Loading...
HomeMy WebLinkAbout20181716 Ver 1_B-175 Permit Plans_20181218, �. � � O N �. � � � • O � � O � � � � � A � V � � � O V STR UCTURES DESIGN DAT.9 ADT 2010 = 450 ADT 2025 = 600 'T = b % V = 25 MPH " TTST = 3 DUAL = 3 FUNQ. CLASS=RURAL LOCAL SU�REGIONAL TIER �"I�.�"I� �. (�I� �(�)I'�'I�I- � � � I'�(�)I.I. � � II�I��I�I(��V� (�I� I-II��I-IV� �1"� ' � III I BRIDGE 1�IO.I75 OVER BIG CREEIC OIV SR I332 (WATERVILLE RD) PROJECT LENGTH LENGTH ROADWAY PROJECT 145P.20441.1 = 0.078 MI. LENGTH STRUCTURE PROIECT 14SP.20447.1 = 0.022 MI. TOTAL LENGTH OF PROJECT 14SP.20441.7 = 0.100 MI. P�epar� In lle 0((lce o(: YAUGHN Cry MELTON I318-F PATTON AVE. ASHEVILLE NC.28806 FOR TfIL NORI'H CAItOL(NA DIVISION OF HfGXIYAYS HARDY Wxc�xe.nE no�scr F LETTINC DATE : MAY 14, 2019 RYAN SHIc�Ncxse ro�ccr nr.sr � n �OCl1MENT NOT CONSIDERE� FINAL UNLE55 ALL SIGNATURES COMPLETEO � STRUCT[IRGS MANAGEhIENT UNlT' � f000 BIRCH RIDGG DX. JtALEIGH, N.C.2I6(0 REvzsioN onTE: MAR, O8, 2018 vaM Yauql�SMellon DIVISlON OA HIGH{i�AYS STATE OF XORTH CAROLINA n�ic n s�rcN a�vcrNsen r.e. 'D&PAR1iNENT OF TRANSPOA[ATfON FEDERAL HIGH{YAY ADMINISTRATION � 0 � � W � is+�o FILL FACE C� EN4 BENT N0,1 STA. 12+75.12 -L- G.P. ELEV. = 3434.10 L'-5"TO LIMITS OF UNCLASSIFIED STRLICTLJRE EXCAVATI01 ETYP.) BEGIN FRONT SLOPE APf ROX. NATLIRAL STA. i2+66.37 GROUNO LINE � EL. 1434.75' Fix 0 CLA55 TI RIP RAP Cd 1.5:1 SL(}PE fTYP,] EMD BENT 1 SPAN A �ow cHORa EL. 1431.22' H.W. EL.=1428.4 qQQ YR.I 0 v � W �30TE5: EiJ� BENTS ANp BENTS ARE PARALL��. PILES AR� NDT SHOWN IN PLAN VTEW F"OR CLARITY. CORED SLABS ARE PAftALLEL 70 � Sl1RVEY -L- AND EXTEN�E� TANCENT. ENd BENT 2 BOTTOM OF CAP AN� BERM ARE STEPPE6. ��. y F< � �eF � n `m" F(. ' j92a RA; N y� � 1928 `9� � � � + 33 N N (, � FILL FAC� � Cd EN� BENT N0.1� � N d BENT N0.1 CONTROL LIiJE STA� 13+�1.49 -L- G.P. ELEV. = 143200 EXISTING EXCAVATE SLIBSTRIJCTl1RE TO EL.lq21. (TYP.) fTYP.) I H.4L EL.=1426.5 � czs YR.I I I FIX �IX i � TEMPORARY I ITOP OF �RILLED I CAUSEWAY PIER EL.1418.5 I N.W.S. EL.=1417.5 I I 3'-0°0 DRILLE� � PTEF2 (7YI'.1 � -- . -- fl __� � -- +� +� +� +� �� +� +� +i +� +� +� +� ' 0 0 0 0 0 0 0 0 0 o a o I N � r � � �ri � � N � � m I V 'v' rT V' Q V V Q P Q" v v J J J J J J J �l ...J � -_1 J W w�,, W � w w w W w w w BENT l S�CTZON ALONG � SIJRVEY -L- SECTIONS ALONG END BEH75 AND BENT ARE AT RSGNT ANGL�S. EXISTING SUBSTRUC ITYP.) STA. 13+51.49 EXTENdE� TdNGENT � �ro s� zaa _� W.P. "1 FILL FkCE ( STA, 12+75.1� BEGTh! F2ETAINING WALL I STA. l2+]9,p1 -L- 23.00' OF'F5E7 ftIGHT _ -�- :H -� - � �Ih1.1CTY�.IV 'L' 2q.88' OFFSET RIGHT SEE R�TAINING WALL al PLAHS � H / ur�.d��c ,i.t� � '� �' S3A.13+33.99 � / r / ///,/ / `i COiJ57. JT. / % L� �� , i /--------__ __ '��j � /� ` /� j� H � �� � °0'0" SKEW a � ��� TEMPORARY %, \ �^ ti CAUSEWAY f 12D°0'0' '•� j m % �� � PROPOSE� 6"' % � �� WATER LINE ! � (ROR�WAY PAY ITEM) ,� / ._.�.-�-�-�-�-�-�-�-�-�-�----- -•- •---•----._._._._.. ._._._._._.._.._.� 75'-q7/F"- SPAN A �, / � PROPOSED 3" ViAT�R LINE SROADIYAY PAY ITEM) BENT NO.I CONTROL LSNE � E�N� �O���P1 �� �� �A2�. -�a 2�� PI.AN ALONG � SIJRVEY -L- LJ ' CLASS II� RSP RAP fTYP.I AB i EN� RETAINING WALL. 2 STA. Y4+z5.27 -L- 38.46' OFFSET LEFT �-- �-�-���� �'''� 60U�QER WALL 1 NEREBY CERTfFY rxnr rrresF PcnNs a�� rx� as-autcr Pc,ays. FOR A NG WALL OETAILS,SEE RETAINING WALL PLANS ITYP.1 B�Np IN WALL 2 STA. 19+Q7.62 31.05' QFFSET LEFT REVISION DATE: MdR. OB, 2018 D APPROACH SLAB A.14�03.56 -L- ❑OCi1MENT NOT CONSYDERE[7 FINAL UNLESS ALL Tp IiJTERSTA7E 4D_ 5IGIVhTURES COMPLETED tONT SLOPE Pf�OJECT N0. 14SP.20441.1 16.20 -L- HAYW00� COLJNTY BENT N0. 2 o`�•RSN CARp�ia'. ,,,,4 �'ss,o,y�-: SjATI03�: 13�'33.99 -L- - aa SEAL �? " _'- Z�TTT `- SHEET 1 OF 3 REPLACES BRIpG£ 175 ; y'�;,,��'ClN�F;o`���y o '�'�,qRpr'i: N��Y�r�+ srArF oF NOH1H CAROLTNA ""���������""" DEPARTMEN�F OF' 7RANSPORTATION �� � �� �,w.�� yaugMw�fMeEion 6 p16"'4�5'0° [ws�tlnY �9lrwxe p lu sr��nr�� sc Ashevine. a � ■ NorfT CwoQnn � Ii4.i!!�]T{ �qtt o w�r.rc o �, �..�c �o n.nr.Na ra�.sra+a o ue„ac. `4m+b�. o uwp�.6•a.�� SPAN B 1'-7" BERM I7YP.1 LOY! CHOR� � EL.S42$.3� ia o0 G,P, ELEV, =ul430.i16 1'-0"MIN. EARTH BERM ITYP.) EL.1430.56' STEP IN EN� BENT CAP �, CLASS B o MIN.ELEV. RIP RAP ^ 141�.5' ��� a Q ��0 1 S. �:7' o�o a o�a 1 o q c� o Q � C��o ---- -------------]---..�....» _.._---------------------- GEOTE7(TILEJ CLA55 TT RIP RAf' TEMPORARY CALJSEWAY ��TATL (-53.3713% ------ �-�2. �sooz PI = 11+15.00 �-13.95�Q% EL = 1,438.50" VC = 30' PI = 14+30.00 El = 1.429.04' VC = 50' VERTICAL GRAQE DATA -L- � � �NP S2X53 W' I STEEL PIL�S ITY?.) SAW CUT AN� REMOVE PI Sta 12+2�.55 "+' +' EXISTING A6UTMENT �= 39' 25'46.1"{RT) p O p, 6, �; �, TO EL. 142SA (TYP.1 LINCLASSTF'rE� 0= 35° 48' 35.5" v v v � S�RLJC7LfRE ExCAVATION L= 110.11' J J J T� 57.33� �, w w R = �6o.oa• �NQ BENT 2 HOR�ZONTA� CURVE DATA -L-- STA.1q+0O.Z( -L- \ 18.33' OFFSET LEFT ,i SFF j��o-, ��� •SHFFl R p� N,TD �•'� jNF, Fp OF Tr ��'� � °R�ti '� iy Tar �/" � i � RlZn�'QF � 7EMPORARY--� SHORING (7YPJ � \ W.F'. ":S FILL FACE c� E STA. 13+92.86 FILL FACE cv� EN� BENT N6. 2 BM "2 - STA 12+85.65 -L- , 44.00 LT., ELEV. (436.84, RAILROAD SPIKE IN 36"SYCAMORE. 2 O W n Nc / N'o N -' CLAS$ ll RlP-RPP fTYPJ PROPOSED GUARORAIL lROAOWAY DETAIL & PAY lrEMl � 5/ 0 BM-2 ' BRIOGE ID, -L- STA/3+3399 � W � V 0 �� IS�1: LOCATION SKETCH / i / /� � � /� � /7 B�� CPEEK .- �� � �_-�� � iHIS STRUCTUFE HAS BEEN DESIGNE� IN ACCOR�ANCE WITH HEC I8, 'EVALIIATING SCOUR AT 9RIDGES". FOF SIJBMITTAL OF WORKING ORAWINGS,SEE SPECIAL PflOVI5I0N5. FOP FALSEWORK AN� FORMWORK.SEE SPECIAL PFOVISIONS. FOR CRANE SAFETY.SEE SPECIAL PROVISIONS. FOR GROIIT FOR STRUCTURES,SEE SPECIAL PROYISIONS. FOR ASBEST�S ASSESSMENT FOR 9RIOGE �EMOLITZON AND NENOVATION ACTIVITIES.SEE SPECIAI PROVISIONS. THE MATEFIAI SHOWN IN THE CRO55-HATCNE� AREA SHALL BE EXLAVATED FOR A DISTANCE OF 25 FT.EACN SI�E OF CENTERLINE ROAOWAY AS �IRELTED BY THE ENCINEER, iHIS WORK WILL BE PAI� FOF AT THE CONTRACT LUMP SUM PRICE FOR UNCLASSIFIEO STRIICTIIRE E%CAVATION. SEE SECiION 412 OF THE STANDARO SPECIFICATIONS. TOTAL BILL OF MATERIAL REMOVAL PILE PILE 7�-Q�9 3'-0"9 IINCLASSIFIE� CSl 6RI�GE qEINFORCING EPDXY COATED SPIRpL COLUMN PILE ORIVINC OF E%ISTING EXCAVATION EXC4VATION ORILLEO �RILLE� STRUCTUPE CLA55 AA CLASS A TESTING APPROACH STEEL FEINFORCING REINFONCINC EOl1IPMENi FOF STRUCTIIFE IN SOIL NOT PIERS PIERS EXCAVATION �ONCRETE CONCftETE SLABS STEEL STEEL HP 12 X 53 IN SOIL IN SOIL NOT IN SOIL STEEL PILES LUMP SIIM LIN. FT. LIN. FT. LIN. FT. LIN. FT. EACH LUMP Sl1M C11. YAR�S CU. YAROS LIIMP SIIM LBS. LfiS. LBS. EACH SUPERSTRUCTIIPE 33.9 LUMP SUM 2.363 ENp BENT 1 q6 5] LUMP SUM 25.6 3,Oi4 � BENT I 29.5 20 1 t9.9 8.729 I110 EN� BENT 2 0 90 LUMP SUM 33.4 4,506 ] TOTAL LIIMP SUM 46 141 29.5 20 1 LIIMP SIIM 33.9 78.4 LIIMP SIIM 16,309 2,363 1310 14 TOTAL BILL OF MATERIAL (CONTJ ANODIZE� l'-2"x 2'-9%' RIP RAP GEOiEXTILE 3'-0"x 1'-9' 3'-0"x 2'-0" HP 12 % 53 STEEL PILE p_BAR CONCRETE CLASS II FOR ELASTOMERIC pRE5TFE5SE0 PRESTRESSE� ASBESTOS WATER LINE STEEL PILES POINTS METAL PARAPET 12'-0" DftAINAGE BEARINGS CONCflETE CONCRETE ASSESSMENT HANGEFS ftAIL THICKI COREO SLABS CORED SLABS N0. LIN.FT. EACH LIN.FT. LIN.FT. TONS SO.YAPOS LI1MP SIIM N0. LIN.FT. N0. LIN.FT, IUMP SUM LUMP SUM SUPERSTRIICTIIPE 2I4.0 213.6 LUMP SUM �� qq0.0 11 925.0 LUMP SUM LUAIP SUM EN� 9ENT 1 '/ �5q,p i 92 102 BENT 1 END BENT 2 "! 125.0 4 �4 82 TOTAL 14 219.0 11 21q.0 213.6 166 I84 LIIMP SUM �� qq0.0 ll 925.0 LIIMP SUM LUMP SIIM WN1 24'WH/rE PME � 70 /-40 GENERAL NOTES: ASSUMED LLVE LOAO = HL-9l OF ALTERNATE LOADINC. THIS BPI�GE HAS 9EEN OESIGNE� IN ACCOF�ANCE WITH THE REQUIPEMENiS OF THE AASHiO LRF� BRI�GE OESIGN SPECIFICATIONS. THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1. FOR OTHER OESIGN �ATA AN� GENERAL NOTES.SEE SHEET SN. FOR EROSION CONTROL MEASURES,SEE EftOSION CONTROL PLANS. THE EXISTING STR�CTURE.CONSISTING OF TWO 42.33 FOOT LONG SPANS WITH TIMBER OECK ON CONTINUOt15 THRU STEEL PLATE GIFDER5,14.33 FT.WIDE,ON PEINFORCEO CONCflETE A9lITMENTS ANO STEEL BENT, AND LOCATED AT THE PROPOSEO STRUCTl1RE.5HALL BE FEMOVEO.THE E%ISiINC BFIDGE IS PRESENTLY NOT POSTE� FOR THE LECAL LOAp LIMIT.SHOlILO THE STRUCTURAL INTEGRITY OF THE BFI�GE FIIRTHER �ETERIORATE,THIS LOA� LIMZTATION MAY BE RE�IILE� AS FOUNp NECESSARY DIIFINC THE LIFE OF THE PROJECT. FEMOVAL OF THE EXISTING 9RZ�GE SHALL BE PERFORMEU IN A MANNER iHAT PEVENTS OEBftIS FROM FALLING INTO THE WATER. THE CONTRACTOR SHALL Sl1BMIT OEMOLITION PLANS FOft REVIEW ANO REMOVE BRIpGE IN ACCOftDANCE WITH APTICLE 402-2 �F THE STANOAFD SPECIFICATIONS. _ THE SUBSTRIICTIIRE OF THE EXISTING 9RIOGE IN�ICATED ON THE PLANS IS FFOM THE BEST INFOPMATION AVAILA9LE.SINCE THIS INFOftMAiION \�� IS SHOWN FOR iHE CONVENIENCE OF THE CONTRACTOR,THE CONTRACTOF \�� SNALL HAVE NO CLAIM WHATSOEVER AGAINST iHE �EPARTMENT OF TRANSPORTATION FOR ANY OELAYS OR A��ITIONAL COST INCIJRREO BASED ON DIFFERENCES BETWEEN THE E%ISTING 9RZ�GE SlIBSTRIICTURE Pll x x SHOWN ON THE PLAN$ ANO THE ACTUAL CON�ITIONS AT THE PROJELT SITE. REVISION �ATE: MAR. O8. 2018 �SH��C �R�„`.,, : 2,o ESSi� : v�: - �a SEAL ��= �: - = zonr = �"5 �'�,NCINi;'Q'�4�� �Roy,i�ii��`"y`• �OCLIMENT NOT CONSI�ERED FINAL 11NLESS ALL SIGNATt1RE5 COMPLETEO �� Yaugi�SMellon OWN. BY: AW CHK�.BY: HLW ASPHALT WEARING SIIRFACE IS INCLUDEO IN ROApWAY pUANTITY ON ROADWAY PLANS. FOF LIMITS OF TEMPOFARY SHORING FOR MAINTENANCE OF TRAFFIC.SEE TFAFFIC CONTROL PLANS.FOR PAY ITEM FOR TEMPORAftY SMORING FOR MAINTENANCE OF iftAFIC,SEE FOADWAY PLANS. FOR WATEF LINE HANGERS,SEE SPECIAL PROVISIONS. INASMIICH AS THE PAINT SYSTEM ON THE EXISTING STFUCTl1RAL STEEL CONTAINS LEA�,THE CONTFACTOR'S ATTENTION IS DIRECTE� TO ARTICLE 10'/-1 OF THE STAN�ARO SPECIFICATIONS.ANY COSTS RESULTING FFOM COMPLIANCE WITH APPLICABLE SiATE OF FEOEFAL FEGULATIONS PERTAINING TO HANpLING OF MATERIALS C�NTAINING LEAD BASE� PAINT SHALI 9E INC�U�E� IN THE BI� PRICE FOR 'ftEMOVAt OF EXISTING SiRIICTIIRE AT STATION I1+33.99 -L :' AT THE CONiRACTOR'S OPTION,PRESTFESSE� CONCftETE END BENT AND BENT CAPS MAY 9E SIIBSTITl1TED IN PLACE OF THE CASi-IN-PLACE CAPS AT ENp 9ENT I ANO 9ENT 1 ONLY.THE CONTRACiOR SHALL COORpINATE WITH THE RESI�ENT ENGINEER TO RECEIVE REVISEO PLANS AN� �ETAILS FFOM TNE STRtICTIIRES MANAGEMENT IINIT.THE RE�ESIGN ANO ANY A�DITIONAL MATERIALS NEE�E� WILL 0E AT NO AO�ITIONAL COST TO THE CONTRACTOF. HYDRAULIC pATA �ATE: 02/Ifl DATE:02/16 OESIGN �ISCHARGE = 5300 CFS DESIGN FRE�l1ENCY = 25 YRS DESIGN HW ELEVATIaN = 1426.5 FT BASE �ISCHARGE = i000 CFS BASE FFE�UENCY = 100 YRS BASE HW ELEVATION = 1426.4i FT OVERTOPPING F100D �ATA OVERTOPPINC pISCHAPGE = 0000 CFS OVERTOPPING FREOUENCY = 100• YFS OVERTOPPING ELEVATION = I430.1 FT DRAINAGE AflEA = 36.1 SO.MI PROJECT N0. 14SP.20441.1 HAYWOOD COUNTY STATION: 13+33.99 -L- DEPARTMENTEOFX�TRANSPORTATION GENERAL DRAWING FOR BRIDGE ON SR 1332 (WATERVILLE ROA01 OVER BIG CREEK BETWEEN SR 1397 AN� INTERSTATE 40 �I SHEEi ry . S-3 0 / � -- �TIMATED OUANTITIES RIP RAP GEOTEXTILE 99 -L- CLA55 II FOR DRAINACE (7-0"THICK) TONS SO�ARE YAR�S ( 1 9z 102 f 2 79 82 + I'-7" BERM NORMAL TO CAP (TYPJ _. .. �,_p„ � i Z, '0„ � 3 � o i ry CEOTEXTILE ��x�w��r.�v� �ES. EGR. OF RECORD: RTS DATE: 02/1 ASSEMBLE� BY ; AW �ATE : 02/19 SLOPE 1 �/ :l r�Hiv 1'-7" BERM NORMAL TO CAP (TYPJ l,_0,• MI N. �I EARTH BERM (iYP.) SECTION 8-B 2 (SHOWING TOP OF BERM ELEVATIONS AT END BENT N0.21 PROJECT No. 14SP,20441e1 HAYWOOD COUNTY sTaTION: 13+33,99 -L- REVISION �ATE: MAe.0e,2o1e DEPARTMENTEOF��TRANSPORTATION DOCl1MENT NOT CONSI�ERE� ""�F'cx FINAL LINLESS ALL SIGNATURES COMPLETE� = RIP RAP DETAILS = �� Vauql�6Mellon �.•.4N C4Rp� ��� .. P..,.,.���,., : 2°:o4E5Sio : s�': - a SEAL?�= ' ' - zmn ` ' ��, q''�CIxfEP,:`y � qEV15I0N5 ���`�`,f,"�y 9 � � Q 5-37 s'39`s l5ht 2)