION METHOD SHALL BE CONSISTENT WITH THE APPROVED CONSTRUCTION PLANS. ALL STABILIZATION MEASURES SHALL BE RECORDED IN THE GRADING AND STABILIZATION LOG. IT IS THE OPERATORS RESPONSIBILITY TO UPDATE THIS LOG AND MAINTAIN IT. 11.1. TEMPORARY STABILIZATION - TEMPORARY STABILIZATION IS REQUIRED AS SOON AS PRACTICAL BUT NO MORE THAN 14 DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED. COVER SEEDED AREAS WITH AN APPROPRIATE MULCH TO PROVIDE PROTECTION FROM THE WEATHER. WHEN THE TEMPORARY VEGETATION DOES NOT GROW QUICKLY OR THICK ENOUGH TO PREVENT EROSION, RE -SEED AS SOON AS POSSIBLE. KEEP SEEDED AREAS ADEQUATELY MOIST. IRRIGATE THE SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION. SEED SELECTION IS BASED ON GEOGRAPHICAL LOCATION, SOIL TYPE AND THE SEASON OF THE YEAR IN WHICH THE 1. THE FOLLOWING CONSTRUCTION -RELATED EQUIPMENT OR ACTIVITIES HAVE THE POTENTIAL TO BECOME POLLUTANT SOURCES: 1.1. CONSTRUCTION EQUIPMENT THAT CONTAINS FLUIDS, FUELS, ETC; 1.2. CONSTRUCTION MATERIALS, INCLUDING PAINTS, LUBRICANTS, FERTILIZERS, ETC. THAT ARE KEPT IN STOCKPILES, OR GENERALLY ONSITE; 1.3. CONCRETE FORMS, ADMIXTURES, FORM LUBRICANTS, ETC.; 1.4. SANITARY OR DOMESTIC WASTE FROM WORKERS; 1.5. LANDSCAPING MATERIALS SUCH AS FERTILIZERS AND HERBICIDES. 2. THE CONTRACTOR SHALL HAVE A PROJECT SPECIFIC SPILL PLAN TO AVOID POLLUTION FROM THESE POTENTIAL POLLUTANTS. ANY SPILL MUST BE REPORTED TO THE CONTRACTOR. THE CONTRACTOR SHALL DETERMINE THE NECESSARY ACTIONS BASED ON THE SPCC. 3. REFER TO 40 CFR 302.4, 40 CFR 117.21 AND 40 CFR 110.10 FOR QUANTITIES RELATING TO SPILLS OR RELEASES WHICH REQUIRE REPORTING. IF A REPORTABLE QUANTITY IS RELEASED, IMMEDIATELY N OTI FY: • NATIONAL RESPONSE CENTER: PHONE: 1-800-424-8802 • NCDEQ-RALEIGH-REGIONAL OFFICE: PHONE: 919-791-4200 4. A RELEASE INCIDENT WILL BE IMMEDIATELY EVALUATED BY THE CONTRACTOR TO DETERMINE IF NOTIFICATION UNDER OTHER REGULATIONS (CERCLA, SARA, RIGHT -TO -KNOW, RCRA, ETC.) WILL NEED TO BE MADE TO THE APPROPRIATE FEDERAL, STATE, OR LOCAL AGENCIES. 5. THE SPILLS AND RELEASES LOG SHALL BE UPDATED WITHIN 24 -HOURS OF AN EVENT. THE SWPPP MUST BE REVIEWED TO IDENTIFY MEASURES TO PREVENT THE REOCCURRENCE OF SUCH RELEASES AND TO RESPOND TO SUCH RELEASES. THE SWPPP MUST BE MODIFIED WITHIN 14 DAYS OF THE EVENT. PLANTING IS TO BE DONE. SEEDING SHALL BE COMPLETED IN ACCORDANCE WITH THE V. PRE -CONSTRUCTION, INSPECTION, AND SEEDING AND PLANTING SCHEDULE INCLUDED CORRECTIVE ACTION ON THE APPROVED CONSTRUCTION PLANS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES '/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: SUPPLY TEMPORARY SEEDING WITH ADEQUATE MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER OR ON ADVERSE SITES. RE -SEED AREAS WHERE THE PLANTS DO NOT GROW QUICK ENOUGH, THICK ENOUGH, OR ADEQUATELY ENOUGH TO PREVENT EROSION. 11.2. PERMANENT STABILIZATION - ONCE ALL LAND -DISTURBING ACTIVITIES AT THE CONSTRUCTION SITE HAVE BEEN COMPLETED, ALL AREAS NOT COVERED BY PERMANENT STRUCTURES, MUST ESTABLISH FINAL STABILIZATION. FINAL STABILIZATION INCLUDES EITHER: • A UNIFORM (E.G., EVENLY DISTRIBUTED, WITHOUT LARGE BARE AREAS) VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF THE NATURAL BACKGROUND VEGETATIVE COVER HAS BEEN ESTABLISHED EXCLUDING AREAS WHERE NO NATURAL BACKGROUND VEGETATIVE COVER IS POSSIBLE (E.G., ON A BEACH), OR • EQUIVALENT PERMANENT STABILIZATION MEASURES (SUCH AS THE USE OF LANDSCAPING MULCH, RIPRAP, CONCRETE, AND GRAVEL). THE PERMANENT STABILIZATION SHALL BE COMPLETED IN ACCORDANCE WITH THE STABILIZATION PLAN INCLUDED IN THE APPROVED CONSTRUCTION DRAWINGS. AND PROJECT SPECIFICATIONS. PERMANENT SEEDING WILL BE APPLIED IMMEDIATELY AFTER THE FINAL DESIGN GRADES ARE ACHIEVED ON PORTIONS OF THE SITE BUT NO LATER THAN 14 DAYS AFTER CONSTRUCTION ACTIVITIES HAVE PERMANENTLY CEASED. AFTER THE ENTIRE SITE IS STABILIZED, ANY SEDIMENT THAT HAS ACCUMULATED WILL BE REMOVED AND HAULED OFF-SITE FOR DISPOSAL. CONSTRUCTION 1. PRE -CONSTRUCTION CONFERENCE: A PRE -CONSTRUCTION CONFERENCE WILL BE HELD PRIOR TO CONSTRUCTION. ALL CONTRACTORS AND SUBCONTRACTORS THAT ARE RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST BE IN ATTENDANCE. 2. INSPECTION PERSONNEL AND PROCEDURES: THE CONSTRUCTION SITE SHALL BE INSPECTED IN ACCORDANCE WITH NCDEQ REQUIREMENTS. INSPECTION FORMS: THE INSPECTOR IS RESPONSIBLE FOR COMPLETING THE APPROVED INSPECTION FORM FOR EACH INSPECTION PERFORMED. RECORD MAINTENANCE: A COPY OF THE INSPECTION REPORT SHALL BE MAINTAINED ON THE SITE AND MADE AVAILABLE TO NCDEQ PERSONNEL UPON REQUEST.. RAINFALL REPORTING: ALL RAIN EVENTS OF 0.5" OR GREATER OF CUMULATIVE RAINFALL, WITHIN A 24 HOUR PERIOD, AS MEASURED FROM A RAIN GAUGE KEPT ONSITE SHALL BE RECORDED IN THE RAIN LOG. RAINFALL EVENTS FROM THE WEEK PRIOR TO INSPECTION SHALL BE RECORDED ON THE INSPECTION REPORT. 3. CORRECTIVE ACTION: THE OPERATOR IS RESPONSIBLE FOR MAKING CORRECTIONS WITHIN 24 HOURS OF NOTIFICATION THAT CORRECTIVE ACTION IS NEEDED. CORRECTIVE ACTIONS SHOULD BE EXECUTED PRIOR TO THE NEXT RAINFALL EVENT IF PRACTICABLE. A CORRECTIVE ACTION LOG SHALL BE USED TO DOCUMENT CORRECTIVE ACTIONS AND SHALL BE MAINTAINED ONSITE. 4. SWPPP MODIFICATIONS: NOTIFY THE SWPPP PREPARER IF SITE CONDITIONS WARRANT THE MODIFICATION OF THE SWPPP. MODIFICATIONS WILL BE AT THE DIRECTION OF THE SWPPP PREPARER. ALL MODIFICATIONS ARE TO BE RECORDED IN THE SWPPP MODIFICATION LOG. MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO: THE ADDITION OF BMPS, REPLACEMENT OF FAILED BMPS, SIGNIFICANT CHANGES IN ACTIVITIES OR SCHEDULING, CHANGES IN PERSONNEL, CHANGES IN DESIGN OF THE SITE, ETC. MAJOR MODIFICATIONS MUST BE SUBMITTED TO THE REGULATED MS4 OR NCDEQ FOR APPROVAL. MINOR MODIFICATIONS MAY BE MADE TO THE DEBRIS, TRASH AND TEMPORARY BMPS WILL ON-SITE SWPPP. ALSO BE REMOVED AND ANY AREAS DISTURBED DURING REMOVAL WILL BE SEEDED IMMEDIATELY. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION l I ZU 125-1 Z- I t5 I `JU% JUbIVII I IAL ■11.a11111119L•\■i■NJWGIMK4IMEM101 KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EROSION AND SEDIMENT CONTROL DETAILS AND NOTES SHEET NUMBER C13 X N N 0 z Q MINIMUM 10 GAUGE LINE WIRES c� �U (D co N N LO -6o -9)co o O az in3: J ry 0 �o rn Y 00ry �O o� O� Yw z- r� O 0 LO U_co w� =w U---) �z > c'6 E cu _j J U_ Printed on io rost-�onsumei IIII IIIA I IIII�.�,�■■■■■■■■■ _ .11111 , I 1 MENNEN ,•�i I I II�,►ic�i�i�►�i�il 010101011", ....►.....�������.� MOB►.pplWe�.EE�.��i _ ♦�►��i�i' u4I II(=.1 SII u * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 3'-0" 26" 2'-0" it I 0 z 75 N STEEL POST - WOVEN WIRE FABRIC SILT FENCE FABRIC FILL SLOPE ,�- GRADE 6" MINIMUM COVER OVER SKIRT \ ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES f- GRADE 77 NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. REMOVE SEDIMENT DEEPER THAN 12" AND REPAIR ANY UNDERMINING IMMEDIATELY. 4. FOR REPAIR OF SILT FENCE FAILURES, USE NO. 57 WASHED STONE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 5. CONTRACTOR SHALL BE RESPONSIBILE FOR PLACEMENT AND REMOVAL OF FENCE. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING DISTURBED AREAS TO PRE -CONSTRUCTION CONDITION. 7. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. DETAIL TEMPORARY SILT FENCING NOT TO SCALE I. RESPONSIBLE PARTIES: 1. OWNER (PRIMARY PERMITTEE): COMPANY: CITY OF RALEIGH II. PROJECT NARRATIVE: 1. EXISTING SITE CONDITIONS: SEE CONSTRUCTION PLANS STORMWATER MANAGEMENT AND SEDIMENT CONTROLS 1. ARE THERE ANY STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY OTHER THAN FOR CONSTRUCTION ACTIVITIES? NO. 2. PERIMETER CONTROLS: PERIMETER CONTROLS ARE CRUCIAL TO THE SWPPP. THESE BMPS SHALL BE INSTALLED PRIOR TO DEMOLITION, CLEARING, OR GRADING ACTIVITIES ON THE SITE. IF MINOR DEMOLITION IS REQUIRED FOR THE INSTALLATION OF THESE PERIMETER CONTROLS, THE DEMOLITION SHOULD BE LIMITED ONLY TO THE PORTIONS OF THE SITE REQUIRED FOR INSTALLATION OF THESE MEASURES. 2.1. SILT FENCE - SILT FENCE CONSISTS OF GEOTEXTILE FABRIC STRETCHED ACROSS STEEL POSTS. THE LOWER EDGE OF THE FENCE IS VERTICALLY TRENCHED INTO THE GROUND AND COVERED BY COMPACTED BACKFILL. STANDARD DETAIL FOR SILT FENCE CAN BE FOUND IN THE APPROVED CONSTRUCTION PLAN. ALL MATERIALS MUST CONFORM TO PROJECT SPECIFICATIONS. LOCATION: AS INDICATED ON THE APPROVED CONSTRUCTION PLANS. SILT FENCE SHALL BE CONSTRUCTED PERPENDICULAR TO FLOW DIRECTION. A DOUBLE ROW OF SILT FENCE IS REQUIRED IN DISTURBED AREAS THAT ARE WITHIN 50' OF A WETLAND. SILT FENCE MUST BE LOCATED AT LEAST TEN (10) FEET FROM ANY WETLANDS OR BODIES OF WATER. SILT FENCE PROTECTING WETLANDS SHALL BE WIRE BACKED. INSTALLATION SCHEDULE: PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING, OR DEMOLITION ACTIVITIES COMMENCE ON THE SITE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES l/ -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: REPAIRS SHALL BE MADE IMMEDIATELY IF ANY TEARS, GAPS, OR DECOMPOSED AREAS ARE NOTED DURING INSPECTION. SEDIMENTS SHALL BE REMOVED WHEN ACCUMULATION HEIGHTS REACH ONE-THIRD (1/3) THE FENCE HEIGHT. 3. SEDIMENT TRACKING DEPOSITING OF SOILS ONTO ADJACENT ROADWAYS SHALL BE REDUCED BY THE USE OF PERIMETER CONTROLS. 3.1. CONSTRUCTION ENTRANCE AND EXIT - A STABILIZED CONSTRUCTION ENTRANCE IS A TEMPORARY STONE -STABILIZED PAD OR STEEL SHAKER PLATES. LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD, DIRT, AND ROCKS TRANSPORTED ONTO PUBLIC ROADS BY MOTOR VEHICLES, EQUIPMENT, AND RUNOFF. LOCATION: AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC WILL BE ENTERING AND EXITING THE PROJECT SITE. INSTALLATION SCHEDULE: PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING, OR DEMOLITION ACTIVITIES COMMENCE ON THE SITE. INSPECTION: DAILY AND AFTER EACH RAINFALL MAINTENANCE: RESHAPE THE STONE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. RINSE OR REPLACE STONES AS NEEDED WHENEVER THE ENTRANCE FAILS TO REDUCE MUD BEING CARRIED OFF SITE BY VEHICLES. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. FREQUENT RINSING WILL EXTEND THE USEFUL LIFE OF STONE. IMMEDIATELY REMOVE ANY MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY. 4. STOCKPILED SEDIMENT, MATERIALS OR DEMOLITION DEBRIS ALL STOCKPILES SHALL BE PROTECTED FROM EROSION WITH TEMPORARY STABILIZATION AND PERIMETER SILT FENCING PER THE APPROVED CONSTRUCTION PLANS. LOCATION: AS DIRECTED BY THE ENGINEER AND THE CLIENT. SELECT STOCKPILE LOCATION TO AVOID SLOPES, NATURAL DRAINAGE WAYS, AND TRAFFIC ROUTES. INSTALLATION SCHEDULE: MATERIAL STOCKPILES MAY NOT BE INITIATED UNTIL AFTER ALL PERIMETER CONTROLS AND SEDIMENT TRAPS/BASINS ARE IN PLACE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES '/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: IF RILLS APPEAR, RE -GRADE AND RE -STABILIZE IMMEDIATELY. STOCKPILES MAY BE COVERED WITH MATTING, SHEETING, OR OTHER MATERIALS TO MINIMIZE EROSION. MAINTAIN SILT FENCE IN ACCORDANCE WITH STANDARD NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND DETAILS FROM CONSTRUCTION PLANS. 5. MINIMIZE DUST DUST CONTROL WILL BE IMPLEMENTED BY APPLYING WATER AS NEEDED ONCE SITE GRADING HAS BEGUN AND DURING WINDY CONDITIONS (FORECASTED OR ACTUAL WIND CONDITIONS OF 20 MPH OR GREATER) WHILE SITE GRADING IS OCCURRING, AND IN AREAS OF EXPOSED SOIL. 5.1. DUST CONTROL - LOCATION: ON DISTURBED AREAS THAT HAVE NOT BEEN STABILIZED WITH VEGETATION. INSTALLATION SCHEDULE: AS REQUIRED BY WEATHER CONDITIONS. DUST CONTROL SHALL BE CONTINUED UNTIL FINAL STABILIZATION IS ACHIEVED. INSPECTION: DAILY OBSERVATION OF CONDITIONS. 6. DISTURBANCE OF STEEP SLOPES STEEP SLOPES ARE ANY SLOPE EXCEEDING 2:1. STABILIZATION MEASURES MUST BE INITIATED ON ANY EXPOSED STEEP SLOPE AREA WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 14 CALENDAR DAYS. 6.1. EROSION CONTROL BLANKETS - TEMPORARY EROSION CONTROL BLANKETS (ECBS) ARE PRODUCTS COMPOSED PRIMARILY OF BIOLOGICALLY, PHOTOCHEMICALLY OR OTHERWISE DEGRADABLE CONSTITUENTS SUCH AS WHEAT STRAW, COCONUT FIBER, OR AGED CURLED EXCELSIOR WOOD PRODUCT WITH LONGEVITY OF APPROXIMATELY 1- TO 3 -YEARS. REFER TO APPROVED TECHNICAL SPECIFICATION AND CONSTRUCTION PLANS FOR INFORMATION ON MATERIALS. MATERIALS SHOULD COMPLY WITH LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. LOCATION: AS NEEDED. INSTALLATION SCHEDULE: USE ECBS FOR TEMPORARY STABILIZATION OF SOIL IMMEDIATELY FOLLOWING SEEDING UNTIL THE VEGETATIVE COVER HAS GROWN AND BECOMES ESTABLISHED. INSTALL IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES %-INCHES OR MORE OF PRECIPITATION. MAINTENANCE: IF WASHOUT OR BREAKAGE OCCURS, REPAIR ALL DAMAGED AREAS IMMEDIATELY BY RESTORING THE SOIL ON SLOPES OR CHANNELS TO ITS FINISHED GRADE, REAPPLY SEED, AND REPLACING THE APPROPRIATE ECB MATERIAL AS NEEDED. VERIFY MATTING MAINTAINS GOOD CONTACT WITH THE SLOPE SURFACE. EROSION SHOULD NOT BE OCCURRING BELOW THE MATTING. IF CONTACT IS LOST BETWEEN MAT AND SLOPE, THE AREA SHOULD BE REPAIRED AND RESTAPLED. 7. TOPSOIL PRESERVING AND USING TOPSOIL TO ENHANCE FINAL SITE STABILIZATION WITH VEGETATION. LOCATION: STRIP TOPSOIL ONLY FROM DISTURBED AREAS OUTSIDE OF THE STREAM CHANNEL. A 4-6 INCH STRIPPING DEPTH IS COMMON, BUT DEPTH VARIES DEPENDING ON THE SITE. ALL TOPSOIL STOCKPILES MUST BE PROTECTED FROM EROSION AS DETAILED IN THE STANDARD STOCKPILE DETAIL INCLUDED IN THE APPROVED CONSTRUCTION PLANS. INSTALLATION SCHEDULE: TOPSOILING MUST BEGIN ONLY AFTER PERIMETER CONTROLS, DIVERSION SWALES, AND SEDIMENT TRAPS ARE IN PLACE. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/ -INCHES OR MORE OF PRECIPITATION MAINTENANCE: INSPECT STOCKPILE FOR SIGNS OF EROSION. STOCKPILE MAY BE COVERED IF STORM EVENTS ARE ANTICIPATED. 8. SOIL COMPACTION CONTRACTOR SHALL MINIMIZE THE COMPACTION OF SOILS IN AREAS NOT DESIGNATED FOR COMPACTION ON THE CONSTRUCTION PLANS. 9. ROCK DITCH CHECK A ROCK DITCH CHECK IS A TEMPORARY ROCK FILL DAM CONSTRUCTED ACROSS A DRAINAGE DITCH, SWALES, OR CHANNEL TO LOWER THE SPEED OF CONCENTRATED FLOW AND REMOVE SUSPENDED SOLIDS. REFER TO THE TECHNICAL SPECIFICATIONS AND CONSTRUCTION PLANS FOR INFORMATION ON MATERIALS. MATERIALS SHOULD COMPLY WITH LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. LOCATION: AS INDICATED IN THE APPROVED CONSTRUCTION PLANS. INSTALLATION: INSTALL PRIOR TO LAND DISTURBING ACTIVITI ES. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: SEDIMENTS SHALL BE REMOVED WHEN ACCUMULATION HEIGHTS REACH ONE-HALF THE STOEB1EE2N CLOGGED NORDD SLODIGED SAM HEGHT. H LE BE AT HAVE REPLACED IMMEDIATELY. 10. DEWATERING PRACTICES CONSTRUCTION DEWATERING INVOLVES THE PUMPING OF THE WATER TO AN APPROPRIATE RECEIVING AREA. PUMP AROUND SYSTEM SHOULD ALLOW FOR STREAM WORK IN THE DRY. LOCATION: AT ALL EXCAVATIONS OR COFFERDAM IMPOUNDMENTS THAT REQUIRE DEWATERING. INSTALLATION SCHEDULE: AS REQUIRED, BUT NOT PRIOR TO INSTALLATION OF PERIMETER CONTROLS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: ENSURE THAT EROSION DOES NOT OCCUR AT THE OUTLET OF THE HOSE FROM THE PUMP DUE TO HIGH CONCENTRATED FLOWS • IN AREAS WHERE DISTURBANCE RESULTS IN SUBSOIL BEING THE FINAL GRADE SURFACE, TOPSOIL WILL BE SPREAD OVER THE FINISHED AREA AT MINIMUM DEPTH OF 2 TO 6 INCHES. • THE SEEDBED WILL BE FREE OF LARGE CLODS, ROCKS, WOODY DEBRIS AND OTHER OBJECTIONABLE MATERIALS. • THE TOP LAYER OF SOIL WILL BE LOOSENED. • GRASS SELECTION SHALL COMPLY WITH THE APPROVED PLANS AND SPECIFICATIONS. • APPLY EROSION CONTROL BLANKET ON CHANNEL SLOPES AND ALL SLOPES GREATER THAN 3:1 . • HYDROMULCH SHALL BE APPLIED IMMEDIATELY FOLLOWING SEEDING AT THE PUBLISHED APPLICATION RATE. • IF VEGETATIVE COVER IS NOT ATTAINED, THE AREA SHALL BE RESEEDED, AND MULCHED IMMEDIATELY. IV. CONSTRUCTION -RELATED POLLUTANTS: 11. SITE STABILIZATION SITE STABILIZATION CAN BE EITHER TEMPORARY OR PERMANENT DEPENDING ON THE NEED FOR FURTHER CONSTRUCTION ACTIVITIES WITHIN THE AREA. SELECTION OF STABILIZATION METHOD SHALL BE CONSISTENT WITH THE APPROVED CONSTRUCTION PLANS. ALL STABILIZATION MEASURES SHALL BE RECORDED IN THE GRADING AND STABILIZATION LOG. IT IS THE OPERATORS RESPONSIBILITY TO UPDATE THIS LOG AND MAINTAIN IT. 11.1. TEMPORARY STABILIZATION - TEMPORARY STABILIZATION IS REQUIRED AS SOON AS PRACTICAL BUT NO MORE THAN 14 DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED. COVER SEEDED AREAS WITH AN APPROPRIATE MULCH TO PROVIDE PROTECTION FROM THE WEATHER. WHEN THE TEMPORARY VEGETATION DOES NOT GROW QUICKLY OR THICK ENOUGH TO PREVENT EROSION, RE -SEED AS SOON AS POSSIBLE. KEEP SEEDED AREAS ADEQUATELY MOIST. IRRIGATE THE SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION. SEED SELECTION IS BASED ON GEOGRAPHICAL LOCATION, SOIL TYPE AND THE SEASON OF THE YEAR IN WHICH THE 1. THE FOLLOWING CONSTRUCTION -RELATED EQUIPMENT OR ACTIVITIES HAVE THE POTENTIAL TO BECOME POLLUTANT SOURCES: 1.1. CONSTRUCTION EQUIPMENT THAT CONTAINS FLUIDS, FUELS, ETC; 1.2. CONSTRUCTION MATERIALS, INCLUDING PAINTS, LUBRICANTS, FERTILIZERS, ETC. THAT ARE KEPT IN STOCKPILES, OR GENERALLY ONSITE; 1.3. CONCRETE FORMS, ADMIXTURES, FORM LUBRICANTS, ETC.; 1.4. SANITARY OR DOMESTIC WASTE FROM WORKERS; 1.5. LANDSCAPING MATERIALS SUCH AS FERTILIZERS AND HERBICIDES. 2. THE CONTRACTOR SHALL HAVE A PROJECT SPECIFIC SPILL PLAN TO AVOID POLLUTION FROM THESE POTENTIAL POLLUTANTS. ANY SPILL MUST BE REPORTED TO THE CONTRACTOR. THE CONTRACTOR SHALL DETERMINE THE NECESSARY ACTIONS BASED ON THE SPCC. 3. REFER TO 40 CFR 302.4, 40 CFR 117.21 AND 40 CFR 110.10 FOR QUANTITIES RELATING TO SPILLS OR RELEASES WHICH REQUIRE REPORTING. IF A REPORTABLE QUANTITY IS RELEASED, IMMEDIATELY N OTI FY: • NATIONAL RESPONSE CENTER: PHONE: 1-800-424-8802 • NCDEQ-RALEIGH-REGIONAL OFFICE: PHONE: 919-791-4200 4. A RELEASE INCIDENT WILL BE IMMEDIATELY EVALUATED BY THE CONTRACTOR TO DETERMINE IF NOTIFICATION UNDER OTHER REGULATIONS (CERCLA, SARA, RIGHT -TO -KNOW, RCRA, ETC.) WILL NEED TO BE MADE TO THE APPROPRIATE FEDERAL, STATE, OR LOCAL AGENCIES. 5. THE SPILLS AND RELEASES LOG SHALL BE UPDATED WITHIN 24 -HOURS OF AN EVENT. THE SWPPP MUST BE REVIEWED TO IDENTIFY MEASURES TO PREVENT THE REOCCURRENCE OF SUCH RELEASES AND TO RESPOND TO SUCH RELEASES. THE SWPPP MUST BE MODIFIED WITHIN 14 DAYS OF THE EVENT. PLANTING IS TO BE DONE. SEEDING SHALL BE COMPLETED IN ACCORDANCE WITH THE V. PRE -CONSTRUCTION, INSPECTION, AND SEEDING AND PLANTING SCHEDULE INCLUDED CORRECTIVE ACTION ON THE APPROVED CONSTRUCTION PLANS. INSPECTION: INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24 -HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES '/2 -INCHES OR MORE OF PRECIPITATION. MAINTENANCE: SUPPLY TEMPORARY SEEDING WITH ADEQUATE MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER OR ON ADVERSE SITES. RE -SEED AREAS WHERE THE PLANTS DO NOT GROW QUICK ENOUGH, THICK ENOUGH, OR ADEQUATELY ENOUGH TO PREVENT EROSION. 11.2. PERMANENT STABILIZATION - ONCE ALL LAND -DISTURBING ACTIVITIES AT THE CONSTRUCTION SITE HAVE BEEN COMPLETED, ALL AREAS NOT COVERED BY PERMANENT STRUCTURES, MUST ESTABLISH FINAL STABILIZATION. FINAL STABILIZATION INCLUDES EITHER: • A UNIFORM (E.G., EVENLY DISTRIBUTED, WITHOUT LARGE BARE AREAS) VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF THE NATURAL BACKGROUND VEGETATIVE COVER HAS BEEN ESTABLISHED EXCLUDING AREAS WHERE NO NATURAL BACKGROUND VEGETATIVE COVER IS POSSIBLE (E.G., ON A BEACH), OR • EQUIVALENT PERMANENT STABILIZATION MEASURES (SUCH AS THE USE OF LANDSCAPING MULCH, RIPRAP, CONCRETE, AND GRAVEL). THE PERMANENT STABILIZATION SHALL BE COMPLETED IN ACCORDANCE WITH THE STABILIZATION PLAN INCLUDED IN THE APPROVED CONSTRUCTION DRAWINGS. AND PROJECT SPECIFICATIONS. PERMANENT SEEDING WILL BE APPLIED IMMEDIATELY AFTER THE FINAL DESIGN GRADES ARE ACHIEVED ON PORTIONS OF THE SITE BUT NO LATER THAN 14 DAYS AFTER CONSTRUCTION ACTIVITIES HAVE PERMANENTLY CEASED. AFTER THE ENTIRE SITE IS STABILIZED, ANY SEDIMENT THAT HAS ACCUMULATED WILL BE REMOVED AND HAULED OFF-SITE FOR DISPOSAL. CONSTRUCTION 1. PRE -CONSTRUCTION CONFERENCE: A PRE -CONSTRUCTION CONFERENCE WILL BE HELD PRIOR TO CONSTRUCTION. ALL CONTRACTORS AND SUBCONTRACTORS THAT ARE RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST BE IN ATTENDANCE. 2. INSPECTION PERSONNEL AND PROCEDURES: THE CONSTRUCTION SITE SHALL BE INSPECTED IN ACCORDANCE WITH NCDEQ REQUIREMENTS. INSPECTION FORMS: THE INSPECTOR IS RESPONSIBLE FOR COMPLETING THE APPROVED INSPECTION FORM FOR EACH INSPECTION PERFORMED. RECORD MAINTENANCE: A COPY OF THE INSPECTION REPORT SHALL BE MAINTAINED ON THE SITE AND MADE AVAILABLE TO NCDEQ PERSONNEL UPON REQUEST.. RAINFALL REPORTING: ALL RAIN EVENTS OF 0.5" OR GREATER OF CUMULATIVE RAINFALL, WITHIN A 24 HOUR PERIOD, AS MEASURED FROM A RAIN GAUGE KEPT ONSITE SHALL BE RECORDED IN THE RAIN LOG. RAINFALL EVENTS FROM THE WEEK PRIOR TO INSPECTION SHALL BE RECORDED ON THE INSPECTION REPORT. 3. CORRECTIVE ACTION: THE OPERATOR IS RESPONSIBLE FOR MAKING CORRECTIONS WITHIN 24 HOURS OF NOTIFICATION THAT CORRECTIVE ACTION IS NEEDED. CORRECTIVE ACTIONS SHOULD BE EXECUTED PRIOR TO THE NEXT RAINFALL EVENT IF PRACTICABLE. A CORRECTIVE ACTION LOG SHALL BE USED TO DOCUMENT CORRECTIVE ACTIONS AND SHALL BE MAINTAINED ONSITE. 4. SWPPP MODIFICATIONS: NOTIFY THE SWPPP PREPARER IF SITE CONDITIONS WARRANT THE MODIFICATION OF THE SWPPP. MODIFICATIONS WILL BE AT THE DIRECTION OF THE SWPPP PREPARER. ALL MODIFICATIONS ARE TO BE RECORDED IN THE SWPPP MODIFICATION LOG. MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO: THE ADDITION OF BMPS, REPLACEMENT OF FAILED BMPS, SIGNIFICANT CHANGES IN ACTIVITIES OR SCHEDULING, CHANGES IN PERSONNEL, CHANGES IN DESIGN OF THE SITE, ETC. MAJOR MODIFICATIONS MUST BE SUBMITTED TO THE REGULATED MS4 OR NCDEQ FOR APPROVAL. MINOR MODIFICATIONS MAY BE MADE TO THE DEBRIS, TRASH AND TEMPORARY BMPS WILL ON-SITE SWPPP. ALSO BE REMOVED AND ANY AREAS DISTURBED DURING REMOVAL WILL BE SEEDED IMMEDIATELY. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION l I ZU 125-1 Z- I t5 1 `JU% JUbIVII I I AL ■n FRO RUN ENUW&zMR4IW0 M 101 KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE EROSION AND SEDIMENT CONTROL DETAILS AND NOTES SHEET NUMBER C13 X N N Z Q (D 0 0� =U N r � C oCN N N LO �o a� U) o O d Z c� J ry 0 �o a, Y ry 00 000 o� OCD Y w ZLuj r O� oLO Lu C:) LL J (n W H =w U� �Z c'6 E (nCU J ILL r& Printed on % Post -Consumer FLOODPLAIN AND UPLAND TIE TO EXISTING GRADE BARE ROOT TREE/SHRUB (TYP.) LIVE STAKE (TYP.) PLUGS (TYP.) APPLY PERMANENT SEED MIX STREAMBANK BOTTOM STREAM CHANNEL LIVE STAKE (TYP.) PLUGS (TYP.) BANKFULL STAGE TYPICAL BASEFLOW ELEVATION REVEGETATION SECTION NOT TO SCALE STREAMBAN I IFLOODPLAIN AND UPLAND _ __ BARE ROOT TREE/SHRUB (TYP.) PLANTING PLAN NOTES 1. THIS IS A TYPICAL SECTION; DIMENSIONS WILL VARY BASED ON STREAM REACH LOCATION AND EXISTING TIE-IN CONDITIONS. 2. SEE PLANT LIST BELOW FOR SPECIES AND SPACING. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE PLANTING PLAN SHEET NUMBER C14 Scientific Name Common Name LS BR Container Plug Seed % Remarks Carya glabra Pignut hickory 125 o Carya ovata Shagbark hickory 125 Z Quercus falcata Southern red oak 125 0- TREES (Bare Root) Ulmus americana American elm 125 Bare root seedlings randomly 0 placed on 8 -ft centers. Z Celtis laevigata Sugarberry 125 Q Fagus grandifolia American beech 125 Z Q a_ Prunus serotina Black cherry 125 m Ilex decidua PoSsumhaw 50 Randomly place between trees in LL SHRUBS (Bare Root) Viburnum nudum Possum -haw 50 groups of 3 or 5 on 3 -ft centers as Vaccinium corymbosum Highbush blueberry 50 directed by engineer. Cornus amomum Silky dogwood 350 One stake per 3 linear feet in rows Z Z Viburnum dentatum Arrowwood 350 spaced one foot apart. Pools -3 mO LIVE STAKES rows, outside bend only. Riffles -2 M Q Sambucus canadensis Elderberry 350 rows, both banks. Randomly Qdistributed. LU w Salix sericea Silky willow 350 Q� (D � > Juncus coriacious Rush 900 Plugs at baseflow elevation on 1 -ft PLUGS Juncus effusus Soft rush 900 centers in riffle sections. Agrostis perennans Autumn bentgrass 15 Andropogon gerardii Big bluestem 10 Coreopsis lanceolate Lanceleaf coreopsis 10 Elymus virginicus Virginia wild rye 20 Apply at 20 lbs/acre. In addition, Juncus effusus Soft rush 5 add temporary seed mix as a 20 Ib/acre PERMANENT SEED MIX nurse crop at a rate of Panicum virgatum Switchgrass 15 in the Winter and 15 Ib/acre in the Rudbeckia hirta Black-eyed susan 10 Summer. Schizachyrium scoparium Little bluestem 5 Sorghastrum nutans Indian grass 5 Tripsacum dactyloides Eastern gamagrass 5 TEMPORARY SEED MIX - Hordeum sp. Barley 100 Winter - Apply at 30 lbs/acre to all WINTER Secale cerea/e Abruzzi Winter rye 100 disturbed areas. Either species. TEMPORARY SEED MIX - Panicum ramosum Brown -top millet 100 Summer - Apply at 30lbs/acre to -11 SUMMER Pennisetum glaucum pearl millet 100 species. PLANTING PLAN NOTES 1. THIS IS A TYPICAL SECTION; DIMENSIONS WILL VARY BASED ON STREAM REACH LOCATION AND EXISTING TIE-IN CONDITIONS. 2. SEE PLANT LIST BELOW FOR SPECIES AND SPACING. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE PLANTING PLAN SHEET NUMBER C14 X N N 0 z Q TOE OF BANK .0 C6 oCN N N LO �o a� U) o O az in3: J ry 0 �o rn N Y '0 ry �O o�N , O Y w z; r� O� oLO Lu C:) LL w� =w U� �z c'6 E cu _j J LL r& Printed on % Post -Consumer NOTES: 1. AREAS IN BETWEEN LABELED FEATURES ARE TRANSITION AREAS. 2. SEE DETAILED CROSS-SECTIONS DETAIL CROSS—SECTION TRANSITION LOCATIONS NOT TO SCALE RAAT! l I MMt-%M/-Ani l TOE OF BANK POOL TOP OF BANK GLIDE I RIFFLE PLAN RUN POOL i I NOTES: 1. BACKFILL WILL BE INSTALLED IN 6" LIFTS. m IO GLIDE RUN I B RIFFLE A PROPOSED RAISED 2:1 A CHANNEL BED EXISTING CHANNEL (BACKFILLED IN SOME LOCATIONS) PROPOSED BANKFULL ELEV. N p BED MATERIAL SEE SPEC. co POOL IMPERVIOUS SELECT 11 II l=1 I 1=1 I 1 —=1 I II I II I II I II I II I II I II I II I II III I II I II I II I I-II , --- I --- ---- — _ _ _ _ _ _ _ _ _—III—III— _ MATERIAL ISI 11—� =-1 I—I 11—I 11=1 I I_1111 I I—I 11—I 11-1 11—I I I—I 11-1 � I-1 i 1—I 11—I i I— PROPOSED 11-11 _�_— C HAN N E L11-1 I MI I 1=1 11-1 I 1-1 I 1 _ _ _ _ _ I_1 E-1 I ELI I I— _ — --. � TOP OF — _I I� 1�; � I � 1=11 I I 111 I I I 1 I 1=I 11=11 I=1 I I=_— _I I I_i=I =III -III I I I_, I l l,;, l l l l l l l l l i l l j l _III III=I ii=1 i= BANK TOE OF BANK�— MATCH PROPOSED CHANNEL CROSS- SECTION PLAN VIEW OF EXISTING CHANNEL WITH CHANNEL PLUG LENGTH VARIES (MIN 15') PROPOSED COIR MATTING 6" MIN.OF CHANNEL ON TOP OF STRIPPED BOTTOM STRIPPED TOPSOIL TOPSOIL SECTION A -A' NOTES: 1. 90% COMPACTION RATE IS REQUIRED ON CHANNEL PLUG OR AS APPROVED BY THE ENGINEER. 2. IMPERVIOUS SELECT MATERIAL TO BE ON SITE FILL COMPACTED IN 6" LIFTS 3. SIDE SLOPE THAT IS ADJACENT TO PROPOSED STREAM NEEDS TO MATCH PROPOSED CROSS SECTION IN THAT REGION. 4. CHANNEL PLUG LENGTH IS 15' UNLESS SPECIFIED TO BE LONGER BY DIRECTION OF THE ENGINEER. EXISTING TOP OF CHANNEL BANK BOTTOM EXISTING CHANNEL (BACKFILLED) IMPERVIOUS SELECT MATERIAL (SEE SPEC.) EXISTING CHANNEL WIDTH VARIES CHANNEL MATERIAL (SEE SPEC.) BOTTOM SECTION B -B' DETAIL CHANNEL PLUG—FOR ABANDONED CHANNELS NOT TO SCALE ELEVATION DETAIL CONSTRUCTED RIFFLE NOT TO SCALE EITHER EXISTING GROUND OR NATIVE BACKFILL FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 1 2018-12-18 90% SUBMITTAL I/R I DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE STREAM RESTORATION DETAILS SHEET NUMBER C15 X N N z Q STRUCTURE SCHEDULE LENGTHS/FT. INVERT ELEVATIONS (FT) STATION STRUCTURE A 1 2 13+02 V1 12 227.6 227.0 FOI OF U 00 .0 C6 o� N N LO C:) a� o U) d Z c� J ry r) �o 0) Y ry 00 o� N I Oo Y w zLu- r 0 LO Lu( 0C:) (n Lu H =w U� �z m coE cu _j J LL r& Printed on % Post -Consumer rw m BANKFULL WIDTH I VV I LI\ I\VUf\J SECTION A -A DETAIL ROCK VANE NOT TO SCALE QYSPECIFIED SUBSTRATE Qo �/ rvUL DUIIUm Iur Ru%lm LAYUUI ; BASELINE LAYOUT PLAN in o STREAMBANK/TOP OF BANK TOP/SIDE ROCK = o" Ln 0 _00 II STEP ROCK 0 0o a ' °0 . , • Q.. O o° DMAX POOL 0 0 o` oC3 \\ ^/ O0Q^� FOOTER ROCK ° o� G?� u ako o , 6 ;, o° P0y 0� ��) DMAX POOLO o FILLER ROCK OR SPECIFIED FOOTER ROCK 4 SUBSTRATE 0 STRUCTURE SCHEDULE n STABILIZE WITH SOIL STABILIZATION MATTING EXISTING AND NEAR -BANK SEED MIX GROUND SIDE ROCK FILLER ROCK 2 TO v \ BENCH VE BENCH VE VARIES I GEOTEXTILE J FABRIC I CHANNEL POOL - SECTION A -A EXISTING STABILIZE WITH SOIL STABILIZATION MATTING GROUND AND NEAR -BANK SEED MIX STEP ROCK 21 T�I VARIABLE I I VARIABLE 3�1 BENCH I I BENCH 5 VARIES 4 GEOTEXTILE a FABRIC CHANNEL STEP - SECTION B -B DETAIL STEP POOL NOT TO SCALE STABILIZE SOIL STABILIZATIONHMATTNG AND NEAR -BANK SEED MIX \ 1 TOP ROCK - BOULDER TOE/CASCADE ROCK FOOTER ROCK STABILIZE WITH SOIL STABILIZATION MATTING AND NEAR -BANK SEED MIX 6 TOP ROCK BOULDER TOE/CASCADE ROCK FOOTER ROCK .- rw m ME CKS ROCKS ROCKS 'ER ROCKS SECTION A -A DETAIL CROSS VANE NOT TO SCALE STRUCTURE SCHEDULE LENGTHS/FT. INVERT ELEVATIONS (FT) STATION STRUCTURE A B C 1 2 3 4 12+68 CV1 12 5 12 226.6 226.0 226.0 226.6 11+64 CV2 12 5 12 224.5 223.9 223.9 224.5 10+72 CV3 12 5 12 222.8 222.2 222.2 222.8 9+95 CV4 12 5 12 221.3 220.7 220.7 221.3 1+05 CV5 12 5 12 - 195.5 i 194.9 194.9 -195.5 STABILIZE WITH SOIL STABILIZATION MATTING EXISTING AND NEAR -BANK SEED MIX GROUND SIDE ROCK FILLER ROCK 2 TO v \ BENCH VE BENCH VE VARIES I GEOTEXTILE J FABRIC I CHANNEL POOL - SECTION A -A EXISTING STABILIZE WITH SOIL STABILIZATION MATTING GROUND AND NEAR -BANK SEED MIX STEP ROCK 21 T�I VARIABLE I I VARIABLE 3�1 BENCH I I BENCH 5 VARIES 4 GEOTEXTILE a FABRIC CHANNEL STEP - SECTION B -B DETAIL STEP POOL NOT TO SCALE STABILIZE SOIL STABILIZATIONHMATTNG AND NEAR -BANK SEED MIX \ 1 TOP ROCK - BOULDER TOE/CASCADE ROCK FOOTER ROCK STABILIZE WITH SOIL STABILIZATION MATTING AND NEAR -BANK SEED MIX 6 TOP ROCK BOULDER TOE/CASCADE ROCK FOOTER ROCK .- rw m ME CKS ROCKS ROCKS 'ER ROCKS SECTION A -A DETAIL CROSS VANE NOT TO SCALE STRUCTURE SCHEDULE FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION 46"=com PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE STREAM RESTORATION DETAILS SHEET NUMBER C16 INVERT (FT) MEASUREMENT DOWNSTREAM (FT) STATION STRUCTURE H L 9+09 STEP ROCK 219.5 0.5 15 8+94 STEP ROCK 219.0 0.5 15 8+79 STEP ROCK 218.5 0.5 15 8+64 STEP ROCK 218.0 0.5 15 8+49 STEP ROCK 217.5 0.5 15 8+34 STEP ROCK 217.0 0.5 15 8+19 STEP ROCK 216.5 0.5 15 8+04 STEP ROCK 216.0 0.5 15 7+89 STEP ROCK 215.5 0.5 15 7+74 STEP ROCK 1 215.0 1 0.5 15 7+59 STEP ROCK 1 214.5 1 0.5 15 FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION 46"=com PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE STREAM RESTORATION DETAILS SHEET NUMBER C16 X N N 0 z Q .0 C6 oCN N N LO C:) U) U) 00 az co J ry 0 �o a, N Y '0 ry �O o� N_ , O� Y � z; r� Oco co oLO U_(0 J co w� =w U� �z c'6 E cu _j J LL SPILLWAY CHANNEL TOP OF BANK HIGH-DENSITY PLANTINGS CA NON -WOVEN FILTER FABRIC o ARMORED SCOUR POOL FLOW W-15' PLACE ALL BOULDERS IN ELLIPTICAL PATTERN PLAN KEY BOULDERS INTO STREAMBANK MIN. 6 -FEET OR TWO FULL BOULDER LENGTHS INVERT ELEVATION PER PROFILE I% SLOPE — lilll EXTEND BOULDERS BEYOND TOB MIN. 6 -FEET OR 2 FULL FIT BOULDERS BOULDER LENGTHS TIGHTLY TOGETHER BEDDING COARSE COMPACTED FILL MATERIAL OR EXISTING EARTH ELEVATION SPILLWAY CHANNEL BED INVERT ELEVATION FLOW PER PROFILE BOULDER SETBACK MIN. 1 -FOOT BOULDER DROP MAX. 2 -FEET I I—I 1=1 11� SCOUR POOL ELEVATION COARSE BACKFILL PER PROFILE NON -WOVEN FILTER FABRIC FOUNDATION BOULDERS COMPACTED FILL MATERIAL�- OR EXISTING EARTH FOUNDATION BEDDING COARSE ARMORED SCOUR POOL BELOW STRUCTURE MIN. ROCK DEPTH 1.5 -FEET SECTION A—A UPSTREAM CROSSING PROFILE 35' 2:1 BEVEL EACH END 10 HOOK BOLTS 18" 36" DIA 12GA CAAP 2=2/3"x1/2"- 1 PIECE ° ° ON CENTER 45' 29' 2:1 BEVEL EACH END ° 10 HOOK BOLTS 18" ° ON CENTER 60" DIA 12GA CAAP 3"x1 "- 1 PIECE I° 45' °I r DOWNSTREAM CROSSING PROFILE 50' COARSE BACKFILL MATERIAL FOUNDATION BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER DETAIL GRADE CONTROL STRUCTURE "rVEL EACH END OK BOLTS 18" INTER Printed on % Post -Consumer ° 36" DIA 12GA CAAP 2-2/3"x1/2"- 2 PIECE @ 30' 30' 44' 30' - 2:1 BEVEL EACH END 10 HOOK BOLTS 18" ON CENTER NOT TO SCALE GRADE CONTROL STRUCTURE NOTES: 1. ALL BOULDERS USED FOR THE GRADE CONTROL STRUCTURE SHALL BE STRUCTUREAL STONE LARGE. CUBICAL OR RECTANGULAR IN SHOPE COLDER DIMENTIONS L:3.5 - 5.5 FT. W: 2.0 - 3.0 FT, D: 1.5 - 2.5 FT. 2. ALL BEDDING COURSE MATERIAL SHALL CONSISIT OF WELL -GRADED RIPRAP AND EARTH (40% INC DOT CLASS A, 40% INC DOT CLASS B, 20% ASTM #57 OR RQUIVALENT BLEND). 3. ALL COARSE BACKFILL MATERIAL SHALL CONSIST OF WELL -GRADED GRAVEL AND EARTH (40% INC DOT CLASS A, 40% INC DOT CLASS B, 20% ASTM #57). 4. THE GRADE CONTROL STRUCTURE SHALL BE CONSTRUCTED IN AN ELLIPTICAL PATTERN PERPENDICULAR TO FLOW OF THE SPILLWAY CHANNEL. DIMENSIONS AND SLOPES OF STRUCTURE DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY ENGINEER TO FIT FIELD CONDITIONS. 5. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 6. THERE SHALL BE NO DROP GREATER THAN 2.0 FT OVER A SINGLE STEP. 7. NON -WOVEN FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE AND ALONG THE BASE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTON OF THE FOUNDATION BOULDERS TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. COARSE BACKFILL MATERIAL SHALL BE PLACED UPSTREAM ON THE STRUCTURE. ALL EXCESS FILTER FABRIC SHALL BE CUT AWAY FROM THE SURFACE OF THE STRUCTURE. 8. THE SCOUR POOL BELOW THE STRUCTURE SHALL BE ARMORED WITH RIPRAP USING THE ROCK BLEND USED FOR THE SPILLWAY CHANNEL LINING. 9. FOR CONSTRUCTION, THE CONTRACTOR SHALL PREPARE THE AREA OF INSTALLATION BY EXCAVATING OR FILLING THE WORK AREA TO THE APPROPRIATE ELEVATION. ALL EARTH BENEATH THE STRUCTURE SHALL BE SUFFICIENTLY COMPACTED WITH THE EXCAVATOR BUCKET OR A VIBRATORY PLATE COMPACTOR TO PREVENT FUTURE SETTLEMENT OF THE STRUCTURE. PLACE NON -WOVEN FILTER FABRIC OVER THE EXCAVATED AREA. INSTALL THE GRAVEL BEDDING COURSE AND FOUNDATION BOULDERS SUCH THAT THE BOULDERS ARE BURIED A MINIMUM OF THE BOULDER DIAMETER. USE COARSE BACKFILL MATERILA TO FILL THE AREA BEHIND THE STRUCTURE AS ADDITIONAL BOULDERS ARE INSTALLED. BOULDER SETBACK SHALL BE A MINIMUM OF 1.0 FT AND NO DROP SHALL BE GREATER THAN 2.0 FT. INSTALL BOULDERS IN ROWS UNTIL THE PROFILE INVERT ELEVATION IS REACHED. STRUCTURE SCHEDULE 10C CORRUGATED BAND 2-2/3„x1/2° REROLLED PIPE ENDS _OPRENE FLAT GASKET DETAIL CULVERT CONNECTION NOT TO SCALE 1/2"x6" STEEL CARRIAGE BOLT BOLT, BAR & STRAP CONNECTOR 1/2" HEX NUT BOLT, BAR & STRAP CONNECTION DETAIL CONNECTION DETAIL 4-3/8" STRAP DETAIL JBLE BOLT, BAR & STRAP GENERAL NOTES: 1. BANDS FOR PIPE -ARCH ARE THE SAME AS FOR EQUIVALENT DIAMETER ROUND PIPE. 2. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: 12" THRU 48" 1 -PIECE 54" THRU 96" 2 -PIECE 3. BAND FASTENERS ARE ATTACHED WITH SPOT WELDS, RIVETS OR HAND WELDS. 4. DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE STANDARD DETAILS SHEET NUMBER C17 INVERT (FT) STATION STRUCTURE 6+70 GRADE CONTROL STRUCTURE 213.0 6+44 GRADE CONTROL STRUCTURE 209.5 6+18 GRADE CONTROL STRUCTURE 206.0 5+92 GRADE CONTROL STRUCTURE 202.5 10C CORRUGATED BAND 2-2/3„x1/2° REROLLED PIPE ENDS _OPRENE FLAT GASKET DETAIL CULVERT CONNECTION NOT TO SCALE 1/2"x6" STEEL CARRIAGE BOLT BOLT, BAR & STRAP CONNECTOR 1/2" HEX NUT BOLT, BAR & STRAP CONNECTION DETAIL CONNECTION DETAIL 4-3/8" STRAP DETAIL JBLE BOLT, BAR & STRAP GENERAL NOTES: 1. BANDS FOR PIPE -ARCH ARE THE SAME AS FOR EQUIVALENT DIAMETER ROUND PIPE. 2. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: 12" THRU 48" 1 -PIECE 54" THRU 96" 2 -PIECE 3. BAND FASTENERS ARE ATTACHED WITH SPOT WELDS, RIVETS OR HAND WELDS. 4. DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 2018-12-18 1 90% SUBMITTAL I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE STANDARD DETAILS SHEET NUMBER C17 Ex N N 0 Fn z < (D 0 �06 �U N -� oco N N LO �o �U) 0 az in J < 0 :z - a, Y ,0O o� OCD Y w z- r� O 0 LO U_(0 J () LU <U =LU U 2� �a -0z > coE cu in a J LL CONSTRUCTION NOTES I. GENERAL NOTES 1. THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF THE UTILITIES INFORMATION SHOWN ON THE DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE EXACT LOCATION OF ALL UTILITIES BEFORE CONSTRUCTION. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE VARIOUS UTILITY OWNERS. 2. THE LOCATION OF UTILITIES SHOWN IN THE PLANS SHOULD BE CONSIDERED APPROXIMATE ONLY. 3. STAKE THE LIMITS OF DISTURBANCE PRIOR TO ANY DEMOLITION, CLEARING, GRUBBING, STRIPPING, OR EXCAVATION. ENSURE THAT EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND THAT SUCH WORK HAS BEEN APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL ROUTINELY INSPECT AND MAINTAIN THESE DEVICES IN ACCORDANCE WITH THE PERMIT. NO CLEARING OR GRUBBING SHALL BE PERMITTED PRIOR TO APPROVAL OF CLEARING LIMITS. 4. THE CONTRACTOR IS TO COORDINATE WITH THE ENGINEER TO STAKE THE LIMITS OF THE STAGING/LAYDOWN AREA. SILT FENCE SHOULD BE UTILIZED IN ACCORDANCE WITH THE BMP HANDBOOK. 5. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, STORM DRAINS, UTILITIES AND OTHER FACILITIES TO REMAIN AND SHALL REPAIR ANY DAMAGES DUE TO CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE OWNER. 6. LIMIT THE TOTAL CLEARING AND GRADING, EXCAVATIONS, AND OTHER DISTURBANCE TO ONLY THOSE AREAS NECESSARY FOR THE ORDERLY FLOW OF WORK. 7. CLEARING AND GRUBBING MATERIALS SHALL BE DISPOSED OF OFF SITE AT THE EXPENSE OF THE CONTRACTOR OR AS DIRECTED BY THE CLIENT. RIPRAP MOVED WITHIN THE STREAM CHANNEL SHALL BE MAINTAINED AND REUSED. BOULDERS RECOVERED DURING CLEARING SHALL BE MAINTAINED AND REUSED. 8. SUSPEND EARTHWORK WHEN SATISFACTORY RESULTS CANNOT BE OBTAINED BECAUSE OF RAIN, FREEZING WEATHER, OR OTHER UNSATISFACTORY CONDITIONS. 9. ROUTE HAULING EQUIPMENT AROUND OR AWAY FROM AREAS OF SOFT OR YIELDING SUBGRADE. 10. THE CONTRACTOR SHALL PRESERVE AND PROTECT FROM INJURY ALL TREES NOT INDICATED TO BE REMOVED. REASONABLE CARE SHALL BE TAKEN DURING CONSTRUCTION TO AVOID DAMAGE TO VEGETATION. TREES WHICH RECEIVE DAMAGE TO BRANCHES SHALL BE TRIMMED OF THOSE BRANCHES TO IMPROVE THE APPEARANCE OF THE TREE. TREE TRUNKS RECEIVING DAMAGE FROM EQUIPMENT SHALL BE TREATED WITH A TREE DRESSING. ALL TREE DRESSING AND REPAIRS SHALL BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION OF A TREE ARBORIST. ADDITIONAL LIMBING MAY BE PERFORMED UPON DEMONSTRATION OF NEED AND APPROVAL FROM ENGINEER. ALL LIMBING PRACTICES SHALL CONFORM TO INDUSTRY STANDARDS FOR QUALIFIED ARBORISTS AND ARE SUBJECT TO THE APPROVAL BY THE CITY OR THEIR DESIGNATED REPRESENTATIVE. 11. PROJECT IMPROVEMENTS SHOULD BE MADE IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS, AND AS INDICATED BY THE PROJECT ENGINEER. 12. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS SHOWN ON THE PLANS AND REVIEW ALL FIELD CONDITIONS THAT MAY AFFECT CONSTRUCTION. SHOULD DISCREPANCIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO OBTAIN THE ENGINEER'S CLARIFICATION BEFORE COMMENCING CONSTRUCTION. 13. THE ENGINEER RESERVES THE RIGHT TO ADJUST THE LOCATION OF ALL PROPOSED IMPROVEMENTS TO MEET FIELD CONDITIONS IF NECESSARY. 14. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE SHOWING SEQUENCE OF WORK ACTIVITIES IN ACCORDANCE WITH SPECIFICATIONS SECTION 01310 IN THE PROJECT SPECIFICATIONS. II. CONSTRUCTION SEQUENCE THE FOLLOWING SEQUENCE OF CONSTRUCTION IS PROVIDED AS GUIDANCE FOR COMPLETION OF CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE ENGINEER WITH A DETAILED SEQUENCE OF CONSTRUCTION AS PART OF SHOP DRAWING SUBMITTALS. 1. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE APPROPRIATE UTILITY PROVIDERS FOR THE IDENTIFICATION AND MARKING OF ALL EXISTING UTILITIES WITHIN THE LIMITS OF CONSTRUCTION. UTILITIES LOCATED ON THESE PLANS ARE FOR PLANNING PURPOSES ONLY. 2. STAKE OUT LIMITS OF DISTURBANCE PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR SHALL SCHEDULE AN ON-SITE PRECONSTRUCTION MEETING WITH THE ENGINEER. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES ACCORDING TO STANDARDS SET FORTH BY THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND IN ACCORDANCE WITH THE CONSTRUCTION PLANS HEREIN. 5. COMPLETE CLEARING, GRUBBING, AND DEMOLITION AS INDICATED ON THESE PLANS. [RIPRAP MOVED WITHIN THE STREAM CHANNEL SHALL BE MAINTAINED AND REUSED. BOULDERS RECOVERED DURING CLEARING SHALL BE MAINTAINED AND REUSED. 6. COMPLETE GRADING AS INDICATED ON THES PLANS. 7. COMPLETE ALL IMPROVEMENTS AS INDICATED ON THESE PLANS INCLUDING BUT NOT LIMITED TO IN -STREAM STRUCTURES, CULVERT REPLACEMENT AND REVEGETATION.[ALL IMPROVEMENTS SHALL BE COMPLETED IN ACCORDANCE WITH THE CONSTRUCTION PLANS AND SPECIFICATIONS AND/OR AS DIRECTED BY THE ENGINEER. 8. COMPLETE FINAL STABILIZATION AS INDICATED ON TH`ESf PLANS. 9. REMOVE EROSION AND SEDIMENT CONTROL MEASURES ONCE FINAL STABILIZATION HAS BEEN ACHIEVED. 10. REMOVE ALL CONSTRUCTION DEBRIS AND CLEAN UP. 11. THE CONTRACTOR SHALL SCHEDULE A FINAL CONSTRUCTION CLOSE-OUT MEETING WITH THE ENGINEER AND ALL APPROPRIATE PARTIES. III. SUBMITTALS TO ENGINEER 1. IF IMPORTED FILL IS DEEMED NECESSARY, SAMPLES AND CERTIFICATION OF THE IMPORTED FILL PER PROJECT SPECIFICATION. 2. IF IMPORTED TOPSOIL IS DEEMED NECESSARY, SAMPLES AND CERTIFICATION OF THE IMPORTED TOPSOIL PER EXECUTION SECTION. 3. SAMPLE AND CERTIFICATION OF THE FILTER FABRIC PER PROJECT SPECIFICATION. 4. PRIOR TO DELIVERY OF SEED, SUBMIT ONE COPY OF SEED ANALYSIS TAG. TAG SHALL STATE SEED NAME(S), MIXTURE, BLEND, OR VARIETY, LOT NUMBER, ORIGIN OF SEED, EACH VARIETY WITH ITS ASSOCIATED PURITY, GERMINATION AND TEST DATE, PERCENTAGES OF CROP, INERT AND WEED, "USE BEFORE" DATE, AMS NUMBER, AND NET WEIGHT. TAG SHALL COMPLY WITH STANDARDS ESTABLISHED BY THE OFFICIAL SEED ANALYSIS OF NORTH AMERICA. 5. CERTIFY IN WRITING, WITHIN 30 DAYS OF NOTICE TO PROCEED, CONFIRMED ORDERS FOR PLANTS AND PROVIDE THE QUANTITY, LOCATION, TELEPHONE NUMBER, CONTACT NAME, AND ADDRESS OF THE GROWER WHO HAS AGREED TO PROVIDE ANY PLANT MATERIAL. 6. CERTIFICATES REQUIRED BY LAW SHALL ACCOMPANY SHIPMENTS. DELIVER ALL CERTIFICATES INCLUDING CERTIFICATE OF NURSERY INSPECTION TO THE ENGINEER. IV. MATERIALS EQUIPMENT AND IN -STREAM WORK 1. EQUIPMENT OPERATING WITHIN THE LIMITS OF CLEARING AND GRADING SHALL BE OF AN ADEQUATE SIZE TO COMPLETE THE NECESSARY STREAM RESTORATION OPERATIONS. 2. CONTRACTOR IS RESPONSIBLE FOR EVALUATION OF EXISTING SITE CONDITIONS, INCLUDING AREAS THAT MAY BE CONSIDERED WET, BOGGY OR OTHERWISE UNSTABLE. WHERE CONDITIONS EXIST THAT Printed on % Post -Consumer MAY INHIBIT VEHICULAR ACCESS, SUITABLE ACCESS AND STABILIZATION SHALL BE INSTALLED AT THE CONTRACTOR'S DISCRETION AND UNDER THE APPROVAL OF THE ON-SITE ENGINEER. DEBRIS IN GENERAL, ALL FOREIGN MATERIAL ON-SITE. DEBRIS SHALL INCLUDE BUT IS NOT LIMITED TO: 1. CONCRETE, ASPHALT, STONE, BRICK, TILE, ETC. 2. BUILDING WOOD, GLASS, TAR PAPER, METAL, CLOTH, PAPER, ETC 3. ABANDONED VEHICLES, AND AUTOMOTIVE PARTS, TIRES, BOXES, CRATES, BARRELS, ETC. 4. MATERIAL DUMPED WITHIN THE WORK AREA DURING THE TIME OF THE CONTRACT. 5. WOODY DEBRIS LOCATED IN CHANNEL RESULTING IN FLOW BLOCKAGES OR ALTERATIONS TO THE CHANNEL GEOMETRY. 6. ALL DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN APPROPRIATE LOCATION AS IDENTIFIED BY THE ON-SITE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING AND COORDINATING A DISPOSAL SITE FOR ALL DEBRIS. WOODY DEBRIS SALVAGE 1. ALL WOODY MATERIAL GREATER THAN 12" IN DIAMETER WITH A MINIMUM TRUNK LENGTH OF 12 FEET. 2. TREES TO BE SALVAGED SHALL BE GENERALLY STRAIGHT AND FREE FROM BOWS. 3. WOODY DEBRIS SALVAGE SHALL BE LESS THAN 18 MO. OLD AND FREE FROM DECAY/ROTTING. BARKED/UNBARKED TREES ARE ACCEPTABLE. CLEARING AND GRUBBING MATERIALS 1. TREES, BRUSH, GRASS, SOD, VEGETATION, AND ROOTS NECESSARY TO FACILITATE CONSTRUCTION ACTIVITIES. 2. CLEARING AND GRUBBING AREA SHALL BE LIMITED TO THAT NECESSARY TO FACILITATE CONSTRUCTION ACTIVITIES. 3. WOODY DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH THE OWNERS DIRECTION. 4. BURNING OF WOODY DEBRIS ONSITE IS PROHIBITED. COMMON EXCAVATION 1. MATERIAL, REGARDLESS OF CONDITION, EXCAVATED FROM THE WORK AREA. FI LL 1. FILL MATERIAL SHALL BE FREE OF DEBRIS AND MEET THE FOLLOWING GRADATION TESTED IN ACCORDANCE WITH ASTM D-422: SIEVE SIZE PERCENT PASSING 2 INCH 100 1 INCH 90-100 3/4 INCH 60-90 NO. 40 0-60 NO. 200 0-35 2. PLASTICITY INDEX (PI) <15 AND LIQUID LIMIT <40 PER ASTM D-4318. 3. THE MAXIMUM AGGREGATE SIZE SHALL BE LIMITED TO 1 ih INCH. 4. FILL MATERIAL MAY BE SITE -EXCAVATED SOILS WHERE THE ABOVE REQUIREMENTS CAN BE MET. UNSUITABLE SOILS FOR BACKFILL (HIGH PLASTIC CLAYS OR ORGANIC SOILS) SHALL NOT BE USED IN THE BACKFILL OR IN THE REINFORCED SOIL MASS BUT RATHER TO FILL THE LARGE RAVINE AT THE PROJECT SITE. VISUAL OBSERVATION SHALL BE SUFFICIENT FOR THE APPROVAL OF SITE -EXCAVATED SOILS IMPERVIOUS SELECT MATERIAL 1. IMPERVIOUS SELECT MATERIAL IS TO BE USED TO ACT AS A BARRIER TO PROTECT AGAINST THE PROPOSED CHANNEL MIGRATING BACK INTO THE THE EXISTING CHANNEL AND RE -ACTIVATING THE OLD CHANNEL. 2. IMPERVIOUS SELECT MATERIAL SHALL BE OBTAINED FROM AN APPROVED ON -OR -OFF SITE BORROW SOURCE. 3. CLAY PLUGS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 4. MATERIALS USED FOR IMPERVIOUS SELECT MATERIAL MAY BE DEFINED AS [CL -ML, CL, CH, MH, OR SC] IN ACCORDANCE WITH ASTM D 2487 AND AS DEFINED IN THE PROJECT SPECIFICATIONS. TOPSOIL SALVAGE 1. TOP 6 INCHES OF SOIL FROM WITHIN THE LIMITS OF CLEARING AND GRADING, WHERE CHANNEL ALTERATIONS (MODIFICATIONS TO THE PLAN, PATTERN, AND/OR PROFILE) ARE TO OCCUR. 2. TOPSOIL SALVAGE SHALL BE FREE FROM SUBSOIL, EXTRANEOUS MATTER, STONES OVER 1" IN ANY DIMENSION, STICKS, ROOTS, RUBBISH, AND STIFF CLAY THAT WOULD HINDER THE APPLICATION AND INCORPORATION OF SOIL AMENDMENTS AND SEEDING OPERATIONS. SOIL AMENDMENTS 1. FERTILIZER SHALL BE GRANULAR, NON -BURNING PRODUCT GUARANTEED ANALYSIS PROFESSIONAL FERTILIZER WITH AN ANALYSIS OF 10-20-20 OR EQUIVALENT PRODUCT AS APPROVED BY ENGINEER 2. AGRICULTURAL GRADE CALCITIC LIMESTONE SHALL BE PULVERIZED AND PASSING A 100 -MESH SCREEN. 3. FERTILIZER AND LIME SHALL BE DELIVERED TO THE SITE IN ORIGINAL UNOPENED CONTAINERS SHOWING WEIGHT, ANALYSIS, AND NAME OF MANUFACTURER. STORE IN A MANNER TO PREVENT WETTING AND/OR DETERIORATION. SPECIFIED BED MATERIAL 1. SPECIFIED BED MATERIAL TO BE SELECTED AND INSTALLED AS SHOWN IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. BOULDERS 1. BOULDERS TO BE SELECTED AND INSTALLED AS SHOWN ON THE CONSTRUCTION PLANS AND SPECIFICATIONS. EROSION CONTROL AND STABILIZATION MATTING 1. THE MATTING SPECIFIED ON THESE PLANS MAY BE SUBSTITUTED WITH AN EQUIVALENT MATTING WITH THE APPROVAL OF THE ENGINEER. CONTRACTOR SHALL SUBMIT A SAMPLE OF THE MATERIAL OR CERTIFICATION STATEMENT OF EQUIVALENT MATTING. 2. MATTING SPECIFICATIONS FOR THE CM -700 OR EQUIVALENT ARE AS FOLLOWS: MATERIAL: 100% COIR FIBER TWINE OR YARN WEIGHT: 700 G / M2 (20.6 OZ / YD2) MINIMUM THICKNESS: 0.30 INCHES MAXIMUM OPEN AREA: 50% MINIMUM LIFE EXPECTANCY: 3 YEARS ELONGATION, WARP X FILL: 34 X 38 % TENSILE: 1348 X 626 LBS / FT MINIMUM PERMISSIBLE VELOCITY: 11 FT/SEC 3. MATTING SHALL BE KEYED IN A MINIMUM OF 6" INTO EXISTING GRADE AT BOTH THE TOE OF SLOPE AND TOP OF GRADING. FILTER FABRIC 1. FILTER FABRIC SHALL BE INERT TO COMMONLY ENCOUNTERED CHEMICALS; RESISTANT TO MILDEW, ROT, INSECTS, AND RODENTS; AND BIOLOGICALLY AND THERMALLY STABLE. 2. MEETS THE FOLLOWING TEST REQUIREMENTS: PHYSICAL PROPERTY TEST METHODS MINIMUM REQUIREMENTS APPARENT OPENING SIZE ASTM D4751 EQUAL TO OR GREATER THAN NO. 50 SIEVE TENSILE STRENGTH ® VTM-52 MIN. 30 LB/LIN INCH 20% (MAX.) ELONGATION PUNCTURE STRENGTH ASTM D4833 MIN. 80 LB SEED 1. TWO (2) SEED MIXES ARE PROPOSED FOR APPLICATION WITHIN THE LIMITS OF GRADING: TEMPORARY SEED MIX AND PERMANENT SEED MIX. 2. THE SEED MIX IS TO BE UNTREATED TESTED SEED OF GOOD QUALITY WITH A GERMINATION RATE OF AT LEAST 90 PERCENT AND FREE OF NOXIOUS WEEDS. 3. SEED SHALL BE DRY AND NOT MOLDY AND SHALL SHOW NO SIGN OF HAVING BEEN WET OR OTHERWISE DAMAGED. 4. EACH BAG SHALL BE LABELED WITH THE VARIETY OF SEED AND MIX PERCENTAGES AND THE SUPPLIER'S NAME AND ADDRESS AND OTHER INFORMATION. 5. THE SEED MIX SHALL BE DISTRIBUTED AS SHOWN ON THE CONTRACT PLANS. NO SUBSTITUTIONS SHALL BE ACCEPTED WITHOUT PRIOR PERMISSION FROM THE ENGINEER OR CLIENT REPRESENTATIVE. 6. REPAIR, AT NO ADDED COST TO THE CLIENT, ANY DAMAGE TO OTHER PLANTS OR OTHER PROPERTY CAUSED BY THE CONTRACTOR DURING REPLACEMENT OF PLANT MATERIALS DURING THE WARRANTY PERIOD. 7. THE SEEDING APPLICATION WINDOW FOR THE SEED MIX SHALL BE AS OUTLINED IN THE PLANTING PLAN, UNLESS OTHERWISE APPROVED BY ENGINEER. 8. OAT SEED WILL BE ADDED TO THE PERMANENT SEED MIX TO SERVE AS A NURSE CROP FOR THE ESTABLISHMENT OF THE PERMANENT SEED SPECIES. 9. GROUND PREPARATION AND SEEDING APPLICATION METHOD SHALL BE COMPLETED IN ACCORDANCE WITH RECOMMENDATION FROM THE SEED PROVIDER. BARE ROOTS, LIVE STAKES, AND CONTAINER STOCK 1. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 2. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF "THE AMERICAN STANDARD FOR NURSERY STOCK". 3. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE PLANT. 4. PLANTS WILL BE INSPECTED AND IDENTIFIED IN ACCORDANCE WITH THE STANDARDIZED PLANT NAMES PREPARED BY THE EDITORIAL COMMITTEE OF THE AMERICAN JOINT COMMITTEE ON HORTICULTURAL NOMENCLATURE. THE ENGINEER MAY INSPECT AND REJECT PLANTS AT ANY TIME AND PLACE. PLANTS WILL BE INSPECTED IMMEDIATELY PRIOR TO BEING PLANTED. IF THEY ARE PLANTED PRIOR TO INSPECTION AND FOUND TO BE UNSATISFACTORY, THEY SHALL BE REPLACED WITH APPROVED PLANTS AT THE CONTRACTOR'S EXPENSE. 5. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 6. NO CHANGE IN THE QUANTITY, SIZE, KIND, OR QUALITY OF PLANTS FROM THOSE SPECIFIED WILL BE PERMITTED WITHOUT THE APPROVAL OF THE ENGINEER. 7. WHEN REQUESTING PERMISSION TO SUBSTITUTE, THE CONTRACTOR SHALL SUBMIT WRITTEN EVIDENCE THAT THE SPECIFIED PLANTS ARE NOT AVAILABLE AND SHALL SUGGEST SUBSTITUTE PLANTS THAT CONFORM TO THE REQUIREMENTS OF THE CONTRACT. THE CONTRACTOR SHALL INDICATE THE REDUCED COST, IF ANY, THAT WILL ACCRUE TO THE ENGINEER AS A RESULT OF THE SUBSTITUTION. THE ENGINEER MAY DELETE PLANTS FROM THE CONTRACT IN LIEU OF APPROVING SUBSTITUTIONS. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 48 HOURS IN ADVANCE OF THE ANTICIPATED DELIVERY DATE FOR PLANTS. A LEGIBLE COPY OF THE INVOICE SHOWING THE KINDS AND SIZES OF PLANTS IN EACH SHIPMENT SHALL BE FURNISHED THE ENGINEER. A COPY OF THE CURRENT CERTIFICATE OF NURSERY INSPECTION SHALL ACCOMPANY EACH SHIPMENT OF PLANTS. 9. REPRESENTATIVE SAMPLES OF EACH SHIPMENT OF PLANTS SHALL BE LEGIBLY LABELED AS TO THE GENUS, SPECIES, SIZE, AND QUANTITY OF THE PLANTS. WHEN PLANTS ARE IN BALES, BUNDLES, BOXES, OR OTHER CONTAINERS, A LEGIBLE LABEL INDICATING THE GENUS, SPECIES, SIZE, AND QUANTITY OF THE PLANTS SHALL BE ATTACHED TO EACH CONTAINER. 10. CONTRACTOR IS RESPONSIBLE FOR PLACEMENT OF PLANT MATERIAL IN ACCORDANCE WITH EACH SPECIES INUNDATION TOLERANCES. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON-SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE PLANTING WINDOW SHALL BE IN ACCORDANCE WITH THE PLANTING PLAN, UNLESS OTHERWISE APPROVED BY ENGINEER. 13. THE WARRANTY PERIOD IS DEFINED AS ONE CALENDAR YEAR AFTER INITIAL PLANT INSTALLATION IS COMPLETE. WARRANTY IS TO INCLUDE ALL LABOR AND MATERIALS ASSOCIATED WITH THE PLANTING SPECIFIED ON THE CONTRACT PLANS. 14. THE CONTRACTOR WILL NOT BE HELD RESPONSIBLE FOR VANDALISM, THEFT, ATYPICAL WEATHER CONDITIONS OR HIDDEN PECULIARITIES OF THE WORK AREA DURING THE WARRANTY PERIOD. 15. ALL PLANT MATERIALS MUST BE IN HEALTHY CONDITION AT END OF THE WARRANTY PERIOD. 16. REMOVE DEAD AND REJECTED MATERIAL WITHIN FIVE DAYS OF BEING SO DIRECTED. REPLACE WITH APPROPRIATE NATIVE SPECIES AS SOON AS POSSIBLE. V. EXECUTION SITE PREPARATION 1. THE ENGINEER SHALL DESIGNATE THE DISPOSITION AND DETERMINE THE SUITABILITY OF PRODUCTS. 2. STAKE THE LIMITS OF CLEARING AND GRADING PRIOR TO ANY DEMOLITION, CLEARING, GRUBBING, STRIPPING, OR EXCAVATION HAS STARTED. ENSURE THAT EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND THAT SUCH WORK HAS BEEN APPROVED BY THE ENGINEER. NO CLEARING OR GRUBBING SHALL BE PERMITTED PRIOR TO APPROVAL OF CLEARING LIMITS AND IDENTIFICATION OF SPECIMEN TREES TO BE REMOVED/SAVED. 3. MAKE MINOR ADJUSTMENTS OR REVISIONS IN LINE OR GRADES, IF FOUND NECESSARY AS THE WORK PROGRESSES. 4. LIMIT THE TOTAL CLEARING AND GRADING; EXCAVATIONS; AND OTHER DISTURBANCE TO ONLY THOSE AREAS NECESSARY FOR THE ORDERLY FLOW OF WORK. 5. SUSPEND EARTHWORK WHEN SATISFACTORY RESULTS CANNOT BE OBTAINED BECAUSE OF RAIN, FREEZING WEATHER, OR OTHER UNSATISFACTORY CONDITIONS. 6. DRAG, BLADE, OR SLOPE THE GRADE TO PROVIDE PROPER SURFACE DRAINAGE. INSTALL TEMPORARY DRAINS AND DRAINAGE DITCHES TO INTERCEPT OR DIVERT SURFACE WATER THAT MAY AFFECT THE PROSECUTION OR CONDITION OF THE WORK. 7. EXCAVATE TO SUCH DEPTH THAT SUFFICIENT MATERIAL WILL BE LEFT ABOVE THE DESIGNATED GRADE TO ALLOW FOR COMPACTION TO THE PROPER GRADE. REPLACE MATERIAL EXCAVATED BELOW THE DESIGNATED LINES WITH APPROVED MATERIALS, IN AN APPROVED MANNER AND CONDITION, AT NO ADDED COST. 8. ROUTE HAULING EQUIPMENT AROUND OR AWAY FROM AREAS OF SOFT OR YIELDING SUBGRADE. 9. FURNISH AND MAINTAIN EARTH -MOVING EQUIPMENT IN SATISFACTORY CONDITION AND OPERATE SUCH EQUIPMENT AS NECESSARY TO CONTROL SECTION AND SMOOTHNESS OF GRADE. 10. IN-PLACE DENSITY AND MOISTURE CONTENT WILL BE DETERMINED BY ASTM D-698. TREE PRESERVATION 1. CLEARLY MARK AND PROTECT THE "CRITICAL ROOT ZONE" (CRZ) FOR ALL TREES TO REMAIN, WITHIN THE LIMITS OF CONSTRUCTION, AS IDENTIFIED BY THE ENGINEER IN THE FIELD PRIOR TO ANY CLEARING AND GRUBBING. 2. ERECT SUITABLE PROTECTIVE BARRIERS, SUCH AS SAFETY FENCING, TO DESIGNATE THE CRZ OF ANY TREE OR STAND OF TREES TO BE PRESERVED PRIOR TO ANY LAND DISTURBANCE. PROTECTIVE BARRIERS SHALL REMAIN SO ERECTED THROUGHOUT ALL PHASES OF CONSTRUCTION. NO GRADE CHANGES OR STORAGE OF EQUIPMENT, MATERIALS, DEBRIS, OR FILL SHALL BE ALLOWED WITHIN THE AREA PROTECTED BY THE BARRIER. 3. GRADE CHANGES AND EXCAVATIONS SHALL NOT ENCROACH UPON THE TREE CRZ EXCEPT AS DESIGNATED ON THE CONTRACT PLANS OR APPROVED BY THE ENGINEER. 4. TREE ROOTS WHICH MUST BE SEVERED DURING GRADING AND EXCAVATION SHALL BE TRIMMED CLEANLY AND COVERED TEMPORARILY WITH MOIST PEAT MOSS, MOIST BURLAP, OR OTHER MOIST BIODEGRADABLE MATERIAL TO KEEP THEM FROM DRYING OUT UNTIL PERMANENT COVER CAN BE INSTALLED. 5. NO CONSTRUCTION TRAFFIC, PARKING OF VEHICLES, OR STORAGE OR DISPOSAL OF LIQUIDS IS PERMITTED WITHIN THE CRZ. CLEARING AND GRUBBING 1. CLEARING AND GRUBBING LIMITS SHALL BE LIMITED TO THE AREAS WITHIN THE LIMITS OF CLEARING AND GRADING NECESSARY TO FACILITATE STREAM RESTORATION AND RELOCATION. 2. COMPLETELY REMOVE AND STOCKPILE ALL WOODY DEBRIS AND BOULDERS AND SALVAGE IN MATERIAL STOCKPILE AREA. 3. CLEARING AND GRUBBING MATERIALS DETERMINED BY THE ENGINEER TO BE UNSUITABLE FOR USE ON-SITE SHALL BE DISPOSED OF OFF-SITE AT THE EXPENSE OF THE CONTRACTOR. STRIPPING 1. STRIP THE TOP 6 INCHES OF TOPSOIL FROM WITHIN THE LIMITS OF CLEARING AND GRADING, WHERE CHANNEL ALTERATIONS (MODIFICATIONS TO THE PLAN, PATTERN, AND/OR PROFILE) ARE TO OCCUR. 2. STOCKPILE SALVAGED TOPSOIL. COMMON EXCAVATION 1. EXCAVATE TO THE GRADES SHOWN ON THE CONTRACT PLANS OR AS OTHERWISE SPECIFIED, MAKING ALLOWANCE FOR PLACEMENT OF TOPSOIL TO REACH FINAL GRADES. 2. STOCKPILE COMMON EXCAVATION IN DESIGNATED EXISTING STREAM CHANNEL FILL AREAS AS SHOWN ON THE CONTRACT PLANS. SHAPE AND COMPACT AS NECESSARY TO MEET FINAL GRADES AS SHOWN ON THE PLANS. FI LL 1. GROUND SURFACES ON WHICH FILL IS TO BE PLACED SHALL BE PLOWED, STEPPED (BENCHED), OR BROKEN UP IN SUCH MANNER THAT THE FILL MATERIAL WILL BOND WITH THE EXISTING SURFACE. 2. FILL MATERIAL SHALL BE PLACED AND COMPACTED IN LIFTS NOT TO EXCEED SIX (6) INCHES. LIFT THICKNESS SHALL BE DECREASED TO ACHIEVE THE REQUIRED DENSITY AS REQUIRED. 3. FILL MATERIAL SHALL BE COMPACTED TO A MINIMUM DENSITY OF 85% OF STANDARD PROCTOR PER ASTM D-698. 4. WHERE FILL MATERIAL IS TO BE PLACED TO RAISE THE CHANNEL BED ELEVATION, THE FILL MATERIAL SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% OF STANDARD PROCTOR PER ASTM D-698 AT AN ELEVATION 3 INCHES BELOW FINAL GRADE. SUBSOIL AERATION 1. SCARIFY OR TILL SUBSOIL THAT IS NOT LOOSE AND FRIABLE TO A MINIMUM DEPTH OF 6 INCHES BEFORE PLACEMENT OF TOPSOIL. 2. AERATE WITH PLOWS, TILLERS, DISKS, OR OTHER SUITABLE EQUIPMENT. TOPSOIL PLACEMENT AND SOIL AMENDMENTS 1. IMMEDIATELY FOLLOWING THE FINAL COMPLETION AND ACCEPTANCE OF ROUGH GRADING, TOPSOIL SPREADING AND SOIL AMENDMENT PREPARATION SHALL COMMENCE. 2. REMOVE ANY EXTRANEOUS MATTER THAT WOULD HINDER THE APPLICATION OF SOIL AMENDMENTS AND SEEDING OPERATIONS. 3. TOPSOIL SHALL NOT BE APPLIED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN TOPSOIL OR SUBGRADE IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SEEDING OR PLANTING. 4. APPLY THE FOLLOWING PROPOSED SOIL AMENDMENTS AT THE SPECIFIED RATE ON TOP OF THE RESPREAD TOPSOIL AS OUTLINED BELOW TO THE ENTIRE LIMITS OF GRADING. A. SEED FERTILIZER SHALL BE APPLIED AT A RATE OF 300 POUNDS PER ACRE. B. CALCITIC LIMESTONE SHALL BE APPLIED AT A RATE OF 2 TONS PER ACRE. 6. ADDITIONAL TOPSOIL AND AMENDMENTS SHALL BE ADDED AND COMPACTED AS NECESSARY TO ACHIEVE FINISH GRADES AS SHOWN ON THE PLANS. FINISH GRADING 1. SHAPE, TRIM, FINISH, AND COMPACT SURFACE AREAS TO CONFORM TO THE LINES, FINISH GRADES, AND CROSS-SECTIONS SHOWN ON THE CONTRACT PLANS OR AS DESIGNATED BY THE ENGINEER. 2. ELIMINATE WHEEL RUTS BY REGRADING. 3. THE FINISHED SURFACE OF SITE GRADING AREAS SHALL VARY NO MORE THAN 0.10 FOOT FROM THE SPECIFIED GRADE AS SHOWN ON THE CONTRACT PLANS. 4. RESTORE PREPARED AREAS TO FINISH GRADES IF EROSION, COMPACTION, SETTLEMENT OR OTHER DISTURBANCE OCCURS PRIOR TO THE COMMENCEMENT OF SEEDING OPERATIONS. 5. REPLACE THE WOODY DEBRIS SALVAGE IN NATURALIZED CLUSTERS OR PILES AFTER INSTALLATION OF THE EROSION CONTROL FABRIC. STREAM STABILIZATION 1. STREAM CHANNEL AND SIDESLOPES, INCLUDING FLOODPLAIN BENCHES SHALL BE STABILIZED WITH CM -700 MATTING OR EQUIVALENT BIODEGRADABLE MATTING ATTACHED WITH BIO -STAKES (WOODEN) NOT METAL. 2. ALL GRADED AREAS, INCLUDING STREAMBED, SIDESLOPES AND FLOODPLAIN BENCHES SHALL BE STABILIZED WITH APPROVED SEED MIXTURE AND PLANTINGS, AS SHOWN ON THE PLANTING PLAN. 3. WOODY DEBRIS SHALL BE USED TO FACILITATE HABITAT DEVELOPMENT AND STABILIZE STREAM MEANDERS. PLACEMENT OF ALL WOODY DEBRIS SHALL BE VERIFIED IN THE FIELD BY THE ENGINEER. 4. STAKE THE LOCATION, EXTENT, AND SHAPE OF EACH IN -STREAM STRUCTURE FOR APPROVAL BY THE ENGINEER PRIOR TO INSTALLATION. 5. IN -STREAM STRUCTURES TO BE INSTALLED IN ACCORDANCE WITH THE CONSTRUCTION PLANS AND SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER. REVEGETATION 1. BRING ALL AREAS TO PROPER LINE, GRADE AND CROSS-SECTION INDICATED ON THE PLANS. 2. REPAIR EROSION DAMAGE PRIOR TO COMMENCING SEED OPERATION. 3. LOOSEN SEED BED TO A MINIMUM DEPTH OF 3." 4. REMOVE ALL ROOTS, CLODS, STONES LARGER THAN 1" IN ANY DIMENSION. 5. CONDUCT SOIL TEST TO DETERMINE PH FACTOR. IF PH IS NOT SUITABLE FOR PERMANENT SEED MIX AND PLANTINGS, ADJUST. 6. MIXTURES OF DIFFERENT TYPES OF SEED FOR THE VARIOUS SCHEDULES SHALL BE WEIGHED AND MIXED IN THE PROPER PROPORTIONS IN THE PRESENCE OF THE OWNERS' REPRESENTATIVES. APPLY UNIFORMLY OVER AREAS TO BE SEEDED AS INDICATED IN THE PLANTING PLAN AND SPECIFICATION. 7. APPLY EROSION CONTROL BLANKET ON CHANNEL SLOPES AS INDICATED IN THE PLANTING PLAN AND AS DIRECTED BY THE ENGINEER. 8. APPLY STRAW MULCH OR EXCELSIOR FIBER MULCH PER PROJECT SPECIFICATIONS IN ORDER TO RETAIN MOISTURE AND PREVENT SEED FROM WASHING AWAY. 9. SEEDING AND PLANTING SHALL BE COMPLETED IN ACCORDANCE WITH THE CONSTRUCTION PLANS AND SPECIFICATIONS. FOR AGENCY REVIEW THESE DOCUMENTS ARE PRELIMINARY AND ARE NOT FOR USE FOR CONSTRUCTION A=COM PROJECT WILDERS GROVE STREAM RESTORATION CLIENT CITY OF RALEIGH 630 BEACON LAKE DRIVE RALEIGH, NORTH CAROLINA 27610 CONSULTANT AECOM 4016 Salt Pointe Parkway North Charleston, South Carolina, 29405 843.767.4602 tel 843.767.4723 fax www.aecom.com REGISTRATION ISSUE/REVISION 1 I 2U18 -12-1b 1 90%6UBMII IAL I/KI UA I t I ULbUKIF' I IUN KEY PLAN PROJECT NUMBER 60523147 SHEET TITLE CONSTRUCTION NOTES SHEET NUMBER C18