HomeMy WebLinkAbout20181716 Ver 1_B174 Design Plans_20181218N
.
�
�
�
O
N
.
�
�
�
� �
�
����� � � ��� ��������
�������� �� ���� ���
LOCA TI01�: BRIDGE 1��.174 O T�ER BIG CREEI�
01� SR 1332 (WATER VILLE ROAD)
T YPE OF WORI�: GRADII�G, DRAII�A GE, PA T�I1�G A1�D S TR UCT URE
'3✓►��RS 2'.
Np,D $
BEGI1� PR OJECT 14SP.20441.2
�O
co
/s,� F,p�
,�9�`�ti�
� �
O
��,,�������,,,,
.�`�� � A R �''%
.
\,� �� �,,����,,,�<i ��;,
; �°, ��ss� 0�?9 ;
- =� SEAL �: -
_ = 20777 ; _
, ; _
: �. ;
; yq, `�,y�� N�� ,. �
. , . :
�i� �Q�����iiii�������.�`��
,'� o y L . `N � ��`,
''�������������`�
✓IENT NOT CONSIDERED
INA� UN�ESS A��
NATURES COMP�ETED
N
N
�
O
O
• �
,� ,-� �
��---------- � / � .
^ ol
��I�
-o�l�
-�, _ , z
Prepared in the Offlce ofe
DESIGI� DATA PROJECT LE11tGTH VA UGH1� � MELT011t
1318-F PATTON AVE. ����
ADT 2012 = 440 ASHEVILLE NC, 28806 00� �%
_ LENGTH ROADWAY PROJECT 14SP.20441.2 = 0.049 MI. FOR rHE NORTH CAROLINA DIV ISION OF HIGHWAYS Q�� ���o
ADT 2025 — 600 LENGTH STRUCTURE PROJECT 14SP.20441.2 = 0.026 MI. 20I8 STANDARD SPECIFICATIONS � ��
* T = 6% TOTAL LENGTH OF PROJECT 14SP.20441.2 = 0.075 MI. �' �
HARDY WILLIS, PE � �
V = � 5 M P H PROJECT ENGINEER � O
* TTST = 3 D UAL = 3 LETTI11lG DATE:
� �
0
JUNE 25, 2019 Q
CHRISTOPHER CORDELL, PE `s��, 0��
PROJECT DESIGN ENGINEER �� �� p�c�Q
FUNC CLASS = LOCAL RURAL
SUB-REGIONAL TIER
Charlotte9
❑ North Carolina
704•357•0488
Tri-Cities9
� Tennessee
423•467•8401
Vaughn & Melloi� Knoxville9
❑ Tennessee
Consulting Engineers 865 •546 •5800
Middlesboro,
Asheville, ° Kentu�ky
■ North Carolina 606•248•6600
828•253•2796 Spartanburg,
� South Carolina
864•574•4775
Copyright� 1994 Vaughn & Melton, Inc.
All Rights Reserved
-L- STA. 11 + 62.50 ��� ��'�
.� �,
.,
'� e�� ��
. , � \ �,���� ,
11+50
�-
�
J
w
10%q" DIA�
VERTICAL
MICROPI�ES
(TYPo)
01 � ,
T�'A � +i
,°� I �
I li I �
I II I �
_ �� I �
w
12+50
SPAN A
TEMPORARY
CAUSEWAY
EXCAVATE TO ' FIX -----'
E�o 1403083 ,��f � +�
I�— �--a I ,- �
� , -'+� � �
I I NWS � I I '�
� �
I I E�o 140300' � I I I -� 1 0 �
I I � ' " -'
w
� � I — ------ ----------- I � (TYPo)
--== 4 I---�-------------'' I I w
I I +� +� I I I
+� I '�' '�'
� I I � � I I I
o ��l I �' e
� J �
J w �' 3'-6" MINo
w
END BENT NOa 1
SECTION ALONG C/L SUR�EY -L-
SECTIONS AT END BENTS ARE AT RIGHT ANG�ESo
�
�
�
�
�
�
\ +
Q
\ �
� J
EARTH BERM �
E�e 1406035 � \
--- � ��
�
�
�
�\
�
�
�
�
�
�
�
�
�
BEGIN FRONT S�OPE
STAo 11+q6o40 —�-
0
O o 00 � o
O
FI�L FACE C�
END BENT NOo1
�R1 _
ro
97
,�
�
�
EXTENDED
TANGENT
BEGIN APPROACH S�AB
STA 11+48091 —�—
STA 11+62050 —�—
WoPo #1
� �—
�
�
�
�
�
�
�
�
����;,
. ��_
�----_ --
�%
��
���
TEMPORARY
SHORING (TYPo
� �
\
\
\
\ EARTH BERM
ELo 1q05o79
\
.,_\
BRIDGE IoDo \,
STA 12+30000 —�— \
/
.,�-�,
C�ASS II ��__
) RIP RAP (TYPo)
� —L—
N l0° l5' S0o6" E
q5 ° —00'\ 00"
�� ��
�
� �
�\�� \��
� ���� ,
�� �
------------- \ ��\��� ��
-------------- �\��� \
EARTH BERM
ELo 1q06o35
a o0
0 0�
o �Do��o�
�� ��
0
TEMPORARY
CAUSEWAY
\
\
.` �
�
��
��
�
45 ° —00'-00"
(TYPo)
� �
� �� EXISTING
�
� �� SUBSTRUCTURE
�
0 0 �� ��\ (TYPe)
�� o �� �
o� o� � ��
� \\�— 1
0
�
c�,
��
��L
��
67,_6„ � 67,_6„
��-E
135'-0" TOTAL LENGTH OF BRIDGE (FIL� FACE TO FILL FACE)
NOTESa
END BENTS ARE PARALLELo
MICROPI�ES NOT SHOWN IN P�AN VIEW FOR C�ARITYo
PLAN ALONG C/L SUR�EY -L-
\1
(TYPo)
�
END BENT NOo 2
z
�
0
°' z
W n
Z �
� �
' � 0
N
O
O
-J
�
�
�
�
�
�
�
�
�
�
�
�� \��
13+00
FILL FACE c� END BENT NOo 2
STA 12+97050 —�—
GoPo ELo 19417o6q
STA 12+97050 —�—
WoPo #2
END APPROACH SLAB
STA 13+11009 —L—
BEGIN FRONT S�OPE
STAo 13+13046 —�—
�� �
�
�
�
�
��� 45 ° —00'-00"
�
�� �
�\
�
�
���„� � � � � �,,,,��
,.�`,�N CAR� '%,�
��� �l ������ii� �/ �i
: ���.O��SS/ �'�,yq �,
= =a SEAL ��- =
= = 20777 = =
, � � � ,
'; ti% N�i NE� ,,: � ,'
. qn i � \ .
�i -7- �����i���� � �.
��'� � y L . `N ���`�.
''�������������``
DOCUMENT NOT CONSIDERED
FINAL UNLESS A�L
SIGNATURES COMPLETED
o MINo E�EVe
,� 1q04'
�
CLASS B
RIP RAP
Y �
0
��o� o � o o ��o j S°l
o�o � o�o
�� � � � � ��0
0 0 � �� o 0
GEOTEXTI�E CLASS II
RIP RAP
TEMPORARY CAUSEWAY DETAI
PI = 11+50000
EL = 1,418038'
VC = 25'
PI = 13+30000
EL = 1,417048'
VC = 30'
(+)305723% ^ (—)Oo5000% ^ �_�7 ����a,
� L/ J /a
VERTICA� GRADE DATA -�-
PI STAo 11+17e63 PI STAo 13+92097
� = 39 ° 56' 09oq" (LT) � = q6 ° 15' 1402" (LT)
D= 44 ° Oq' 2502" D= 4q ° 04' 2502"
L = 90061' � = 10qo95'
T = q7o23' T = 55052'
R = 130000' R = 130000'
HORIZONTAL CURVE DATA -L-
ROCK ANCHOR
RETAINING WAL�
(SEE P�ANS)
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
0
SHEET 1 OF 3
I HEREBY CERTIFY
THAT THESE PLANS
ARE THE AS-BUI�T
P�ANSo
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoN� 12+30000 -�-
REP�ACES BRIDGE NOo 174 I
FI�� FACE �a END BENT NOo 1
STA 11+62050 —�—
GoPo EL o 19418032
1'-6" TO �IMITS
OF UNCLASSIFIED
STRUCTURE EXCAVATION �OW CHORD
E�o 1412028
BEGIN FRONT S�OPE
12+00
STAo 11+46oq0 —L— EXCAVATE TO
Go Po E�o 1q18 19______�________— — � � ELo 1q03o83
----- EXP `��� I
j�''— CLASS II
+i I �
� I�� � RIP RAP
� +' I �j � �� (TYPo)
� � I
� � j �� I � �
w �' 1So � ---
UNCLASSIFED
STRUCTURE EXCAVATION
LOW CHORD BEGIN FRONT SLOPE
HoWo E�o 141509 E�o 1q11a71 STAo 13+13oq6 —L—
Go Po E�o 1417056
(Q100) � ---__
EXISTING —''--
�-- I—� �'� —''---
— SUBSTRUCTURE —'---------_
TO I-40
FI�L FACE �
END BENT NOo 2
��--�� �� iu
� � ��
� ��� �
��� �� ��
EARTH BERM \\ ��
E�o 1405a79
�
�
�
�
�
�
+
�
Q
ti
�
c�
�
i
I O
�
� 10%q" DIAo
BRACE
MICROPI�E
I
i10 � 103/4" DIAe
O BRACE
MICROPI�E
END BENT NOo 1
BRIDGE IoDo
STAo 12+30000 —�—
FOUNDATION LAYOUT
33,_0„
FOUNDATION NOTES
FOR MICROPI�ES9SEE MICROPI�ES SPECIAL PROVISION
DESIGN BOND �ENGTH FOR MICROPILES AT END BENT NOe1 FOR A FACTORED RESISTANCE OF 95 TONS PER PILEe
USE REINFORCING CASINGS WITH YIE�D STRENGTHS OF AT �EAST 50 KSI FOR MICROPI�ES AT END BENT NOo1e
DIMENSIONS �OCATING MICROPI�ES ARE TO CENTER�INESo
BRACE MICROPI�ES SHA�� BE BATTERED AT 30120
INSTA�� REINFORCING CASINGS FOR MICROPI�ES AT END BENT NOo1 TO A TIP E�EVATION NO HIGHER THAN 19380 FT (�T)9
19382 FT (RT) AND WITH A PENETRATION OF AT �EAST 10 FT INTO ROCKo
DESIGN BOND �ENGTH FOR MICROPI�ES AT END BENT NOe2 FOR A FACTORED RESISTANCE OF 95 TONS PER PI�Ee
USE REINFORCING CASINGS WITH YIE�D STRENGTHS OF AT �EAST 50 KSI FOR MICROPILES AT END BENT NOo2o
INSTA�� REINFORCING CASINGS FOR MICROPI�ES AT END BENT NOo2 TO A TIP E�EVATION NO HIGHER THAN 19390 FT (�T)9
19396 FT (RT) AND WITH A PENETRATION OF AT LEAST 10 FT INTO ROCKo
MICROPI�ES AT END BENT NOo1 & END BENT NOo2 ARE DESIGNED FOR A FACTORED SHEAR �OAD OF 6 KIPSo
� 1O3�q" DIAo
VERTICAL
MICROPI�ES
���111I111���
,.�`�� C A R �''%,
,�` ��N,,, � � �,,,�<i '%
: �°,.o�Essio�;�.� :
= =� SEAL �� =
= = 20�77 = =
� � �� �� �
= ti "�,, tic, NE ,: � :
'%Q�Q ''���������` �,��:
. p Y �, �.
'����'' � � � � �� � � �� ``���`
END BENT NOo 2
45°-00'-00"
(TYPJ
10%q" DIAo
BRACE
MICROPILES
FI�� FACE Ca�
END BENT NOo 2
�O
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
STAo 12+97e50 —�—
WoPo #2
KEY
O — 103/q" DIAo
VERTICA�
MICROPILES
SHEET 2 OF 3
12+30000 —�—
� 103/q" DIAo
BRACE
MICROPI�E
I
----------�--
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
BM#1 N 761788 E 78q091 STAo 10+79017 —�— 2208' (�T) E�EV�=1q17oq5' RAILROAD SPIKE IN 2q" HEMLOCK
\ ��`-'�
� ✓S� �
� �s
\ \ .
.. \ �� � .
�s �
� " .
\ �c ✓s -
� \ � �� \.
� \ ��
\ �S � \�
\ T� � S
� � �. \
> c
- \ � � BM#1 �
�9 � \s \..
q], � . S.
F� �
``�
��
��
��
j,�
+,�
0
� �
�
��
``�
�,�
�
°�
��
� \
��
��
`s,p �����
F
\/�`�� ,p�90
CLASS II
RIP RAP (TYPo)
�S.
����'�. � �
���
, ~1,',6
� ------- =��,�y. I
��� �I
�—��5 2�.
Np,D $
WOODS
/ ,,
,,
�
z \ � ,,
� � � ��
-� m
� = Z �.
o �, ,-,-, /
�� �
RETAINING D� m j
WALL �"Z /
� D . /O
` , , �a
/
� � /� /
PROPOSED gRIDGE IoDo � � � �
BRIDGE + _ _ , /
STAo 12 30000 L . /
�
. `;,_1� \
;
� . � � ----
,
. ;
� _�_ ; ;.
,
. ` ;, ,
, . ,'
�� ` - , `
,,
,,
,,
. � I
� -�.--------�____________________ �, ;;
,
� ' ,
, I
, � � _ -�
:.s� q5 ° —00'-00" � ' . ` �
(TYP) �, � � C �
� �''''� I
'�� \�
� �
,,
�,
,,
�
,,
�,' -
,,
�
%
,�
�
,,
,,
i,
.\ ,,
��� �
� %'
/�
O\ ��
°,� �;,
� �,
��� ��
��
�
�
�
�
�
�
�
,
, ^
�
� ---------------------`-------:-�
PROPOSED I
��� EXISTING 'S\ GUARDRAIL _
STRUCTURE (ROADWAY
' �S� DETAIL
..� \& PAY ITEM) �
�s—�' �S \
�� \ ✓s \
, � �
% �
/��� \ "�� 15��
�
i�� ,,s / �S/
�'
%' � �S
�, �,-.
�
,
,%i'� �� \
�� �o \ \
� %-�— °� �s �
; ,' � �
\
/ \
,'��'
,/� �� �
,
FOR UTILITY INFORMATION9SEE UTILITY PLANS AND SPECIAL PROVISIONSo
�OCATION SKETCH
HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN HW E�EVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW E�EVATION
= 5300
= 25
= 141qo4
= 7000
= 100
= 141509
OVERTOPPING FLOOD DATA
OVERTOPPING DISCHARGE = 9900
OVERTOPPING FREQUENCY = 500
OVERTOPPING E�EVATION = 141606
DRAINAGE AREA = 3602
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
SQo MIo
GENERA� NOTESo
ASSUMED LIVE LOAD = HL-93 OR ALTERNATE LOADINGo
THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE INITH THE
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONSo
THIS BRIDGE IS LOCATED IN SEISMIC ZONE 10
FOR OTHER DESIGN DATA AND GENERAL NOTES9SEE STANDARD
SHEET SNe
FOR SUBMITTAL OF WORKING DRAWINGS,SEE SPECIAL PROVISIONSa
FOR FALSEINORK AND FORMWORK9SEE SPECIAL PROVISIONSa
FOR CRANE SAFETY9SEE SPECIAL PROVISIONSo
FOR GROUT FOR STRUCTURES9SEE SPECIAL PROVISIONSe
THE CONTRACTOR SHALL USE A MINIMUM OF ONE TEMPORARY
BENT FOR EACH STAGE FOR THE ERECTION OF STEEL PLATE GIRDERSo
SEE "GIRDER ERECTION DETAILS" SHEETo
FOR TEMPORARY BENT9SEE SPECIAL PROVISIONSoPAYMENT FOR
THE TEMPORARY BENT SHALL BE INC�UDED IN THE LUMP SUM
PRICE BID FOR STRUCTURAL STEELo
REMOVABLE FORMS MAY BE USED IN LIEU OF METAL STAY—IN—PLACE
FORMS IN ACCORDANCE WITH ARTICLE 420-3 OF THE STANDARD
SPECIFICATIONSe
THE MATERIAL SHOWN IN THE CROSS—HATCHED AREA ON SHEET S-1
SHALL BE EXCAVATED FOR A DISTANCE OF 25 FTaEACH SIDE OF
CENTERLINE ROADINAY AS DIRECTED BY THE ENGINEERoTHIS WORK WILL
BE PAID FOR AT THE CONTRACT LUMP SUM PRICE FOR UNCLASSIFIED
STRUCTURE EXCAVATIONoSEE SECTION 412 OF THE STANDARD
SPECIFICATIONSa
FOR LIMITS OF TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC9SEE
TRAFFIC CONTROL PLANSeFOR PAY ITEM FOR TEMPORARY SHORING FOR
MAINTENANCE OF TRAFFIC,SEE ROADWAY PLANSo
AFTER SERVING AS TEMPORARY STRUCTURE9THE EXISTING STRUCTURE
CONSISTING OF 2 SPANS9 1 C� 59' AND 1 C� 56'-6"9 17025 FTo INIDE,
116 FToTIMBER DECK ON STEEL GIRDERS ON REINFORCED CONCRETE
END BENTS AND BENT,AND �OCATED AT THE PROPOSED STRUCTURE,
SHALL BE REMOVEDoTHE EXISTING BRIDGE IS PRESENTLY NOT
POSTED FOR LOAD LIMIToSHOULD THE STRUCTURAL INTEGRITY
OF THE BRIDGE DETERIORATE DURING CONSTRUCTION OF THE PROPOSED
BRIDGE,A �OAD LIMIT MAY BE POSTED AND MAY BE REDUCED AS
FOUND NECESSARY DURING THE LIFE OF THE PROJECTa
THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS
IS FROM THE BEST INFORMATION AVAILABLEoSINCE THIS INFORMATION
IS SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR9THE
CONTRACTOR SHALL HAVE NO CLAIM WHATSOEVER AGAINST THE
DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR ADDITIONAL
COST INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING BRIDGE
SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS
AT THE PROJECT SITEa
NEEDLE BEAMS WILL NOT BE ALLOINED UNLESS OTHERWISE
CALLED FOR ON THE PLANS OR APPROVED BY THE ENGINEERo
ALL STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 501N
AND PAINTED IN ACCORDANCE WITH SYSTEM 5 OR SYSTEM 6
OF THE STRUCTURAL STEEL SHOP COATINGS PROGRAM AND SECTION
442-8 OF THE STANDARD SPECIFICATIONS UNLESS OTHERWISE
NOTED ON THE PLANSo
INASMUCH AS THE PAINT SYSTEM ON THE EXISTING STRUCTURAL
STEEL CONTAINS LEAD9THE CONTRACTOR'S ATTENTION IS DIRECTED
TO ARTICLE 107-1 OF THE STANDARD SPECIFICATIONSoANY COSTS
RESULTING FROM COMPLIANCE INITH APPLICABLE STATE OR FEDERAL
REGULATIONS PERTAINING TO HANDLING OF MATERIALS CONTAINING
LEAD BASED PAINT SHALL BE INCLUDED IN THE BID PRICE FOR
"REMOVAL OF EXISTING STRUCTURE AT STATION 12+30000 —L—o"
THE CLASS AA CONCRETE IN THE BRIDGE DECK SHALL CONTAIN
FLY ASH OR GROUND GRANULATED BLAST FURNACE SLAG AT THE
SUBSTITUTION RATE SPECIFIED IN ARTICLE 1024-1 AND IN
ACCORDANCE INITH ARTICLES 1024-5 AND 1024-6 OF THE STANDARD
SPECIFICATIONSoNO PAYMENT WILL BE MADE FOR THIS
SUBSTITUTION AS IT IS CONSIDERED INCIDENTALTO THE COST
OF THE REINFORCED CONCRETE DECK SLABo
FOR CONSTRUCTION9MAINTENANCE9AND REMOVAL OF TEMPORARY ACCESS9
SEE SPECIAL PROVISIONSo
REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED SO AS NOT TO
ALLOW DEBRIS TO FALL INTO THE WATERoTHE CONTRACTOR SHALL REMOVE
THE BRIDGE AND SUBMIT PLANS FOR DEMOLITION IN ACCORDANCE WITH
ARTICLE 402-2 OF THE STANDARD SPECIFICATIONSe
THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH " HEC 18—
EVALUATING SCOUR AT BRIDGEo"
FOR EROSION CONTROL MEASURES,SEE EROSION CONTROL PLANSe
FOR ASBESTOS ASSESSMENT FOR BRIDGE DEMOLITION AND RENOVATION
ACTIVITIES,SEE SPECIAL PROVISIONSo
AT THE CONTRACTOR'S OPTION9AND UPON REMOVAL OF THE CAUSEWAY,
THE CLASS II RIP RAP USED IN THE CAUSEWAY MAY BE PLACED AS
RIP RAP SLOPE PROTECTIONoSEE SPECIAL PROVISIONS FOR CONSTRUCTION9
MAINTENANCE AND REMOVAL OF TEMPORARY ACCESS AT STATION
12+30000 —L—o
TOTAL BILL OF ATERIAL
CONST9 MAINT, APPROXo
REMOVA� OF UNCLASSIFIED REINFORCED GROOVING BRIDGE 2—BAR 1'-2" X 2'-6" RIP RAP FOAM 3„
& REMOVAL ASBESTOS CLASS A REINFORCING 192700 LBSo GEOTEXTI�E ELASTOMERIC 10 /4 DIAo
EXISTING STRUCTURE CONCRETE BRIDGE APPROACH ' METAL CONCRETE CLASS II JOINT
OF TEMPo STRUCTURE A S S E S S M E N T EXCAVATION DECK SLAB FLOORS C O N C R E T E SLABS S T E E L S T R U C T U R A L RAIL PARAPET (2'-0"THICK) F O R D R A I N A G E B E A R I N G S SEALS M I C R O P I L E S
ACCESS STEEL
LUMP SUM LUMP SUM LUMP SUM LUMP SUM SQo FTo SQa FTo CUo YDSo LUMP SUM LBSo LUMP SUM LINo FTo LINo FTo TONS SQo YDS LUMP SUM LUMP SUM NOo LINo FTo
SUPERSTRUCTURE LUMP SUM 39863 39809 LUMP SUM 246a67 279010
END BENT 1 7404 79508 220 240 10 300
END BENT 2 6605 6,181 210 235 9 155
TOTAL LUMP SUM LUMP SUM LUMP SUM LUMP SUM 39863 3,809 14009 LUMP SUM 13,689 LUMP SUM 2q6a67 279010 430 475 LUMP SUM LUMP SUM 19 455
��,,�������,,,,,
,.�`� C A R ' �.
������NESS%�o<�1'.y :
;oF oy;
= =a SEAL �= =
= = 20777 = =
�:, tiq�FNc� NE��� ��;'
-, o �������� �,� ,�
��'�. Y L . `N � ��.�.
�''�����������``�
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
� ❑ Boone. NC
828•355�9933
❑ Tri-Cities. TN
423•467•8401
� Knoxville, TN
Vaughe&Me110n a65•546•5800
Consulting Engineers � Spartanburg, SC
864�574•4775
Asheville, O Cnor�eston,SC
■ North Carolina 843•974•5650
828 •253 •2796 ❑ Middlesboro, KY
❑ Roleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 � 357 � 0488 ❑ Atlonto, GA
770•627•3509
Copyright � 2006 Vaughn & Melton,lnc. AIIRights Reserved
PROJEC T NOo 14 S P o 2 0 4 410 2
HAYWOOD COUNTY
sTATzoNo 12+30000 -�-
HEET 3 OF
DWNo BYo RWW DATEo 03/18
CHKDo BYo HLW DATEo 03/1g No
DESo EGRo OF RECORDo CBC DATEe 03/18 �
�
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
GENERA� DRAIN I NG
FOR BRIDGE OVER
BIG CREEK ON SR 1332
(WATERVI�LE RDo) BETINEEN
SR 1397 AND I—q0
REVISIONS SHEET N0.
BY: DATEa N0. BY: DATE: S-3
� TOTAL
SHEETS
� 40
FILL FACE C� END BENT 1
STAo 11+62050—�— �
BO�TED FIE�D
SP�ICE
APPROXIMATE TOP OF EXISTING PIERWALL ELo1411oqoPIERWA�L SHALL REMAIN
IN P�ACE DURING STAGE I(SEE "CONSTRUCTION SEQUENCE"9SHEET S-6)o
IT IS ANTICIPATED THAT 9"OF VERTICA� C�EARANCE WILL EXIST OVER THE
EXISTING PIERWA�� AT GIRDER 3(INCLUDING ��+IM DEF�ECTIO MeTHE CONTRACTOR
SHA�� VERIFY THIS BEFORE BEGINNING GIRDER ERECTION (OF ANY GIRDER)e
IF A CONFLICT IS UNAVOIDABLE9THE CONTRACTOR SHALL RESOLVE THE CONFLICT
BY SAWCUTTING AND REMOVING A PORTION OF THE PIERWA�� AS NECESSARY90R
________ SOME OTHER METHOD APPROVED BY THE ENGINEERo
----------- — .`
.
.
.
��` I
` I
._
____
EXP --` � _ .
�` i �--� ��
��� i � � � .
� � � TEMPORARY � �
i
�� I BENT i i i
� � i i �
♦ I i i �
i
��� � i i EXISTING CONCo i
�___ I i � PIERWALL �
--'------- I
________ i i
� � � � � 1 � � � — _ _ _ � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
I� � � � � � � � � � � � � � � � � �I _ _ � � � �
� � � � � � � � � � � � i � �
I I I � � � � � � � �
I � �
� �
� � EXISTING
� � GROUND �INE
j i i
i i
i i
i � i
END BENT NOo 1
FILL FACE C�a END BENT 1
STAo 11+62o50—L— �
EXP
.
.
.
.
.
�
�
�`__
END BENT NOo 1
I
TEMPORARY BENT
BO�TED FIE�D
SPLICE
PHASE I — GIRDER ERECTION
SECTIONS AT END BENTS ARE AT RIGHT ANG�ES
.'
.'
.
.�
.'
.'
.
FIL� FACE C� END BENT 2
STAo 12+97050 —�—
.�"'--�—
.' —'---_
.
.' '--�
I
I
_�
♦ � �----� �
� � i i �.
�` � i i ;
�� � � TEMPORARY � �
i
�� I BENT i i i
� i i �
� I i i �
i
�`� � i i EXISTING CONCo i
�___ I i � PIERWALL ;
—'---------------------- —�_ __ i i ______------------- ----------"--�
i------------------------------�-----�-----------------------''''—
� i i
i i
i i EXISTING
� � GROUND �INE
j i i
i i
i i
� i i
TEMPORARY BENT
PHASE II — GIRDER ERECTION
GIRDER ERECTION NOTES
FOR TEMPORARY BENTS9SEE SPECIA� PROVISIONSo
CONSTRUCT A SEPARATE TEMPORARY BENT FOR EACH STAGE OF CONSTRUCTION (SEE "CONSTRUCTION SEQUENCE"9SHEET S-6)o
SECTIONS AT END BENTS ARE AT RIGHT ANG�ES
ERECT A MINIMUM OF TWO GIRDERS WITH A�� DIAPHRAGMS/CROSSFRAMES BETWEEN THE GIRDERS IN P�ACE AND THE BO�TS TIGHTENED PRIOR TO RE�EASING THE GIRDERSo
ERECT EACH SUBSEQUENT GIRDER WITH DIAPHRAGMS/CROSSFRAMES CONNECTING TO THE ADJACENT PREVIOUS�Y ERECTED GIRDER AND TIGHTEN A�� BO�TS BEFORE RE�EASING THE GIRDERSo
THE STRUCTURAL STEEL SHALL BE SUPPORTED DURING ERECTION IN ITS CAMBERED POSITIONoA MINIMUM OF ONE TEMPORARY BENT SHALL BE USED IN THE SPAN FOR EACH STAGE OF CONSTRUCTIONo
THE TEMPORARY BENT SHA�� REMAIN IN P�ACE UNTI� A�� GIRDERS9DIAPHRAGMS9AND CROSSFRAMES ARE IN P�ACE FOR THAT STAGE9AND A�� HIGH STRENGTH BO�TS ARE TIGHTENEDo
THE TEMPORARY BENT SHALL PROVIDE BEARING AT CONNECTOR PLATE LOCATIONSoWHEN CONNECTOR PLATES ARE USED AS TEMPORARY BEARING STIFFENERS9DIAPHRAGMS MUST BE ATTACHEDo
THE CONTRACTOR'S ERECTION PLANS SHALL INCLUDE A METHOD OF TEMPORARY BENT REMOVAL THAT WILL UNIFORM�Y TRANSFER THE STRUCTURAL WEIGHT
TO THE DIAPHRAMS/CROSSFRAMES SUCH THAT THE GIRDERS WILL REMAIN IN THE CAMBERED POSITIONSo
PLANS FOR TEMPORARY BENT ERECTION AND REMOVA� SHA�� BE SUBMITTED TO THE ENGINEER FOR REVIEWo
THE CONTRACTOR IS RESPONSIB�E FOR DESIGNING THE TEMPORARY BENToTHE DESIGNS SHA�� BE COMP�ETED BY A PROFESSIONA� ENGINEER REGISTERED
IN THE STATE OF NORTH CAROLINAoTHE CONTRACTOR SHALL SUBMIT SIGNED AND SEALED WORKING DRAWINGS AND CALCULATIONS FOR APPROVAL BY THE ENGINEERo
DURING THE GIRDER ERECTION PROCEDURE9THE CONTRACTOR SHA�� BE RESPONSIBLE FOR PROVIDING TEMPORARY �ATERA� BRACING AND OTHER MEANS OF SUPPORT9AS REQUIRED9
TO ENSURE STABI�ITY OF THE GIRDERS9AVOID UP�IFT OF THE GIRDERS AT THE TEMPORARY BENT9AND TO ENSURE P�UMBNESS OF THE GIRDERS IN THE FINA� CONDITIONe
NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR PROVIDING THE TEMPORARY BENToTHE COST FOR A�� MATERIA�S9EQUIPMENT9TOO�S9�ABOR9AND ANY INCIDENTA�S NECESSARY TO
PROVIDE THE TEMPORARY BENT SHA�� BE CONSIDERED INCIDENTA� TO THE �UMP SUM BID PRICE FOR STRUCTURA� STEE�o
,,,,,,,, � �,,,,,,,,,
�`� �N � Q RO ''%
,�� � ��, � � � �,,,� <� .,
`� �°,o� ES S i oy �.� =;
= =a SEAL � - =
= = 20777 = =
=; yq� F�y� � N���.� \�;:
-, -,,,,,,, �,,,,
��'� � Y L . `N � ,�.�.
''�������������`�
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
FILL FACE C� END BENT 2
STAe 12+97050 —�—
.�"'-- —_
'�i --������,
.�
FIX
END BENT NOo 2
END BENT NOo 2
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright O 2006 Vaughn & Melton, Inc. All Rights Reserved
.'
.'
.�
.�
.�
��
FIX
PROJECT Noo 14SPo2044102
HAYINOOD COUNTY
sTATIoNo 12+30000 —�—
THE CONTRACTOR MAY SUBMIT AN ALTERNATE ERECTION METHOD TO THE ENGINEER FOR REVIEW AND APPROVALo
LOAD FACTORSo
�
�OAD AND RESISTANCE FACTOR RATING (�RFR) SUMMARY FOR STEE� GIRDERS
STRENGTH I �IMIT STATE SERVICE II �IMIT STATE
MOMENT SHEAR MOMENT
O z z z �
v� o 0 o w
� LL � H � � H � z O � O �
O � Z O � � Z O � � �
c�c� � � o� � a �� o" �- a �� � o� � a ��
Z Z C� X J H� C� C� I� 0 H� C� c� LL � � H� C� c� LL O Z
� HH Q �?' �� Q O �� Q O ��' �� Q O
�� � � Q � � � wo+ � � � wo+ Q � � J 'J-�o�
,� v J a � o cn m cn c� z,� m�n c� z,� o cn m cn c, z,� z
J � O� C� II J� H� C� � Zw� H� C_7 � Zw� J� H� C� � Zw�
� C� _� � �Z I O �O Z W Q �O Z W Q I O �O Z W Q w
W H C� z � � H H � W� �� H Z � �
� = H � ZQ z � � Z iU (n C� � Q � ln � Q (/� U � Q � � � Q � C� (/� U � Q � � � Q �
W W W� O O H Q� O H Q H Q Q � H H W� H Q Q � H H W� H Q H Q Q � H H W� O
J � �� U J ��� � J LL � LL � (� C� � J(n � LL � (� C� � J(� J LL � LL � ln C � � J(n C�
H�-93 (INVENTORY) N/A O1 1a01 -- 1075 Oo661 1022 A E 63e96 Oo798 4079 A I 0 1030 Oe661 1.01 A E 63096
DESIGN H�-93 (OPERATING) N/A 1031 -- 1035 Oo661 1059 A E 63096 Oo798 6e20 A I 0 1000 Oo661 1e31 A E 63096
�OAD
RATING HS-20 (INVENTORY) 36000 O2 1050 53e97 1075 Oo661 1082 A E 63e96 Oo798 6099 A I 0 1e30 Oa661 1.50 A E 63096
HS-20 (OPERATING) 36000 1095 70015 1035 Oo661 2036 A E 63096 Oo798 9007 A I 0 1000 Oe661 1095 A E 63096
SNSH 13e500 3066 q9oq5 1040 Oo661 5055 A E 63096 Oo798 22006 A I 0 1030 Oe661 3e66 A E 63096
SNGARBS2 200000 2061 52013 1040 Oo661 3095 A E 63096 Oo798 15027 A I 0 1030 Oe661 2061 A E 63096
w
� SNAGRIS2 22e000 2oq2 53024 1040 Oo661 3069 A E 63e96 Oo798 14002 A I 0 1030 Oa661 2e42 A E 63096
H
w-, SNCOTTS3 270250 1082 q9o54 1040 Oo661 2076 A E 63096 Oo798 10e97 A I 0 1030 Oe661 1082 A E 63096
»
�
J" SNAGGRSq 340925 1047 51042 1040 Oo661 2023 A E 63e96 Oo798 8082 A I 0 1030 Oe661 1oq7 A E 63096
c�
H SNS5A 350550 1044 51029 1040 Oo661 2019 A E 63096 Oo798 8079 A I 0 1030 Oe661 1oq4 A E 63096
�
SNS6A 390950 1030 52e10 1040 Oo661 1e98 A E 63e96 Oo798 7092 A I 0 1030 Oe661 1030 A E 63096
�EGA� SNS7B q2e000 O3 1024 52013 1040 Oo661 1088 A E 63096 Oo798 7064 A I 0 1030 Oa661 1.24 A E 63096
�OAD
RATING � TNAGRIT3 33e000 1059 52033 1040 Oo661 2e40 A E 63e96 Oo798 9051 A I 0 1030 Oe661 1059 A E 63096
�
Q TNTqA 330075 1059 52050 1040 Oo661 2041 A E 63096 Oo798 9038 A I 0 1030 Oe661 1059 A E 63096
�
�
,� TNT6A q1o600 1042 59012 1040 Oo661 2a16 A E 63a96 Oo798 8084 A I 0 1030 Oa661 1oq2 A E 63096
�
v� TNT7A q2o000 1042 59oq5 1040 Oo661 2015 A E 63096 Oo798 8071 A I 0 1030 Oo661 1oq2 A E 63096
�
��
�� TNT7B q2a000 1041 59011 1040 Oo661 2013 A E 63a96 Oo798 8026 A I 0 1030 Oa661 1a41 A E 63096
� --
�
� TNAGRIT4 q3o000 1025 53088 1040 Oo661 1090 A E 63096 Oo798 7035 A I 0 1030 Oo661 1025 A E 63096
�
� TNAGT5A q5a000 1031 59004 1040 Oo661 1a99 A E 63096 Oo798 7093 A I 0 1030 Oa661 1a31 A E 63096
�
� TNAGTSB q5o000 1047 66019 1040 Oo661 2023 A E 63096 Oo798 9004 A I 0 1030 Oe661 1oq7 A E 63096
FATIGUE H�-93 (INVENTORY) Y��=0a75 -- --
� CONTROLLING LOAD RATING
O1 DESIGN �OAD RATING (H�-93) � �
O2 DESIGN �OAD RATING (HS-20) � �
O3 �EGA� �OAD RATING � �
�� SEE CHART FOR VEHIC�E TYPE
GIRDER �OCATION
I — INTERIOR GIRDER
EL — EXTERIOR �EFT GIRDER
ER — EXTERIOR RIGHT GIRDER
�
127'-11�/8"
3
2
1
END BENT 1
�RFR SUMMARY
���,, � � � � � �,,,,,�
,.�` C A R '%
,�` ����,� � � �,,,�<��.,
,���,.o��ss,o-,,.� :
= =� SEAL �' =
_ ; 20777 ; =
, � �� `;
'; tiq�%,ti� i NE,,��'� �� :
-, o �����„� �,�. ,�
'''������ � i Li i i i� ���`��.
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
,
❑ Boone, NC
828�355�9933
❑ Tri-Cities. TN
423•467•8401
❑ Knoxville. TN
Ya ug h n� M e Ifo n 865�546�5800
Consulting Engineers � Spartanburq, SC
864•574•4775
Ashevilleq � Charleston, SC
■ North Carolina 843•974�5650
828 •253 •2796 � Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770 627 3509
Copyright OO 2006 Vaughn & Melton.lna AIIRights Reserved
�
PROJECT Noo 14SPo2044102
HAYINOOD COUNTY
sTATIoNo 12+30000 —�—
END BENT 2
DESIGN LIMIT STATE Y�c Y�W
�OAD STRENGTH I 1025 1a50
RATING
FACTORS SERVICE II 1000 1000
NOTESo
MINIMUM RATING FACTORS ARE BASED ON THE STRENGTH I AND
SERVICE II �IMIT STATESo
A�LOWABLE STRESS FOR SERVICE II �IMIT STATE ARE AS REQUIRED
FOR DESIGNo
COMMENTSo
10
20
_G�.
�
STDo NOo �RFR3
� � EXISTo BRIDGE
NOTES
FOR PHASING OF TRAFFIC AND OTHER
DETAILS9SEE TRAFFIC MANAGEMENT P�ANSo
IRAFFIC
=DGE NOo 174)
2-BAR
METAL
;------,
� ,
� ,
� ,
� ,
� ,
� �
� �
� �
, �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
-----------------------------------------------------------
,------;
�
�
�
�
�
�
____'_'__________'_'__________'_'__________'_'_____'____'_______'_J
MAINTAINING TRAFFIC ON THE EXISTING BRIDGE9CONSTRUCT STAGE I OF EACH END BENTo
CONSTRUCT TEMPORARY BENT FOR STAGE I GIRDER ERECTION (SEE SHEET S-4)o
ERECT GIRDERS 1 THRU 3 IN ACCORDANCE WITH THE GIRDER ERECTION DETAILS,SHEET S-4o
REMOVE TEMPORARY BENT FOR STAGE Io
5o CONSTRUCT REMAINDER OF SUPERSTRUCTURE FOR STAGE Io
6e CONSTRUCT STAGE I OF EACH APPROACH SLABo
STAGE 1
-L- AND
STAGE LINE
29'-3" (OUT TO OUT)
1��2�� � � 1,_2„
��[»
� ��
�� � �
�� ��
�� ��
�� ��
� ; ; sr
� � � ��.?�
����
II�
;��
,��
.__� �
26'-8" (CLEAR ROADWAY)
1,_2„ � � 1i�2„
STAGE II TRAFFIC
� � � �
� , ,
� `- -' i
� '
�
�
�
�
�
�
�
�
-----------------------------------------------------------------------------------------
� �
r
�
�
�� ----------------
, -------------------------------, ,��;
�ri�-----
LJN___L_____TI______I�________________________________�C_____`II' Ic_______________________________ YY
II
\��/ �� II
VY i� n
ii i� n
�� n
ii �� n
ii �� n
ii ii ii
ii ii n
ii i� n
ii ii
ii �� n
ii ii n
v i o
STAGE II
—L— AND
STAGE LINE
29'-3" (OUT TO OUT)
1 ��2 „
�
1 ��2 „
2—BAR
METAL RAI�
SHIFT TRAFFIC TO STAGE I STRUCTUREo
REMOVE EXISTING BRIDGEo
CONSTRUCT STAGE II OF EACH END BENTo
CONSTRUCT TEMPORARY BENT FOR STAGE II GIRDER ERECTION (SEE SHEET S—q)o
ERECT GIRDERS 4 AND 5 IN ACCORDANCE WITH THE GIRDER ERECTION DETAILS,SHEET S-4o
REMOVE TEMPORARY BENT FOR STAGE IIo
CONSTRUCT REMAINDER OF SUPERSTRUCTURE FOR STAGE IIo
CONSTRUCT SUPERSTRUCTURE CLOSURE POURo
CONSTRUCT STAGE II OF EACH APPROACH SLABo
OPEN ENTIRE BRIDGE TO TRAFFICo
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
CLOSURE POUR
STAGING SEQUENCE
````���IIIIIII���,'
,. CAR '%,
� �����N�S�S i �o��'Ly'-:
, : pF �y : ,
= =a SEAL �� =
_ = 20777 = _
�: ti �FNc� NE�-��: � .'
���9�QO�����ii�������; �`
� �. Y L . `N �, .
'���/11111111\\\\
CONSTRUCTION SEQUENCE
10
20
3a
40
70
80
90
10a
110
120
130
1qo
150
160
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
, ,
❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
�Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved �
I 1�-��� ���-��� rri F�R Rnoni�ioY� 1�-��� I
��'-�" (�I 1T T� �l IT)
NOTES
PROVIDE 1�/q" HIGH BEAM BO�STERS UPPER AT 4'-0" CTSo
ATOP THE STAY—IN—PLACE METAL FORMS TO SUPPORT THE
BOTTOM MAT OF "A" BARSo WHEN USING REMOVABLE FORMS9
PROVIDE CONTINUOUS HIGH CHAIRS FOR META� DECK
(CoHoCoMe) � 4'-0" CTSo WITH A HEIGHT TO SUPPORT THE
BOTTOM MAT OF 'A' BARS A CLEAR DISTANCE OF 2�/2"
ABOVE THE TOP OF THE REMOVABLE FORMo
THE CONTRACTOR MAY9WHEN NECESSARY9PROPOSE A SCHEME
FOR AVOIDING INTERFERENCE BETWEEN STAY—IN—P�ACE
META� FORM SUPPORTS OR FORMS AND GIRDER STIFFENERS
OR CONNECTOR PLATESoTHE PROPOSAL SHALL BE INDICATED9
AS APPROPRIATE90N EITHER THE STEE� WORKING DRAWINGS
OR THE STAY—IN—P�ACE META� FORM WORKING DRAWINGSo
STRUCTURAL STEEL ERECTION SHALL BE COMPLETE BEFORE
FALSEWORK OR FORMS ARE PLACED ON THE UNITo
SHA�L BE P�ACED IN THE SAME HORIZONTA� P�ANE
TOP AND BOTTOM S�AB REINFORCING STEE�o
PREVIOUS�Y CAST CONCRETE IN THE SPAN SHA�� HAVE
ATTAINED A MINIMUM COMPRESSIVE STRENGTH OF 39000 PSI
BEFORE ADDITIONA� CONCRETE IS CAST IN THE SPANo
STAY—IN—PL�
METAL FORM
HALF-SECTION C� END BENT DIAPHRAGMS
HALF-SECTION C� INTERMEDIATE DIAPHRAGMS
SING�E SPAN9SIMP�Y LOADED FOR DEAD LOAD AND �IVE LOAD9
WITH COMPOSITE DECK ON WE�DED STEE� P�ATE GIRDERSo
4" C�o TO "S" BAR
FOR FOAM JOINT SEAL DETAILS
AT END BENT9SEE P�ANS FOR BRIDGE
APPROACH S�ABSo I
�5G �
�
----- � -- .� . �
�---�---
2" CLoTO
"K" BARS
2" HIGH BoBo —
� JOINT
11 � 1
I�' .■I�Ii► _
D'
p �
.
Y
I �
I �
�
CONNe � �I"
I
I
I
FIL� FACE� !
I
�
I
�5 "K" BARS
�4 "S" BARS
GIRDERS ARE PARALLEL TO C/L —L—e
"A" BAR
,�—"B" BAR
�q �� QS X 4 „ �
SHEAR STUDS
� #5G BAR MAY BE
SHIFTED SLIGHTLY9
AS NECESSARY9T0
CLEAR REINFORCING
STEE� & STIRRUPSo
END OF GIRDER DETAI� AT END BENT
6'-0"
BAY 3
c-i n n n n nc� �inT
�RITY
C�OSURE BAY AT END BENT DIAPHRAG�
S
. �
❑ Boone, NC
828•355•9933
❑ Tri-Cities, TN
423•467•8401
� Knoxville, TN
Vaughn & Melton 865 �546 �5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville' ❑ Charleston, SC
■ North Carolina 843 974 �5650
828�253 2796 ❑ Middlesboro,KY
❑ Raleigh, NC ❑ Charlotte, NC 606�248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
` Copyright � 2006 Vaughn & Melton, Inc. All Rights Reserved J
\\��,� � � � � � � �,,,����
.�` �AR %
,�` ��N,, � � � � �,,�<i,i%
: ���.O��SS/�'; q':
= 'a SEAL �' =
= = 20777 = =
� ;;
,: y "',.F�cl N� �, � :'
'-,Q� '������„��,���,,.
'''����� i i�i i i i �� `� ��````
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
Bo Bo Uo
AT 3'— 0" CTSe
1 �/q" HIGH BoBoUo
SEE NOTES
STAY—IN—PLACE
METAL FORMS
TYPICA� SECTION DETAI� "A"
� NOTEo
EDGE OF S�AB AND PARAPET ARE PARA��E�
TO EXTENDED TANGENT (NOT CURVED)o
#5 A101 TO A107 C� 6�/2" CTSo
(3 BARS EAo) (TOP OF SLAB)
#5 A201 TO A207 C� 6�/2" CTSo
(3 BARS EAJ (BOTe OF S�AB)
2,_7i�8„
�
3—#6 A9 � 6"CTSo
(TOP OF S�AB)�
� JOINT�\�
\ ,�
�� -
#5 A108 � 6�/2" CTSo �
(2 BARS EAJ (TOP OF S�AB)
#5 A208 � 6�/2" CTSo
(2 BARS EAo) (BOTo OF S�AB)
216—#5 A1 � 6�/2" (TOP OF S�AB)
216—#5 A2 � 6�/2" (BOTo OF S�AB)
6 ��2 „
#5 A107 OR
� �#5 A207
6 ��2 „
135'-0" (WoPo #1 TO WoPo #2)
233—#5 A5 na 6�/2" (TOP OF SLAB) (TO EXTEND 2'-8" INTO STAGE I I)
233—#5 A6 C� 6�/2" (BOTo OF S�AB) (TO EXTEND 2'-4" INTO STAGE II)
�
�
�
�
�
�
j--------------i--��----�--------------�
—�
�.-
.\
�
b-----3—#5 K1-------
`�-OVER GDR #1— --
�
�\
\� �#5 A101 OR�
#� n�n� I
��
GUTTER�INE ~'�
� GDRo 1 �-' H m � GDRe 2 � � Q
�JQz ��' � '—'J'-' i�
H � �J� �W �NJcnz �
� � � � � U U � � H�� � �
\ Cw� � L� �� JQ� W�(�LL�
�O � OLO � O
----------------------------_-�--- Q , oQ— � , � � � ------------- c� � c� � ---- --------------------------
cn o Q i Q
\ (nmN�m W�'; CC l/�^-- �N' ��
O� ��O�Q �wm cnmc�0� �
# H��. ��N�m �C�HQ^ �z�M
� GDRo 3 0� oco o� o���� #�m
�' v�H� �o�cn�� ,��-�-' ;
# w : o
---------------------------------
� � �@N � �'
--� � � ,' �Q �,
� _ � N N O m
------------------------ ------ --- -----1------------ � m � i----------- --------------------------
� � z�� �' �
� # H O �
I � �
� � `. �- L(7
(
�� 45 ° —00'-00"
� �, �,
�
` ------------------�--------------------------
�
—i-� — ----------- ------------ ------------------ �------------------- -------------------------
�- -- - � � —
`\ I I ---- � --- �\��o ----------- � w ---------------- \ rr,
♦ . � \ �j 0 U C� ^ -- i
�--� m z
�``; \ \\� ��PQ�� H`9�Q� � �
� � �� . �n cn
�` �� � � ; � ;
� � `� �@o�a �
#5 G2 ` Q � o m �
� ---------- -------- -------------
- � �
.-r ,, , ,
\ ,�'��-�=- ------------� m N � � --------------- � _ ----�- --------------------------
o� -
- - o --------
3—#5 K3 ` , � �.� �z� ° �
v' -- �'-------- — �
-- ---------- H �
------- — —
OVER GDR #5 \ #� U � a
I � � � `" i--i J
#5 A301 OR
#5 A401
�
/ �
.\
\
6 ��2 „
�--� \ c� J(n � � W p� �
H�� Z U C� Q -
6�(nL��� , H J -
: w ; O� H�N�lnz
N � @ N ,��� \N
� a ,' �� rn�n� � \
� � N N �Q w ; � CC �
�m �m �@N
z � ' a ,' � a
# �--� O� � N N O p�
i� m � m o� i
� `� `� Z � M
# �--� O �'
� m
� v
216—#5 A3 �a 6�/2" (TOP OF S�AB)
216—#5 A4 Ca� 6�/2" (BOTo OF S�AB)
NOTESo
PARTIAL PLAN OF SPAN
�
#5 B2 (BOTo
OF SLAB)
FOR �OCATION OF INTERMEDIATE DIAPHRAGMS9SEE "FRAMING P�AN"o
FOR �OCATION OF TRANSVERSE CONSTRUCTION JOINT9SEE POURING SEQUENCE ON BI�� OF MATERIA� SHEETo
FOR CONCRETE PARAPET REINFORCING STEEL AND DETAI�S9SEE "PARAPET AND END POST DETAI�S"SHEETo
�
�
�� ,
�
�
�
�
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 1 OF 2
``\���IIIIIIII/I'',
.�` � A R '�
,�` ��N,,,���,,,�<i,y�,
: ���`O��s$/�''.�.� :
= 'a SEAL ��= -
_ = 20777 = _
� (t� Q` `` �
"ti; NG�NE�� �,.
'%Q �'��,������`�� �.�,�
��'��Y L . `N����`.
'����1111111����`
�
#5 B2 (BOTo
OF SLAB)
------------_�-------------- --- ---------------------------------------- ------------------------
� — — —
�
, �
❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
�Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved �
DOCUMENT NOT CONSIDERED
FINA� UNLESS ALL
SIGNATURES COMP�ETED
#5 A301 TO A306 � 6�/2" CTSo
(3 BARS EAo) (TOP OF SLAB)
#5 A401 TO A406 � 6�/2" CTSo
(3 BARS EAo) (BOTo OF S�AB)
135'-0" (WoPo #1 TO WoPo #2)
216—#5 A1 c� 6�/2" (TOP OF SLAB)
216—#5 A2 C�a 6�/2" (BOTo OF S�AB)
6 ��2 „
�
�
� \�
�
�
�
�
\
�
�
�
�T �
#5 B2 (BOTo
OF SLAB)
#5 A115 OR—
#5 A215
—CONSTo JTe
\�1;
� � �
O � �
i � �
45 ° —00'-00" � � �
�
-----------------=----------------- ------_��---------------------------------- - ---�,� �
-- � .
� � w ``----------------------------- — =- "�� —� �� �`�
� `
� c� H m z
� H�JQ�
H i � J
� (/ ) � �
'�-� �' � ,� a
i�� Q@oom
J ------------------ ------------- c�i� m `�' �� GUTTER�INE_
ZO`i_'_'__
(� # H �
� W � , �
� � �
� w m a Z
�NH��
UUQ �H�J��
�
\ � Jz HO�InLL� �N
H���� w@; o� \
6��LL� C� N �
W � � Q N'I �m
� @ N � � m N O
Q i�Q ln o� i
�NNO� �z�f�'�
(� m e� i # H ��
z�r� � �m
# Ho� ��
��m �
�„
#5 A307 OR
#5 A407
3—#6 A10 C� 6" CTSo
(TOP OF SLAB)
�1 \
\'
%;
/ 6—#q S1
C� 8" CTSo
(THIS BAY ONLY)
� STA 12+97050 —�—
�
� � WoPo #2
�
� �� ` ♦
\ �� �
� �
� ♦ �
� � �
� � �
� � �
� ��
` � —
i% �` ��
6 ��2 „
7—#q S1
C� 8" CTSo
(TYPo BAYS 19 3 & 4)
1,9�
�i
%;
H
w
�
a
�
�
H
H
w
�
a
�
�
�FILL FACE C�
END BENT NOo 2
� 3—#5 K3
�,\VER GDR #5
� \
. \
�
'� #5 A314 C� 6�/2" CTSo
(2 BARS EAe) (TOP OF S�AB)
#5 A414 � 6�/2" CTSa
(2 BARS EAo) (BOTo OF S�AB)
6 ��2 „
2,_2���„
216—#5 A3 C� 6�/2" (TOP OF SLAB)
216—#5 A4 C� 6�/2" (BOTo OF S�AB)
PARTIAL PLAN OF SPAN
#5 A307 TO A313 C� 6�/2" CTSo
(3 BARS EAo) (TOP OF S�AB)
#5 A407 TO A413 C� 6�/2" CTSo
(3 BARS EAJ (BOTo OF S�AB)
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
SHEET 2 OF 2
233—#5 A5 C� 6�/2" (TOP OF S�AB) (TO EXTEND 2'-8" INTO STAGE II)
233—#5 A6 � 6�/2" (BOTo OF S�AB) (TO EXTEND 2'-4" INTO STAGE II)
#5 B2 (BOTo
OF S�AB)
NOTESo
FOR LOCATION OF INTERMEDIATE DIAPHRAGMS9SEE "FRAMING PLAN"o
FOR LOCATION OF TRANSVERSE CONSTRUCTION JOINT9SEE POURING SEQUENCE ON BIL� OF MATERIAL SHEETo
FOR CONCRETE PARAPET REINFORCING STEEL AND DETAILS9SEE "PARAPET AND END POST DETAILS"SHEETo
�
� � 1 ��
/
#5 A109 TO A115 � 6�/2" CTSo
(3 BARS EAo) (TOP OF SLAB)
#5 A209 TO A215 � 6�/2" CTSo
(3 BARS EAo) (BOTo OF S�AB)
\ � �
3—#5 K1
OVER GDR #1
\
.\
� �
�
` ��� �
� `
� �
3—#5 K2 `� \� ��
(TYPo OVER `� '�
INTo GDRSo) `� �
�--------------------- -----------` — —
=-y ---------------------- --------------
� T '
,
� -------------------------------#5\G2Ti
> > � �- #5 A109 OR i „
— �\ #5 A209 6/2 #5 A116 C�c 6�/2" CTSo
----------��--------------------------- --------- -T- ,-� (2 BARS EAJ(TOP OF S�AB)
1r-------------------------- - ---------'_ -� ,
`----------------------- �� #5 A216 C� 6��2�� CTSo
� w �� \
(2 BARS EAJ (BOTo OF S�AB)
� w m o c� c� -- � .` �� � JOINT 4,_8„
c�c�Q� v�� ; Hmz � �`
'r' HJz �w i--i�o�a� �� �
� \NJ�� �UU� , � � .
`� W � c�i� � � �---- � � J Qz- w �' � � ------- ----`- -- -� \
---------------------------- ----- c� � �, � �-------- � _�� --� � � cJi��- Q @ � o Q -------- --#5 G1-- --�i-�- �. ��
;
Q � m �
a N'I � m \�-W ���--ln m N� ------- � I I ��� ♦♦
� m c� o o �� oQ o o� -------- \-- `�
� �
LI�z~M �w� �p�N�� # H~� \\� \�`
�--� o`" c, Q o � \ `
# �m �UH J ^ J zo� o� � �
�" � NJ V� z U�H� � �� ��\ ♦
� # \ � ♦
i� � � � � � � � ------ ��`�O�,Q' `� ����
� ,� ; o �---- ----------- �, � ----- --- i . �
�---------------------------� ------------ � � `� Q ----- ----- � —�-- ---------- - - ----- �'1.�---------- - -I � ���
m
_ � , �m
v�NNO \
- Om o� i
� z��
� C, # H � " \
i �m �
� `_'
� �
/ --------------------------
``�N ��CQRO,,
��� ,'��i
,� � �,,����,,, <,y.,
`: ��;o��SS o�; :,
/ y
= '� SEAL �' =
_ = 20777 = _
�; ti ;n-�`'�Gi NE��;� � �:
��iQ'r �����ii����� ���:
��'� � Y L . `N �\"•�`•
������iiiii�����``
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
12+30000 —�—
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
135'-0" (WoPo #1 TO WoPo #2)
% ��— I I g�c u
H
W
�
Q
�
�
H
H
W
C�
Q
�
�
O
�
N
���-n„
�n�-n��
�
BO�TED FIE�D SP�ICE
(TYPJ (SEE 'STRUCTURAL STEE�
DETAILS'9 SHEET 4 OF 5)
0
EXP
(E69P2)
�n�-n��
FRAMING PLAN
���-n„
FOR DIMENSIONS A�ONG GIRDER SEE "STRUCTURA� STEE� DETAI�S"SHEET 1 OF 5a
0
FIX
(E59P1)
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
````�11111111/���,''
.�` �AR�%
,�` ���',,, � � �,,,� i�%
: �°,.o��ssi o�; v ';
= =� SEAL �� =
_ = 20777 = _
' � �Q:;� \
": tiq�-,Nc�NE .� �:
��i � ����iii�������\���
��'� � Y L . `N � ��.�.
''���/lllllll���\\
1'rl�-Ilg�c��
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
12+30000 —�—
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
� BO�TED FIE�D SP�ICE
(SEE DETAI�S SHEET 4 OF 5)
129'-7�/8" OUT—TO—OUT
127'-11�/8" � BRGo TO � BRG
�[��
155 ROWS � BRGo TO � BRG
(2 STUDS PER ROW)
� BEARING �
1" x 7" BEARING
STIFFENER (EAo SIDE)
I I
1�-3��i6„
(TYPJ
90'-11�/8„
5 ROWS (2 STUDS PER ROW)
__� SEE SHEET 4 OF 5 FOR SPACING 107 ROWS � 10" = 88'-4"
i�olooll
, ��
�
GIRDER E�EVATION
NOT TO SCALE
129'-7�/8" OUT—TO—OUT ALONG GRADE)
10"
,�
o��`°
,�
� ��
(L Q �
��
, �
FILL FACE
END BENT 1
\ � BEARING
.� \
\'�
'. .
127'-11�/8" � BRGo TO � BRGo ALONG GRADE)
3�q�� X i�� MINo —
INTERMEDIATE
STIFFENER
� BEARING—� \
��,
%q" x 7" MINo
INTERMEDIATE
STIFFENER
r' �ni Trn
�
�4 �� � X 4 „
SHEAR STUC
�[��
� � BEARING
1" x 7" BEARING
STIFFENER (EAo SIDE)
DETAI� "B"
SEE SHEET 3 OF 5
FI�L FACE Ca�
END BENT 2
� JOINT
� JOINT�\��
.\
.\
.\
� ��
` �� —
�
� ��
� \
�� i�
FI�L FACE ��� �—� �
` '�
�
� ��
FRONT FACE OF � '�
APPROACH SLAB `� '�
�
�
w�
� �o
o z c�
� Q
J LL
�o
- COPE IF
NECESSARY
F�ANGE C�IPPING DETAI�
2"
�
(END BENT 2 SIMI�AR)
FILL FACE C
END BENT 1
W
� ��
� oQ
� �J
� � GIRDER
--------- --- --- �
(TYPJ
5/I 6 �/ r
5�6
5�6 ��
5/6 ,�
3/q" x 55" �
� WEB (TYPo)
91,_gi�8„
1" x 1'-8" �
3/q" � X 5„
SHEAR STU
(TYPJ
(2 STUDS PER ROW)
��
1" x 1'-8" I�
� CHANNE'
�
C� EACH END GIRDER
END OF GIRDER DETAI�
(END BENT 2 SIMI�AR)
SHEAR
I I
1,_3i „
16
10"
7,_�„
TO DRIP BEAD
�
C� END BENT DIAPHRAGM
STUD DETAI�
````���IIIIIII/���'
�. ,��, C A R� '�,,�
,•� � ,,, � � � �,,, <� %
. � i � .
: �`.O��S$/ 0''.� .� :
' 'a SEAL �= _
_ = 20777 = _
�:, ti,9� Fi�c � N���;�' �� �:
�i� Q ��iiii�� ��``��
�'�. Y L . `N � �..
����/��iiii�����`
DOCUMENT NOT CONSIDERED
FINA� UNLESS ALL
SIGNATURES COMPLETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 1 OF 5
NOTEa TRANSVERSE STIFFENERS SHA�� BE ON�Y ON
INTERIOR SIDE OF WEB FOR EXTERIOR GIRDERSo
37'-10"
37,_0„
q3 ROWS � 10" = 35'-0"
(2 STUDS PER ROW)
� 3�q" X 7" MINo %4" x 7" MINo
TRANSVERSE g 0 T T 0 M F � A N G E D E T A I � 1�-3��i6��
1�_3�16�� STIFFENER INT ST IF�FENER
NOT TO SCALE
� r�Tnn�n
�\ �`
�
� ���e � �
�i� „ �i� „
� �
� �o
�`�
�
�
TOP OF SLAB
C— 3/q" QS X 4" STUDS C� 1'-0" CTSo
MC 12 x 35
�/2" GUSSET �
(TYP)
7" X 1" BRGo �
OR 7" X 3/q"
INTERMEDIATE
STIFFENER (TYPJ
10"MINo
�ENGTH i�q��
�
�
►
�
.i
i
s � �
i
�
.�
i
•�
�•i
� �/2" GUSSET %' 5�6"
TYPo 5
c� �_ --. �6
i-- --------- i
�� ��
.\
_
�/4 ��
WT6 x 2205
.— I�4�,
�
�
_\
10"MINo
�ENGTH
i
i
i
i
i
20"MINo
LENGTH
�
10"MINo �
�ENGTH i�q��
END BENT DIAPHRAGMS CD1)
i s v�
i �
i • � ��
�
i • r�' �
� �.
i� @
� 7�8 �
2�� HoSo BOLTS
I II TYPo (TYPe)
.
•
•
•
.
@ �
���
� ��
�~
�
1 ��2 „
TYPo
�
N
�
�/2" CON�
�-
�
TYPICA� INTERMEDIATE CROSS�RAME
_ TOP OF SLAB-----------------------------
�
N
�
�/2" CON�
�-
1 J�l� � V LI\ I o JLV I J
TYPICA�
INTERMEDIATE
FOR C�OSURE
CROSSFRAME
� �
NOTES
A�� STRUCTURAL STEE� SHAL� BE AASHTO M270 GRADE 50W AND PAINTED
IN ACCORDANCE WITH SYSTEM 5 OR SYSTEM 6 OF THE STRUCTURAL STEE�
SHOP COATINGS PROGRAM AND SECTION 442-8 OF THE STANDARD SPECIFI—
CATIONS UN�ESS OTHERWISE NOTED ON THE P�ANSo
A�� DIMENSIONS SHOWN ARE HORIZONTA� OR VERTICA�9UN�ESS OTHERWISE
NOTEDo
A�� FIE�D CONNECTIONS TO BE 7/8" DIAo HIGH STRENGTH BO�TS
UNLESS OTHERWISE NOTEDe
BEARING STIFFENERS ARE TO BE P�ACED NORMA� TO THE WEB OF THE
GIRDER AND SHA�� BE P�UMBo
A CHARPY V—NOTCH TEST IS REQUIRED FOR WEB PLATES9BOTTOM FLANGE
PLATES9BOTTOM F�ANGE SP�ICE P�ATES9AND WEB SP�ICE P�ATES FOR
A�� GIRDERS AND IN ACCORDANCE WITH ARTIC�E 1072-7 OF THE STANDARD
SPECIFICATIONSo
PERMITTED FLANGE AND WEB SHOP SP�ICES SHA�� NOT BE �OCATED
WITHIN 15 FEET OF MAXIMUM DEAD �OAD DEF�ECTIONoKEEP 2 FEET
MINIMUM BETWEEN WEB AND F�ANGE SHOP SP�ICESoKEEP 6"MINIMUM
BETWEEN CONNECTOR P�ATE OR TRANSVERSE STIFFENER WE�DS AND WEB OR
FLANGE SHOP SPLICESo
STUDS ON GIRDERS MAY BE SHIFTED UP TO 1"IF NECESSARY TO CLEAR
F�ANGE SP�ICE WE�Do
TENSION ON THE ASTM A325 BO�TS SHA�� BE CA�IBRATED USING
C D 2) DIRECT TENSION INDICATOR WASHERS IN ACCORDANCE WITH ARTIC�E
440-8 OF THE STANDARD SPECIFICATIONSo
END OF GIRDERS SHA�� BE P�UMBo
BEARING STIFFENER MAY REQUIRE COPING IF WIDER THAN BOTTOM F�ANGEe
FABRICATORS SHAL� DETAI� DIAPHRAGM MEMBERS AND CONNECTIONS FOR
STEE� DEAD LOAD FIT UPoGIRDER SHA�� BE P�UMB AFTER THE FULL
AMOUNT OF DEAD �OAD IS APP�IEDo
�""���_"yORIZe SLOTS
CD�)
NUTS ON BO�TS FOR CONNECTING DIAPHRAGM TO CONNECTOR PLATE SHALL
BE �EFT �OOSE FOR PURPOSE OF ADJUSTMENT UNTI� BOTH SIDES OF SLAB
HAVE BEEN POUREDo
��,,, � � � � �� �,,,,,
�.�`,�N CAR� '%,�
,�� � ��, � � � �,,, <��.,
: ��;o� �S S, o� ;� �,
= =a SEAL � - =
_ = 2�777 ; =
, F �� ``
� ti '�, ti�i NE ,' �
; .�,�., .. . :
,, -,,,,,,,�, �,,,.
''���0 y � � �� � � �� ���`���.
PROJECT NOo
HAYWOOD
STATIONo
SHEET 2 OF 5
1qSPo2044102
COUNTY
12+30000 —�—
DOCUMENT NOT CONSIDERED
FINA� UNLESS ALL
SIGNATURES COMP�ETED
. �
❑ Boone, NC
828 355•9933
❑ Tri-Cities, TN
423•467•8401
❑ Knoxville. TN
Vaughn OC Me�t�n 865 546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville, ❑ Char�eston.SC
■ North Carolina 843�974�5650
828�253•2796 ❑ Middlesboro.KY
❑ Raleigh, NC ❑ Charlotte. NC 606�248�6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770�627�3509
� Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved I
STDo NOo �B1
_ TOP OF SLAB-----------------------------
� � , „ �,
r
1"
(TYPJ
i „+ i „
4 � — S2
�LJ � �I�ICI
�2�� �
I / „ � ��8 ��
)
E�EVATION
TYPICA� F�ANGE & WEB BUTT JOINT
� GRIND SMOOTH AND F�USH ON OUTER FACE OF EXTERIOR GIRDERS
�/2 ,�
SIDE VIEW
E�ir� r�r iniri n
SILICONE CAULK
OR STEEL EPDXY
BETWEEN FI��ET
WE�D AND DRIP
BEAD
i�2�� X 1�� �
/ —►{ I�4 �,+ �/8 �,
I (TYPJ
1"C�o ��4„+ i�8„
(TYPo) i/q„+ i/8„ (TYPJ
(TYPo)
SECTION
DRIP BEAD DETAI�S
MC 12 X 35
�
GU�
GUSSET
�/8 �,
(TYPJ
TYPICAL GUSSET PLATE CONNECTIONS
INE�D TERMINATION DETAI�S
1 ��2 „
�
�
\
�
7„
SVERSE
FENER
C
� OF WE�D
WT
I/q �� + I/8 �
(TYPJ
END OF WE�D
CONNECTOR OF
STIFFENER I�
END OF WE�D
�
MILL
TO
BEAR
1 :
, "-�� �
.�
GUSSET �
WE�DED CONNECTION
�-- � BO�TED
CONNECTION
CONNECTOR I�
WEB I�
DETAI�
„B„
5�6„
5�6 „
INE�D TERMINATION DETAIL
AT STIFFENER OR CONNECTOR PLATE
BEARING STIFFENER/
CONNECTOR PLATE
-IGHT FIT NOTEeDO NOT C�IP P�ATE AT TOP OUTSIDE
CORNER OF STIFFENER PLATEo
� WE�D TO BOTTOM F�ANGE IS ON�Y
REQUIRED WHEN BEARING STIFFENER
IS ALSO CONNECTOR PLATE
TRANSVERSE STIFFENER
SEE FRAMING PLAN FOR LOCATIONSo
1 ��2 „
C
``��,,, � � � � � � �,,,,,,
,. CAR %
:'�����N� s's �'��'�.� :
F o';
�o
= =a SEAL �' =
= = 20777 = -
:; y ;,F`�,�� N���;� � ;:
=,4.� �---,,,,,,�, .,,,,,
'''������ � i Li i i i� ��`�```•
PROJECT NOo
HAYWOOD
STATIONo
SHEET 3 OF 5
,
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone. NC
828•355•9933
❑ Tri-Cities, TN
423�467�8401
❑ Knoxville, TN
Va u g hn & M e Ifo n a65 546•5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolino 843•974•5650
828•253 �2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte. NC 606 248�6600
919 • 977 • 9455 704 � 357 � 0488 ❑ Atlanta, GA
770•627•3509
Copyright � 2006 Vaughn & Melton,lnc. AIIRights Reserved
1qSPo2044102
COUNTY
12+30000 —�-
1 ��2 „
END BENT
DIAPHRAGM
STDo NOo �B1
G M1N�
CONNECTOR PLATE
AT INTERMEDIATE DIAPHRAGM
1 3/a" ± �/R" (TYPo)
0
�
�
� �
� ;
0
— � ��_ �
15 "Q� HO�ES—
(72 REQUIRED)
P�AN CTOP
SHEAR STUDS SPACED AS SHOWN
IN GIRDER ELEVATION VIEW
� c�n �
�
�� � SP�ICE
3,_4„
� GIRDER
� 3�4„ X 5„
SHEAR STUDS (TYPo)
(SPAo�ONGITUDINA��Y
AS SHOWN BELOW)
OF TOP F�ANGE)
A
2'-0"
10 � /� " 9 " q ��2 �� 4 ��2 �� g „
2,_7i�8„
r_ � n n �
g5� „ 8„
R
�
�
P�AN (TOP OF BOTTOM
SHEAR STUDS SPACED AS SHOWN
IN GIRDER E�EVATION VIEW
�IRDER
F�ANGE)
1,_g„
I/ „ v �, ��, v �, �„ l�
�,_�„
�q �� 6 X 5 „
SHEAR STUDS (
SHEAR STUD DETAI� FOR
TOP F�ANGE SP�ICE P�ATE
SHEAR STUDS ARE TO BE SHOP WELDED
ON TOP OF PLATE BEFORE FIELD ASSEMBLYo
1,_8„ X 3,_4„ �
�4 �
SHEAR S1
��2�� x g��q„ x 3,_4„ �
�
�
a
�
1'-2" I 1'-2"
2,_q„
A
BO�TED FIE�D
� 3�_4�� �
�
�4„ X 3,_4„ �
)E)
SP�ICE
�
�
�
�
C�
a
�
�
�
�
i�2„ X 1,_8„ X 3 ���
DETAI�S
SECTION A-A
``�N � �C Q „o��
�,
. .
.� � �.
`�O ``������,,���/y���
�,o��ss�o ; .� :
= 'a SEAL ��= =
- - 2�777 - -
;: y ;`��cl N���,: � .'
'�.9�Q ''���������` �,��:
''���0'Y � � �� � ��� `���```
DOCUMENT NOT CONSIDERED
FINA� UNLESS A�L
SIGNATURES COMP�ETED
10 " I�
�
�
� x g��q„ x 3,_q„ �
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 4 OF 5
� ���� � , ��,.
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
` Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved �
NOTES
�
"S" DIAPHRAGM SPACING
"S"/2
"S"/2
A
, ���� \�� ��!
�'x ; :'x �
:'x \`x�:
;
,
�
�
I
�
�
`� INTERMEDIATE
; DIAPHRAGM
; (TYPa)
�
�
�
_� __
,,. - � --�,
, ; _
�
, �
�
�
� ,
�
�
�
�
x�` � '�x
�x; � �x,
�
., .,
�
�
�
�
�
�
�
�
,
�
,
�
�
' x ; ��x� �
'�x, �x`
5x5x�/2"
�ATERA� BRACING
(TYPJ �
x� `;
�x,
PART P�AN
� �
� H �
, ,
, ,
,
, II��/ ,
,,
�� ,- SEE DETAI� "A"
- NEAR TOP F�ANGE �ATERA�
(THROUGHOUT EXTERIOR BAYS ONLY)
PARAPET
�/2 " G I
�ATERA� BRACING
Tnn ri n �ir�r
/ y
SECTION
/ y
�
SECTION A-A
BRACING
`xx
�/2" GUSSET F�
�
�
�/q �,
�/q „
TAI�"
X
� '��.
�/ �, ' \
DETAI� "B"
0
�
�
� EXTERIOR
GIRDER
7/8" QS HeSo BOLTS (TYPo)
SPACED AT A 2%q" MINo
THRU CONNECTION
STANDARD HO�ES
1i�2„ SPACED C�d 23�q" MINo
MINo
(T
�
I/4 �� + I/
(TYPo;
2" MIN
(TYPo)
� 7/8" � HoSo BO�TS (TYPo)
SPACED AT 2%q" MINo
�/q „
�/q ��
3" MINe
�
�
�
�
�
�
TOP FLANGE
(TYPJ
�^r�. /
i�i
� ``��
'''' �
i
,'
� INTo GIRDER
TOP F�ANGE
(TYPJ
\' — �
, r-. ``�.
� ��\
�
\ ��� \��
_ ��
. �
3 " �,
,,
- MINo �
�ATERA� BRACING
(TYPe)
ENSURE BRACING PROJECTION
�INES INTERSECT AT � OF WEB
INTERMEDIATE
DIAPHRAGM
�ATERA� BRACING
� (TYPJ
/,,
� ''� ,
%' .
� CONNo �
MINIMIZE CONNECTION SIZE
ENSURE BRACING AND INTERMEDIATE
DIAPHRAGM PROJECTION LINES
INTERSECT AT � OF WEB
DETAI� "A"
2" MINa
10" MAXo
�
�/2" GUSSET
� (TYPo)
CONNECTION DETAI�
PROJECT NOo 14SPo20q41o2
HAYWOOD COUNTY
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities. TN
423•467�8401
❑ Knoxville, TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg,SC
864�574 4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828•253•2796 ❑ Middlesboro.KY
❑ Raleigh, NC ❑ Chorlotte, NC 606 � 248 •6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
�Copyright c0 2006 Voughn & Melton,lna AIIRights Reserved
STATIONo
SHEET 5 OF 5
12+30000 —�—
TOP FLANGE (TYPe)
� EXTo GIRDER
SEE DETAI� "B"
,,
,
,
�
�
��„�������,,,,
,.�`�N C A R p '''%,
,,��o� ,,,, � � � �,,,, <,y•,,
; �;.o�Essi o-,; q -,
' 'a SEAL �' =
= = 2�777 = -
; �, ��, _
=;tiq�,,tic�NE,,.� ��;:
-, o -,,,,,,, �,,, ,.
',,���� �� � ��i i i i i� ���`��.
� INTERIOR DOCUMENT NOT CONSIDERED
GIRDER FINAL UNLESS ALL
SIGNATURES COMPLETED
LATERA� BRACING ASSEMBLY SHALL COMPLY WITH SECTION 1072
OF THE STANDARD SPECIFICATIONSo
A�� STRUCTURA� STEE� SHA�� BE ASTM A325 GRADE 50W OR
APPROVED EQUA�o
TENSION ON THE ASTM A325 BO�TS SHA�� BE CA�IBRATED
USING DIRECT TENSION INDICATOR WASHERS IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONSo
A�� BO�TED CONNECTIONS SHAL� BE 7/8"QS HIGH STRENGTH BO�TSo
THE CONTRACTOR HAS THE OPTION TO CLIP THE PROTRUDING
CORNERS OF THE GUSSET P�ATES9AT NO ADDITIONA� COST TO
THE DEPARTMENTo
BENT GUSSET P�ATES OR RO��ED ANG�E SHAPES MAY BE
SUBSTITUTED FOR THE WE�DED GUSSET PLATES DETAI�ED IF
APPROVED BY THE ENGINEER9AT NO ADDITIONA� COST TO THE
DEPARTMENTo
INSTA�� THE LATERA� BRACING AFTER ERECTING THE EXTERIOR
GIRDER AND THE ADJACENT INTERIOR GIRDER AND INSTA��ING
THE INTERMEDIATE DIAPHRAGMSo
STDo NOo �B1
GIRDER NOe1
0 Oe05 Oe1 Oel5 0,2 Oe25 Oe3 Oe35 Oe4 Oe45 Oe5 Oe55 Oe6 Oe65 Oe7 Oa75 Oe8 Oe85 Oo9 Oo95 1
DEFLECTION DUE TO WEIGHT OF GIRDER (FT.) + 0 Oo021 Oo042 Oo061 Oo079 Oo094 Oo107 Oo118 Oo126 Oo131 Oo132 Oo131 Oo126 Oo118 Oo107 Oo094 Oa079 0.061 Oe042 Oo021 0
DEFLECTION DUE TO WEIGHT OF SLAB (FTo) � + 0 0.000 0.000 0.019 0.049 0.076 0.099 0,118 0.132 Oe139 0.142 Oe139 0.0132 0.118 0.099 0,076 Oa049 Oe019 O°000 O°000 0
DEFLECTION DUE TO WEIGHT OF BARRIER RAIL (FTe) + 0 0,009 O°018 Ov027 Ov035 Ov042 Ov048 Ov052 Oe056 0.058 Oa059 0.058 O°056 Oa052 Oa048 Oa042 Oe035 Oa027 O°018 O°009 0
TOTAL DEAD LOAD DEFLECTION (FT,) + 0 Oe000 Ov045 Oe107 Oe163 Oe212 Oo254 Oe288 Oe314 Oo328 Oo333 Oe328 0.314 Oe288 Oe254 Oa212 Oo163 Oo107 Ov045 Oe020 0
REQUIRED CAMBER (INJ � � 3�a 1�/4 1i�4 115�6 29�6 3�i6 37�6 33�a 315�6 4 315�6 3�a 37�6 3��i6 29�6 115�6 1i�4 1�/4 5�s �
GIRDER NOe 2
0 Oa05 Oal Oel5 0,2 Oe25 Oe3 Oe35 Oa4 Oe45 Oa5 Oe55 Oe6 Oe65 Oe7 Oa75 Oe8 Oe85 Oe9 Oe95 1
DEFLECTION DUE TO WEIGHT OF GIRDER (FT,) + 0 Oe021 O°042 O°061 0.079 0.094 Oe107 Oe118 Oe126 Oe131 Oe132 Oe131 Oe126 Oe118 Oe107 Oe094 Oa079 0.061 Oa042 Oo021 0
DEFLECTION DUE TO WEIGHT OF SLAB (FTe) � + 0 0,020 0,017 0,051 0.083 0.111 0.135 0.154 0.168 0.176 0.179 0.176 0.168 0.154 0.135 0.111 Oe083 0,051 Oe017 Oe020 0
DEFLECTION DUE TO WEIGHT OF BARRIER RAIL (FTe) + 0 Ov009 O°017 Ov025 Ov033 0.039 Ov045 Oa049 Ov053 0.055 O°055 0.055 Oa053 Oa049 Oa045 Oa039 Oa033 Oa025 Oo017 Ov009 0
TOTAL DEAD LOAD DEFLECTION (FT,) + 0 Oo010 Oo076 Oo137 Oo195 Oo244 Oo287 Oo321 Oo347 Oo362 Oa366 Oo362 Oo347 Oo321 Oo287 Oo244 Oe195 Oo137 Oo076 0.010 0
REQUIRED CAMBER (INa) � Q ��8 15�6 15/8 25�6 215�6 37�6 37/$ q3�6 q3/$ q3/8 q3/$ 43�6 37/$ 37�6 215�6 25�6 15�8 15�6 ��8 �
GIRDER NOe 3
0 Oa05 Oal Oel5 0,2 Oo25 Oe3 Oo35 Oa4 Oa45 Oa5 Oo55 Oe6 Oo65 Oe7 Oa75 Oe8 Oe85 Oe9 Oe95 1
DEFLECTION DUE TO WEIGHT OF GIRDER (FT,) + 0 Oe021 Ov042 O°061 0.079 Oe094 Oe107 Oe118 Oe126 Oe131 Oe132 Oe131 Oa126 Oe118 Oe107 Oe094 Oa079 0.061 Oe042 O°021 0
DEFLECTION DUE TO WEIGHT OF SLAB (FTe) � + 0 Oa011 Ov049 Ov084 Oe117 Oe146 Oe171 Oe190 Oe205 Oe213 Oe216 0.213 Oe0205 Oe190 Oe171 Oe146 Oe117 Oa084 Oa049 O°011 0
DEFLECTION DUE TO WEIGHT OF BARRIER RAIL (FTe) + 0 0,009 Oo017 Oo025 Oo033 Oo039 Oo045 Oe049 Oo053 Oo055 Oo055 Oo055 Oa053 Oo049 Oa045 Oe039 Oa033 Oa025 Oe0187 O°009 0
TOTAL DEAD LOAD DEFLECTION (FT,) + 0 Oo041 Oo108 Oo170 Oo229 Oo279 Oo323 Oo357 Oo384 Oo399 Oo403 Oo399 Oo384 Oo357 Oo323 Oo279 Oe229 Oe170 Oo108 Oe041 0
REQUIRED CAMBER (INJ � � ��2 15�6 2��i6 2�a 33�a 3��$ q5�6 q5�$ q13�6 q13�6 413�6 q5�8 q5�6 37/$ 33/$ 2�a 2�i6 15�6 ��2 �
GIRDER NOe 4
0 Oa05 Oal Oe15 0,2 Oe25 Oe3 Oe35 Oa4 Oe45 Oa5 Oe55 Oe6 Oe65 Oo7 Oo75 Oo8 Oo85 Oo9 Oo95 1
DEFLECTION DUE TO WEIGHT OF GIRDER (FTe) + 0 Oe021 O°042 O°061 0.079 Oe094 Oe107 Oe118 Oe126 Oe131 Oe132 Oe131 Oa126 Oe118 Oe107 Oa094 Oa079 0.061 Oe042 O°021 0
DEFLECTION DUE TO INEIGHT OF SLAB (FTe) � + 0 Oo042 Oo080 Ooll7 Oo151 Oo181 Oo206 Oo227 Oo241 Oo250 Oo253 Oe250 Oo241 Oo227 Oo206 Oo181 Oe151 0,117 Oo080 Oa042 0
DEFLECTION DUE TO yVEIGHT OF BARRIER RAIL (FTe) + 0 Oo009 Oo017 Oo025 Oo033 Oo039 Oo045 Oo049 Oo053 Oo055 Oo055 Oo055 Oo053 Oo049 Oo045 Oo039 Oa033 Oa025 0.017 O°009 0
TOTAL DEAD LOAD DEFLECTION (FT,) + 0 O°072 Oe139 Oe203 Oe263 Oe314 Oe358 Oe394 Oe420 Oe436 0.440 Oe436 Oa420 Oe394 Oa358 Oa314 Oe263 Oe107 Oe139 Oa072 0
REQUIRED CAMBER (INa) � � 7�a 1ii�i6 2�6 3��a 3�a 45�6 4�4 5�i6 5��a 55�6 5��a 5��i6 4�4 45�6 3�a 3�/8 27/6 1ii�i6 7�s �
GIRDER NOe 5
0 Oo05 Ool Oo15 0,2 Oo25 Oo3 Oo35 Oo4 Oo45 Oo5 Oo55 Oo6 Oe65 Oe7 Oe75 Oe8 Oe85 0,9 Oe95 1
DEFLECTION DUE TO WEIGHT OF GIRDER (FT,) + 0 Oe021 Ov042 O°061 0.079 0.094 Oe107 Oe118 Oe126 Oe131 Oe132 Oe131 Oe126 Oe118 Oe107 Oe094 Oa079 0.061 Oa042 O°021 0
DEFLECTION DUE TO WEIGHT OF SLAB (FTe) � + 0 Oo072 Ooll2 Oo150 Oo185 Oo216 Oa099 Oo263 Oo278 Oo287 Oa290 Oo287 Oo0278 Oo263 Oo242 Oo216 Oa185 Oe150 Oe112 Oa072 0
DEFLECTION DUE TO yVEIGHT OF BARRIER RAIL (FTe) + 0 O°009 Oe017 O°025 O°033 0.039 O°048 Oe049 O°053 0.055 0.055 0.055 Oa053 Oe049 Oa045 Oe039 Oa033 Oa025 O°017 Ov009 0
TOTAL DEAD LOAD DEFLECTION (FT,) + 0 Oe102 Oe171 Oe236 Oe297 Oe349 Oe394 Oe430 Oe457 Oe473 Oe477 Oe473 Oe457 Oe430 Oe394 Oe349 Oe297 Oe236 Oe171 Oe102 0
REQUIRED CAMBER (INe) � 0 1��a 2�i6 213�6 39�6 q3�6 q3�4 5i�8 5i�2 5ii�i6 5�a 5���i6 5��2 5��s 4�4 43�6 39�6 213�6 2�i6 1��4 �
� INCLUDES SLABS,BUILDUPS,AND STAY-IN-PLACE FORMS
� BEARING
C� END BENT 1
� BEARING
C� END BENT 2
`���,� � � � � ��,,,��
,.�` C A R '%,
,�` ��N�,�����,,�l�,y%
� ������SS/ '�,, y%
0
- =a SEAL �' =
_ = 20777 = _
:, y ;,F�,�� N���;� � ;;
%,Q•Q�'� �, � � � � � � `� ��,;�,�`
''����� i i Li i i �� `���``
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
0
N
\
�
0 0 0 0 0 0 0 0
N N N N N N N N
� � � � � � � �
� N I`n Q" L(� LO �` O�
0
N
�
�
0
N
\
�
�
0
N
�
�
�
20 EQUAL SPACES
0
N
�
N
�
0
N
�
I`n
�
0
N
�
�
�
0
N
�
�
�
SPAN A
SCHEMATIC
OF CAMBER ORDINATES
0
N
�
t9
.-�
0
N
�
�
�
0
N
�
�
�
0
N
�
6�
�
�
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
12+30000 -�-
FOR CAMBER VALUES AT EACH GIRDER TWENTIETH POINTS9SEE TABLE ABOVEo
NOTES
5� 6 „
5�6„
� GIRDER��
2" � PIPE SLEEVE
EXTENDING �/8" ABOVE SOLE
WITH STANDARD WASHER
5�6 „
5�6 �� ��
P2 q"THREAD
(TYPo)
P1
E5
ii�ii
II�II —
ii� �ii
� �
ii� �ii
�iT--;�,
� ��� ��� �
�t
BRIDGE
`SEAT
/
� E6
��
\
� � ; �
I�
SEE �� ,�
DETAIL "A" , �
1%q" QS X 25"� �,d 4„ � X 1,_6i�q„
ANCHOR BOLTS STDoPIPE —
�
ANCHOR BOLT SHALL BE GROUTED IN
PLACE USING NON—SHRINK NON—METAL�IC
GROUT AS APPROVED BY THE ENGINEERo
�/q ��
5" � �/2" CLOSURE �
( AASHTO M270 GRADE 36 )
FIXED EXPANSION
END VIEIN
C
�
WELD
�
15"
SWEDGE
(TYPJ
1" QS GROUT PIPE
THREADED 1"
� 1 15�6�� X 2 ��4„
SLOTS TAPERED TO
1 15�6" DIAo HOLES
11"
, 5��2�� �
� �
� �
� � i �
� I �
�
�
�
� 2g�6��X
I SLOTS
�J
�' P 1
( FIXED )
P1 ( 5 REQ'D )
11"
\5 �2 '�
m �
� �
� � �
SOLE PLATE DETAILS
N
N
� „P„ �
UP—STATION �
SOLE � ("P")
SO�E � P�ACEMENT DETAI�
AT ALL FIXED POINTS OF SUPPORT9NUTS FOR ANCHOR BOLTS
ARE TO BE TIGHTENED FINGER TIGHT AND THEN BACKED OFF
�/2 TURNo THE THREAD OF THE NUT AND BOLT SHALL THEN BE
BURRED WITH A SHARP POINTED TOOLe
THE 2" � PIPE S�EEVE SHALL BE CUT FROM SCHEDULE 40 PVC
PLASTIC PIPEo THE PVC PLASTIC PIPE SHAL� MEET THE
REQUIREMENTS OF ASTM D1785o
THE PAYMENT FOR THE PIPE S�EEVES SHALL BE INCLUDED IN
THE SEVERA� PAY ITEMSo
FOR PAINTED STRUCTURAL STEEL (EXCLUDING AASHTO M270
GRADE 50W), SOLE P�ATES, ANCHOR BOLTS9 NUTS AND WASHERS
SHALL BE GALVANIZED IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONSo
FOR AASHTO M270 GRADE 50W STRUCTURAL STEEL9SOLE P�ATE
SHALL BE AASHTO M270 GRADE 50W AND SHALL NOT BE
GA�VANIZEDo ANCHOR BOLTS9NUTS AND WASHERS SHALL BE
GALVANIZED IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONSo
ANCHOR BOLTS SHA�� MEET THE REQUIREMENTS OF ASTM A4490
NUTS SHALL MEET THE REQUIREMENTS OF AASHTO M291—DH OR
AASHTO M292-2Ho WASHERS SHALL MEET THE REQUIREMENTS OF
AASHTO M293o SHOP DRAWINGS ARE NOT REQUIRED FOR ANCHOR
BO�TS9NUTS AND WASHERSe SHOP INSPECTION IS REQUIREDo
WHEN FIELD WE�DING THE SOLE PLATE TO THE GIRDER FLANGE9
USE TEMPERATURE INDICATING WAX PENS90R OTHER SUITAB�E
MEANS9T0 ENSURE THAT THE TEMPERATURE OF THE SOLE
P�ATE DOES NOT EXCEED 300°FaTEMPERATURES ABOVE THIS
MAY DAMAGE THE ELASTOMERo
ALL SURFACES OF BEARING PLATES SHA�L BE SMOOTH AND
STRAIGHTo
THE E�ASTOMER IN THE STEEL REINFORCED BEARINGS
SHALL HAVE A SHEAR MODU�US OF Oo160 KSI9IN ACCORDANCE
WITH AASHTO M2510
FOR STEEL REINFORCED ELASTOMERIC BEARINGS9SEE SPECIA�
PROVISIONSo
THE CLOSURE PLATE9GROUT PIPE AND STANDARD PIPE FOR
THE EXPANSION ASSEMBLY NEED NOT BE GALVANIZEDe
THE CONTRACTOR'S ATTENTION IS CALLED TO THE FOLLOWING
PROCEDURE9WHICH MAY BE REQUIRED BY THE ENGINEER,TO
RESET ELASTOMERIC BEARINGS DUE TO GIRDER TRANS�ATION
AND END ROTATIONo
10 ONCE THE DECK HAS CURED9THE GIRDERS SHALL BE
JACKED THEN THE ANCHOR BOLTS AND ELASTOMERIC
BEARING S�OTS CENTERED AS NEARLY AS PRACTICA�
ABOUT THE BEARING STIFFENERoTHIS OPERATION SHALL
BE PERFORMED AT APPROXIMATELY 60°Fo
2o AFTER CENTERING THE ELASTOMERIC BEARING SLOTS AND
ANCHOR BOLTS9THE ANCHOR BOLTS SHALL BE GROUTEDo
THE CONTRACTOR MAY PROPOSE A�TERNATE METHODS9PROVIDED
DETAILS ARE SUBMITTED TO THE ENGINEER FOR REVIEW AND
APPROVALo
TYPICA� SECTION OF E�ASTOMERIC BEARINGS
� 1 15�6„
HOLE
�
N
N
E5 (5 REQ'D) E6 (5 REQ'D) �
N
PLAN VIEW OF E�ASTOMERIC BEARING
TYPE III
DETAI� "A"
MAxIMuM ALLO�ABLE
SERVICE LOADS
DaLa+LaLa `NO IMPACT)
TYPE III 255 k
,,,,,,, � �,,,,,,,,
�.�`,�N CAR� '%,�
,.� � ,,,,,,,,, �, -,
: o � - ti,
. �,.o� �s S, o-,, .� :
= 'a SEAL �' =
_ = 2�777 ; =
. y ;F,y N ��;� � :
� ; q� ,,, c� E,,� . :'
,,��'' � Y , ,�, ,: , � \��,``�.
��'������������`��
PROJECT NOo
HAYWOOD
STATIONe 12+30000 —�-
1qSPo204q1o2
COUNTY
DOCUMENT NOT CONSIDERED
FINAL UNLESS A�L
SIGNATURES COMPLETED
� ❑ Boone, NC
828•355•9933
❑ Tri-Cities. TN
423�467•8401
❑ Knoxville, TN
Vaughn � Me���n 865 �546 �5800
Consulting Engineers � Spartanburg, sC
864�574�4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 253 �2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
STDo NOo EB1
P 2
( EXP )
P2 ( 5 REQ'D )
�/8" ( TYPo)
3/6" STEEL I� 3/6" RIB ,,
g„ g„ ,.�I
STDo PIPE
SECTION C—C
132�-OS�g" (� JTo TO � JTo) (A�ONG OUTSIDE FACE OF PARAPET)
�
15,_05�6„
5,_15�6„
�
.\
4— #5B4
.
.
. —
.
�
�
�
�
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
WoPo #1 �``
\
.
q— #5B2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
FILL FACE C� —
END BENT NOo 1
.
.
.
�
.
.
�
�
�
�
.\
.\
4— #5B5
3�-115�6„
15,_05�6„
�
4 SECTIONS � 25'-6" = 102'-0"
124 —#5 S1 AND #5 S2 BARS � 1'-0" CTSo = 123'-0"
15,_05�6„
3�-115�6„
4— #5B5
8— #5B1 EACH
25'—C" SEGMENT
(TYPo)
—L-
8— #5B1 EACH
25'-6" SEGMENT
(TYPa)
4— #5B3
�/2"EXPo JTo
MAT'Lo (TYPo) �
i
I
I
.
.
.
.
.
�
�
�
�
.
.
.
.
��� WoPo #2
.
.
.
.
.
.
.
.
.
.
�
�
.
.
.
.
.
.
�
� �
�
�
�
.\
4— #5B4
124 —#5 S1 AND #5 S2 BARS C� 1'-0" CTSo = 123'-0"
4 SECTIONS � 25'-6" = 102'-0"
FILL FACE C�
END BENT NOa 2
�
.
.
.
.
.
�
�
.
.
.
.
.
.
.
.
4— #5B2
5,_15�6„
15,_05�6„
132�-O5�g" (� JTo TO � JTo) (ALONG OUTSIDE FACE OF PARAPET)
P�AN OF CONCRETE PARAPET
�
PROJECT NOo 1qSPo2044102
HAYINOOD COUNTY
STATIONo 12+30000 —L—
SHEET 1 OF 2
.
❑ Boone, NC
828 355•9933
❑ Tri-Cities, TN
423•467•8401
❑ Knoxville, TN
Vaughn & Melton $65 �546 5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville, ❑ Char�eston,SC
■ North Carolina 843•974•5650
828•253•2796 ❑ Middlesboro.KY
❑ Raleigh, NC ❑ Charlotte, NC 606 � 248 6600
919 � 977 � 9455 704 � 357 � 0488 ❑ Atlanta, GA
770•627•3590
Copyright OO 2006 Vaughn & Melton, Inc. All Rights Reserved
\
`���,��� � � � �,,,,��
��.�,�N CAR� ,,�
,� � �,,����,,, 1��.,
: ����`O��Ss�O�i�.� :
:
' =� SEAL �' =
_ = 20777 = _
�/ � `� �
; ti ��, Nc� NE�.�� ��;:
�,Q•Q ��niii��� ��, �.
��'��� Y L . `N � ````��
'�������������
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
I
I
�/2"EXPo JTo
MAT'Lo (TYPJ
4— #5B3
�
.\
.\
�
�
�
�
N
I
�
P�AN OF PARAPET
#7E1
3,_g„
1'-2"
2" CLoTO PERMITTED
#6 "F" BAR (TYPo) CONSTo JTo
#6F5 OR
#7 "E" BARS � � #6F11
#6F3 OR #6F10 #6F4 OR #6F9
#6F1 (EAoFACE)
#6F6 OR F8 J
U �
#6F2 OR #6F7 �,-,
00 __ ___
� ------
� ______ �
2" CLo (TYPo) ------ �
G=====_ � �
CONSTo JTo
(LEVEL)
#5S3
�
�
N
#7E1
.�
6"
#7 „E„ BARS C�
9�/2" CTSo (EAo FACE)
�
�
N
I
�
n
� GUARDRAIL
ANCHOR
ASSEMBLY
3,_g„
#7 "E" BARS C�
9�/2" CTSo (EAo FACE)
ii ii— i i
�� �� � �
I I I I I I
�� �� � �
I I I I� I I
�#6 "F" BARS
1'-10" � GUARDRAIL
ANCHOR ASSEMBLY
P�AN OF END POST
1
---- --- — ----- ----- -- — ------ I
0 0 �
�
O �
�
#7E2 � � �
o ,
CONSTo JTo �
�
I '
�
0
�
�
O
�
N
i
N
#5S2 , w
�
�o Q
�
# 5 „B „ �
N Q
�
PERMITTED
CONSTa JTo
�"�:�
#5S1
#6F
r-----
�
�
�
i
�
�
I
�
�
�
�
�
#5S3
(EAo FACE)
#5S1
END V I EIN
#5S3
(EAa FACE)
END POSTS
(3 RED'Q)
PARAPET
� �/2" EXPoJToMAT'L HELD T"'
PLACE WITH GALVANIZED
( NOTEo OMIT EXPo JTo MA1
WHEN SLIP FORM IS USE[
CONSTo JTo
DRAWN BY e MAF
CHECKED BY : HLyV
DATEe 03/18
DATEe 03/18
coNs
(LEVE
SECTION S—S
AT DAM IN OPEN JOINT
(THIS IS TO BE USED ONLY
WHEN SLIP FORM IS USED)
ELEVATION AT EXPANSION JOINTS
CONCRETE PARAPET DETAILS
2 ��2 „
� CONCa INSERTS
\
ti
�
2 ��2 „
� CONCo INSERTS
-#7E6
#6F3 OR F5
— PERMITTED
CONSTo JTo
END POST C� END BENT #29 LEFT
(1 RED'�)
AND END POST FOR TINO BAR RAIL
NOTES
ALL REINFORCING STEEL IN PARAPETS AND END POSTS SHALL
BE EPDXY COATEDo
FOR DETAIL OF CONCRETE INSERT AND GUARDRAIL ANCHOR
ASSEMBLY, SEE "RAIL POST SPACINGS AND END OF RAIL
DETAIL"SHEETo
GROOVED CONTRACTION JOINTS9 �/2" IN DEPTH, SHALL BE
TOOLED IN ALL EXPOSED FACES OF THE PARAPET AND IN
ACCORDANCE WITH ARTICLE 825-10(B) OF THE STANDARD
SPECIFICATIONSo A CONTRACTION JOINT SHALL BE LOCATED
AT EACH THIRD POINT BETWEEN PARAPET EXPANSION JOINTSo
ONLY ONE CONTRACTION JOINT IS REQUIRED AT MIDPOINT OF
PARAPET SEGMENTS LESS THAN 20 FEET IN LENGTH AND NO
CONTRACTION JOINTS ARE REQUIRED FOR THOSE SEGMENTS
LESS THAN 10 FEET IN LENGTHo
PARAPET IN THE SPAN SHALL NOT BE CAST UNTIL ALL SLAB
CONCRETE IN THE SPAN HAS BEEN CAST AND HAS REACHED A
MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSIa
THE #5 S3 BARS SHALL BE INSTALLED9 USING AN ADHESIVE
ANCHORING SYSTEM, AFTER SAWING THE JOINTo THE YIELD
LOAD FOR THE #5 S3 BARS IS 1806 KIPSoFIELD TESTING FOR
THE ADHESIVE BONDING SYSTEM IS NOT REQUIREDo
�
�
�
�
w
�
;Q a
N �
a
� CON`.
(LE'
�
SECTION THRU PARAPET
2 ��2 „
� CONCo INSERTS
0
�
.-�
0
�
#7E12-
#6F10 OR F11
PERMITTED —
CONSTo JTo
; �, #5S2�
� �
� a
N �
a
�
PERMITTED
CONSTo JTo
��
#7 „E„ BARS C�
9�/2" CTSo (EAo FACE)
BAR TYPES
10"
�
m
i
N
BILL OF MATERIAL
FOR 2 PARAPETS AND 4 END POSTS
BAR NOo SIZE TYPE LENGTH WEIGHT
� B1 64 #5 STR 25'-1" 1674
� B2 8 #5 STR 13'-6" 113
� B3 8 #5 STR 15'-6" 129
� B4 8 #5 STR 14'-4" 120
� B5 8 #5 STR 14'-8" 122
� E1 3 #7 STR 2'-7" 16
� E2 6 #7 STR 2'-11" 36
� E3 6 #7 STR 3'-4" q1
� E4 6 #7 STR 3'-8" 45
� E5 6 #7 STR 4'-0" 49
� E6 6 #7 STR q'-4" 53
� E7 1 #7 STR 3'-3" 7
� E8 2 #7 STR 3'-6" 14
� E9 2 #7 STR 3'-8" 15
� E10 2 #7 STR 3'-11" 16
� E11 2 #7 STR 4'-2" 17
� E12 2 #7 STR q'—q" 18
� F1 6 #6 STR 2'-5" 22
� � F2 3 #6 STR 3'-5" 15
� F3 3 #6 STR 3'-8" 17
� F4 3 #6 STR 4'-0" 18
� F5 3 #6 STR q'-11" 22
� F6 1 #6 STR 3'-5" 5
� F7 1 #6 STR 3'-5" 5
� F8 1 #6 STR 3'-10" 6
� F9 1 #6 STR 4'-7" 7
� F10 1 #6 STR 3'-3" 5
� F11 1 #6 STR q'—g" 7
� S1 248 #5 1 6'-1" 1573
� S2 248 #5 2 5'-6" 1423
� S3 36 #5 STR 3'—q" 125
�� EPDXY COATED
REINFORCING STEEL 5,285 LBSo
�� CLASS AA CONCRETE 2906 CUo YDSo
�� 1'-2" x 2'-6" 264010 LINo FTo
CONCRETE PARAPET
�� CONCRETE PARAPET ON APPROACH SLAB
IS NOT INCLUDEDoSEE BRIDGE APPPROACH
SLAB SHEETSe
8„
10"
�
� 2
N
ALL BAR DIMENSIONS ARE OUT TO OUT
� ❑ Boone. NC
828•355•9933
❑ Tri-Cities, TN
423•467•8401
� Knoxville. TN
Va ug hn & M elf0 n $65•546•5800
Consulting Engineers � Sportonburg, SC
864•574•4775
Asheville. ❑ Char�eston,SC
■ NOrth COrOlina 843•974�5650
828 •253 •2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte. NC 606 • 248 • 6600
919�977•9455 704�357•0488 ❑ Atlanta,GA
770•627•3590
� Copyright � 2006 Vaughn & Melton, Inc. All Rights Reserved
PROJECT NOo 1qSPo20qq1o2
HAYINOOD COUNTY
STAT IONo 12+30000 —L—
SHEET 2 OF 2
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
,,,,,,,���",,,,, CONCRETE PARAPET
'�����"cQR°���"' AND END POST
:�� °� �''� s�si'' ��ti��';
� �: oF� °��= 9 �,
= 'a SEQ��"= = DETAI�S
_ - 2�777 - =
;y�-�'�c�NE�����:' 2 BAR C I Q� RQI�
-.,q,� -.,,,.,,,,,� ��,.� M
i�� Q Y ��, ``�
���''������ ������``.
REVISIONS SHEET N0.
DOCUMENT NOT CONSIDERED N0. BY: DATE: No. BY: DATE: 5-19
FINAL UNLESS ALL � � TOTAL
SIGNATURES COMPLETED SHEETS
� � 40
Z�_11 � i�r�� �� c� o #� c�
1'-2"
��c-�
NOTES
STRUCTURAL CONCRETE INSERT
�
ANG�E TO BE MADE FROM
�/2" X q" X 11" � AND
i/2" X 4" X 4" �
I/2�� �
� 1�/2" QS HO�E
� %16 n 1 JLV I J ,�
ELEVATION
THE STRUCTURAL CONCRETE INSERT ASSEMBLY SHALL CONSIST OF THE FO�LOWING COMPONENTSa
Ao FERRU�ES SHA�� BE MADE FROM STEE� MEETING THE REQUIREMENTS OF AASHTO M1699 GRADE 12�14 AND
SHAL� HAVE A MINIMUM LENGTH OF THREADS OF 1�/2"0
Bo 1— 3�q" 6 X 15�g" BOLT WITH WASHERo BOLT SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307o BOLT
AND WASHER SHA�� BE GA�VANIZEDe (AT THE CONTRACTOR'S OPTION9STAIN�ESS STEE� BO�T AND WASHER
MAY BE USED AS AN A�TERNATE FOR THE %q" � X 15�g" GA�VANIZED BO�T AND WASHERo THEY SHA��
CONFORM TO OR EXCEED THE MECHANICA� REQUIREMENTS OF ASTM A307o THE USE OF THIS A�TERNATE
SHA�� BE APPROVED BY THE ENGINEERo)
Co WIRE STRUT SHOWN IN THE CONCRETE INSERT ASSEMBLY DETAIL IS THE MINIMUM ALLOWABLE SIZE AND
7 7�8�� SHAL� HAVE A MINIMUM TENSILE STRENGTH OF 1009000 PSIo AS AN OPTION9 A 7/6" � WIRE STRUT WITH
A MINIMUM TENSI�E STRENGTH OF 909000 PSI IS ACCEPTAB�Eo
NOTES
METAL RAIL TO END POST CONNECTION
TOP VIEW
q„
2" 2"
�
i
— + — �
� �
� 1�/2" 6 HO�E �, � � c�
7/8�� � i I 7/8��
���
� SLOTS
END VIE�
RAI� SE�TT��'
STANDARD
C�AMP BAR
� RAIL POST
ATTACHMENT BRACKET
RAI� SECTION
STANDARD
BAR CLAMP
1'-4"
� �
� 3�q" STRUCTURAL
CONCRETE INSERT
3/q" � X 15�8�� BO�T
AND 2" OeDoWASHER
��/2" QS C13 THREAD7 X 1�/q" � �ROADWAY
STAIN�ESS STEE� HEX HEAD CAP FACE
SCREWS & 1%16" OoDo9 17�32" I�D�9 1��2��
�/16" THICK WASHER
PLAN — RAIL AND END POST
��/2" 6 C13 THREAD7 X 1�/q"
STAIN�ESS STEE� HEX
HEAD CAP SCREWS &
� I�2�� � 1��16�� �0�09 17�32�� l0�09
�/16" THICK WASHER
FIXED
sECTzoN H-H cFzx�
DETAI�S FOR ATTACHING META� RAI� TO END POST
THE METAL RAI� TO END POST CONNECTION SHALL CONSIST OF THE FO�LOWING COMPONENTSo
Ao�/2" P�ATES SHA�� CONFORM TO AASHTO M270 GRADE 36 AND SHA�� BE GA�VANIZED AFTER FABRICATIONo
B� 3/q" STRUCTURAL CONCRETE INSERT SHALL HAVE A WORKING LOAD SHEAR CAPACITY OF 4800 LBSo THE
FERRU�ES SHA�� ENGAGE A 3�q"QS X 15�g" BO�T WITH 2" OoDo WASHER IN P�ACEo THE 3/q"QS X 15�g" BO�T
SHAL� HAVE No Ca THREADSe
Co CAP SCREWS FOR RAIL ATTACHMENT TO ANGLE SHALL CONFORM TO THE REQUIREMENTS OF ASTM F593 A�LOY
305 STAIN�ESS STEE�o CAP SCREWS TO BE CENTERED IN S�OTS AT 60°Fo
Do STANDARD C�AMP BARS (SEE META� RAI� SHEET )o
Eo �/2" 6 PIPE S�EEVES (IF REQUIRED) TO BE GA�VANIZEDo
THE COST OF THE STANDARD C�AMP BARS AND CAP SCREWS USED IN THE META� RAI� TO END POST CONNECTION
SHA�� BE INC�UDED IN THE UNIT CONTRACT PRICE BID FOR �INEAR FEET OF 1 OR 2 BAR META� RAI�So
THE 3/q" STRUCTURAL CONCRETE INSERT WITH BOLT SHALL BE ASSEMBLED IN THE SHOPo
THE COST OF THE 3/q" STRUCTURAL CONCRETE INSERT ASSEMBLY9AND THE �/2" PLATES COMPLETE IN PLACE
SHA�� BE INC�UDED IN THE VARIOUS PAY ITEMSo
THE CONTRACTOR9AT HIS OPTION9MAY USE AN ADHESIVE BONDING SYSTEM IN �IEU OF THE STRUCTURA�
CONCRETE INSERT EMBEDDED IN THE END POSTo IF THE ADHESIVE BONDING SYSTEM IS USED9 THE 3/4" � X 15�g"
BO�T WITH WASHER SHA�� BE REP�ACED WITH A 3/4"QS X 6�/2" BO�T AND 2" OoDo WASHERo ALL SPECIFICATIONS
THAT APPLY TO THE 3/q" � X 15�g" BOLT SHALL APP�Y TO THE 3/q"� X 6�/2" BOLTo FIELD TESTING OF THE
ADHESIVE BONDING SYSTEM IS NOT REQUIREDo
RoPoWo( TYPoALL
CONTACT POINTS )
+
FERRULE
e37�
WIRE
PLAN
�'— 1" 1(1'-7�/0" 4�F�'TT�N� Ca� �5'—�" = 1 ��'—�" 1(1'-7�/0„ �,_q„
LUS�U—�I�IU
-RRULE
�
x
0
�
�
�
Q
E�EVATION
STRUCTURAL CONCRETE
INSERT
� EACH WE�DED ATTACHMENT OF WIRE TO
FERRULE SHALL DEVELOP THE TENSILE
STRENGTH OF THE WIREo
�
PLAN OF RAIL POST SPACINGS
,,,,,,,,, �,,,,,,,,
.�` .�N � A Rp %,
,�` � ��,����,,, <iy.,
�O � ;
: �;.o�ESS/o�,;y ;
= =� SEAL �" =
= = 20777 = -
; � �� ;; ;
' ti "�- Nc� NE .� � .
;q��. �� �:
% �'��������� ��,��•
,'''����� � i�i i i i i� ��`����
€�
PROJECT NOo 1qSPo20qq1o2
HAYWOOD COUNTY
STATIONo 12+30000 —�—
SHEET 1 OF 3
(FIX AND EXPo)
STDo NOa BMR2
„
r� i�i „„ �„ ,-� ,.T,- 2 �_i i_
END POST �N� NUSI
�
�
SEE "RAIL POST SPACINGS AND END OF RAIL DETAILS" SHEET
1'-4"
•�•
..
..
..
..
..
3,_0„
---------- ---------
� 1"
..
..
..
..
1'-4"
..
.
SPLICE NOT �
EXPe JTo
..
..
PARAPET
1"
� I�2 „
II
E�E�ATION
NOTE oFOR ATTACHMENT OF METAL RAIL TO END POST9SEE STANDARD NOoBMR2o
�
�
9�6�� X 13�6„
SLOTS
(TYPe)
�
�
i
�
�
N,
\,
PLAN
..
..
2 7�a „
17�8�� 17�s�� ;
�
� ;
� �
�16��
� � ��
� �� � � __,
� �� � �
I � rJ �, � I I �
, , � � � � --�
, , � � � , �
, , �� ; , ;
, , � � � � --,
�� '���' �� _'
�� � �
��
, , �� ; � -�
, , �� , , ,
, , �� , , ,
, , �� , , ,
, , �� , , ,
i � II i i �
� � �� � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� ���� � �
� ���� � �
� ���� � �
� ���� � �
� � � � � � �
� ���� � �
� ���� � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � � �
� '� � � � � �� �
� �� � � � � � �
� � � � � � � �
� � � � � � �
� � � � � � --,
� + ���� + � �
� � � � � � �
� ���� � --,
� ���� � � �
� I � � � � � --�
� o ����� o � � �
�� � � __;
� ����� �
� � � � � � � �
� � � � � � �
� � � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� ���� � �
� ���� � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� � � � � � �
� ����� � � �
� I �� � � � �
� � � � � � � �
� ���� � �
� ���� � �
� ���� � �
� ���� � --,
�+ ���� +� �
� ���� � �
� � � � � � --�
� ���� � �
� ���� � � ,
� ���� � �
� ����� � � �
� � � � � O _, �
� � �� � � �
� + ���� + � �
� ���� ; --;
� '�, �i ; � � �i
� � �i� � � ii
5/6" QS DRI�� 1" DEEP & �
4— 0766" � HO�ES 3/8" QS C16 THREAD7 TAP i„
PUNCHED FOR RIVETS 7/8" D E E P F O R 3/8" � X 1�/2" 4�4
STAIN�ESS STEE� CAP SCREW
FRONT E�EVATION SIDE E�EVATION
DETAI�S OF POST
4— %q" QS BOLTS WITH
ROUND WASHERS
ANCHOR ASSEMB�Y
JTo
_)
SECTION THRU PARAPET
AND RAI�
53�4„
613/6�,
15�6�� 45/8��
� �
� �
� �
� � �
� � �
� � �
, ,
0 � �
+ � �
� �
� �
� �
, , -� �
��
��
�� � �
��
� ��
�r-, � �
� �
i � �
� -
� �
� �
� �
� � �
+ , ,
��
��
� �
, ,
� �
� �
� �
��
P�AN
„
q — 0766" � �2 �6 ►�
�
�
�
�
�
�
�
�
�
�
�
�
,�
�
7/8 � M
HOLES
� � DRILL & COUNTER BORE
� FOR 3/8" QS C16 THREAD7
CAP SCREW
7�8�� 1�� 33�q�� HOLES PUNCHED �'/q"
FOR RIVETS
; —� 0 —;
� �
�' —O O — N �
I � �
----�-i- --------t--_--------�-�-�---- N
�
PERMITTED WEL
FRONT E�EVATION
POST BASE
NOTE o BASE CAN BE SUPPLIED
AS ONE EXTRUSION OR TWO
EXTRUSIONS WE�DED TOGETHER
AS SHOWNo
�
N �`
\ ��
I ; ; I ;
D 2 2 �4 �
N
�/4��
SIDE E�EVATION
DETAI�S
� �r,
'� o
'�' o
�' +i
PAY �ENGTH = 245057 �INo FTo
0750"
o7q5"
RIVET DETAIL
``���,, � � � � � �,,,,,�
.�` �N � A RO �''%
�� �1 `�,�iii,,, ��yi,
``���O��S$/�'��9�'�
= =a SEAL � = =
= = 20��� = =
:, y ;,F,y�� N���;� � ,;
%Q�Q ''��������`� �.�,��
��'�.pY L . `N `�.�`.
���������,,,�
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone, NC
828•355•9933
❑ Tri-Cities. TN
423 •467 •8401
❑ Knoxville, TN
Va ug hn & M elfo n $65�546�5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville, ❑ Chor�eston, SC
■ North Carolino 843•974•5650
828 •253 •2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 � 977 � 9455 704 • 357 � 0488 ❑ Atlanta, GA
770•627•3590
�Copyright � 2006 Vaughn & Melton,lnc. AIIRights Reserved
PROJECT NOo
HAYINOOD
STATIONo
SHEET 2 OF 3
1qSPo20q41o2
COUNTY
12+30000 —�—
NOTES
AT THE CONTRACTOR'S OPTION9METAL RAIL MAY BE EITHER ALUMINUM OR GALVANIZED STEEL IN ACCORDANCE
WITH THE REQUIREMENTS OF THE GENERA� NOTES AND THE FO��OWING SPECIFICATIONS FOR THE A�TERNATE
MATERIALS9HOWEVER9THE CONTRACTOR WILL BE REQUIRED TO USE THE SAME RAIL MATERIAL ON ALL STRUCTURES
ON THE PROJECT FOR WHICH META� RAI� IS DESIGNATEDe
UN�ESS OTHERWISE REQUIRED IN THE CONTRACT DOCUMENTS9THE CONTRACTOR HAS THE OPTION TO USE AN
A�TERNATE TO THE 2 BAR META� RAI�o THE A�TERNATE RAI� SHA�� MEET THE REQUIREMENTS OF THE AASHTO
LRFD BRIDGE DESIGN SPECIFICATIONS AND MUST BE �ISTED ON THE DEPARTMENT'S APPROVED PRODUCTS �IST
(APL) UNDER "2 BAR METAL RAIL ALTERNATE"o ADJUSTMENTS TO THE CONCRETE PARAPET WILL NOT BE AL�OWEDo
A�UMINUM RAI�S
MATERIA� FOR POSTS9 BASES AND RAI�S9 EXPANSION BARS AND C�AMP BARS SHA�� BE ASTM B-221 A��OY 6061—T6o
MATERIA� FOR RIVETS SHA�� BE ASTM B316 A��OY 6061—T6o RIVETS SHA�� BE STANDARD BUTTON HEAD AND CONE
POINT CO�D DRIVEN AS PER DRAWINGo
THE BASE OF RAIL POSTS90R ANY OTHER ALUMINUM SURFACE IN CONTACT WITH CONCRETE SHALL BE THOROUGHLY
COATED WITH AN ALUMINUM IMPREGNATED CAU�KING COMPOUND OF APPRO�ED QUALITYo
MATERIA� FOR SHIMS TO BE ASTM B209 A��OY 6061—T6o
GA�VANIZED STEE� RAI�S
MATERIA� AND GA�VANIZING ARE TO CONFORM TO THE FO��OWING SPECIFICATIONSo
POST9POST BASES9RAILS9EXPANSION BARS AND C�AMP BARSo AASHTO M270 GRADE 36 STRUCTURAL STEEL —
GA�VANIZED TO AASHTO M1110
RIVETSo RIVETS SHA�� MEET THE REQUIREMENTS OF ASTM A502 FOR GRADE 1 RIVETSo
THE CUT ENDS OF GA�VANIZED STEE� RAI�ING9AFTER GRINDING SMOOTH SHA�� BE GIVEN TWO COATS OF ZINC
RICH PAINT MEETING THE REQUIREMENTS OF FEDERA� SPECIFICATION MI�—P-26915 USAF TYPE 190R OF FEDERA�
SPECIFICATIONS TT—P-6410
SHIMSo SHIMS SHA�� MEET THE REQUIREMENTS OF ASTM A570 FOR GRADE 33 OR A611 FOR GRADE C AND SHA��
BE GA�VANIZED IN ACCORDANCE WITH AASHTO M1110
RAI� CAPSo RAI� CAPS SHA�� MEET THE REQUIREMENTS OF ASTM A570 FOR GRADE 33 OR A611 FOR GRADE C
AND SHA�L BE GA�VANIZED IN ACCORDANCE WITH AASHTO M1110
GENERA� NOTES
RAI�ING SHA�� BE CONTINUOUS FROM END POST TO END POST OF BRIDGEo EACH JOINT IN RAI� �ENGTH SHA��
BE SP�ICED AS DETAI�EDo PANE� �ENGTHS OF RAI� SHA�� BE ATTACHED TO A MINIMUM OF THREE POSTSa
FOR END OF RAI� TO C�EAR FACE OF CONCRETE END POST DIMENSION9SEE STANDARD NOeBMR2e
CAP SCREWS SHA�� BE ASTM F593 A��OY 305 STAIN�ESS STEE�oWASHERS SHA�� MEET THE REQUIREMENTS OF
ASTM F84q EXCEPT THEY SHALL BE MADE FROM ALLOY 304 STAINLESS STEELo
CERTIFIED MILL REPORTS ARE REQUIRED FOR RAI�S AND POSTSo SHOP INSPECTION IS NOT REQUIREDo
META� RAIL POSTS SHA�L BE SET NORMAL TO CURB GRADEo
METHOD OF MEASUREMENT FOR METAL RAILSo FOR LENGTH OF METAL RAI�S TO BE PAID FOR9SEE THE STANDARD
SPECIFICATIONSo
CURVED RAI� USAGEo WHERE RAI�S ARE TO BE USED ON BRIDGES ON HORIZONTA� AND/OR VERTICA� CURVATURE
THE CONTRACTOR MAY9AT HIS OPTION9HAVE THE REQUIRED CURVATURE IN THE RAI� FORMED IN THE SHOP OR
IN THE FIE�Do IN EITHER EVENT9THE RAI� SHA�� CONFORM WITHOUT BUCK�ING OR KINKING TO THE REQUIRED
CURVATURE IN A UNIFORM MANNER ACCEPTAB�E TO THE ENGINEERo
TO INSURE FUTURE IDENTIFICATION OF THE FABRICATOR9A PERMANENT IDENTIFYING MARK SHA�� BE P�ACED
ON EACH POSTe THE METHOD OF MARKING AND LOCATION SHALL BE SUCH THAT IT DOES NOT DETRACT FROM THE
APPEARANCE OF THE POST9BUT REMAINS VISIBLE AFTER RAIL PLACEMENTo
SHIMS SHAL� BE USED AS NECESSARY FOR POST A�IGNMENTo
A��OY 6351—T5 MAY BE SUBSTITUTED FOR A��OY 6061—T6 WHERE APP�ICAB�Eo
MINOR VARIATIONS IN DETAI�S OF META� RAIL WI�� BE CONSIDEREDo DETAI�S OF SUCH VARIATIONS9IF
DESIRED9SHALL BE SUBMITTED FOR APPROVALo
GROOVED CONTRACTION JOINTS9�/2"IN DEPTH9SHALL BE TOO�ED IN A�� EXPOSED FACES OF THE PARAPET
AND IN ACCORDANCE WITH ARTIC�E 825-10(B)OF THE STANDARD SPECIFICATIONSoA CONTRACTION JOINT SHA��
BE �OCATED AT EACH THIRD POINT BETWEEN PARAPET EXPANSION JOINTSoONLY ONE CONTRACTION JOINT IS
REQUIRED AT MIDPOINT OF PARAPET SEGMENTS �ESS THAN 20 FEET IN �ENGTH AND NO CONTRACTION JOINTS
ARE REQUIRED FOR THOSE SEGMENTS �ESS THAN 10 FEET IN �ENGTHo
STDo NOo BMR3
1'-2" 1 i/2„
N
�
�
\
�
PLAN
�/q" ( TYPo)
5 ��2 „
�
SIDE VIEW
E�EVATION
Oo375" �
WIRE
STRUT
4—BO�T META� RAI� ANCHOR
(qq ASSEMB�IES REQUIRED )
�/q��
�
DIMP�E "B"
�a
\ H
0
�
\ a
-lo
�DIMP�E "A"
�/8 „
SECTION B — B
DIMP�E
EXPANSION BAR
„A„
13�8 , ,
TO FIT RAI�
SECTION
DETAI�S
7�32,�
9�32��
�/z" �S C13 THREAD7 HOLE FOR �/2" � X 1" STAINLESS STEEL
HEX HEAD CAP SCREW & 1�/16" OoDo9 17/32" IoDo9
I/ �� Ti iTr�v iei n ci i�n iTvn �
N
�
N
�
4"
3 I �3 2 ,
7 16
�
2 I/3 2 � ,
,�
�
�
BAR SECTION
�32„
�16
�
,�
----------------------------- �
�
,�
�
7�32��
23/32„
C�AMP BAR DETAI�
�4 REQUIRED PER POST )
N
�
�
N
N
\
� 7/8" QS HOLES
(PERMITTED
CUTLINE )
RAI� CAP
1��q„
�
`���� � � � � � �,,,,��
,.�` C A R '%,
,.� ��N�,,���,,,�<i��,
: ��,o��ss,o,,,.�=;
= =a SEAL �' -
_ = Zo��� ; =
� � ���� �
:
=;tiq�,,tic�NE,.��' ��;
�i O �������� �� ��
,','����� � i�i i i i �� ���`���
DOCUMENT NOT CONSIDERED
FINA� UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone, NC 1
828�355�9933
❑ Tri-Cities, TN
423 �467 � 8401
❑ Knoxville, TN
Va ug hn & M e Ifo n 865�546 5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville, ❑ Char�eston,sC
■ NOrth Carolina 843•974•5650
828 253 2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3590
� Copyright p 2006 Vaughn & Melton, Inc. All Rights Reserved J
4 �q „
3/4 I 5�3 2 � �
�/8��
� � SEMI—E�LIPSE
MAJOR
AXIS
MINOR
AXIS
SECTION
PROJECT NOo
HAYINOOD
STATIONo
SHEET 3 OF 3
1qSPo20q41o2
COUNTY
12+30000 —�—
r�ar�v�
CLAMP ASSEMBLY
�
�
�
� 7�g" � HOLES
(PERMITTED
CUT�INE )
FRONT P�ATE REAR P�ATE
SHIM DETAI�S
NOTE o
SHIMS MAY BE CUT ALONG PERMITTED CUTLINE OR
S�OTTED TO EDGE OF P�ATE TO FACI�ITATE P�ACEMENTo
��q" QS BOLT WITH
�ED STEE� INSERTS
;�OSED BOTTOM TO
WASHERo
��
ASSEMB�Y
q �q „
�
NOTES
STRUCTURAL CONCRETE ANCHOR ASSEMBLY
THE STRUCTURAL CONCRETE ANCHOR ASSEMBLY SHALL CONSIST OF THE
FOLLOWING COMPONENTS o
Ao FERRULES SHALL BE MADE FROM STEEL MEETING THE REQUIREMENTS OF AASHTO
M1699 GRADE 12�1q AND SHA�� HAVE A MINIMUM �ENGTH OF THREADS OF 2"
FOR 3/q" FERRULESo
Bo 4—%q" � X 2�/2" BOLTS WITH WASHERSo BOLTS SHALL CONFORM TO THE
REQUIREMENTS OF ASTM A307o BO�TS AND WASHERS SHA�� BE GA�VANIZEDo
AT THE CONTRACTOR'S OPTION9STAIN�ESS STEE� BO�TS AND WASHERS MAY BE
USED AS AN A�TERNATE FOR THE 3/q" QS X 2�/2" GA�VANIZED BO�TS AND
WASHERSo THEY SHA�� CONFORM TO OR EXCEED THE MECHANICA� REQUIREMENTS
OF ASTM A307o THE USE OF THIS A�TERNATE SHALL BE APPROVED BY THE
ENGINEERo
Co WIRE STRUT SHOWN IN THE CONCRETE ANCHOR ASSEMB�Y DETAI� IS THE
MINIMUM ALLOWABLE SIZE AND SHA�� HAVE A MINIMUM TENSI�E STRENGTH OF
1009000 PSIo AS AN OPTION9 A 7/6" � WIRE STRUT WITH A MINIMUM TENSILE
STRENGTH OF 909000 PSI IS ACCEPTABLEo
Do THE META� RAI� ANCHOR ASSEMB�IES TO BE HOT DIPPED GA�VANIZED TO
CONFORM TO REQUIREMENTS OF AASHTO M1110
Ee THE COST OF THE METAL RAIL ANCHOR ASSEMBLY WITH BOLTS AND WASHERS
COMP�ETE IN P�ACE SHA�� BE INC�UDED IN THE PRICE BID FOR �INEAR FEET
OF METAL RAILo
Fo BO�TS TO BE TIGHTENED ONE—HA�F TURN WITH A WRENCH FROM A FINGER—TIGHT
POSITIONo
THE CONTRACTOR MAY USE ADHESIVE�Y ANCHORED ANCHOR BO�TS IN P�ACE OF THE
META� RAI� ANCHOR ASSEMB�Yo �EVE� ONE FIE�D TESTING IS REQUIRED9AND THE
YIE�D �OAD OF THE %q" � BO�T IS 10 KIPSo FOR ADHESIVE�Y ANCHORED ANCHOR
BOLTS OR DOWELS9SEE THE STANDARD SPECIFICATIONSe
WHEN ADHESIVE�Y ANCHORED ANCHOR BO�TS ARE USED9BO�TS SHA�� MEET THE
REQUIREMENTS OF ASTM F593 A��OY 304 STAIN�ESS STEE� WITH MINIMUM 759000
PSI U�TIMATE STRENGTHe NUTS SHA�� MEET THE REQUIREMENTS OF ASTM F594
A��OY 304 STAIN�ESS STEE� AND WASHERS SHA�� MEET THE REQUIREMENTS OF
ASTM F844 EXCEPT THEY SHALL BE MADE FROM ALLOY 30q STAINLESS STEELo
I/2�� I
�q �
5 �16�� I
�6
� �
� '�
� �
\� �� �
,�
�
RAI�
STDo NOo BMRq
4 5�8 , �
4 5/R" �TT
2��q„
�
2��q„
�
NOTES
�
11"
� GUARDRAI�
ANCHOR ASSE
� 1�/16" � HO�ES (
THE COST OF THE GUARDRAIL ANCHOR ASSEMBLIES WITH BOLTS9NUTS AND WASHERS
COMP�ETE IN P�ACE9SHA�� BE INC�UDED IN THE VARIOUS PAY ITEMSo
�/q" HO�D—DOW
�O�D—DOWN �
PLAN
�o
�
�
� GUARDRAI�
ANCHOR
ASSEMB�Y
� GUARDRAI�
ANCHOR ASSEMBLY
� 7�a�� � X 1,_4„ B(
WITH ROl
WASHERS (T`
1 ��4 �� �
I I V L L \ I I I o/
1'-2"
END VIEW
GUARDRAI� ANCHOR ASSEMB�Y DETAI�S
THE GUARDRAI� ANCHOR ASSEMB�Y SHA�� CONSIST OF A�/q" HO�D DOWN P�ATE AND
7— 7/8" QS BOLTS WITH NUTS AND WASHERSo
THE HO�D—DOWN P�ATE SHA�� CONFORM TO AASHTO M270 GRADE 36oAFTER
FABRICATION9THE HO�D—DOWN P�ATE SHA�� BE HOT—DIP GA�VANIZED IN ACCORDANCE
WITH AASHTO M1110
BOLTS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307 AND NUTS SHALL
CONFORM TO THE REQUIREMENTS OF AASHTO M291e BOLTS9NUTS AND WASHERS SHALL
BE GALVANIZEDoAT THE CONTRACTOR'S OPTION9STAIN�ESS STEEL BOLTS9NUTS
AND WASHERS MAY BE USED AS AN A�TERNATE FOR THE 7/8" QS GA�VANIZED BO�TS9
NUTS AND WASHERSoTHEY SHA�� CONFORM TO OR EXCEED THE MECHANICA�
REQUIREMENTS OF ASTM A307oTHE USE OF THIS A�TERNATE SHA�� BE APPRO�ED BY
THE ENGINEERo
THE GUARDRAI� ANCHOR ASSEMB�Y IS REQUIRED AT A�� POINTS WHERE APPROACH
GUARDRAIL IS TO BE ATTACHED TO THE END OF THE PARAPETeFOR POINTS OF
ATTACHMENT9SEE SKETCHa
AFTER INSTA��ATION9THE EXPOSED THREAD OF THE BO�T SHA�� BE BURRED WITH A
SHARP POINTED TOO�o
THE VERTICA� REINFORCING BARS MAY BE SHIFTED S�IGHT�Y IN THE END POST TO
C�EAR ASSEMB�Y BO�TSo
THE 1�/q" Q� HO�ES SHA�� BE FORMED OR DRI�LED WITH A CORE BITo IMPACT TOO�S
WI�� NOT BE PERMITTEDo ANY CONCRETE DAMAGED BY THIS WORK SHA�� BE REPAIRED
TO THE SATISFACTION OF THE ENGINEERo
SKETCH
� LOCATION OF GUARDRAIL ATTACHMENT
�
1'-2"
�
END VIEIN P�AN
(TWO BAR METAL RAIL) (END BENT 1 SHOWN9 END BENT 2 SIMILAR ON RIGHT SIDEo)
�OCATION OF GUARDRAI� ANCHOR AT END POST
�
❑ Boone, NC
828 355�9933
❑ Tri-Cities. TN
423�467�8401
❑ Knoxville. TN
Vaughn & Melfon 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864�574 4775
Asheville, ❑ Char�eston,SC
■ North Carolina 843 974 5650
828 �253 •2796 ❑ Middlesboro, KY
❑ Raleigh, NC ❑ Charlotte. NC 606�248 6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770�627 3590
Copyright Q 2006 Vaughn & Melton, Inc. All Rights Reserved
�
END BE
SHOINING POINTS OF ATTACHMENT
`���,, � � � � � � �,,,,,,
.�` � A R '%
,�` ��N,,�����,,��i,y%
`: ��,o��SSi Dy ,v�=,
= �a SEAL � = =
- - 2�777 - -
=; tiq �-�tic� NE��� ��;�
-, �p �,������ ��, ,�
��'��� Y L . `N � ���`��
���/IIII11\\�\
DOCUMENT NOT CONSIDERED
FINAL UNLESS A�L
SIGNATURES COMPLETED
1qSPo20qq1o2
COUNTY
12+30000 —�—
PROJECT NOo
HAYWOOD
STATIONo
(SHT 2a) STDo NOo GRA3
I 4" 4" I
I T /l ii I T /l
�
�
STDo NOo BOM1
�
� JTo TO � JTo A�ONG —L—
APPROACH SLABS
�
�AYOUT �OR
OF REINFORCED
C SQo
COMPUTING AREA
CONCRETE DECK S�AB
�To = 39863)
H
w
�
a
�
�
H
H
w
c�
a
�
cn
SUPERSTRUCTURE REINFORCING STEEL
�ENGTHS ARE BASED ON THE
FO��OINING MINIMUM SP�ICE �ENGTHS
SUPERSTRUCTURE
EXCEPT APPROACH APPROACH SLABS PAQNDET
BAR SLABS, PARAPET,
SIZE AND BARRIER RAIL BARRIER
RAIL
COATED L-1NCOATED COATED �NCOATED
#q 2,_�„ 1�_g�� 2,_�„ 1,_g„ 2,_g„
#5 2,_6„ 2�-2�� 2,_6„ 2�_2,� 3,_5„
#6 3,_�„ 2�-7�� 3'-10" 2'-7" q,_q„
#7 5,_3„ 3,_6„
#8 6,_10„ q,_7„
z
0
H
�
�
�
�
�
�
z
0
�
z
0
H
�
�
�
�
�
�
z
0
�
GROOVING BRIDGE F�OORS
STAGE I
STAGE II
BRIDGE DECK
STAGE I
STAGE II
TOTAL
� TRANSVERSE
3�^„ CONSTo JTo
L/2
�P OF SLAB
TRANSVERSE CONSTRUCTION JOINT
NOTEo REINFORCING STEEL IN SLAB NOT SHOWNo
�ONGITUDINA� REINFORCING STEEL SHALL BE
CONTINUOUS THRU JOINT
��,,, � � � � � ���,,,,��
.�` � Q R '%
'``°��N� � �S�S i �oC �y �'
`' �; oF E p'� ;-� ;
= =� SEAL �= =
= = 2�777 = -
�: y ;`�`NGi N��Q�,: � .'
--,9.� �---,,,,,,�� �,�,��
��'� � Y L . � ��'`�`.
�''���iii n ���`���
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
,
❑ Boone, NC
828�355•9933
❑ Tri-Cities, TN
423•467•8401
❑ Knoxville. TN
Vaughn � �elfon 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville9 ❑ Cnar�eston, SC
■ North Corolina 843�974�5650
828•253•2796 ❑ Middlesboro,KY
❑ Raleigh, NC ❑ Charlotte, NC 606 • 248 • 6600
919•977•9455 704•357•0488 ❑ Atlanta,GA
770�627�3509
Capyright c0 2006 Vaughn & Melton. Inc. All Rights Reserved
354
343
1556
1556
:�•
PROJECT
SQeFTe
SQoFTo
SQeFTo
SQoFTo
S�oFTo
Npo 1qSPo2044102
HAYINOOD
STATIONo
SHEET 2 OF 2
COUNTY
12+30000 —L—
DETAI�
STDo NOo BOM1
�
�
� JOINT�� '� �
.\
49'-9�/2" (OUT TO OUT)
25,_3i�q„
.�
\
�
,�
�
22'-103/8" (STAGE I)
20,_13�g"
2,_10„ 5,_713�6„
2,_10„ 5,_713�6„
3,_1„
4,_g„ I q„
(TYPo) SEE DETAI� "A"
—L—
#4 S1 & S2 SHEET 5 OF 6 2'-9"
� GDRo 1 ��, � GDRo 3
�� � GDRa 2 Z►��
i � i
i" i� i"
�, ,,_----- , �, �,
, , , , .
� , �' ' . , --�------ ---------
/ i i
. /, ; /, . /, ,,\1 . /,�
�� ;�'��. � � ,�'�'� � ;�'��.
�, i �, �,
, . , . , , .
. ,
. _-� - -- � - � -- � ,
,_ ., ,_ , ,_ _ .
, � , � � , , .
�---�- =��— � �,-- -----�--�-----�---- -=�—r!��{�-- ---�----- ------� � -�. — !��
- r----t-- ----� -' -F--- ---- -- — t----�---------� ------ ------ --- - +--------- ------------ - - -- � — - -- C
<
. *.--- i----- rt- i--� �� <
� i ✓ ` � i � � �\ i i � i � �
� JTo
;
� . � ��.i� � � . � ��.� i / i �y>
\
/ y ii / , i. �r:
� � � �, � ---------------------
/" � � /� �+ , " / ' �
� � �� , ' � �
� � � '------'� ' '
1" EXPo JTo
MAT'Lo
O � � �
�
�, ��Q
,—J, w c�
Q- �
� �H�
N
C� �
8�_5i3�6„
20�_23�6„
PLAN
FILL FACE
8�_5i3�6„
o �
� �
� m
� �
N
�WoPo #1
� WORKLINE
1'-5"
26'-11�/8" (STAGE II)
29,_8i�8„
45 ° —00'-00"
� ;
� � �
� �� Q
NOTESo
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTSo
BACKWA�� SHAL� BE P�ACED BEFORE APP�YING THE EPDXY PROTECTIVE COATINGo
THE TOP SURFACE OF THE END BENT CAPS SHA�� BE CURED IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONS EXCEPT THE MEMBRANCE CURING COMPOUND
METHOD SHA�� NOT BE USEDe
THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUI�DUPS SHA�L BE
S�OPED TRANSVERSELY FROM THE FILL FACE TO THE BACK FACE AT THE RATE
OF 2%0
THE CONCRETE IN THE SHADED AREA OF THE WING SHA�� BE POURED AFTER THE
JOINT BETWEEN THE DECK AND APPROACH S�AB HAS BEEN SAWED AND THE PARAPET
IS CAST IF S�IP FORMING IS USEDa
EPDXY COAT THE END BENT CAP AFTER ADJUSTMENTS ARE MADE TO BEARINGS
AND ANCHOR BO�TS ARE GROUTEDo
2'-10"
J
�
a
o �
� �
� �
Q
m
DETAI�
„B„
N
�
J �
�� �
�
4,_g„
� � � �7
22'-103/8" (STAGE I)
z
H
�
�
�
�
�
z
�
�
�
�-
BOTTOM OF #4 "S" BARS
CAP LEVEL SPLAYED AS SHOWN
9 "�
(TYPe)
#4 U4
� � (2 BAR RUNS) � ,N ��� � 6„ � ,� � `` ��,����CA�,,,,� �
---+,--- •�`,�N Rp ''.
i
I i i i
-�f�- -Lf�- i � � -L—��- �
, � � � �, �
r r I i i. i..� i
i i i i i i. i i
-----T-r r-------
-------------�--�--;-------
� �
I I 4—#4S7 � I � I �
# „ „ � #4B6 BARS � � � ,_ „ ,_ „ ; � ;
D BARS B � (EAo FACE) � (TYPILA) � � 2 g 3 0 ,
#4 S3 & S4 I (2—BAR RUNS) I j w� I � �
# � J Z ' i ' i
i i
8— qB6
/ I I �OVER PI�ES) � o n�� I � I�
� 103/q" DIAo MICROPI�ES
2
A
3
6'-0"
C� p� �-
H
�w
6,_�„
q
E�EVATION
WING NOT SHOWN FOR CLARITYo
(SEE SHEET 6 OF 6 FOR MICROPI�E CONCRETE CO��ARS)
' �g„
3„
5
0
�� � `���ii�i�� ��,'��
; �°,.o��ssi o�;�.� =;
- �a SEAL �'_ -
= = 20777 = =
'; ti �-F�I,G� NE�Q•�� � ;
�iQ� ����iii����� �\�`�
��'� � Y L . `N �`;•�`•
'����IIII111\\\\\
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
VIE D—D
� ❑ Boone, NC
828•355•9933
❑ Tri-Cities, TN
423•467•8401
❑ Knoxville, TN
Vaughn � �e���n 865 �546 5800
Consulting Engineers � Spartonburq, SC
864•574•4775
Asheville9 ❑ Cnar�eston, SC
■ North Corolina 843•974•5650
828 �253 •2796 ❑ Middlesboro, KY
❑ Raleigh, NC O Charlotte. NC 606�248�6600
919 • 977 • 9455 704 • 357 • 0488 O Atlanta, GA
770�627�3509
Copyright OO 2006 Vaughn & Melton.lnc. AIIRights Reserved
E�EVATIONS
LOCATION ELEVo
A� 1q07o35
�B 1q11e85
C� 1q11e97
OD 1q11e85
ED 1q12o19
OF 1q12o07
G� 1q12o35
� 1q18o13
� 1q16o46
O 1q16o99
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 1 OF 6
N
#
�
�
0
�
2—#4 K2 —
C� 9" CTSo
(EAo FACE)
� # 4 S 1& S 2 OC D �- -- -----
,.- ���, -------------`------------- M E C H A N I C A � S P � I C E
� ,'� — ---- � (TYPo #9 „B„ BARS)
,,
E"�
.
22—#5V1 C� 1'-0" CTSo (EACH FACE)
22—#4U1 Ca� 1'-0" CTSo
/q 5—#4K1 � 1'-0" CTSo
(2—BAR RUNS)
3„
26'-11�/8" (STAGE II)
— i (EACH FACE) WORKLINE
OO J SPLI ME NTYPo)
Oo026
� ----------------------------
T0 P 0 F i-------------�--------------
MICROPI�E SEE DETAI� "B" �_
E�o 1409035 i
------------�--------------
CONSTe (TYPo) i CONSTo JTe
J T o # q B 5 U N D E R # 4 B 6 �-------------�- -----------
B 5_#g ��g�� OVER PILES C� 4'-0" CTSo E i
� B A R S ( 6 R E Q' D I N S T A G E I) i----------- _�--------------
F � � 1 0 MINo
; — — — — — — — L � — — — r �----------------- ---------
-----------
--- ------ --- — ------ ------ -- --s-------L-- ----------- . I
,
� �. -----F--------°-----
, , � � ��
I '------- -' � ; � �
�
� � �
i ;-----------,�------;------- 2, 5„ MINo
# � � � -
� � - i � � � SPLICE (TYPe)
� � - ----------- ---;-------
o i � � '_-' � � ��,
� #4 S5 & S6 i •, � � . , ; ' , , , , i � �.; , ; �
� � � � i� � �
� � �.,T.�
-- - ----------- �- --� -
10—#4S1 & _I
S2 � 6" CTSo
(TYPo) g���
(TYPe)
6'-0"
q—#qS1 &
S2 � 6" CTSe
6'-0"
19'-10� ��i6�� 5�-49�6„
6'-5i5 „
�6
�" � �_#/II I`� � �"
q9'-9�/2" (OUT TO OUT)
29,_8i�8„
22'-103/8" (STAGE I)
� GDRo 3 � -�
i
�
,� / /
�--------- --------------- � i
�"
�� �
�
/ I
i �
/ �
�
------ �� ----- ---------�
� I
-1� --- ------------L
5�_qi3�6�� _ _ 2'_10„ _ _ 5�_713�6„
2,_g„
6
�
�
—L-
26'-11�/8" (STAGE II)
2'-10"
4,_g„
(TYPJ
3,_g„
45 ° —00'-00" ,' � I� I
� � GDRo q � GDRo 5��,�
� ,------�\ �
,�� . ,��
� � �
,
,
, -., � � ,
,
� ;i;;�,�. ,
., , �� �
�
�- �
"� j� ,'_'� �
,
, , ----- --�-T-�- -�--�----------�--
,
---- ti---r--------- `---
-----.- - — --- ------ ---------7 -
� i �---- � i �
� . �
._ /� � �%y� _,
.�
�� ,r.
i i
�� i i
i
� �
� o as
� � �
WoPo #1 � � v� Q
�Hw �
�- J
� �H�
N
c� �
7�_�7/8,�
WORKLINE
FILL FACE � �
�m
� �
N
8�_5i3 „
�6
19'-11"
10%q" DIAe
MICROPILE
10
1-
�O ;
�
�
M
,�
�
�
�
, �
�
\
�
�
�
�
NOTESo
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTSo
BACKWA�� SHAL� BE P�ACED BEFORE APP�YING THE EPDXY PROTECTIVE COATINGo
THE TOP SURFACE OF THE END BENT CAPS SHA�� BE CURED IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONS EXCEPT THE MEMBRANCE CURING COMPOUND
METHOD SHA�� NOT BE USEDe
THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUI�DUPS SHA�L BE
S�OPED TRANSVERSELY FROM THE FILL FACE TO THE BACK FACE AT THE RATE
OF 2%0
THE CONCRETE IN THE SHADED AREA OF THE WING SHA�� BE POURED AFTER THE
JOINT BETWEEN THE DECK AND APPROACH S�AB HAS BEEN SAWED AND THE PARAPET
IS CAST IF S�IP FORMING IS USEDe
EPDXY COAT THE END BENT CAP AFTER ADJUSTMENTS ARE MADE TO BEARINGS
AND ANCHOR BO�TS ARE GROUTEDo
2'-10"
DETAI� "B"
q,_g„
PLAN
22'-103/8" (STAGE I)
WORKLINE
MECHANICAL SPLICE
(TYPo #9 BARS)
CONSTo JTa
26'-11�/8" (STAGE II)
. ..
21—#5V3 C�c 1'-0" CTSo (EACH FACE)
21—#4U5 � 1'-0" CTSo
5—#qK3 na 1'-0" CTSo
(EACH FACE)
2'-5" MINo
SP�ICE #qB12 UNDER #qB13
(MINo) OVER PILES C� 4'-0" CTSo
Oa028 �6 REQ'D IN STAGE II)
� �
8 ��2 �`
SEE DETAI� "A"
SHEET 5 OF 6
5�—���8�� _ �
5,_65�8„
2— #4 K4
C� 9" CTSo
(EAo FACE)
----- --- ----------------I--- --------- B �
---------------i---
-------- 14—#4U6 C� 1'-6" CTSo (P�ACED AS SHOWM
i �
--------- ----------------i---- ------- -
1'-0" MINo M SEE DETAI� "B" 0
______ _ f CONSTo
--------- ------ -------- ---- N J T e
L
--------� --------------- ---- , --- ---L=,------ — -----J ---- — L--------------
,
� �
"��""J ------}------� _ _ _ _ _ _ _ _ _ _ r _ j
i i i �� � �� � �
>- ;�-----� --�:--� � , , , , ,
r------r-1- -- , .
' ' ' ' � ' ' � �'- -
� � � � � --- "
� � i #4B12
__-J____ __J____________ _ __ _________
�
� � ,
� �
� �
� � -
___�_____ __a___i________ ___________' m \ J
i T�_-� l� i � f I � /
� � ,� �_ ,� �_
����� � ��� ,;� ,�� ,��
, � � � �
�
---�-,--- -�y------------1
� � I � � I � —�� .-��'
ii ii I i � i r r
---�-r--r -�-�------------ --- i i i i i
-----�--, -r---------� --
� I ; „ � j � #4B13 �
� j � 2,_g„ 3,_�„ � 4— #4 S14 � � BARS �
' (TYPo EAo PILE)
,� , � �
' �� � I w�- � (EAo FACE) �
i i
� �, � �z � �
�
� j; 5-#qS10 & I I ���� I B� I
�__-, _� S11 C� 6 CTSe7 � ����
3„
� 10%q" DIAo MICROPI�ES
6'-0"
9" (TYPJ
10—#4510 &
S11 C� 6"CTSo
(TYPa)
6'-0"
�w�
N Umv
H
� W
9" (TYPJ
6'-0"
4_#g „B„ �
BARS I
6'-0"
E�EVATIoN
WINGS NOT SHOWN FOR CLARITYa
(SEE SHEET 6 OF 6 FOR MICROPI�E CONCRETE CO��ARS)
TOP OF
MICROPI�E
E�o 1409035
(TYPo)
4_#4 „B„
BARS
#4 S12 & S13
�#4U9
#4U9
BAR
5_#g „B„
BARS
E
L 8—#4 B13
(OVER PI�ES)
2_#q „s„
SP�AYED
AS SHOWN
� N
\ #
�
� �
� �
� o
�
, �
� #
�
N C[
I �
Lf� �
�
0
BOTTOM OF
CAP �EVEL
E
�
�
J �-
�
�
�e n i i �
#4 U8
VIEW E—E
\\���1111111/////
��.�` N C A R� '%,
\. �� ���,����,,, �i �'%
\ �� O��SS/ � ;'Ly �
� �
= =� SEA� �= =
_ ; 20777 � _
; : ;
, Q: : ,
: ti ��`�tic� N��,�� � :
,q�, � �.
% �'��������� ��, �•
��'�� Y L a `N � ��`��
��������������`��
DOCUMENT NOT CONSIDERED
FINA� UN�ESS A��
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355•9933
❑ Tri-Cities, TN
423•467•8401
❑ Knoxville, TN
Yd�1qhn & Me110n 865 •546 •5800
Consulting Engineers � Sportanburg, SC
864•574•4775
Asheville, ❑ Charleston, SC
■ North Carolina 843�974•5650
828 �253 •2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte. NC 606�248�6600
919 • 977 • 9455 704 • 357 � 0488 ❑ Atlanta, GA
770•627•3509
Copyright cQ 2006 Voughn & Melton, Inc. All Rights Reserved
ELEVATIONS
�OCATION E�EVo
�K 1407035
� 1412023
OM 1412050
ON 1412038
O 1412065
�P 1412053
O 1417055
�R 1419022
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 2 OF 6
#4 S10 & S11
�
��
� Q
_
�
-r
�" I �_#�i i� I �"
FILL
FACE
"V" BARS
16'-2"
6�_6ii�i6„
30'—gii�i6„
P�AN — INING IN1
�
#
�
C
d
.,
.
.
24— #5 V2 c� 1'-0" CTSe (EAo FACE)
X
A
A
�
w
C�
Q
LL
J
J
H
LL
N
_
�
#
�
�
2 SPAo
Ca� 6 "
SECT ION A—A
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
SHEET 3 OF 6
E�EVATION — INING
IN 1
MICROPILE
�
A
���,, � � � � � � �,,,,
.�` .�H � A R p %,
,•� � ��,, � � �,,, <,�.,
: 0 � i
: ���`��SS/ ��i�.� :
= 'a SEAL �' -
- - 2�777 - -
'; ti "n�-FNG� NE���� � :'
��iQ'r �����ii����� �\���
��'� � Y L . � ��'.�`.
'���/IIIIII����```
DOCUMENT NOT CONSIDERED
FINA� UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
12+30000 —�-
1'-1�/2" �
�
2,_3„
(TYPJ
2q,_3„
8,_1„
0
�
�
�
<
�
�
L
C
a
�
�
�
#
�
CONSTo
JTo
IGH BoBo
SECT ION X—X
FIL
FAC
1'-0"
� " (� I _ I I
#5 v� C� 1 �" C;TS�
�,_�„ �,_�„
20- #5 V4 C� 1'-0" CTSo (EAo FACE)
A
� 3-#6 S16 C� 4" CTSo
c
2" C�o
(TYPJ
#q H4
2" C�o
(TYPo) i�
� N
�°
�, C�
�
,,
�° ��
� �o
,, �
�
� s� \
FILL �1 �
FACE O;S
��s ��
o.
#q H3
#5Vq
3-#6 S15 BARS
� 1O3�q" DIAo
MICROPILE
7,_3„
I
1
2,_3„
(TYPe)
I
I�
21'-9"
14'-6"
27,_�5/8„
A
� �
� �
N �
1,_1i�2„
P�AN — INING IN2
A
��- #5 \/q n 1'-n" �'T�_ (FQ_ FQ�'F)
�
L1
L
<
L1
�
L
�
�
LL
�
�
c
#
�S
IN
�
A
Y
ELEVATION — INING
W2
5,_35�8„
� �.
----�
N
#
�
�
O
�
#
�
�
0
�
1'-0"
I I � " (� I _
FI�
FAC
#5 „�„BA
CONSTo
JTo
3" HIGH E
�1
�
�
�
L
J
�
�
L
�
L
�
�
i
9
�
rr
rr
SECTION Y—Y
2,_3„ 1,_�„
SECTION A—A
I��
�CE
2 SPAo
� 6"
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 4 OF 6
`\`���IIII111/���/''
.�`.�N �ARp %,
,.� � ��„� � �,,, ��y.,
: ���.0��5$/��•� .� :�
= =� SEAL �� =
_ = 20777 = _
� � ���: �
:
�; ti,q� ;,�GI NE��,� �`��
�i O ��iii��� �� `�
��'�� Y L . `�i � ��.�.
'����IIII111���\`
DOCUMENT NOT CONSIDERED
FINA� UN�ESS A��
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
�
12 j � 10%q" DIAo
� MICROPI�E
1'-0"
�
�
�, #4 U1
�
2"C�o
m
�
i� w
i
N z
H
�
v�
�
� -- FILL FACE �
o W
� �
�' a 2" C L o
� _
� U
� Q
� w #5 V1 —
#
�
�
5_#g „B„
�
�
N
i �a
��/
8-#4B6 C�a 4"CTS L��CLo
OVER PI�ES
(2-BAR RUNS) #
(2'-5" MINo SP�ICE) 4 S1�
4_ #g „B„
SPAo AS SHOWN
1'-0"
�
�
�, #4 U5
�
FILL FACE�
2" C�o
#5 V3
CONSTo JTo
�
' #q S2 `��
---- ----------
� � � /
��� ��� ���
S
I
1,_3„ 1'-1��2�� 1�-1��2�� 1,_3„
" 'f________________I
�--- ---- ,
�, �
�
��� �
�� �
��� � �
�� �
'� � � �
a '� ' � ' �` �
�
� � � �; � � �
� � � ��� � � �
� �� ��� � � �
' ��
� �� � — —
�I� �
�� �
�� �
��� �
�� � i
��� �
�� �
��� �
��� �
�� �
a_ua c� ;i� �
ELEVATIONS BETWEEN BRIDGE
SEAT BUI�D—UPS ARE TAKEN
AT THIS POINTo
� �
m�w
#4 B5 �-' Q ; o
# o � �o z
� H
I � Q � �
2" CLo ~ 'Y' w
Q z @ `"
�� , w
� -o �
� o
r� @ N m i�
� �
; w �
�
3" HIGH BoBo
—� MICROPI�ES
5_#q „g„
m
� w 5—#q „g„
i
N z
H
� 5_#g „g„
8—#4B13 � 4" CTSo
OVER PILES
�
�
N
���
�L�
��j
��ti
���
2"C�o
#4 S10�
4_ #g „B„
SPAo AS SHOWN
�
�
�
L
�
�
�
�
' #4U6
� � �
��
`�S
�� p ��,�
• � • � • � �
P��O p�f9 p���
•� •� •�
���o ��� ��� i
6�
, #4511
1,_3„ 1'-1��2�� 1�-1��2„
r '"i • • • • • • i'•
—���----- -----"��
f________________I
� __,
--- � ----,,----�
� � �
� ��� �
� �� �
� � ��� �
� �� �
� � � �
� ' '' ' �
ti � ��� �
ti � � �; � �
� � � �� � �
� � ' '' ' �9
� � � ��� I
�� — _
� �I� I
�
� �� �
�� �
� ��� �
� ��� �
� �� �
� �,� �
� �� �
� �L' I
� ��� �
1,_3„
� '
���
E�EVATIONS BETWEEN BRIDGE
SEAT BUI�D—UPS ARE TAKEN
AT THIS POINTo
�
�2
�
\I�
�9��—#qB12
r�, v� --�
�, � W
#4B12 °� �' Q
� O �
# i e
�, a
� W
2" C�o z r� � �
' Q w
� � —� �
� � i
0
r� @ c� � �
� �
� w �'
3" HIGH BoBo
—� MICROPI�ES
GRADE TO DRAIN
BAGGED STONE AND PIPE SHA�� BE P�ACED IMMEDIATE�Y AFTER COMP�ETION
OF END BENT EXCAVATIONo PIPE MAY BE EITHER CONCRETE9CORRUGATED
STEEL9CORRUGATED ALUMINUM AL�OY90R CORRUGATED PLASTICo PERFORATED
PIPE WI�� NOT BE A��OWEDo
BAGGED STONE SHA�� REMAIN IN P�ACE UNTI� THE ENGINEER DIRECTS THAT
IT BE REMOVEDo THE CONTRACTOR SHA�� REMOVE AND DISPOSE OF SI�T
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEERo
BAGS SHA�� BE REMOVED AND REP�ACED WHENEVER THE ENGINEER DETER—
MINES THAT THEY HAVE DETERIORATED AND �OST THEIR EFFECTIVENESSe
NO SEPARATE PAYMENT WI�� BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERA� PAY ITEMSo
TEMPORARY DRAINAGE AT END BENT
��—� n„
13�q" Q� x 2'-1" ANCHOR
BOLTS TO PROJECT 7"
�ABOVE TOP OF CAP
�
N
SECTION A-A
SECTION B-B
�9
i
�
0
�
CE
FILL FA
c
�
�
MICROPI�E DETAI�
(TYPo EACH MICROPI�E)
ANCHORAGE PLATE
� MICROPI�ES
ORCEMENT
I
.
ASING
EDGE OF
�
C
SECT ION F-F
TEE� CASING
REINFORCEMENT
CEMENT GROUT
FILLED ANNULUS
VLIVILNT GROUT
6" ( MINJ PIPE
FOR DRAINAGE
MINIMUM OF 3— ONE CUBIC
FOOT BAGS OF #78M STONEo
BAGS SHA�� BE OF POROUS
FABRIC9SECURELY TIEDe
---�---�-
J----�---l---- ��
TOE OF SLOPE
` ���,, � � � � � � �,,,,,,
,. C A R ',.
: �`°��N���S�Si'���ti�',
.� , ,, 9 ;
' a SEAL ��- =
_ = 20777 = =
' � �� ;: ;
'; tiq� ,,;�c� NE,,,�� ��;�
'i�� Q ���ii��� \��\`��
'������ � i�i i i i i� `���``
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
HAYINOOD
sTATIoNo 12+30000
SHEET 5 OF 6
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
)44102
COUNTY
-L-
4-#4 �14 � �I� I
10,_g7�8„
3,_g„ 7,_07�8„
NOTESo
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTSo
BACKWA�� SHA�� BE P�ACED BEFORE APP�YING THE EPDXY PROTECTIVE COATINGo
THE TOP SURFACE OF THE END BENT CAPS SHA�� BE CURED IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONS EXCEPT THE MEMBRANCE CURING COMPOUND
METHOD SHA�� NOT BE USEDe
THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUI�DUPS SHA�� BE
S�OPED TRANSVERSELY FROM THE FILL FACE TO THE BACK FACE AT THE RATE
OF 2%a
THE CONCRETE IN THE SHADED AREA OF THE WING SHA�� BE POURED AFTER THE
JOINT BETWEEN THE DECK AND APPROACH S�AB HAS BEEN SAWED AND THE PARAPET
IS CAST IF S�IP FORMING IS USEDo
�
�
�
C
i
\_
2'-10"
DETAI�
„B„
4,_g„
VIEIN D—D
�n ii�
PLAN
27'-5�/8" (STAGE I)
2— #4K2 � 9" CTSe
(EAo FACE)
1,_1i�2„
4'-10�/8" , �
18—#5V1 nd 1'-0" CTSo (EACH FACE)
18—#4U1 C� 1'-0" CTSo
5—#4K1 C� 1'-0" CTSo
(EACH FACE)
�#
�
� �
� �
0
� �
TOP OF
MICROPILE
E�o 1408079
(TYPo)
5—#g —
"B" BARS
�— D
Z �,
� � #4S5 & S6
� �
' o #4S3 & S4
� � ��
� #4S1 &� S2
D �
:
.
,
,
;
F
.
,
,
,
,
�
i
,
,
,
,
;
�
,
�
r
1
;
q—#g —
"B" BARS
-BOTTOM OF
CAP �EVE�
#q "S"BARS
LAYED AS SHO�
� 103/4" DIAo MICROPI�ES
�A
CONSTo #qB5 UNDER #4B6
JTo OVER PILES C� q'-0" CTSo
SEE �6 REQ'D IN STAGE I)
DETAI�
„B„
--- ---- � D �
,,- .,
, ,
� �
�
• r
i
�
I
�
I
1
� 2—#4B6
(EAo FACE)
(2 BAR RUNS)
g„ g„
(TYPo) (TYPJ�
10—#qS1 &
S2 �a 6" CTSo
(TYPo)
6'-0"
•��
� �
�
�
�
i
�
I
�
I
2
Oo018
.
i
�
1'-0" MINo !
CONSTo JTo
-----------�MECHANICAL SPLICE
(TYPo #9 "B" BAR)
��� � �
�
�
� �
I 4—#4S7 j
j (TYPe EAo �
� PILE) �
�
j 8—#4B6 �
� (OVER PILES)
, (2 BAR RUNS) ,
3
E�EVATIoN
WING NOT SHOWN FOR C�ARITYo
(SEE SHEET 6 OF 6 FOR MICROPILE CONCRETE CO�LARS)
�
�---- ---- --------------
----- --------�.-----
� �. � .
,, �
, �
,, �
�
'----------- �------1-
� �------ 2' — 5" M I N o
i� ' ______ SPLICE (TYPo)
� �
- ----------- `------;-
� - �
II _�___ _�_�
i' � ' ''
�
� �r-- --�i
- ----------- �--
--�+-------
I I •L__ I�I
, �-- ,
II .�__r__,_�
�
----- r r-------
"""�"" """"
� j �
2,_3„ � �
� �
� �
���
� �
� � �
� � �
i i
i � i
i i
i I i
� �
� � �
� � �
� �
' —'i,--'-
3"
5,_3„ g„
6'-0"
5
#4 U4
��,,�������,,,,
.�`�� � A R �''%
,�` �'�N�, � � � �,,,�<i�.,
;�°,.o� ES s i o�,, q=;
= �a SEAL ��_ =
= = 20777 = =
;� yq�F`,yG� N���; \�;;
., o ,,,�,,,, �,�, ,,
','������ � � Li i i �� `���````
DOCUMENT NOT CONSIDERED
FINA� UN�ESS A��
SIGNATURES COMP�ETED
N
�
J �
' � #
O
�
t
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
E�EVATIONS
LOCATION ELEVo
A� 1406079
�B 1411029
CO 1411e41
O 1411e29
O 1411056
OF 1411044
O 1411071
O 1417061
�I 1415094
O 1416031
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 1 OF 6
�.,
A
w�
J Z
H W ^
o ���
� oo�
�w�
N U��
H �
�w
6'-0"
2'-5" MINo
SPLICE (TYPJ
I g ��
�f�
5—#4S1 &
S2 � 6"CTSo
6'-0" �
22'-5�/8" (STAGE II)
3„
WORKLINE
��
#q S3 &
�" I �-#al 17 � ���
NOTESo
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTSo
BACKWA�� SHA�� BE P�ACED BEFORE APP�YING THE EPDXY PROTECTIVE COATINGo
103/q" DIAo 1\
MICROPI�E o,
O
i��
THE TOP SURFACE OF THE END BENT CAPS SHA�� BE CURED IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONS EXCEPT THE MEMBRANCE CURING COMPOUND
METHOD SHA�� NOT BE USEDo
THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUI�DUPS SHA�L BE
S�OPED TRANSVERSELY FROM THE FILL FACE TO THE BACK FACE AT THE RATE
OF 2%0
THE CONCRETE IN THE SHADED AREA OF THE WING SHA�� BE POURED AFTER THE
JOINT BETWEEN THE DECK AND APPROACH S�AB HAS BEEN SAWED AND THE PARAPET
IS CAST IF S�IP FORMING IS USEDe
J
�
Q
O �
i �
� C�
a
m
� �
i Q �
� U i
�
CONSTe
-------
/
/
� GDRo 3� -�
.�
,
27'-5�/8" (STAGE I)
21—#5V3 � 1'-0" CTSo (EACH FACE)
21—#4U5 � 1'-0" CTSo
3,_g„
49'-10�/q" (OUT TO OUT)
PLAN
7„
WORKLINE
----------------------------------r-
T0 P 0 F ---------------------------------- i--- --
-----
MICROPI�E �
-----
E � 0 14 0 8 0 7 9 ------ --------------------------- --- --
i
(TYPo) �
---- -----------------------------
MECHANICAL SP�ICE i
(TYPo #9 BAR)
---------- ----------------------- ----------
i
- --------
r-----------------
------------- --� t-------�------�r �
� � �
_____________yi____i___ti__1______Y�_� _ __
� I � I I �I � I '
I � I I I I
I I I I
I I I
_____-------1--- --_-1-----------L - ---____
I I I
I I I I
� � �
� � ��
� � �
------------�----- --�-----------�,- ---------
i i i
i i i i
i•' , i i �
i i i i i I
i ,�--�� i i
------------�-,--- --i-i-----------i�
i
i�i i I
i i i
�.� r.i i I
i. ii i -�
------------�-r-- T-----------r - --
i 3"
� 2,_3„
I
I
I
I
5— #q S10 &
S11 C� 6" CTSo
d
(TYPa)
� 103/q" DIAo MICROPI�ES
�
STAGE I
6'-0"
,_o„
. .
�
�
g„
O
STAGE II
B
Oe018
22'-5�/8" (STAGE II)
5—#4K3 na 1'-0" CTSo
(EACH FACE)
SEE DETAI� "B"
` 12—#4U6 C� 1'-6" CTSo
(PLACED AS SHOWN)
\ #q B12 UNDER #4 B13
OVER PILES � 4'-0" CTSo—
(6 REQ'D IN STAGE II)
0
,�
-� - - '�- -
,,
.;� T
�
� I �
�
B
w�
Jz
i--� w --
O ���
I � 0 �
�w�
N Umv
H
� W
9" _
(TYPJ
6'-0"
O
O
�— E�EVATION
WINGS NOT SHOWN FOR CLARITYo
(SEE SHEET 6 OF 6 FOR MICROPI�E CONCRETE CO��ARS)
7"
--
��
��
I
I
I
I
O
6,_�i�8„
��
5_#4 „B„
BARS
5_#g „g„
BARS 1 /
BOTTOM OF
CAP �EVEL
� #q "S" BARS
SP��AYED AS SH
N
>12 & S13
15�_4g�6„
2— #4K4 C� 9" CTSa
(EACH FACE)
CONSTe
JTo
E
#4U9
BAR
E
N
� #
� �
� �
� o
�
\ � ��
\ #
� �
� �
�
�
#4 U8
2'-10"
DETAI�
4,_g„
„B„
N
�
J �
� � �
�
�n ii�
VIE E—E
`��,, � � � � � � �,,,,,
�.�` C A R '%,
,�` ��N,,, � � � �,,�l�,y%
� ��:oFEssi p'�;y',
= �a SEAL � = =
� � �0�� I � �
/' n• �� �
. ti �;,tic� NE .��� � ,,
--,Q� ��--„�„�,. �.,,.
��'� � Y L . � ��.�`.
'���/lllllll\\\\\
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
E�EVATIONS
LOCATION ELEVo
O 1406079
O 1411059
�M 1411086
�N 1411074
OO 1412001
0 1411089
O 1416031
O 1416067
� 1418034
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 2 OF 6
`� '_ I__� \� I'/ i
.I .
�
� I �
� �2—#4B13 �
(EAo FACE) �
(2 BAR RUNS)
I
_ 4—#9 �
"B" BARS
10—#4S10 & '
S11 � 6" CTSo
(TYPo) g���
(TYPo)
6'-0"
�
�
4—#qS16
(TYPo EAo—
PILE)
8—#qB13
(OVER PI�ES)
(2 BAR RUNS)
6'-0"
�" I �-#QI I� � ���
1'-0"
I I 7" CI �
O J
� �' #4 H2—
�' N
J
�
N
J V L
8-#5V2 C� 1'-0" CTSo (EAo FACE)
10'-0"
5,_35�8„
FILL
FACE
#5 „�„ BA
CONSTo
JTo
P�AN — INING IN3
3"HIGH f
�1
�
�
�
a
�
�
L
C
�
�
_
�
#
�
�-
E�EVATION — INING
W3
N
#
�
�
0
�
#
�
�
0
�
SEC T I ON
1��1
�l
J
�
L
�
J
�
L
�
z
�
�
�
�
�
,,,,,,,, �,,,,,,,,
�.�`,�N C AR� '�,,�
,�` � ,,�����,, �i �,
: ��,o��SS� o�;'L '-;
' =� SEAL � 9 =
= = Zo777 = =
;
:, y ;,Fti�i N���; � ,;
'%Q�Q �'���������` �,��:
',���O�Y � � L� � � �� � �`�``•
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
HEET
F 6
x
f�—#5V� Ca� 1,_�„ �:TS� (FA� FA�:F)
0
�
1,_�„ 2,_3„
I
2,_3„
(TYPo)
14'-6"
5,_35�8„
27�_O5�g��
21'-9"
P�AN — WING Wq
A
�n ++r � i n r. n i � n �T(— ir n r n �r�
N
#
�
�
O
�
�
#
�
�
0
�
�
�
�:
6
C
�
�
�
#
i
n
ELEVATION
MICROPI�E �j
A
ING Wq
7,_3„
LJ
�
�
L
�
�
�
L
�
Z
�
�
�
9
�
�
�
<
�
�
L
c
�
�
�
�
�
#
�
SEC T I ON
FILL
FACE
CONSTo
JTo
"V" BARS
IIGH BaBo
1'�'�
``���iiiiiiiiiiii
,.�`,�N CAR� '�,,�
,�` � ��,����,,, <iy.,
: ��,.o�ESSio�; y';,
= =a SEAL �" =
— � 2��77 ' _
i � � `C' �� �
; ti �,, Nc, NE�-,�� � ;
,,��q�O,Y, � �L � a � �; ��` ``�
,,, � � �,,,
FIL
FAC
2 SPAo
C�a 6 "
DOCUMENT NOT CONSIDERED
FINAL UN�ESS A�L
SIGNATURES COMP�ETED
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
SECTION A—A
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
HEET 4 OF 6
12+30000 —�-
1'-0"
�" �' � _ I I
� 1O3�q" DIAo �,
MICROPILE� �, 12
'`�
1'-0"
�
�
�, #4 U1
�
2"C�o
�
i� w
�
N z
H
�
v�
U
-- FILL FACE �
o W
� �
�' a 2" C L o
@ _
� �
� Q
� w #5 V1 —
#
�
�
5_#g „B„
�
�
N
I ��
��/
8—#4B6 C�a 4"CTS L��CLo
OVER PI�ES
(2—BAR RUNS) #
(2'-5" MINo SP�ICE) 4 S1�
4_ #g „B„
SPAo AS SHOWN
CONSTo JTo
�
' #q S2 `��
---- ----------
� � � /
�96��' `��� ���
S
I
1,_3„ 1'-1��2�� 1�-1��2�� 1,_3„
" 'f________________I
�--- ---- ,
�, �
�
��� �
�� �
��� � �
�� �
'� � � �
a '� '' ' � �
�
� � � �� � � �
� �9 � ��� � 6� 6�
� �� ��� � � �
' ��
� �� � — -
�I� �
�� �
�� �
��� �
�� � i
��� �
�� �
�'� �
��� �
�� �
a_ua c� ;i� �
SECTION A—A
ELEVATIONS BETWEEN BRIDGE
SEAT BUI�D—UPS ARE TAKEN
AT THIS POINTo
#5 V3
�
�
N
� �
m�w
#4 B5 �-' Q ; o
# � LL �9 Z
� H
I � Q � �
2" CLo ~ 'Y' w
a, z @
��'_o�
� o
n�' � c� W i�
m i
� �
� w �
3" HIGH BoBo
—� MICROPI�ES
1'-0"
�
�
�, #4 U5
�
�
ti
8—#4B13 C�a 4" CTS
OVER PILES 2" C�o
(2—BAR RUNS)
(2'-5" MINo SP�ICE)
#4 S10�
�
�
�
L
�
�
�
�
� #4U6
� �
p�`�� \�9 \�cp
•� •� •�
���o ��� ��� i
6�
, #4511
1,_3„ 1'-1��2�� 1�-1��2„
r '�i • • • • • • i'•
-���----- -----"��
f________________I
� ,
--- � ----,, �
� � �
� ��� �
� �� �
� � ��� �
� �� �
� � � �
� ' '' ' �
ti � ''' �
ti � � �; � �
� � � �� � �
� � ' '' ' �9
� � � ��� I
�� — _
� �I� I
�
� �� �
� �
� ��� �
� ��� �
� �� �
� �,� �
� �� �
� �L' I
� ��� �
1,_3„
� '
���
E�EVATIONS BETWEEN BRIDGE
SEAT BUI�D—UPS ARE TAKEN
AT THIS POINTo
�
\I�
�
,9
r�, v� --�
�, � W
#4B12 °� �' Q
� O �
# � e
�, a
�� w
2" C�o Q z �' @
�� � w
� -O �
� o
r�' @ N W i�
m i
� �
� w �'
3" HIGH BoBo
—� MICROPI�ES
�
�
SECTION B—B
FILL FA
c
�
�
MICROPI�E DETAI�
(TYPo EACH MICROPI�E)
ANCHORAGE PLATE
� MICROPI�ES
ORCEMENT
I
.
4_ #g „B„
SPAo AS SHOWN
EDGE OF
�
C
SECT ION F—F
ASING
TEE� CASING
REINFORCEMENT
CEMENT GROUT
FILLED ANNULUS
VLIVILNT GROUT
` ���,, � � � � � � �,,,,,,
,. C A R ',.
: �`°��N���S�Si'���ti�',
.� , ,, 9 ;
' a SEAL ��- =
_ = 20777 = =
' � �� ;: ;
'; tiq� ,,;�c� NE,,,�� ��;�
'i�� Q ���ii��� \��\`��
'������ � i�i i i i i� `���``
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMP�ETED
0
�
�
�
�
N
MINIMUM OF 3— ONE CUBIC
FOOT BAGS OF #78M STONEo
BAGS SHA�� BE OF POROUS
FABRIC9SECURELY TIEDe
6" ( MINJ PIPE
FOR DRAINAGE
----�—
J----�---l---- ---��
GRADE TO DRAIN
TOE OF SLOPE
BAGGED STONE AND PIPE SHA�� BE P�ACED IMMEDIATE�Y AFTER COMP�ETION
OF END BENT EXCAVATIONo PIPE MAY BE EITHER CONCRETE9CORRUGATED
STEEL9CORRUGATED ALUMINUM AL�OY90R CORRUGATED PLASTICo PERFORATED
PIPE WI�� NOT BE A��OWEDo
BAGGED STONE SHA�� REMAIN IN P�ACE UNTI� THE ENGINEER DIRECTS THAT
IT BE REMOVEDo THE CONTRACTOR SHA�� REMOVE AND DISPOSE OF SI�T
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEERo
BAGS SHA�� BE REMOVED AND REP�ACED WHENEVER THE ENGINEER DETER—
MINES THAT THEY HAVE DETERIORATED AND �OST THEIR EFFECTIVENESSe
NO SEPARATE PAYMENT WI�� BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERA� PAY ITEMSo
TEMPORARY DRAINAGE AT END BENT
FI
1
BOLTS TO PROJECT 7"�
ABOVE TOP OF CAP
(TYPo)
DETAI� "A"
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
sTATIoNo 12+30000 —�—
SHEET 5 OF 6
� ❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
5_#4 „B„
� 5_#g „g„
� w
�
c� z
H
�
FILL FACE�
2" C�o
q—#4 �1 h � �li I
NOTES o
�
\
�%
\
EARTH BERM
ELo 1406035 \
FILL FACE � —
END BENT NOo1
\
.\
�_
`� .
��
`\
�,
��
���r--
� —L—
EARTH BERM
\ E�o 1405079
�
\
\
BRIDGE IoDo \�
STA 12+30000 —�— \
.,,\
�����--
C�ASS II
RIP RAP (TYPJ
� .�
\
�
�
,, �
q5 ° —00'-00"
STA 11+62050 —�—
WoPo #1
�-- --- ---------
PLAN
�
�
�
�
���� \��
�\�\\\\ �\\
—������ ��
�\��\ \
�\��� �.
EARTH BER \.
M
E�o 1406035 \
.` �
C� END BENT 1
N l0° l5' S0a6" E
�
45 ° —00'-00"
(TYPJ
0
�
��
o�
��G
��
FOR BERM WIDTH DIMENSIONS9SEE GENERA� DRAWINGe
STA 12+97050 —�—
WePa #2
ROCK ANCHOR
RETAINING WA��
(SEE P�ANS)
�
�\
45 ° —00'-00"
� �� `�
� �
� ��� �
� ��
� �
EARTH BERM \\ ��
E�o 1405079
PLAN C� END BENT 2
FILL FACE C�c
END BENT NOa 2
1'-7" MINe BERM
;--, NORMAL TO CAP
� �
� �
� �
; �-----,
E�o 1408035 (EB1)
� �
o , �
� �
� ,
E�o 1407079 (EB2)
� ,
, ,
� , �
i r__� i
i i i i
ii i i
� ' ' S�OPE 1�/20 1
� �__L__1__
i i
i i
i i
V I I
2'-0"
1'-0" MINo EARTH BERM
NORMAL TO CAP
,�
0
��
GEOTEXTI�E
� SECTION
BERM RIP RAPPED
GROUND �INE
� z
I H
� �
��„�������,,,,
,.�`�N C A R� ''�.,,
��� �l ������ii� �/ �i
: ���.O��SS/ �'�,yq �,
= =a SEAL ��- =
_ - 2�777 = -
, � � � ,
'; ti% N�i NE� ,,: � ,'
. qn i � \ .
�i -7- �����i���� � �.
��'� � y L . `N ���`�.
'����1111111����`
ESTIMATED QUANTITIES
BRIDGE C� RIP RAP GEOTEXTI�E
STAo 12+30000 —L— CLASS II FOR DRAINAGE
(2'-0" THICK)
TONS SQUARE YARDS
END BENT 1 220 240
END BENT 2 210 235
PROJECT Noo 14SPo2044102
HAYWOOD COUNTY
STAT IONo
, ,
❑ Boone, NC
828�355�9933
❑ Tri-Cities, TN
423�467 8401
❑ Knoxville. TN
Vaughn & Melton 865 •546 •5800
Consulting Englneers � Spartanburg, SC
864•574•4775
Ashevilleq ❑ Charleston, SC
■ North Carolina 843•974•5650
828 •253 �2796 ❑ Middlesboro. KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright c0 2006 Vaughn & Melton, Inc. All Rights Reserved
� /
12+30000 —�—
DOCUMENT NOT CONSIDERED
FINAL UNLESS A�L
SIGNATURES COMPLETED
�
\
M
rn
�
0
m
TAILS
�CH
ETo
852 LBSo
1032 LBSo
903 Co Yo
107 Co Yo
1100 Co Yo
EIGHT
198
211
423
610
821 LBSo
621 LBSe
900 Co Yo
SP�ICE �ENGTHS
BAR EPDXY �NCOATED
SIZE COATED
#q 2,_�„ 1,_g„
#5 2'-6" 2'-2"
#6 3'-10" 2'-7"
�
..
..
.
—SEE ARC OFFSETS
DETAIL THIS SHEET
— #5B6 (TOP OF SLAB)
#6B10 (BOTTOM OF SLAB)
�� N,�
#5B3 (TOP OF SLAB)�
6B7 (BOTTOM OF SLAB)
\
�--�a ���,�.
UQ U� ��
�o �, �O ,� �'�''�
@ ,� � � \�s
a �' � c"� � � #qA2
o m o � � (BOTo 0��
a � � # o ,� SLAB)
� � v � m ,�, #4A1—
� (TOP OF
a a SLAB)
w �,
�
U —
�� H
� H
� w
� �
o� a
N �
� c/� m �
N
� JOINT (� 5'-0"
END BENT NOo 2
#5 B3 THRU #5 B6
C� 6" CTSe �'�
,
(TOP OF SLAB) ��, '�'�
�� #� R7 THRI I#F R1 Q �
.�
�•� C� 6" C T S e �\ `�
�� � (BOTTOM OF SLAB) �
` �� `.
♦�� '\ N H ,\ ��
•. \ , Q •\ •.
��
•�� \.� ,� � •�`.
�� 15'-�„ (ALONG -L-) �\ �`.
`� ��� ���` g „
#4A1 C� 1'-0" CTSo � �
1'-3" (TOP OF SLAB)(2 BAR RUN) �
„ `.
#4A2 c� 1'-0" CTSo 9 #qA5 �� ��
(BOTTOM OF SLAB)(2 BAR RUN) OR #4A6 �. �•
� �
o , „ �, #4A1 �. ``•
TO SHORT �`,\\�� �R #qA2 STAo 12+97050 -L- �. ��
.
CHORD SHORT �� � WoPo #2 �'� ���
CHORD � � � �`
�`.� �•� STAo 11+62e50 -L- �• �
`�, �� WoPo #1 �,
----- ---- � .
#5B11 (TOP OF SLAB)
#6B12 (BOTTOM OF SLAB)
I�
�
�
W J
�H
�Q
� ��
a
m
15'-0"
14-#4A5 C� 1'-0" CTSa
(TOP OF SLAB)
14-#4A6 C� 1'-0" CTSo
(BOTTOM OF SLAB)
\
�
#4A5 ��
(TOP OF
SLAB)
�—m�Q BEGIN APPROACH SLAB
�a �`� STAo 11+48091 -L-
�� �
��@o
��N�
m o0 0
# o `� �
��#�
�.��o
N N m
m �
��
�
U
14-#4A�3 c� 1'-0" CTSo
(TOP OF SLAB)
14-#4A4 (� 1'-0" CTSo
(BOTTOM OF SLAB)
#4A4 \
(BOTo OF
�� SLAB) \
��j #4A3
� ; (TOP OF�
SLAB)
.`` .� .\ .``
.\ 3 9
3" �`��, � 45 ° -00'-00" �'� �``.` „
�`� \' (TYPo) 14-#4A3 C� 1'-0" CTSe „
�� � ��� (TOP OF SLAB) 3
`�`•� \\, 1q-#4A4 C� 1'-0" CTSo
FILL FACE C� ����` \\ # (BOTTOM 0\ SLAB)
�� 4A3 FILL FACE C�
END BENT NOo 1 � \\�--�END BENT NOo 2
`� � OR #4A4 � ��
`. � �\ `.
.` '� �� �`
� �`, � � �`,
H
w
c�
a
�
�
�
�
Q
0
�
�
�
�
�
H
- #4A4 H
(BOTe OF
SLAB) 9�9� c�
a
�6 = �
�
� ��� N
\� �� �
i
#4A3 �
� � #4A3 � � (TOP OF
� N `.� \ ` SLAB)
�
� ��� � JOINT C�
� N � END BENT NOo
.�
END BENT NOo 1
OR #4A4 \� `� � N
.� \ ,
1 �N
END BENT NOo 2
� ��� ��
CONSTo JTo � �� �• �`. �CONSTo JTo
\
�
tSAWED OPENING FOR
JOINT SEAL
r_I / �� (`/l%ITT�II ini ic- i iTri i ri i n Tn i innrn
I 3,_�„
��
SECTION THRU S�AB
(TYPE II - STANDARD APPROACH FILL)
10'-0"
:�
SECTION N-N
`�o,
•I�S
1 �,
1,_3„
- #4A6 END APPROACH SLAB
(BOTe OF STAo 13+11009 -L-
SLAB) ,�
-L-
..
.. �
�
�
0
�
0
�
�
�
�
O
�
�
�
N
3�-105�6„
=�
_�
�
�
----------�-----
BEG APPROACH SLAB
��•���
REINFORCING STEEL
� EPDXY COATED
REINFORCING STEEL
CLASS AA CONCRETE
,�
�
�
---- -------- -------------- �_
\�'� � JOINT
��,�END BENT #1
.�
OUTSIDE EDGE OF
APPROACH SLAB
3,_1i�2„
CURB DETAI�S
� v� m
� ^ � Q
UQU�
. J
����
���o
��N�
m mo
# o `9 � �
��#� a
� �
rn �- � m
N N � �
a
0
�
�
a
w
U
�
�
�� N
�--�Q
UQU�
, J_
����
���o
��N�
m o0 0
� o `9 �
��#�
���o
N N m
�
�
CURB
ARC OFFSETS DETAI�
END BENT #19 �EFT SIDE
BILL OF MATERIAL BILL OF MATERIAL
APPROACH S�AB AT EB #1 APPROACH S�AB AT EB #2
STAGE I STAGE I
BAR NOo SIZE TYPE LENGTH INEIGHT BAR NOo SIZE TYPE LENGTH WEIGHT
� A1 30 #4 STR 12'-8" 254 � A5 15 #4 STR 22'-11" 230
A2 32 #4 STR 12'-7" 269 A6 16 #4 STR 22'-8" 242
� B 1 2 8 # 5 S T R 1 3'- 1 1" 4 0 6 � B 1 2 8 # 5 S T R 1 4'- 6" 4 2 3
B2 28 #6 STR 13'-11" 585 B2 28 #6 STR 14'-6" 610
� B3 1 #5 STR 11'-5" 12 � B11 1 #5 STR 9'-9" 10
� B4 1 #5 STR 7'-10" 8 B12 1 #6 STR 9'-9" 15
� B5 1 #5 STR 5'-3" 5 � B13 5 #5 2 6'-10" 36
� B6 1 #5 STR 3'-1" 3 � B14 5 #5 STR 9'-9" 51
B7 1 #6 STR 11'-5" 17 � B15 5 #5 STR 14'-6" 76
B8 1 #6 STR 7'-10" 12
B9 1 #6 STR 5'-3" 8 � S1 22 #5 STR 3'-11" 90
B10 1 #6 STR 3'-1" 5 � S2 16 #6 1 4'-10" 116
REINFORCING STEEL
� EPDXY COATED
REINFORCING STEEL
CLASS AA CONCRETE
896 LBSo REINFORCING STEEL
� EPDXY COATED
688 LBSo REINFORCING STEEL
1006 Co Yo CLASS AA CONCRETE
SLAB
BARRIER RAIL
STAGE II TOTAL
BAR NOo SIZE TYPE LENGTH INEIGHT
� A3 15 #4 STR 19'-9" 198
A4 16 #4 STR 19'-9" 211 S T A G E I I
� B1 28 #5 STR 13'-11" q06 BAR NOo SIZE TYPE LENGTH
B2 28 #6 STR 13'-11" 585 � A3 15 #4 STR 19'-9"
A4 16 #4 STR 19'-9"
REINFORCING STEEL 796 LBSo � B1 28 #5 STR 1q'-6"
� EPDXY COATED g2 28 #6 STR 14'-6"
REINFORCING STEEL 604 LBSe
CLASS AA CONCRETE 900 Co Yo
17,_85�$„
5'-0" 5'-0" 3'-105/6"
_�_ �
�
�
�
------------------�-----
��,, � ► � � � � �,,,,
.�`���N � A RO ��''%
,• � ��, � � � � �,, <i %
: ��,.o� �S S i o�,,'�y =;
= - � SEAL � = -
- _� _ _
_ = 20777 ; =
_ ; _ ;
F �� :
';tiq'�-,N�� NE,,��' .`�:
-, � --, �,,,, ��, ,�
°Y ,
''���''��������►��` � ````
� ❑ Boone, NC
828�355•9933
O Tri-Cities. TN
423•467•8401
❑ Knoxville, TN
Vaughn & Melfon 865 •546 •5800
Consulting Engineers � Spartanburg, SC
864 •574 •4775
Asheville, ❑ Chor�eston,SC
■ NOI'th Carolino 843•974•5650
828•253•2T96 ❑ Middlesboro.KY
❑ Raleigh, NC ❑ Charlotte. NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlanta, GA
770•627•3509
Copyright � 2006 Vaughn & Melton, Inc. All Rights Reserved
DWNo BYo MAF DATEo 03/18
CHKDo BYo CBC DATEo 03/1g No. BY:
DESo EGRo OF RECORDo CBC DATEo 03/18 �
DOCUMENT NOT CONSIDERED
FINAL UNLESS AL�
SIGNATURES COMPLETED
PROJECT NOo
HAYINOOD
STATIONo
SHEET 1 OF 2
1qSPo20qq1o2
COUNTY
12+30000 —L—
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
BRIDGE APPROACH SLAB
FOR FLEXIBLE PAVEMENT
REVISIONS
DATE: N0. BYa
�
DATE:
SHEET N0.
S-39
TOTAL
SHEETS
40
8„
END OF CURB WITHOUT
SHOULDER BERM GUTTER
�
�
1'-2"
CO
(
SECTION M—M
CONS
(LE\
SECTION L—L
15'-0"
5'-0"
EDGE OF
APPROACH SLAB
4—#5S1 C� 1'-0" CTSo
� M�
��• • • \i
N '
�
� �
. ;
� �
.
.• • • ;
M�
1'-2" q—#5S1 C� 1'-0"CTSo
\
1'-0"
7—#5S1 C� 1'-0" CTSo
5—#5B13 � �
(FIELD BEND)
10'-0"
5—#5B14
5—#5B15 � � GUTTER LINE
7—#5S2 C� 1'-0" CTSa
�
c�
�
K�
K�
9—#5S2 C� 6" CTSo
�
SECTION K—K
6" . 7—#5S1 C� 6" CTSo
�
1'-5"
P�AN OF BARRIER RAI� TRANSITION - �EFT SIDE
(S2 BARS SHALL BE FIELD BENT TO MAINTAIN
2"C�EAR OF TRANSITION FACE)
�
CL,QJS ��p„ ST�NE ao cP
FOR EROSION CONTROL
aa o�
�fl �
-------------------------
TEMPo SLOPE DRAIN
2'-0"MINo
—'I
EARTH DITCH BLOCK
APPROACH
SLAB
� �
, �
;;
, �
� �
� �
1'-0"
�H
FUTURE SHOULDER
----� ---------
z
/� R PZN � � H �
� � �� c" � _
� E � zN� �
GR P P tiP� '
C9 Z -� Q � � N
`�' � � FLOIN LINE
� EROSION RESISTANT MATERIAL
END OF APPROACH SLAB 1'-6" MINe
NOTEo IMMEDIATELY AFTER THE CONSTRUCTION OF THE APPROACH SLAB9
THE CONTRACTOR SHALL PROVIDE TEMPORARY BERM AND SLOPE
DRAINo CONTRACTOR SHALL GRADE TO PIPE INLET
AND PROVIDE EROSION RESISTANT MATERIAL AS SHOWNo THE
EROSION RESISTANT MATERIAL SHALL BE EITHER 1)ASPHALT
PLANT MIX9 TYPE 1 OR TYPE 29 MIN� 2" DEPTH9 2) EROSION CONTROL
MAT9 OR 3) CONCRETE, AS DIRECTED BY THE ENGINEERo
THE SLOPE DRAIN SHALL CONSIST OF A NON—PERFORATED
TEMPORARY DRAINAGE PIPE912 INCHES IN DIAMETERa
P�AN VIEW
.�`���N 11� A RO ��''�.
�� � ����i��i� �/ �i
: �°,,o� �s s i o�,,tiq =;
' =a SEAL � = =
= = 20777 = =
; ;F ��; ;
= ti �, N N ,.� � :
�- Q '�����,,,��, �.,,,
���'?�� Y L . `N ��.�`.
��,�����������
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
. �
❑ Boone, NC
828•355•9933
� Tri-Cities, TN
423•467•8401
O Knoxville, TN
Va ug hn & M e If0 n s65•546•5800
Consulting Engineers � Spartanburg, SC
864•574•4775
Asheville, ❑ Char�eston,SC
■ North COI'011flp 843•974•5650
828•253•2796 ❑ Middlesboro.KY
❑ Raleigh, NC ❑ Charlotte, NC 606•248•6600
919 • 977 • 9455 704 • 357 • 0488 ❑ Atlonta, GA
770•627•3509
� Copyright � 2006 Vaughn & Melton, Inc. All Righ+s Reseryed J
E�ASTOMERIC CONCRETE
END ELASTOMERIC
BENT CONCRETE �
NOo (CUo FTo)
1 6e9
2 609
TOTAL 1308
\
� BASED ON THE MINIMUM BLOCKOUT SHOWNe
PROJECT NOo 1qSPo20qq1o2
HAYINOOD
STATIONo
SHEET 2 OF 2
COUNTY
12+30000 —L—
q,_�„
12" MINIMUM
SECTION S—S
FILL SLOPE
BRIDGE DECK
1 r v�ivi�� _� �
OPENING
SECTION C—C
FOAM JOINT SEAL
(PRE—SAINED ELASTOMERIC
CONCRETE DIMENSIONS)
GENERA� NOTES
FOR BRIDGE APPROACH FILL INC�UDING GEOTEXTILE, 4"� DRAINAGE PIPE9
AND SELECT MATERIAL BACKFILL9SEE ROADWAY PLANSo
GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE INITH THE STANDARD
SPECIFICATIONS SECTION 1056e
SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI)SHALL BE IN
ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 10160
SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF
BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLABa
APPROACH SLAB SHALL NOT BE CONSTRUCTED PRIOR TO COMPLETION OF THE
BRIDGE DECKo
THE JOINT SHALL BE SAINED PRIOR TO THE CASTING OF THE BARRIER RAIL
AND END POSTo
FOR THE 4" � DRAINAGE PIPE OUTLET(S), SEE ROADWAY STANDARD DRAWINGSa
AREA BETWEEN THE ININGINALL AND APPROACH SLAB SHALL BE GRADED TO
DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL
BE PAVEDoSEE ROADWAY PLANSo
WITH FOAM JOINT SEAL
FOR FOAM JOINT SEALS9SEE SPECIAL PROVISIONSo
THE NOMINAL UNCOMPRESSED SEAL WIDTH OF THE FOAM JOINT SEAL
SHALL BE 2"a
FOR ELASTOMERIC CONCRETE9SEE SPECIAL PROVISIONSo
� JTo C�
1��/i6" C� 45° F_ ��END BENT #1
1g�6�� C� 60° F
13�g " C� 9 0° F
SAWED OPENING FOR
FOAM JOINT SEAL �
A�
BEVEL AS SHOWN`
FROM GUTTER TO
GUTTER
ELASTOMERIC
CONCRETE
�
�
1" FORMED OPENING _ �
SECTION C—C
FOAM JOINT SEAL
( EXPANSION )
_OCKOUT FOR
_ASTOMERIC
JNCRETE
2"SAWED OPENING FOR
\
� JTo C�
END BENT #2
I 4S o
1" FORMED OPENING _�' �
SECTION C—C
FOAM JOINT SEAL
( FIXED )
�� CAP FLOW LINE ONLY INITH
� EROSION RESISTANT MATERIAL
BACKFILL EXCAVATION HOLE
AND GRADE TO DRAIN
NOTEeIF THE APPROACH SLAB IS NOT CONSTRUCTED IMMEDIATELY
AFTER THE BACKFILLING OF THE END BENT EXCAVATION9
GRADE TO DRAIN TO THE BOTTOM OF THE SLOPE AND PROVIDE
EROSION RESISTANT MATERIAL, SUCH AS FIBERGLASS ROVING
OR AS DIRECTED BY THE ENGINEER TO PREVENT SOIL EROSION
AND TO PROTECT THE AREA ADJACENT TO THE STRUCTUREo
THE CONTRACTOR WILL BE REQUIRED TO REMOVE THESE
MATERIALS PRIOR TO CONSTRUCTION OF THE APPROACH SLABe
TEMPORARY DRAINAGE DETAI�
TEMPORARY BERM AND S�OPE DRAIN DETAI�S
(TO BE USED WHEN SHOULDER BERM GUTTER IS REQUIRED)
ELBOW
TEMPORARY
S�OPE DRAIN
�ELBOW
RAI� NOTES
THE BARRIER RAIL ON THE APPROACH SLAB SHALL NOT BE CAST UNTIL ALL SLAB
CONCRETE HAS BEEN CAST AND HAS REACHED A MINIMUM COMPRESSIVE STRENGTH
OF 3,000 PSIo
WHEN FOAM JOINT SEAL IS REQUIRED,THE JOINT IN THE DECK SHALL BE SAWED
PRIOR TO THE CASTING OF BARRIER RAILe
ALL REINFORCING STEEL IN BARRIER RAILS SHALL BE EPDXY COATEDo
�THESE S1 BARS SHALL BE INSTALLED9USING AN ADHESIVE ANCHORING SYSTEM9
AFTER SAWING THE JOINTo THE YIELD LOAD FOR THE S1 BARS IS 1806 KIPSo
FIELD TESTING FOR THE ADHESIVE BONDING SYSTEM IS NOT REQUIREDo
GROOVED CONTRACTION JOINTS9�/2"IN DEPTH9SHALL BE TOOLED IN ALL EXPOSED
FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 825-10(B)OF THE
STANDARD SPECIFICATIONSoTHE CONTRACTION JOINT SHALL BE LOCATED AT EACH
THIRD POINT BETWEEN BARRIER RAIL EXPANSION JOINTSo ONLY ONE CONTRACTION
JOINT IS REQUIRED AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN 20 FEET
IN LENGTH AND NO CONTRACTION JOINTS ARE REQUIRED FOR THOSE SEGMENTS LESS
THAN 10 FEET IN LENGTHo
THE COST OF THE PARAPET TO BARRIER RAIL TRANSITION ON THE LEFT SIDE OF
THE END APPROACH SLAB SHALL BE INCLUDED IN THE UNIT PRICE BID
FOR 1'-2" X 2'-6" CONCRETE PARAPETo
TOE OF FILL�" ���'"' "" �
CLASS "B" STONE
FOR EROSION CONTROL
SECTION R—R
� 3"EROSION RESISTANT
MATERIAL OVER PIPE
� EARTH DITCH BLOCK
.
\ �— ----------------- �
4S o
FOAM JOINT SEAL�
Q�
BEVEL AS SHOWN �
FROM GUTTER TO
GUTTER
ELASTOMERIC
CONCRETE
STDo NOo BASq csHT 3a�
5 ��2„
� JTo C� (TYPo) � �
END BENT � `�' �
STANDARD NOTES
�
DESIGN DATAo
SPECIFICATIONS — — — — — — — — — — — — — — — — —
�IVE �OAD — — — — — — — — — — — — — — — — — — — —
AoAoSoHoToOo (CURRENT)
SEE P�ANS
IMPACT A��OWANCE — — — — — — — — — — — — — — — — SEE AeAoSeHeToOo
STRESS IN EXTREME FIBER OF
STRUCTURA� STEE� — AASHTO M270 GRADE 36 —— 209000 �BSo PER SQo INo
— AASHTO M270 GRADE 50W —— 279000 LBSo PER SQo INo
— AASHTO M270 GRADE 50 —— 279000 �BSo PER SQo INo
REINFORCING STEE� IN TENSION — GRADE 60 ———
CONCRETE IN COMPRESSION — — — — — — — — — — — —
CONCRETE IN SHEAR
STRUCTURA� TIMBER — TREATED OR UNTREATED
EXTREME FIBER STRESS — — —
COMPRESSION PERPENDICU�AR TO GRAIN
OF TIMBER
EQUIVALENT FLUID PRESSURE OF EARTH
249000 �BSo PER S�o INo
19200 �BSe PER SQo INo
S E E AeAoSoHoToOo
19800 �BSe PER SQo INo
375 LBSo PER SQo INe
30 LBSe PER CUo FTe
(MINIMUM)
MATERIA� AND WORKMANSHIPo
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIA�
PROVISIONS9 ALL MATERIA� AND WORKMANSHIP SHA�� BE IN ACCORDANCE WITH
THE 2018 "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES"OF THE
NoCeDEPARTMENT OF TRANSPORTATIONo
REINFORCING STEE�o
�
STEEL SHEET PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL
BE HOT ROLLEDo
CONCRETEo
UN�ESS OTHERWISE REQUIRED ON P�ANS9C�ASS A CONCRETE SHA�� BE
USED FOR ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THATa
C�ASS AA CONCRETE SHA�� BE USED IN BRIDGE SUPERSTRUCTURES9
ABUTMENT BACKWALLS9AND APPROACH SLABS9AND CLASS B CONCRETE SHALL
BE USED FOR SLOPE PROTECTION AND RIP RAPo
CONCRETE CHAMFERSo
UNLESS OTHERWISE NOTED ON THE PLANS9ALL EXPOSED CORNERS ON
STRUCTURES SHALL BE CHAMFERED 3/q"WITH THE FOLLOWING EXCEPTIONSo
TOP CORNERS OF CURBS MAY BE ROUNDED TO 1�/2"RADIUS WHICH IS BUI�T
INTO CURB FORMS9 CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS
SHA�� BE ROUNDED WITH A�/q"FINISHING T00� UN�ESS OTHERWISE REQUIRED
ON PLANS9AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES
AND TOPS OF CURBS AND SIDEWA�KS SHA�� BE ROUNDED TO A�/4"RADIUS
WITH A FINISHING STONE OR T00� UN�ESS OTHERWISE REQUIRED ON P�ANSo
DOWE�So
DOWE�S WHEN INDICATED ON P�ANS AS FOR CU�VERT EXTENSIONS9SHA��
BE EMBEDDED AT �EAST 12"INTO THE O�D CONCRETE AND GROUTED INTO
PLACE WITH 102 CEMENT MORTARo
A��OWANCE FOR DEQD �OAD DEF��ECTION9 SETT�EMENT9
ETCoIN CASTING SUPERSTRUCTURESo
BRIDGES SHA�� BE BUI�T ON THE GRADE OR VERTICA� CURVE SHOWN ON P�ANSo
S�ABS9CURBS AND PARAPETS SHA�� CONFORM TO THE GRADE OR CURVEo
A�� DIMENSIONS WHICH ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD �OAD
DEF�ECTIONS ARE DIMENSIONS AT CENTER �INE OF BEARING UN�ESS OTHERWISE NOTED
ON P�ANSo IN SETTING FORMS FOR STEE� BEAM BRIDGES AND PRESTRESSED CONCRETE
GIRDER BRIDGES9ADJUSTMENTS SHA�� BE MADE DUE TO THE DEAD �OAD DEF�ECTIONS
FOR THE E�EVATIONS SHOWNo WHERE B�OCKS ARE SHOWN OVER BEAMS FOR BUI�DING
UP TO THE S�AB9THE VERTICA� DIMENSIONS OF THE B�OCKS SHA�� BE ADJUSTED
BETWEEN BEARINGS TO COMPENSATE FOR DEAD �OAD DEF�ECTIONS9VERTICA� CURVE
ORDINATE9AND ACTUA� BEAM CAMBERo WHERE BOTTOM OF S�AB IS IN �INE WITH
BOTTOM OF TOP F�ANGES9DEPTH OF S�AB BETWEEN BEARINGS SHA�� BE ADJUSTED
TO COMPENSATE FOR DEAD �OAD DEF�ECTION9VERTICA� CURVE ORDINATE9AND
ACTUA� BEAM CAMBERo
IN SETTING FALSEWORK AND FORMS FOR REINFORCED CONCRETE SPANS9AN
A��OWANCE SHA�� BE MADE FOR DEAD �OAD DEF�ECTIONS9SETT�EMENT OF FA�SEWORK9
AND PERMANENT CAMBER WHICH SHA�� BE PROVIDED FOR IN ADDITION TO THE
ELEVATIONS SHOWNo AFTER REMOVAL OF THE FA�SEWORK9THE FINISHED STRUCTURES
SHAL� CONFORM TO THE PROFILE AND ELEVATIONS SHOWN ON THE PLANS AND
CONSTRUCTION E�EVATIONS FURNISHED BY THE ENGINEERe
DETAI�ED DRAWINGS FOR FA�SEWORK OR FORMS FOR BRIDGE SUPERSTRUCTURE
AND ANY STRUCTURE OR PARTS OF A STRUCTURE AS NOTED ON THE P�ANS SHALL
BE SUBMITTED TO THE ENGINEER FOR APPROVA� BEFORE CONSTRUCTION OF THE
FA�SEWORK OR FORMS IS STARTEDo
A�� REINFORCING STEE� SHA�� BE DEFORMEDe DIMENSIONS RE�ATIVE TO
P�ACEMENT OF REINFORCING ARE TO CENTERS OF BARS UN�ESS OTHERWISE INDICATED
IN THE P�ANSo DIMENSIONS ON BAR DETAI�S ARE TO CENTERS OF BARS OR ARE OUT
TO OUT AS INDICATED ON P�ANSo
WIRE BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE
INDICATED ON THE P�ANSo WHEN BAR SUPPORT PIECES ARE P�ACED IN CONTINUOUS
�INES9THEY SHA�� BE SO P�ACED THAT THE ENDS OF THE SUPPORTING WIRES SHA��
BE �APPED TO LOCK �EGS ON ADJOINING PIECESo
STRUCTURA� STEE�o
AT THE CONTRACTOR'S OPTION9 HE MAY SUBSTITUTE 7/8" � SHEAR STUDS FOR THE
%q" 6 STUDS SPECIFIED ON THE P�ANSo THIS SUBSTITUTION SHA�� BE MADE AT
THE RATE OF 3— 7/8" QS STUDS FOR 4— 3�q" QS STUDS9 AND STUD SPACING CHANGES
SHA�� BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVA�ENT NUMBER OF 7/8"Q1 STUDS
A�ONG THE BEAM AS SHOWN FOR 3/4" QS STUDS BASED ON THE RATIO OF 3— 7/8" Q�
STUDS FOR q— 3�q" 6 STUDSo STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST
BE PROVIDEDo THE MAXIMUM SPACING SHA�L BE 2'-0"0
EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER
PLATE IS IN CONTACT WITH BEARING PLATE9THE CONTRACTOR MAY9AT HIS OPTION9
SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE
EQUIVA�ENT AREA PROVIDED THESE P�ATES ARE AT �EAST 5/6"IN THICKNESS AND
DO NOT EXCEED A WIDTH EQUAL TO THE F�ANGE WIDTH �ESS 2"OR A THICKNESS
EQUAL TO 2 TIMES THE FLANGE THICKNESSo THE SIZE OF FILLET WELDS SHALL CONFORM
TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS "BRIDGE WELDING CODE"o
E�ECTROS�AG WE�DING WI�� NOT BE PERMITTEDo
WITH THE SO�E EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER
SURFACES9AL� SHARP EDGES AND ENDS OF SHAPES AND PLATES SHA�L BE S�IGHTLY
ROUNDED BY SUITAB�E MEANS TO A RADIUS OF APPROXIMATE�Y �/16INCH OR
EQUIVA�ENT F�AT SURFACE AT A SUITAB�E ANG�E PRIOR TO PAINTING9GA�VANIZING9
OR META��IZINGo
HANDRAI�S AND POSTSo
METAL STANDARDS AND FACES OF THE CONCRETE END POSTS FOR THE METAL
RAI� SHA�� BE SET NORMA� TO THE GRADE OF THE CURB9UN�ESS OTHERWISE SHOWN
ON P�ANSo THE META� RAI� AND TOPS OF CONCRETE POSTS USED WITH THE A�UMINUM
RAIL SHALL BE BUILT PARA�LEL TO THE GRADE OF THE CURBo
META� HANDRAI�S SHA�� BE IN ACCORDANCE WITH THE P�ANSo RAI�S SHA�� BE
AS MANUFACTURED FOR BRIDGE RAI�INGo CASTINGS SHA�L BE OF A UNIFORM APPEARANCEa
FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR OTHERWISE SHALL BE
REMOVED IN A MANNER SO THAT A UNIFORM COLORING OF THE COMPLETED CASTING SHALL
BE OBTAINEDoCASTINGS WITH DISCO�ORATIONS OR OF NON—UNIFORM CO�ORING WI��
NOT BE ACCEPTEDeCERTIFIED MI�� REPORTS ARE REQUIRED FOR META� RAI�S AND POSTSo
SPECIA� NOTESo
GENERA��Y9IN CASE OF DISCREPANCY9THIS STANDARD SHEET OF NOTES SHA��
GOVERN OVER THE SPECIFICATIONS9BUT THE REMAINDER OF THE P�ANS SHA�� GOVERN
OVER NOTES HEREON9AND SPECIA� PROVISIONS SHA�� GOVERN OVER A��o SEE
SPECIFICATIONS ARTICLE 105-40
REV, 6-16-95 EEM (�) RGW REV, 5-7-03 RWW (�) JTE REV, 10-1-11 MAA (�) GM
REVo 8-16-99 RWW (✓) LES REV, 5-1-06 TLA (✓) GM REV, 12-17 MAA (✓) THC
STDo NOo SN