Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19890348 Ver 1_Complete File_19890101 (2)
SLAT[ ?? i'tf" State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor November 29, 1989 R. Paul Wilms William W. Cobey, Jr., Secretary Director Mr. Haywood King, P.E. Allen, Williams, Carmen, & King, Inc. Post Office Box 1179 Burlington, North Carolina 27216 Dear Mr. King: Subject: Proposed Fill in Headwaters or Isolated Wetlands Duke Power Operations Center Alamance County Upon review of your request for Water Quality Certification to place fill material in wetlands adjacent to a tributary of Haw River, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2176 issued November 4, 1987. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 26. If you have any questions, please contact Bill Mills at 919/733-5083. Sincerely, ?J? l%/ /hj? R. Paul Wilms Attachment cc: Wilmington District Corps of Engineers Winston-Salem Regional Office P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer alley, cAffla -s)9 carmen, han 9 gne E N G I N E E R S & A R C H I T E C T S p.o. box 1179 . 740 chapel hill road burlington, north caroling 27216 telephone 919/226-5534 May 11, 1989 88165 Mr. Bill Mills Permits and Engineering Division of Environmental Management N. C. Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611 Re: 401 Certification Culvert Installation Burlington, Alamance County, North Carolina Dear Mr. Mills: IT ' pb O l 61939 opii: So- We are enclosing two (2) copies of the Application for Water Quality Certification (401 Certification) for the installation of three (3) culverts in unnamed branch with pertinent Junction Boxes, Catch Basins, and etc. We are forwarding a copy of this letter to the Corp of Engineers requesting that they review and approve the installation. If there are any questions, please give our office a call. Sincerely, ALLEY, WILLIAMS, CARMEN, & KING, INC. t ?. C? - ?? Haywo B. King, P. E. HBK/ sj encls. - Site Map/Profile and Cross Sections (2 Each) cc: Robert Biddle, P. E., Duke Power Co./Enclosure Corp of Engineers LAURENCE A. ALLEY, P.E. HERBERT A. CARMEN, A.I.A. HAYWOOD B. KING, P.E. DARRELL L. RUSSELL, P.E. J. EARL WILLIAMS, P.E., RET. 'k APPLICAT ION FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT c0+rlment of Administration State of North Carolina Department of the Army ;5 14&121 Department of Natural Resources and Community ocvtlopmcnt Corps of Ensin*ers, Wllm(n9ton District (GS 113.229, 143.215.3(al(1). 143.215.3(c). 113A•118 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. Applicant Information A. Name Duke Power Company ATTN• Mr. Robert B. Biddle, Jr.,- P.E. Last First Middle 13. Address Post Office Box 33189 Street, P. 0. Box or Route Charlotte, North Carolina 28242 1-704-373-4011 City or Town State Zip Code Phone 11. Location of Proposed Project: A. County Alamance 6. 1. City. town, community or landmark City of Burlington 2. Is proposed work within city limits? Yes X No C. Creek, river, sound ur bay upon which project is located or nearest named body of water to project Unnamed Branch - Tributary to Haw River 111. Description of Project c7 A. 1. Maintenance of existing project 2. New work Culverts Py/ B. Purpose of excavation or fill 6 1. Access channel Ien6tls width depth 2. 8(mt basin length width depth 3. Fill area length width depth Ditch Dim. 4. Other Culverts length 485 width depth Varies 4' - 8' (See Attachment) C. 1. Bulkhead length ---- Average distance waterward of MHW (sho(eline) 2. fype of bulkhead construction (material) ---- D. Excavated material (total for project) 1, Cubic yards ---- 2. Type of material E. fill material to be placed below MHW (sec also V1. A) Cubic yards ---- 2. Type of matcrill IV. Land Type, Disposal Area, and Construction Equipment: A. Dues the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Discs the disposal a?ca include any marshland. swamps or other wetland? Yes No X C. Disposal Area 1. Location On Site 2. Do you claim title to disposal area? Yes D. Fill material uw(ce if (ill is to be trucked in N/A L. How will excavated material be entrapped and erosion controlled? Silt Fences and Rip Rap Dams I . 1 1•pc of equipment to be used G. Will marshland be crossed in transporting equipment to project site? If yes, explain No _ V. Intended Use of Project Area (Describe) A. I. Private- Pnrki nn and General Storage 2• Commercial 3. Housing Development or Industrial 4. Other Culvert Lot size(s)-______N /A 2. Elevation of lot(s) above mean high water N/A 3. Soil type and texture N/A 4. Type of building facilities or structures N/A 5. Sewage disposal and/or waste water treatment A. Existing X Planned 0. Describe 6• 'Land Classifiution'(circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI, Pertaining to Fill and Water Quality: A- Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes-No 2. Type of discharge N/A - Storm Water 3. Location of discharge VII. Present rate of shoreline erosion (if known): N/A VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: IX. Length of time required to complete project- 2 months after Letter to Proceed X. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property- OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written N/A Permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 851 X 11" white paper (sce instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served N/A _ D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. N/A - Duke Power Owner of Property on each side of Branch XI- Certification requirenvrit: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program, XI1. Any permit Issued pursuant to this application will allow only the development described in this appli- cation and plat, Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, land clearing. DATE Applican Signature Di F•B2 Rev. to/7a SEE REVERSE SIDE FOR MAILING INSTRUCTIONS C m -v O 00 ? c m r m -1 ? O z Cl) I ¦ 0 z m m i lr': 1 h f V!l T .. { AP1't_iCAT (ON r, . FOR PERMIT TO EXCAVATE ANO/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Oart-nt of Adm(nluratlon State of North Carolina Ocpartmentof the Army 'S 146.121 Department of Natural Resources and Communlly Oevtlopmcnt Corps of Entln#en, Wllmintton District (GS 113.229, 143.215.3(al(1), 143.215.3(c), 113A•119 (33 CFR 209.320-329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in 04ank. I. Applicant Information A. Name Duke Power Company ATTN• Mr. Robert B. Biddle; Jr. ,- P.E. Last First Middle 8. Address Post Office Box 33189 Street, P. O. Box or Route Charlotte, North Carolina 28242 1-704-373-4011 City or Town State Zip Code Phone 11. Location of Proposed Project: A. County Alamance 8. 1. City, town, community or landmark City of Burlington 2. Is proposed work within city limits? Yes X No C. Creek, river, sound or bay upon which project is located or nearest named body of water to proicct Unnamed Branch - Tributary to Haw River 111. Description of Project 2. New work Culverts A. 1. Maintenance of existing project B. Purpose of excavation or fill I. Access channel Icngth width depth 2. Boat basin Icngth width depth 3. Fill area length_1--width depth Ditch Dim. 4. Other Culverts length 485 width depth Varies 4' - 8' (See Attachment) C. I. Bulkhead length ---- Average distance waterward of MHW (shoreline) 2. fype of bulkhead construction (material) ---- D. Excavated material (total for project) 1. Cubic yards ---- 2. Type of material --- E. Fill material to be placed below MHW (sec also VI. A) 1. Cubic yards ---- 2. Type of materiel IV. Land Type, Disposal Area, and Construction Equipment: A. Ones the area to be excavated include any ma(shland, swamps or other wetland? Yes No X B. Does the disposal i)ea include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location_ On Site 2 Do you claim tide to disposal area? Yes D. F ill material source if 1111 is to be trucked in N/A L. How will excavated material be entrapped and erosion controlled? Silt Fences and Rip Rap Dams I . I ype of equipment to be used G. Will marshland be crossed in transporting equipment to project site? If yes, explain No ti V. Intended Use of Project Arci (Describe) A. 1- Private P-kjnp end General Storape 2- Commercial 3- Housing Development or Industrial 4. Other Culvert ©• 1. Lot size(s) N/A 2. Elevation of lot(s) above mean high water N/A 3• Soil type and texture N/A 4. Type of building facilities or structures N/A 5. Sewage disposal and/or waste water treatment A. Existing X Planned B. Describe 6• 'Land Classification'(circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A- Does the proposed project involve the placement of fill materials below mean high water? Yes No X B. 1- Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes-No 2• Type of discharge N/A - Storm Water 3. Location of discharge VII. Present rate of shoreline erosion (if known): N/A Vill. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: IX. Length of time required to complete project- 2 months after Letter to Proceed X. In addition to the completed application form, the following items must be provided: A- Attach a copy of the deed with State ( application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written N/A Permission from the owner to carry out the project on his land. B- Attach an accurate work plat drawn to scale on 8Si X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served N/A D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. N/A - Duke Power Owner of Property on each side of Branch XI- Certifiptlon requirement: 1 certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approvod coastal management program and will be conducted in a manner consistent with such program. XII. Any permit Issued Pursuant to this application will allow only the development described In this appli- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, Vand clearing. SATE ? !1 i&`4 Applicant' Signature 04 F-62 Rar• 1017R SEE REVERSE ctnF Fna tirefi v.v- IMCV081i-r-,,- c° m O W r O Z -v z ;..I O z n Cl) 0 z m i 1! C-01 T