Loading...
HomeMy WebLinkAbout20181714 Ver 1_Stream Buffer Determination Request_20181213Water Resources ENVIRONMENTAL OUALiY ROY COOPER MICHAEL S. REGAN S"o u"i S. JAY ZIMMERMAN 1);;,r ,,, DWQ Use Only: Project # 11-011 Stream Origin/Buffer Applicability Determination Required Information 1. Owner Information (corporation/individual who is legally responsible for the property and its compliance) 1 a. Name(s) on Recorded Deed Carolina Power and Light Company 1b. Responsible Party (for LLC) 4021 Stirrup Creek Drive, Suite 100 Durham NC 27703 1c. Mailing Address 410 S Wilmington St Raleigh NC 27601 1d. Telephone Number 919 546-7457 1 1e. Email Address steve.cahoon@duke-energy.com 2. Location of Project Site - please include the county, nearest named town and highway number: HE Lee Energy Complex — 1199 Black Jack Church Road Goldsboro NC 3. Has anyone from DWQ visited the site? I Y I Staff Name I Multiple staff Date of Visit? I Multiple site visits Additional Requested Information 4. Agent/Consultant Information (if applicable) 4a. Name, Company Wood Environment and Infrastructure Solutions, Inc 4b. Mailing address 4021 Stirrup Creek Drive, Suite 100 Durham NC 27703 4c. Telephone no. Josh Witherspoon 4d. Email address 5. Project and Site Information 5a. Name of project HE Lee Stream and Buffer 5b. County Wayne 5c. Nearest Named Stream Neuse River 5d. River Basin Neuse 5e. Provide a brief description of this project (attach site plan if available): Make a stream call for buffer determination. See Attached soil survey page from Wayne County Soil Survey. Discussion with Anthony Scarbraugh on 12/7 he is available for a site visit on 12/13. Please attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey. If you are unable to locate either of these maps, please contact the Regional Office for assistance. DWQ Use Only: Is this stream call for the purpose of: _X_ buffer mitigation _ nutrient offset credit I v soon M zma z000 raa a R,.,wr Sola 1:20000 -.. v.—,..vavraaamamesaaeu:e.awwisGRb>aaavrss@,^4Y1Gmwr.ivtiv.. nci+r,. �..uw.. _ Co a a Ex I Nos Nr92 <V,9 LmM', VawttS W Evi I iM lJmmsNap (� DUKE ENERGY, Ms. Lyn Hardison Washington Regional Office North Carolina Department of Environment and Natural Resources 943 Washington Square Mall Washington, NC 27889 Dear Ms. Hardison, Environmental Services Duke Energy 410 S Wilmington Street Raleigh, NC 27601 RECEIVED/NCDENR/DWR DEC 17 2018 Water quality Regional Operations Section Washington Regional Office Enclosed is a check for $200.00 for an express review stream call performed by staff from DWR's Washington Regional Office on Thursday, December 13, 2018, at the HF Lee Energy Complex ash beneficiation project. If you have any questions or need clarification, feel free to contact me at steve.cahoon@duke- energy.com or 919 546-7457 at your convenience. Respectfully submitted, Steve Cahoon Duke Energy EHS-CCP Permitting and Compliance