HomeMy WebLinkAbout20181714 Ver 1_Stream Buffer Determination Request_20181213Water Resources
ENVIRONMENTAL OUALiY
ROY COOPER
MICHAEL S. REGAN
S"o u"i
S. JAY ZIMMERMAN
1);;,r ,,,
DWQ Use Only: Project # 11-011
Stream Origin/Buffer Applicability Determination
Required Information
1. Owner Information (corporation/individual who is legally responsible for the property and its compliance)
1 a. Name(s) on Recorded Deed
Carolina Power and Light Company
1b. Responsible Party (for LLC)
4021 Stirrup Creek Drive, Suite 100 Durham NC 27703
1c. Mailing Address
410 S Wilmington St Raleigh NC 27601
1d. Telephone Number
919 546-7457
1 1e. Email Address
steve.cahoon@duke-energy.com
2. Location of Project Site - please include the county, nearest named town and highway number:
HE Lee Energy Complex — 1199 Black Jack Church Road Goldsboro NC
3. Has anyone from DWQ visited the site?
I Y
I Staff Name
I Multiple staff
Date of Visit?
I Multiple site visits
Additional Requested Information
4. Agent/Consultant Information (if applicable)
4a. Name, Company
Wood Environment and Infrastructure Solutions, Inc
4b. Mailing address
4021 Stirrup Creek Drive, Suite 100 Durham NC 27703
4c. Telephone no.
Josh Witherspoon
4d. Email address
5. Project and Site Information
5a. Name of project
HE Lee Stream and Buffer
5b. County
Wayne
5c. Nearest Named Stream
Neuse River
5d. River Basin
Neuse
5e. Provide a brief description of this project (attach site plan if available): Make a stream call for buffer determination. See
Attached soil survey page from Wayne County Soil Survey. Discussion with Anthony Scarbraugh on 12/7 he is available
for a site visit on 12/13.
Please attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey.
If you are unable to locate either of these maps, please contact the Regional Office for assistance.
DWQ Use Only: Is this stream call for the purpose of: _X_ buffer mitigation _ nutrient offset credit
I v
soon M zma z000 raa a R,.,wr
Sola 1:20000
-.. v.—,..vavraaamamesaaeu:e.awwisGRb>aaavrss@,^4Y1Gmwr.ivtiv.. nci+r,. �..uw.. _
Co
a
a
Ex
I
Nos
Nr92
<V,9
LmM', VawttS W Evi I iM lJmmsNap
(� DUKE
ENERGY,
Ms. Lyn Hardison
Washington Regional Office
North Carolina Department of Environment and Natural Resources
943 Washington Square Mall
Washington, NC 27889
Dear Ms. Hardison,
Environmental Services
Duke Energy
410 S Wilmington Street
Raleigh, NC 27601
RECEIVED/NCDENR/DWR
DEC 17 2018
Water quality Regional
Operations Section
Washington Regional Office
Enclosed is a check for $200.00 for an express review stream call performed by staff from DWR's
Washington Regional Office on Thursday, December 13, 2018, at the HF Lee Energy Complex ash
beneficiation project.
If you have any questions or need clarification, feel free to contact me at steve.cahoon@duke-
energy.com or 919 546-7457 at your convenience.
Respectfully submitted,
Steve Cahoon
Duke Energy EHS-CCP
Permitting and Compliance