Loading...
HomeMy WebLinkAbout19900070 Ver 1_COMPLETE FILE_19900101?d DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concer ing an ap lication for State Fe eral CAMA Permit(s) from ? l 16 i A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. X This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: V That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: L Certification is not required for this project. A) B) C) Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after . The proposed project is certified under General Certification No. 1179 issued on January 25, 1977, for sewer line construction No. 1272 issued on November 10, 1978, for bulkhead construction. No. 1273 issued on November 10, 1978, for discharges of liquid effluent from diked upland disposal areas. D) No. 1431 issued on October 16, 1980, for boat ramp construction. E) No. 1664 issued on September S, 1983, for Rip-Rap Placement. F) No. 1665 issued on September 19, 1983, for incidental bridge construction. 4 /4" WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT PROJECT NAME: Gary Mercer/Beaufort Landing Townhomes S, COUNTY: Carteret Project 9008-H STREAM OR ADJACENT WATER BODY: Taylors Creek CLASS: SC OPEN OR CLOSED: Closed STORMWATER PLAN REQ'D: No IF YES, DATE APPROVED: PROJECT DESCRIPTION: The applicant proposes to rearrange slips at an existing community marina. To: Bill Mills Planning Branch ^;> < AUG ]990 DIVISION OF ENVIRONMENTAL MANAGEMENT ?'cr; J CAMA MAJOR PERMIT APPLICATION REVIEW QUALITY co C punning Branch REVIEWER: Gregson JOINT NOTICE: No DATE APP. RECD: 9RECOMMENDATION: Issue INITIAL REPORT: 90/08/21 (ISSUE/DENY/OTHER) FINAL REPORT: WATER QUALITY CERT. (401) CERT. REQ'D: No IF YES, TYPE: SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOSED: Existing City System (EXISTING, PROPOSED, SEPTIC TANK ETC.) TO BE PERMITTED BY: N/A (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FILL AREA OF FILL: WATER: N/A WETLAND: N/A IS FILL ELIMINATING A SIGNIFICANT USE? N/A DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? N/A IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? N/A MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A (ATTACH A MARINA USE ATTAINABILITY EVAL.) RECOMMENDED CONDITIONS OR PERITIT RESTRICTIONS: That the project be done in such a way as to not cause the turbidity to exceed 25 NTU. -A cc: CF, WiRO DCM - David Noble Jim Gregson DIVISION OF COASTAL MANAGEMENT Lat:34042104" FIELD INVESTIGATION REPORT Long:76037153" 1. APPLICANT'S NAME Gary Mercer - Beaufort Landing Townhomes 2. LOCATION OF PROJECT SITE Beaufort Landing Townhomes, Front Street, Taylors Creek, Beaufort, Carteret County; *SEE 1984 AERIAL PHOTO #33-1206 (V-21); *NOTE* NO 1989 PHOTO AVAILABLE. 3. 4. INVESTIGATION TYPE: DREDGE & FILL INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 5-90 (B) WAS APPLICANT PRESENT YES CAMA X (ONLY) 5. PROCESSING PROCEDURE: APPLICATION RECEIVED July 12, 1990 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Beaufort LAND CLASSIFICATION FROM LUP Developed DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE NOTED (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE COASTAL WETLANDS PUBLIC TRUST WATERS X ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X (E) TYPE OF WASTE WATER TREAT74ENT: EXISTING town system PLANNED SAME (F) TYPE OF STRUCTURES: EXISTING townhomes & dock PLANNED rearrange dock (G) ESTIMATED ANNUAL RATE OF EROSION N/A SOURCE 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS NONE (B) NON-VEGETATED WETLANDS: marina renovation AREA DREDGED FILLED OTHER (C) OTHER: NONE 7560 sq.ft (D) TOTAL AREA DISTURBED: 7560 sq. ft. 8. PROJECT SIR-24ARY: The applicant proposes to rearrange slips at an existing community marina. FIELD INVESTIGATION REPORT - GARY MERCER/BEAUFORT LANDING TOWNHOMES, CARTERET COUNTY PAGE #2 *NOTE: AN ADDITIONAL PROJECT, BEAUFORT LANDING VILLAGE (GARY MERCER) IS CURRENTLY IN PROCESS FOR CONSTRUCTION OF NEW DOCKS. 9. NARRATIVE DESCRIPTION: The applicant's property is a developed multi-residential townhome complex named "Beaufort Landing Townhomes" located on Front Street, Taylors Creek, Carteret County. This existing project is located just west of an additional CAMA Major Permit Application project currently under review. Beaufort Landing Townhomes were constructed several years ago, and CAMA Major Permit #188-85 was issued to Taylor Creek Investments (subsequently transferred to Frank-Kay II) for dredging and construction of a 20 slip community dock. The existing community dock was constructed in 1988. This new permit application is for the renovation and addition of the existing dock. Specifically, the applicant proposes to add 1.5' x 80' wide catwalks down each side of the existing 5' x 80' access pier. The catwalks will provide better access for dinghies. The applicant also proposes to delete two (2) catwalks and add four (4) new catwalks with finger piers on the landward side of the t-head pier. This realignment will allow for easier docking with the tidal flow. The total number of existing slips is 17, and under the new proposal, there will be 16. The original permit was for 20 slips. A major permit is required for the renovation since it is a commercial facility. The project, as constructed, does not meet the 27 sq. ft. community dock rule. However, the proposed renovation does not increase the overall footprint of the slip area. ANTICIPATED IMPACTS: The classified as 'SC' by the Management and are closed Environmental Health and Significant environmental anticipated. waters of Taylors Creek are Division of Environmental to shellfishing by the Division of Division of Marine Fisheries. impact from the project is not PREPARED BY: W. DAVID NOBLE DATE: AUGUST 9, 1990 Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT me,me_r PUildin a. Name Address ?16fY]• A nrtsvilh City ??? ?y i 1Iz State tJG Zip 20,540 Day phone `11'1.3 •314°1 Landowner or -- Y A thorized agent b. Project name (if any) J?ea >Fe 1?'y?d i uq. c. If the applicant is not the andowner, also give the owner's name and address. 'S SoC 2 LOCATION OF PROPOSED ' PROJECT a. Street address or secondary road number b. City, to , community, or landmark OeA L) c. County d. Is proposed work within city limits or planning U-105- jurisdiction? e. Name of body of water nearest project 0 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). k l 0 S i If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both?. ba-uQ.- c. Will the project be for commercial use? rate or ]to F i TO . .._..................... _ - d. Describe the planned use of the project. $a? fin cks 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract - b. Size of individual lot(s) W l c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum ivl,L- d. Soil type(s) and texture(s) of tract e. Vegetation on tract 11'e -)a Wn IL'i S f. Man-made Ltures now on tract ? -= +DEhNn knvps g. What is the CAM Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional -4- Developed Community Rural Other h. How is the tract zoned by local government? i. How are adjacent waters classified? `1^ j. Has a professional archaeolo icaI survey been carried out for the tr ct? If so, by whom? - - 5 UPLAND DEVELOPMENT Complete this section if the project includes any upland development. a. Type and number of b ild' gs, facilities, structures proposed r1 Ab "I b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) it ltd d. Size of area to be graded or disturbed) e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tact within 75 feet of mean high water to be covered by im- permeable surfaces, such as.paygment, buildings, or rooftops. Iy 79 g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N/?' h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? /A i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? ?/A k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example surface runoff, sanitary wastewater, industrial/commercial effluent, or "wash down"). RIA m. Water supply source V 1A n. If the project is oceanfront development, describe the steps that will be taken to main- tain established public beach accessways or pro- vide new access. W ,A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? __?A 6 EXCAVATION AND FILL. INFORMATION a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas b. Amount of material to be excavated from below water level in cubic yards c. Type of material_ ?X d. Does the area to be excavated include marsh- land, swamps, or other wetlands? M/14 e. High ground excavation, in cubic yards f. Dimensions of spoil disposal area 1474- g. Location of spoil disposal area h. Do you claim title to the disposal area? If not, attach a letter granting permission from the owner. i. Will a disposal area a available for future maintenance?/ If so, where? j. Does the disposal a ea include any marshland, swamOland,'or water areas? 1A k. Will the fill material b placed below mean high water? 1. Amount of fill in cubic yards- in. Type of fill material - X /1k Y_ n. Source of fill material o. Will fill material be place on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be ke t on site and erosion controlled? r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? J:J?1?1ywrg . S?vys . s. Will wetlands be crossed in transporting equip- ment to the project site?= If yes, explain the steps that will be taken to lessen en- vironmental impacts. F7 SHORELINE STABILIZATION a. Length of bulkhead or riprap M/A b. Average distance waterward of can high water or normal water level c. Shoreline erosion during rec ding 12 months, in feet d. Type of bulkhead material'/ il e. Amount of fill, in cubic yar /to be placed below mean high water ?4 /A f. Type of fill material 2 8 ADDITIONAL INFORMATION. In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V1 x 11 white paper. (Refer to Coastal Resources Commission Rule 7].0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). l- Name_ Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.,- A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION .NAND I'EAWS' SION TO:ENTER ON-1ANI)Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. Thi is the A day of V v 50C . X t `?n$ Lan mer or Aut rized agent 2-Name -jQWM 0 ?o t.Joliti`(ovrg Send the completed application materials to the Address 0 . 0 Division of Coastal Management Office nearest you ?3PA u /J C 2- ?lh and the U.S. Army Corps of Engineers. See the Name map on the inside front cover for the appropriate Address DCM office and addresses and phone number. EJUL 1 2 1990 3 6, Existing Dock boardwalk - I C ) Existing Dock boardwalk 2-12"T x b" K 5tep5 24" Down to new catwalk tMcan High Water Line New 4'w. x 8" Kioem x 12" Treads Steps Down to Marsh - Dennis K. Mercer Designs Land Planning - Landscape Architecture 103 Dunbar Lane ,•t ?ARC) Jacksonville - NC • 28540 ??`p oscryf i •? 919.455.0086 ::OI ss July 6, 1990 ni5 K. Mercer, nd5cape Architect #301 jilts $81 11SIS 10' Newt' Catwalk New 2' Catwalk Existing Piers- 10' TFFFM 15' Ki5er5 X Top Exist Dock Elev. 2-12" Treads *6'M51- Steps Down to 1'-6" i -- - - -Catwalk 2' -? M5L- - _ 2-2x10 PT Joiot5 per pier II II 0 -? 11 ?-2' II II II it 0 0 C.A.M.A. Major Permit a>rWL 12 logo ' Renovation to Existing P s-P..?..t. Beaufort Landing Tow;r?es Front Street, Beaufort, NC Development By: Gary A. Mercer, Mercer Building Company, Inc. 1009-A Onrville Drive, Jacksonville, NC 28540 Jacksonville 919-346-3149, Beaufort, 919-728-6636 Sheet 2 of 2 j. North Flood Taylor's Creek Ebb -+ 15'b -9 135' 0 16 o a o 0 0 Existing 6' pier & 2' catwalks (outlined) 0 15 14.E 13 II 12 11 I? Remove catwalk -}- 9-11 7 Notes: I o 8 I , 1. No excavation or dredging i5 proposed. New 2' catwalks, 2' 2. All New construction will be lower than exiot. pier removal and rebuilding dock walks a5 shown. New 18" w. catwalk. 2' lower . No additional boat dock I than exist. pier, each s(de- 3spaces will be made. N Al to 4. All lumber used will be treated. 5. Existing Docks built under CAMA Mayor Permit; Number 188-85 dated Nov. 5,1985 Gary A. Mercer Property I Nearest riparian land owner not related to builder i5 Town of Beaufort, lease to NC State Wildlife Dept. for Public Boat Kamps - Attn. to Mr. John Young, Bldg. Inoptr., Town of Beaufort, P.O. Box 390, Beaufort, NC 28516 ----•--?---._ _•.?_.... -- r Existing BcauforG Landing Townhomce --j Dennis K. Mercer Designs C.A.M.A. Major Permit Plan, Land Planning • Landscape Arch itecturerAR' Renovation to Existing Docks at: 103 Dunbar Lane Jacksonville • NC • 2,5540 Beaufort Landing Townhomes ?:=0 ? •;.•; 919.4550086 'Front Street, Beaufort, NC July 6, 1990 Development By: 1" = 40' Gary A. Mercer, Mercer Building Company, Inc. k1009-A On5ville Drive, Jacksonville, NC 28540 V? %??S jtE.•`° Jacksonville 919-346-3149, Beaufort, 919-728-6636 Den is K. 4mcrc Londocapc Architect 301 5heet 1 of 2 ew w. V pb down to marsh --? ------------------- Existing 5' Dock Walk -- 5 Existing Conc. Paver Walkway I 1 Beaufort Landing Owners Association c/o Jere Woltz, 530 Woodland Dr., Greensboro, NC 27408 J L 1 2 ?SSJ Front Street 4 3 =I 15 O O 10 15 v o ? I 9 15' - 6' 2 a`20 0 0 ? catwalk ?- New 2' catwalko, 2' lower than exist. pier 6x6'deckway corner addition each bide I Mean High Water 176' > ? I -951- Marsh 100' 1 I Existing Bulkhead 70'