HomeMy WebLinkAbout20170951 Ver 1_W-5601A_Wetland Impact Summary Sheet_20181204_revised_20181204WETLAND PERMIT IMPACT SUMMARY AND IMPA Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) SITE #1 -L- 21+55 42" RCP 0.01 0.002 SITE #1 -L- 21+55 Remove existing 24" RCP 0.005 0.002 TOTALS': 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0 0 0.00 "Rounded totals are sum of actual impacts NOTES: Site 1: Permanent SW impacts = 657 Sq. Ft. Site 1: Temporary SW impacts = 159 Sq. Ft. '�