HomeMy WebLinkAbout20181720 Ver 1_PCN Form Submission_20181218DWR
IDIOM n of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
tial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned
20181720
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
Information for Initial Review
1a. Name of project:
Whittington Park Townhomes Stream Restoration
1a. Who is the Primary Contact?*
Kris Bass
1b. Primary Contact Email:*
kbass@kbeng.org
Date Submitted
12/18/2018
Nearest Body of Water
Black Creek
Basin
Neuse
Water Classification
Q NSW
Site Coordinates
Version# *
1
What amout is owed?*
r $240.00
r $570.00
Select Project Reviewer*
Stephanie Goss:eads\szgoss
1c. Primary Contact Phone:*
(919)960-1552
Latitude:
Longitude:
35.8027001
78.7885278
AProcessing Information
U
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?*
r Yes r No
1a. Type(s) of approval sought from the Corps:
* Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
rJ Nationwide Permit (NWP)
F- Regional General Permit (RGP)
F Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
F Non -404 Jurisdictional General Permit
F Individual Permit
27 - Restoration
1e. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
W Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r- Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r- Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
O Yes r No
B. Applicant Information
1d. Who is applying for the permit?
F_ Owner W Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
r Yes r- No
2. Owner Information
2a. Name(s) on recorded deed:
Whittington Park HOA
2b. Deed book and page no.:
(007648,00586)
2c. Responsible party:
2d. Address
Street Address
0 Grande Meadow Way,
Address Line 2
City
Cary
Postal / Zip Code
27513
2e. Telephone Number:
(919)790-8000
2g. Email Address:*
jramsey@sentrymgt.com
2a. Name(s) on recorded deed:
Town of Cary
2b. Deed book and page no.:
(000000,00000)
State / Ffovinoe / Region
NC
Country
U.S.A
2f. Fax Number:
(919)790-5824
r- Yes r No
r- Yes r No
2c. Responsible party:
2d. Address
Street Address
2201 NW Maynard Rd.
Address Line 2
City
Cary
Postal / Zip Code
27513
2e. Telephone Number:
(919)469-4030
2g. Email Address:*
feedback@townofGary.org
3. Applicant Information (if different from owner)
3a. Name:
Iris Bass
3b. Business Name:
Kris Bass Engineering
3c. Address
Street Address
625 S. Lakeside Dr.
Address Line 2
cfty
Raleigh
Postal / Zip Code
27606
3d. Telephone Number:
(919)960-1552
3f. Email Address:*
kbass@kbeng.org
C. Project Information and Prior Project History
I.roject Information
State / R -wince / F�egion
NC
Country
U.S.A
2f. Fax Number:
State / Ftwince / Pagion
NC
Country
U.S.A.
3e. Fax Number:
1b. Subdivision name:
(if appropriate)
Whittington Park
1c. Nearest municipality/ town:
Cary
2. Project Identification
2a. Property Identification Number:
2b. Property size:
0764371056
5
2c. Project Address
Street Address
0 Grande Meadow Way
Address Line 2
(Ily
State / Ffwince / Pagion
Cary
NC
Postal / Zip (ode
Country
27513
U.S.A.
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Black Creek
3b. Water Resources Classification of nearest receiving water:*
Q NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12 -digit HUC in which the project is located.
030202010801
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The existing conditions of the stream are a highly eroded stream that sees extremely flashy flows due to upstream impervious. The stream channel has mostly vertical side slopes that
go to the edge of the townhomes on one side and a floodplain area on the other. The stream bed is made mostly of sand and stone of various sides. The stream is currently eroding the
bank near the townhomes at a rapid rate putting these townhomes in danger if unaltered.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r^ Yes r No r^ Unknown
4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
KBE_WhittingtonParkTownhomes_NC_Cary_USGS_Topo_Map_Excerpt.pdf 1.25MB
4e. Attach an 8 1/2X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil Map_ Whittington Park Townhomes Stream Restoration Soil Types _8.5x11.pdf 379.22KB
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
750
4h. Explain the purpose of the proposed project:*
The purpose of this project is to move the stream away from the existing townhomes and to rebuild a stable bank where the current erosion problem is occurring.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The goal of this project is to move the existing stream away from the townhomes as it is beginning to undermine the back patios connected to the townhomes. The bank behind these
patio's is vertical and bare and eroding at a rapid rate. We are proposing to move the stream away from this eroding bank and build a new stream in the existing floodplain. The eroded
bank will be repaired and connected to the floodplain. The proposed stream has been designed using standard stream restoration techniques. A stormwater outlet enters into the
existing stream downstream of the townhomes, this stormwater outlet will continue to be open and will connect to the proposed stream. The equipment used to construct this project will
include a small excavator, a skid steer, and potentially a dump truck.
4j. Please upload project drawings for the proposed project.
KBE_WhittingtonParkTownhomes_StreamRestoration_Compiled_Submittal.pdf 1.97MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No 4 Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
W Wetlands
F Open Waters
2. Wetland Impacts
W Streams -tributaries
F Pond Construction
W Buffers
2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name * 2e. Forested * 2f. Type of2g. Impact
Jurisdicition*(?) area*
1 Stream Restoration P Bottomland Hardwood Forest Wetland 1 Yes Both 0.420
(acres)
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.000 0.420
2g. Total Wetland Impact
0.420
2h. Comments:
Stream to be relocated through existing wetlands.
3. Stream Impacts
❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. "me * 3e. Stream Type * 3f. Type of ]3g.S.width* 3h. Impact
(?) Jurisdiction* length*
Relocation -Restoration Permanent Relocation Black Creek =ff::]
Both ]�;;;harfee
S1 )
:]
31. Total jurisdictional ditch impact in square feet:
6c. Per or Temp
0
6f. Zone 1 impact
3i. Total permanent stream impacts:
3i. Total temporary stream impacts:
175
0
3i. Total stream and ditch impacts:
3,335
175
3,335.00
3j. Comments:
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
pdf
Check all that apply.
V Neuse
r Tar -Pamlico
F Catawba
r Randleman
F Goose Creek
r Jordan Lake
F Other
6b. Impact Type
6c. Per or Temp
6d. Stream name 6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
Exempt
T
Black Creek
No
3,335
2,708
6h. Total buffer impacts:
Zone 2
2,708.00
Zone 2
0.00
Zone 2
2,708.00
124.2KB
Zone 1
Total Temporary impacts:
3,335.00
Zone 1
Total Permanent impacts:
0.00
Zone 1
Total combined buffer impacts:
3,335.00
61. Comments:
Supporting Documentation
KBE_ WhittingtonParkTownhomes_StreamRestoration_lmpactsMap.
pdf
Zone 2
2,708.00
Zone 2
0.00
Zone 2
2,708.00
124.2KB
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
This stream restoration project was designed using natural stream channel design techniques. It includes an erosion control plan as well as avoids
more established trees on the site. The project design also increases the amount of stream buffer area as well as fixes an existing erosion problem.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The construction of this project will use low impact equipment to do all the grading and moving of materials. An erosion control plan will be followed to
avoid any downstream sedimentation. Tree fencing will surround the site to prevent any unnecessary tree removal.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes
r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
This is a stream restoration/relocation project and does not propose an increase in the amount of impervious area on the project site.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
F- Level Spreader
F- Vegetated Conveyance (lower SHWT)
r Wetland Swale (higher SHWT)
r Other SCM that removes minimum 30% nitrogen
R Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes r No
Comments:
No impervious surfaces proposed
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
2. Violations (DWR Requirement)
u
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B.0200)?*
r Yes
r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes
r No
3b. If you answered "no," provide a short narrative description.
This project is a stream restoration/relocation and does not propose any new impervious areas. Since no new impervious area Will be added there wil
be no additional runoff and no impact to nearby streams
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR forth is project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
f Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
f Yes r No
5d. Is another Federal agency involved?*
r Yes r No
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r^ Yes r No
r- Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
U.S. Fish and Wildlife Critical Habitat For Threatened & Endangered Species ArcGIS Map
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
U.S. Fish and Wildlife Critical Habitat For Threatened & Endangered Species ArcGIS Map
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r' Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
North Carolina Listings in the National Register of Historic Places as of 11/28/2018
7c. Historic or Prehistoric Information Upload
NC_HistoricalPlaces.pdf 318.48KB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
FEMA Flood Risk Information System
Miscellaneous
Comments
Included in this submittal is a letter from the Town of Cary granting permission for this project to use a piece of the property that they own in a greenway easement.
Miscellaneous attachments not previously requested.
TownofCary_lasementLetter.pdf 34.78KB
Signature
*
[f By checking the box and signing below, I certify that,
I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Kristopher Bass
Signature
Sign
Date
12/18/2018
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï
―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
Ï
―│Ï ―│Ï
│―│Ï│―│Ï
―│Ï ―│Ï
―│Ï ―│Ï
――│Ï
│Ï
#!"
▄▄OP
¥^
█n
█n
█n
█n
█n
█n
█n
█n█n
█n
█n
█n
█n
█n
█n
F
F450450
450400350500500 45
0 450500
500400450450
50
0
0
450 45500 450500
500
4504
0
0
400
450450
450
450450500500400450
45
0
45
0
45
0
450 40045
0
500
500
450
450450
500 450500¬«54
1747
¬«5
¬«54
K
E
T
P
L
BALMORABAYOAK DRWINFAIR DR
MEDLIN DRHIGH HOUSE RD
POND STW CORNWALL RD
W JOHNSON STSUDBURY DRNORTHAMPTON DRBRIARCLIFF LN
ELLYNN DRB R A N N I F F D R
M A P L E A V E
MADISON AVE
N
O
RMANDY S T
WICKLOW DRUNION STD
O
R D
BROOKGREEN DR
N E W RAIL DRKILMAYNE DR
C
A
R
O
L
Y
N
C
TGREGORY DRKEY
W
ME
WS
COUNTRY LN
TANGLEWOOD DRHOLTZ LNN D R
DR
L I A D R
TRIMBLE AVEW D Y N A S T Y D R
GRIFFIS STS WALKER STE CHATHAM ST
RALPH DRE DYNASTY DR
MAYODAN DRDRPRINCESS ANNE RDCASTLEF E R N D RWI
L
S
O
N
RD
CARROUSEL LN
BANY
O
N TREE LNTS HARRISON AVENORTHWOODS DRE C E D A R S T
BELHAVEN RD
OAKRWASHINGTON STWARREN AVEWALDO ST
M E D F IE L D R D
FINCASTLE DRTHER
S
T
O
N
E WAYS
H
E
L
D
O
N
D
R
WINWOOD DRPAMLICO DRSHIRLE Y D RS W STWESTONGATE WAY
E JOHNSON ST
E PARK ST
W E B S T E R ST
SORRELL ST
INDIGO DR
RYAN RDW
ESTHAVEN DRFAIRBANKS RDL A K E D R
W BOUNDARY ST KINGSW OOD DRJ
A
M
E
S
J
A
C
K
S
O
N
AVE
TOW
E
R
V
I
E
W CTH
O
W
L
A
N
D AVES I L V E R G R O V E D R
RIDGE C R E S T R D
W PARK ST
MEADOW DR REEDY CREEK RDTATE STREED S T
ELECTRA DR
Maynard Pond
Holiday Acres Lake
S
wi
f
t CrC
o
le
s
B
r
L
y
n
n BrHill
Crest
Cem
««««««««««««¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬
Feet01020
6RLO0DS²:DNH&RXQW\1RUWK&DUROLQD:KLWWLQJWRQ3DUN7RZQKRPHV6WUHDP5HVWRUDWLRQ6RLO7\SHV1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRI35° 48' 12'' N78° 47' 26'' W35° 48' 12'' N78° 47' 15'' W35° 48' 6'' N78° 47' 26'' W35° 48' 6'' N78° 47' 15'' WNMap projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 Feet MetersMap Scale: 1:1,270 if printed on A landscape (11" x 8.5") sheet.Soil Map may not be valid at this scale.