Loading...
HomeMy WebLinkAbout20181349 Ver 1_eApproval Letter_SAW-2016-01335_20181220Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 November 30, 2018 Re: NCIRT Review and USACE Approval of the Mill Dam Creek Mitigation Plan; SAW -2016-01335; NCDMS Project # 97136 Mr. Tim Baumgartner North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Dear Mr. Baumgartner: The purpose of this letter is to provide the North Carolina Division of Mitigation Services (NCDMS) with all comments generated by the North Carolina Interagency Review Team (NCIRT) during the 30 -day comment period for the Mill Dam Creek Mitigation Plan, which closed on November 5, 2018. These comments are attached for your review. Based on our review of these comments, we have determined that no major concerns have been identified with the Draft Mitigation Plan, which is considered approved with this correspondence. However, several minor issues were identified, as described in the attached comment memo, which must be addressed in the Final Mitigation Plan. The Final Mitigation Plan is to be submitted with the Preconstruction Notification (PCN) Application for Nationwide permit approval of the project along with a copy of this letter. Issues identified above must be addressed in the Final Mitigation Plan. All changes made to the Final Mitigation Plan should be summarized in an errata sheet included at the beginning of the document. If it is determined that the project does not require a Department of the Army permit, you must still provide a copy of the Final Mitigation Plan, along with a copy of this letter, to the appropriate USACE field office at least 30 days in advance of beginning construction of the project. Please note that this approval does not preclude the inclusion of permit conditions in the permit authorization for the project, particularly if issues mentioned above are not satisfactorily addressed. Additionally, this letter provides initial approval for the Mitigation Plan, but this does not guarantee that the project will generate the requested amount of mitigation credit. As you are aware, unforeseen issues may arise during construction or monitoring of the project that may require maintenance or reconstruction that may lead to reduced credit. Thank you for your prompt attention to this matter, and if you have any questions regarding this letter, the mitigation plan review process, or the requirements of the Mitigation Rule, please call me at 919-554-4884, ext 60. Sincerely, BROWNING.KIMBERLY.Digitally signed by BROWNING.KIMBERLY.DANIELLE.1527683510 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, DANIELLE.1527683510 Date:2018.11N301^243605'00'LLE.1527683510 Kim Browning Mitigation Specialist for Henry Wicker Enclosures Electronic Copies Furnished: NCIRT Distribution List Paul Wiesner — NCDMS Matthew Reid — NCDMS