HomeMy WebLinkAboutWQ0040343_Application (FTSE)_20181210Central Files: APS SWP
10/8/2018
-rn t earn-_er WQ0040343
Permit Tracking Slip
Program Category
Non -discharge
Status Project Type
In review New Project
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
dean.hunkele
Coastal SWRulle
Permitted Flaw
Version Permit Classification
A Individual
Permit Contact Affiliation
Facility Name
Woodlands at Echo Farms Trace 3C Private Sewer Major/Minor Region
.
Location address Minor Wilmington
County
New Hanover
Facility Contact Affiliation
I
Owner Name
Echo Farms LLC Owner Type
Non -Government
Owner Affiliation
Joseph S. Taylor
�i�ve Cn 4000 Forsgate Dr C- s
Cranbury NJ 08512
Scheduled
Orig Issue App Received Draft Initiated Issuance
10/5/2018 p
Public Notice Issue Effective Expiration
NORRIS & TUNSTALL
CONSULTING ENGINEERS P.C.
902 Market Street
Wilmington, NC 28401
(910) 343-9653
(910) 343-9604 Fax
John S. Tunstall, P.E.
T. Jason Clark, P.E.
September 28, 2018
NC DEQ
Division of Water Resources
Water Quality Regional Operations Section
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Gravity Sewer Extension Fast -Track Permit Application
Woodlands at Echo Farms —Tract 3C (Private)
4114 Echo Farms Blvd
Wilmington, NC
N&T Project No. 16083
Dear Sir or Madam:
1429 Ash -Little River Road
Ash, NC 28420
(910) 287-5900
(910) 287-5902 Fax
J. Phillip Norris, P.E.
Thomas J. Scheetz, E.I.
-b
� W
OCT 0 5, 2018
`Water Quality Regional
Ooerat±Ctins ScrTion
Wilmington Regional O ii C
Enclosed is one (1) original application form with one (1) copy, two (2) copies of the Sewer
Narrative, one (1) original Flow Tracking /Acceptance Form (FTSE 08-13) from the Cape Fear
Public Utility Authority with one (1) copy, two (2) 8 % x 11 color USGS Topographic Maps, two
(2) site plans (ledger size) and a $480.00 check for the processing fee.
Please review this information for approval and contact us with any questions or comments you
may have. Thank you for your assistance on this project.
Sincerely,
NORRIS & TUNSTALL
CON ULTING ENGINEERS, P.C.
1
i
T. Jas Clark, P.E.
TJC/asn
16083 09-28-18-s-swr-Itr (Tract 3C Private)
Enclosures
NCBELS License C-3641
• File an Annual Report/Amend an
Annual Report • Upload a PDF Filing•
Add Entityto Order a Document Online •
My Email Notification List •View Filings
dings • Print an Amended a Annual
Report form •Print a
Pre -Populated Annual
Report form
Limited Liability Company
Legal Name
ECHO FARMS, L.L.C.
Information
SosId-: 0449822
Status: Current -Active
Annual Report Status: Current
Citizenship: Foreign
Date Formed: 2/6/1998
State of Incorporation:
NJ
Registered Agent: Corporation Service Company
Addresses
Reg Office
2626 Glenwood Avenue, Suite 550
Raleigh, NC 27608
Mailing
Echo Farms, LLC 3 Centre Drive
Monroe Twp, NJ 08831-1564
Company Officials
Reg Mailing
2626 Glenwood Avenue, Suite 550
Raleigh, NC 27608
Principal Office
Echo Farms, LLC 3 Centre Drive
Monroe Twp, NJ 08831-1564
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
Vice President Manager President
Donald M. Epstein . Mem nfnnnr nn�fr;..
• ate p h
CN 4000, Fors Taylor , MemofMgr
g Drive CN g a rix Echo, LLC Jose S. T4000 Fors
gate Drive CN 4000, Fars ate Drive
Cranbury NJ 08512 g
Cranbury NJ 00512 Cranb
ury NJ 08512
State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 &SUPPORTING DOCiTMENTATION
Application Number: w&QQ Ltd2q3 (to be completed by Dwx)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Echo Farms, LLC (company, municipality, HOA, utility, etc.)
2. Applicant type: [:1 Individual
Z Corporation [:1 General Partnership
❑ Federal
❑ State/County ❑ Municipal
3. Signature authority's name: Joseph S. Tam per 15A NCAC 02T .0106(b)
Title: Manager
4. Applicant's mailing address: c/o Matrix Development Group, CN 4000, Forsgate Drive
City: Cranbury State: NJ
Zip: 0 -
5. Applicant's contact information:
Phone number: (732) 521-2900
Email Address: jtavlor@matrixcoMpanies.com
n- PROJECT INFORMATION•
1.
2.
3.
4.
5.
El Privately -Owned Public Utility
❑ Other
r0
3> �
l.; a
52018 s
Project name: Woodlands at Echo Farms -Tract 3C
Application/Project status: ®Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
County where project is located: New Hanover
Approximate Coordinates (Decimal Degrees): Latitude: 0.34' Longitude:--0.77°
Parcel ID (if applicable): R07006-002-00 1 -000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: T. Jason Clark, P.E. License Number: 030869
Firm: Norris & Tunstall Consulting Engineers, P.C.
Mailing address: 902 Market Street
City: Wihn on State: NC Zip: 28401-
Phone number: (910) 343-9653 Email Address: jclark@ntengineers.com cc: anorris@ntengineers.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: M'Kean Maffitt (Southside WWTPPermit Number: NC 0023973
Owner Name: Cape Fear Public Utility Authority
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ(DEQ Doesn't Know) - CFPUA Pump Station 927
System Wide Collection System Permit Number(s) (if applicable): WQCS,
Owner Name(s): Cape Fear Public Utility Authority
FORM: FTA 04-16 Page 1 of 5
VI S GENERAL REQUIREMENTS
L If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
Yes ❑YNN/A
2. If the Applicant is a Developer of lotsto be sold has a. rational M: DEY
DevelMer's Operational been attached?
Agreement (FOR
Q Yes ❑No ZN/A
lie i is: H
1. Ifthe Applicant a ome/Prop
_grty,O
Association, has an ODer
Wners ational Agreement (FORM: been attached?
1:1 Yes E]No MIN A
4.. Origin ofwastewater::(checkall that
apply):
EIResidential Owned
ElRetail stores, centers, malls)[] Car ash
W
Residential Leased
❑Retail with food preparatioil/service EJ lRot0l.and/or.Motels
0 School I preschool day,care
ElMedical dental. veterinary facil2ties ❑ S wi.
mming. ool /Clubhouse.
Food and drink facilities❑
•
El Businesses./ offices / factories
Church n SwimmingPoaTilterBackwash
.(EpEH erxlain a.Attachment )
5. Nature of wastewater: 100 % Domestic/Comm iercial % Commercial
% Industrial (See 15A. NCAC 09T .0'1
Is -there a Pretreatment in effect? ❑Yes ❑ No.
6* Hasa flow reduction been approved under -C 09T.01 ? nY s F1 No�
IJA NC AC e
Jf1Ves,:1.3r . ov. idea :copy of flow reduction approval letter
Summarize 0
ummartze wastewater generated by project:
Establishment Type (see 02T.01 14(f))
Daily Design Flow Noi,,6:6f Unifs F16W
-Townhomes (3 Bedroom) 3 60 gal. 4
figO GPI)
L
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
1otal 4,1680 GPD
a See 15A NCAC 0')TAl 14(b). (d
(e)(1) and (e)(2.) for caveats to, wastewater design flow rates (Le., mmininum flowper
dwellinpro ose d uhkn Wn non -re 8idential d vdlo
merit uses;publ*
access facilitieslDented near high public use areas;
and residenruial propettylocated 8 east Atlantic Intracoastal Waterwaytobe used as vacation rentals as defined
south or s . the Atlan c
In. G.Sr 42A-4)..i.
b Per 15A NCAC 02T .0. 1 14(c)j dio- flow wrates for,establishments not .identified �[in table 15A NCAC O� T.01 14 shall be
determined
usirig avat e flow data, water i fixtures -occupancy or:'operation patterns, and other measured data.
8. Wastewater
generatedJJiypt0Jed0. GPI) (per -1 5A NCAC 02T.0 114
> D i '0 notmcludefuture flows or previously permitted allocations
If pettili.tWd. flow i indicate why:
szeroinca
.i
Pump Station avity.
Sewer -where flow:will*be permitted mi:subsequent permi or Gravity ts that connect t this Tine
Flow has already been allocated in Permit Number:
El Rehabilitation or replacement •of existing sewer with no new flow: expected
[] Other (Explain):
FORM: FTA 04-16
Page 2 of 5
A _.
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 298 PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (PumpoStatioons/Force
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
l . Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305�h)_ (1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 , Page 3 of 5
IN. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
l . Does the project comply with all separations found in 15A NCAC 02T .0305(ff) &
➢ 1 5A NCAC n?T (11(1 M rnntninc minimum epr,ara+;nrnc! +lka+ oh -all 1,A "rnx,,;Al A ft,r ro.7,ro,- n«�+o,,,�.•
❑ Yes ❑ No
Setback Parameter*
Se aration Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
* *Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinkin water
100 feet
"Waters Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
-Any building -foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
My swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0345(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ "Stream Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes ❑ No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? Yes ❑ No
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)?
0 Yes ❑ No
Per 15A NCAC 02T.0105(c)_,., (6}, directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
E]Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location)
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
Lf to
X CERTIFICATIONS:
Docs the submitted system Comply with JZs�N-
-A I Ll ILL I
J) �2T -, t h e M-i M' qli!-Q(�.
A PM
alid Eorcc 8- awst yerij "If and the GMe V
Sewer XCilp'num D!CS11211 ciit�dpAi
test VC sion) as applicable?
--------------
yes No
0
If No, Camplete and submit -the. Varianc
e/Alternative Design Request application (VADC 10- 14) and supporting documents for
revlew. ADPrOval of the re nest is rqquired Prior
to SMbMiltal the Fast Track AmAcatio-11 gnu Su vinrtina --own Mts.
2. Professional Engineer's Certification:
(Professional En gi 'neerts- �nanie from App . 11
Rem.! 1. 1. L.)
attest that this application for
has been reviewed b atad Y me: i is accurate., oomplete anal ,Consistent with the inform I in,th
ation supplied. e plans, spe ifi
n.9incer no calcufafi
Ion, s and all other supportinp d
Ocumentation, to the best -of my knowledge. I further attest that to the .eatbest
Of my knowledge the proposed design. hms been prepared in accordance with the applicable re ujatjoT) 1 5, Ora ity -sewel"
T
Mial'ITI.u�inDesign .Criten"a for Gravity Sewers (latest version') and the Minimum Desig riteria for the Fast -Track Permitting
gn.
of P t J
UMP Stations and Roe Main- s (latest very' Although other Professionals rn M portioti of lon aY have developed certal
Wbraittal package in
elusion of these inaterials under my signa-ttire and seat signifies
U ge
that I 'hall
ta and have. j d it �to be consistent wftb. the. le reviewed this Mater' I
PrOpOsed des g*;i.
NOTE - In. accordance w'th General Statutes 143-21.5.6A and :14 -21.5 6B any person
who 'knowingly in�kts any false
statement, re resentat'
P o0u, or cerfification in any application packag; shall be guilty of a Class misdemeanors wh.ich may
include a fine not to exceed S 10 000 as
well asc,iVilpe-nalti
les, up tO S25,000 per violation.
..........
North Ca 1" profto
ro Ina ss" dal Enne gier's wall signature, and. date:
� ���, � • �''
O
SE
030 69
4$�
s time
...........
I Applicant's Certification per .15A NCAC,02'r .0106(b):
(Si )
Attestth t thsplication forii 0 tUre Author,Ts. name ationiteml.3.
has been reviewed by me and is accura'
te. and com*pfeie to t u tand that, - all rea
this appi .. . i . . - he best of illy knowledge.. I ndeis if Wred parts of
wationare not completed and that
if All required sudocumen
pporring tation and attachments
aPplication packagge Is sa-bje-c-t to being return are not this
ed as InCoMplete. I u. nderstand that a disch ft - wate t
discharge r. ste r M is nollm
qys;tem to surface waters or the lid w- ny a , I of %ya 41. :fro h
Mn .111, result in.an im.inediate enforcement action that ma in
111JU Ctiv n Y elude civil: Penalties,
n e relief, and/ C 'Minal prosecution. I will make no- claim against the.Division of Water Res
i
V 0 ources should a condition
this permit be.. i lated. I also understand that if all, req. ire' parts o
U d fth" a ficationp
all re.quire is PP I ack.ageare not completed and that 'T
d support, 8 , fo ill . - I
In in emotion and attach are n i
ot ncludcd this ppi t k will be returned to me as
2 - a tcaion pac age
NOTE - In accordance iti, Generaj ,�tatateW
L —J!-.�A)-A and I 41.24 -5 6 B
statement, representa . tion, or cer-tification any person who knowingly makes any false
in� any applicat3on package shall be
j -guilty a C1 S. 2 M,,
-include alfine -not tocxlceej $10,000 as well as cj* 41� of as isdemeanor, which may
V1 Ties lip to.S25 00 per vio ,P
Signature..
Daw
FORM.- FTA,04,iii 16-
page 5 of 5
1
State of North Carolina
9
YL' Department of Environmental Quality
5 4 Y Division of Water Resources��
1. Ivis—I Water- Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Echo Farms, LLC
Project Name for which flow is being requested: Woodlands. Echo Farms Ph 1-Tr 3 C (p riv
More than one FTSE may be required for a single project if the owner of the is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: M'Kean Maffitt (Southside) WWTP
b. WWTP Facility Permit #: NPDES NC O023973
All f lows are in MGD
c. WWTP facility's permitted flow 12.000
d. Estimated obligated flow not yet tributary to the WWTP 2.000
e. WWTP facility's actual avg. flow 8.044
f. Total flow for this specific request 0.004680
g. Total actual and obligated flows to the facility 10.048
h. Percent of permitted flow used 83.7%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm
Flow**
Current Avg.
Tributary
Flow Plus
(Name or
Capacity, *
(Firm / p f),
Daily Flow,
Daily Flow,
Obligated
Available
Number)
MGD
MGD
MGD
MGD
Flow
Capacity***
27
0.378
0.151
0.151
0.094
0.245
-0.094
t ne r irm capacity of any pump station is ciennea as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cape Fear Public Utility Authority
Downstream Permit Number: Not Available
Page 1 of 6
FTSE 04-16
t
III. Certification Statement:
I Matthew Tribett, CFPUA Eng..Mgr certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Signing Official Signature Date
Page 2 of 6
FTSE 04-16
PLANNING ASSESSMENT ADDENDUM PAA
Submit a planning assessment addendum for each um station '
Capacity is < 0. pump listed in Section II where Available
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
and MGD of the Available Capacity (E) in Pump Station
and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
PS 26 & 27 Upgrades is in design or under construction with
Planned completion in _ 3rd qtr 2021 (latest) ; and/or
d. The following applies:
The developer of this project is required by agreement to complete an upg
3,rade of PS 27
tenor to activating the sewer for this project The average daily design capacity of PS 27
will be increased to a minimum of 0.387 m d.
_Capacity created by the upgrade has been obligated to the developer by the agreement.
The flow requested for this project is a portion of that obligation
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow
this flow to be permitted, without a significant like
lihood elihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
k)"gning UVicial Signature
rJ
Date
Page 3 of 6
FTSE 04-16
SEWER NARRATIVE (PRIVATE)
WOODLANDS AT ECHO FARMS — TRACT 3C
4114 Echo Farms Boulevard
Wilmington, North Carolina
For
Echo Farms, LLC
c/o Matrix Development Group, CN 4000, Forsgate Drive
Cranbury, NJ 00512
(732) 521-2900
``�`, ��tttt tturrrNrrr���''i
`��\` • S S • • • � �i
• i
•
SEAL r• f
• 086
•._ IN
r���rrJr r►+r t t� 1 N N 1N�����
March 2018
Prepared by:
NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C.
902 Market Street
Wilmington, North Carolina 28401
(910) 343-9653
(910) 343-9604 (Fax)
License # C-3641
N&T Project #16083 (Tract 3C -Private)
SEWER SYSTEM NARRATIVE (PRIVATE)
WOODLANDS AT ECHO FARMS —TRACT 3C (PRIVATE)
This private gravity system is designed signed to serve townhomes. A to
PVC sewer line will be extendedtotal of 298 LF of 8
in Tract 3C. Flow from this tract •
#27. ct flows to Pump Station
This system will be seared by the Cape Fear Public Utility Authority.
Pump Station #27 is owned and operated by the Cape Fear Public Utility Authority.
An upgrade of Pump Station #27 is required and has been submitted to the Cape Fear
Public Utility Authority for review.