HomeMy WebLinkAbout20181714 Ver 1_Stream Buffer Determination letter_20181219ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Duke Energy Progress, LLC
Attn: Mr. Steve Cahoon
410 South Wilmington Street
Raleigh, NC 27601
NCRTH CAROLINA
Ertoranmomtrrl Qualify
December 19, 2018
EXP DWR #18-1714
WAYNE County
Subject: On -Site Determination for Applicability to Neuse Riparian Buffer Rules (15A NCAC 02B .0233)
Subject Property/ Project Name: H.F. Lee Construction Staging Area
Address/Location: 1199 Black Jack Church Rd, Goldsboro
Stream(s) Evaluated: Uts to Neuse River
Determination Date: 12/17/18
Staff: Anthony Scarbraugh
Determination Type:
Buffer:
Stream:
® Neuse (15A NCAC 02B.0233)
❑ Intermittent/Perennial Determination
❑ Tar -Pamlico (15A NCAC 02B.0259)
Soil
❑ Catawba (15A NCAC 0213 .0243)
❑ Jordan (15A NCAC 02B .0267) (governmental
Subject
and/or interjurisdictional projects)
❑ Randleman (15A NCAC 0213 .0250)
Survey
❑ Goose Creek (15A NCAC 02B .0605-.0608)
Stream #1
Stream
E/1/P*
Not
Subject
Start@
Stop@
Soil
USGS
Subject
Survey
Topo
Stream #1
Ditch
X
Flag: Stream #1
Flag: Stream # 1
X
Begin
End
Stream #2
Ditch
X
Flag: Stream #2
Flag: Stream # 2
X
Begin
End
*E/1/P/NSP = Ephemeral/Intermittent/Perennial/No Stream Present
The Division of Water Resources has determined that the streams listed above and included on the
attached map have been located on the most recent published NRCS Soil Survey of WAYNE County, North
Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale and evaluated for
D, E
North Carolina Department of Environmental Quality (Division of Water Resources -Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
Wayne County
Page 2 of 2
applicability to the NEUSE River Riparian Buffer Rules. Each stream that is checked "Not Subject" has been
determined to not be at least intermittent or not present on the property. Streams that are checked
"Subject" have been located on the property and possess characteristics that qualify them to be at least
intermittent streams. There may be other streams or features located on the property that do not appear
on the maps referenced above but may be considered jurisdictional according to the US Army Corps of
Engineers and subject to the Clean Water Act.
This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director.
An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in
writing.
If sending via US Postal Service:
c/o Karen Higgins
DWR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 2 7699-1 61 7
If sending via delivery service (UPS, FedEx, etc.):
clo Karen Higgins
DWR — 401 & Buffer Permitting Unit
512 N. Salisbury Street
Raleigh, NC 27604
This determination is final and binding as detailed above, unless an appeal is requested within sixty (60)
days.
This determination only addresses the applicability to the buffer rules and does not approve any activity
within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any
inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of
Engineers Washington Regulatory Field Office at (919)-554-4884, Ext. 22.
If you have questions regarding this determination, please feel free to contact Anthony Scarbraugh at
(252) 948-3924.
Sincerely,
vm—a "
David May, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: LASERFICHE
Samir Dumpor, DELMR WaRO
Josh Witherspoon, Wood Environmental and Infrastructure Solutions, Inc. (via email)
'EQ:>
North Carolina Department of Environmental Quality (Division of Water Resources - Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
1974 Wayne County NRCS Soil Survey
Management Commission
Division of Water Resources
For i ;Lulc Basin Buffer
Date i_/r ,20/Jr
Reviewed by hi