Loading...
HomeMy WebLinkAboutWQ0040343_Application (FTSE)_20181210Central Files: APS SWP 10/8/2018 -rn t earn-_er WQ0040343 Permit Tracking Slip Program Category Non -discharge Status Project Type In review New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer dean.hunkele Coastal SWRulle Permitted Flaw Version Permit Classification A Individual Permit Contact Affiliation Facility Name Woodlands at Echo Farms Trace 3C Private Sewer Major/Minor Region . Location address Minor Wilmington County New Hanover Facility Contact Affiliation I Owner Name Echo Farms LLC Owner Type Non -Government Owner Affiliation Joseph S. Taylor �i�ve Cn 4000 Forsgate Dr C- s Cranbury NJ 08512 Scheduled Orig Issue App Received Draft Initiated Issuance 10/5/2018 p Public Notice Issue Effective Expiration NORRIS & TUNSTALL CONSULTING ENGINEERS P.C. 902 Market Street Wilmington, NC 28401 (910) 343-9653 (910) 343-9604 Fax John S. Tunstall, P.E. T. Jason Clark, P.E. September 28, 2018 NC DEQ Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Gravity Sewer Extension Fast -Track Permit Application Woodlands at Echo Farms —Tract 3C (Private) 4114 Echo Farms Blvd Wilmington, NC N&T Project No. 16083 Dear Sir or Madam: 1429 Ash -Little River Road Ash, NC 28420 (910) 287-5900 (910) 287-5902 Fax J. Phillip Norris, P.E. Thomas J. Scheetz, E.I. -b � W OCT 0 5, 2018 `Water Quality Regional Ooerat±Ctins ScrTion Wilmington Regional O ii C Enclosed is one (1) original application form with one (1) copy, two (2) copies of the Sewer Narrative, one (1) original Flow Tracking /Acceptance Form (FTSE 08-13) from the Cape Fear Public Utility Authority with one (1) copy, two (2) 8 % x 11 color USGS Topographic Maps, two (2) site plans (ledger size) and a $480.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS & TUNSTALL CON ULTING ENGINEERS, P.C. 1 i T. Jas Clark, P.E. TJC/asn 16083 09-28-18-s-swr-Itr (Tract 3C Private) Enclosures NCBELS License C-3641 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing• Add Entityto Order a Document Online • My Email Notification List •View Filings dings • Print an Amended a Annual Report form •Print a Pre -Populated Annual Report form Limited Liability Company Legal Name ECHO FARMS, L.L.C. Information SosId-: 0449822 Status: Current -Active Annual Report Status: Current Citizenship: Foreign Date Formed: 2/6/1998 State of Incorporation: NJ Registered Agent: Corporation Service Company Addresses Reg Office 2626 Glenwood Avenue, Suite 550 Raleigh, NC 27608 Mailing Echo Farms, LLC 3 Centre Drive Monroe Twp, NJ 08831-1564 Company Officials Reg Mailing 2626 Glenwood Avenue, Suite 550 Raleigh, NC 27608 Principal Office Echo Farms, LLC 3 Centre Drive Monroe Twp, NJ 08831-1564 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Vice President Manager President Donald M. Epstein . Mem nfnnnr nn�fr;.. • ate p h CN 4000, Fors Taylor , MemofMgr g Drive CN g a rix Echo, LLC Jose S. T4000 Fors gate Drive CN 4000, Fars ate Drive Cranbury NJ 08512 g Cranbury NJ 00512 Cranb ury NJ 08512 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 &SUPPORTING DOCiTMENTATION Application Number: w&QQ Ltd2q3 (to be completed by Dwx) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Echo Farms, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: [:1 Individual Z Corporation [:1 General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Joseph S. Tam per 15A NCAC 02T .0106(b) Title: Manager 4. Applicant's mailing address: c/o Matrix Development Group, CN 4000, Forsgate Drive City: Cranbury State: NJ Zip: 0 - 5. Applicant's contact information: Phone number: (732) 521-2900 Email Address: jtavlor@matrixcoMpanies.com n- PROJECT INFORMATION• 1. 2. 3. 4. 5. El Privately -Owned Public Utility ❑ Other r0 3> � l.; a 52018 s Project name: Woodlands at Echo Farms -Tract 3C Application/Project status: ®Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 County where project is located: New Hanover Approximate Coordinates (Decimal Degrees): Latitude: 0.34' Longitude:--0.77° Parcel ID (if applicable): R07006-002-00 1 -000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: T. Jason Clark, P.E. License Number: 030869 Firm: Norris & Tunstall Consulting Engineers, P.C. Mailing address: 902 Market Street City: Wihn on State: NC Zip: 28401- Phone number: (910) 343-9653 Email Address: jclark@ntengineers.com cc: anorris@ntengineers.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: M'Kean Maffitt (Southside WWTPPermit Number: NC 0023973 Owner Name: Cape Fear Public Utility Authority V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ(DEQ Doesn't Know) - CFPUA Pump Station 927 System Wide Collection System Permit Number(s) (if applicable): WQCS, Owner Name(s): Cape Fear Public Utility Authority FORM: FTA 04-16 Page 1 of 5 VI S GENERAL REQUIREMENTS L If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? Yes ❑YNN/A 2. If the Applicant is a Developer of lotsto be sold has a. rational M: DEY DevelMer's Operational been attached? Agreement (FOR Q Yes ❑No ZN/A lie i is: H 1. Ifthe Applicant a ome/Prop _grty,O Association, has an ODer Wners ational Agreement (FORM: been attached? 1:1 Yes E]No MIN A 4.. Origin ofwastewater::(checkall that apply): EIResidential Owned ElRetail stores, centers, malls)[] Car ash W Residential Leased ❑Retail with food preparatioil/service EJ lRot0l.and/or.Motels 0 School I preschool day,care ElMedical dental. veterinary facil2ties ❑ S wi. mming. ool /Clubhouse. Food and drink facilities❑ • El Businesses./ offices / factories Church n SwimmingPoaTilterBackwash .(EpEH erxlain a.Attachment ) 5. Nature of wastewater: 100 % Domestic/Comm iercial % Commercial % Industrial (See 15A. NCAC 09T .0'1 Is -there a Pretreatment in effect? ❑Yes ❑ No. 6* Hasa flow reduction been approved under -C 09T.01 ? nY s F1 No� IJA NC AC e Jf1Ves,:1.3r . ov. idea :copy of flow reduction approval letter Summarize 0 ummartze wastewater generated by project: Establishment Type (see 02T.01 14(f)) Daily Design Flow Noi,,6:6f Unifs F16W -Townhomes (3 Bedroom) 3 60 gal. 4 figO GPI) L gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD 1otal 4,1680 GPD a See 15A NCAC 0')TAl 14(b). (d (e)(1) and (e)(2.) for caveats to, wastewater design flow rates (Le., mmininum flowper dwellinpro ose d uhkn Wn non -re 8idential d vdlo merit uses;publ* access facilitieslDented near high public use areas; and residenruial propettylocated 8 east Atlantic Intracoastal Waterwaytobe used as vacation rentals as defined south or s . the Atlan c In. G.Sr 42A-4)..i. b Per 15A NCAC 02T .0. 1 14(c)j dio- flow wrates for,establishments not .identified �[in table 15A NCAC O� T.01 14 shall be determined usirig avat e flow data, water i fixtures -occupancy or:'operation patterns, and other measured data. 8. Wastewater generatedJJiypt0Jed0. GPI) (per -1 5A NCAC 02T.0 114 > D i '0 notmcludefuture flows or previously permitted allocations If pettili.tWd. flow i indicate why: szeroinca .i Pump Station avity. Sewer -where flow:will*be permitted mi:subsequent permi or Gravity ts that connect t this Tine Flow has already been allocated in Permit Number: El Rehabilitation or replacement •of existing sewer with no new flow: expected [] Other (Explain): FORM: FTA 04-16 Page 2 of 5 A _. VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 298 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (PumpoStatioons/Force COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT l . Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305�h)_ (1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 , Page 3 of 5 IN. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): l . Does the project comply with all separations found in 15A NCAC 02T .0305(ff) & ➢ 1 5A NCAC n?T (11(1 M rnntninc minimum epr,ara+;nrnc! +lka+ oh -all 1,A "rnx,,;Al A ft,r ro.7,ro,- n«�+o,,,�.• ❑ Yes ❑ No Setback Parameter* Se aration Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet * *Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinkin water 100 feet "Waters Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet -Any building -foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet My swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0345(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ "Stream Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes ❑ No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? 0 Yes ❑ No Per 15A NCAC 02T.0105(c)_,., (6}, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. E]Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 Lf to X CERTIFICATIONS: Docs the submitted system Comply with JZs�N- -A I Ll ILL I J) �2T -, t h e M-i M' qli!-Q(�. A PM alid Eorcc 8- awst yerij "If and the GMe V Sewer XCilp'num D!CS11211 ciit�dpAi test VC sion) as applicable? -------------- yes No 0 If No, Camplete and submit -the. Varianc e/Alternative Design Request application (VADC 10- 14) and supporting documents for revlew. ADPrOval of the re nest is rqquired Prior to SMbMiltal the Fast Track AmAcatio-11 gnu Su vinrtina --own Mts. 2. Professional Engineer's Certification: (Professional En gi 'neerts- �nanie from App . 11 Rem.! 1. 1. L.) attest that this application for has been reviewed b atad Y me: i is accurate., oomplete anal ,Consistent with the inform I in,th ation supplied. e plans, spe ifi n.9incer no calcufafi Ion, s and all other supportinp d Ocumentation, to the best -of my knowledge. I further attest that to the .eatbest Of my knowledge the proposed design. hms been prepared in accordance with the applicable re ujatjoT) 1 5, Ora ity -sewel" T Mial'ITI.u�inDesign .Criten"a for Gravity Sewers (latest version') and the Minimum Desig riteria for the Fast -Track Permitting gn. of P t J UMP Stations and Roe Main- s (latest very' Although other Professionals rn M portioti of lon aY have developed certal Wbraittal package in elusion of these inaterials under my signa-ttire and seat signifies U ge that I 'hall ta and have. j d it �to be consistent wftb. the. le reviewed this Mater' I PrOpOsed des g*;i. NOTE - In. accordance w'th General Statutes 143-21.5.6A and :14 -21.5 6B any person who 'knowingly in�kts any false statement, re resentat' P o0u, or cerfification in any application packag; shall be guilty of a Class misdemeanors wh.ich may include a fine not to exceed S 10 000 as well asc,iVilpe-nalti les, up tO S25,000 per violation. .......... North Ca 1" profto ro Ina ss" dal Enne gier's wall signature, and. date: � ���, � • �'' O SE 030 69 4$� s time ........... I Applicant's Certification per .15A NCAC,02'r .0106(b): (Si ) Attestth t thsplication forii 0 tUre Author,Ts. name ationiteml.3. has been reviewed by me and is accura' te. and com*pfeie to t u tand that, - all rea this appi .. . i . . - he best of illy knowledge.. I ndeis if Wred parts of wationare not completed and that if All required sudocumen pporring tation and attachments aPplication packagge Is sa-bje-c-t to being return are not this ed as InCoMplete. I u. nderstand that a disch ft - wate t discharge r. ste r M is nollm qys;tem to surface waters or the lid w- ny a , I of %ya 41. :fro h Mn .111, result in.an im.inediate enforcement action that ma in 111JU Ctiv n Y elude civil: Penalties, n e relief, and/ C 'Minal prosecution. I will make no- claim against the.Division of Water Res i V 0 ources should a condition this permit be.. i lated. I also understand that if all, req. ire' parts o U d fth" a ficationp all re.quire is PP I ack.ageare not completed and that 'T d support, 8 , fo ill . - I In in emotion and attach are n i ot ncludcd this ppi t k will be returned to me as 2 - a tcaion pac age NOTE - In accordance iti, Generaj ,�tatateW L —J!-.�A)-A and I 41.24 -5 6 B statement, representa . tion, or cer-tification any person who knowingly makes any false in� any applicat3on package shall be j -guilty a C1 S. 2 M,, -include alfine -not tocxlceej $10,000 as well as cj* 41� of as isdemeanor, which may V1 Ties lip to.S25 00 per vio ,P Signature.. Daw FORM.- FTA,04,iii 16- page 5 of 5 1 State of North Carolina 9 YL' Department of Environmental Quality 5 4 Y Division of Water Resources�� 1. Ivis—I Water- Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Echo Farms, LLC Project Name for which flow is being requested: Woodlands. Echo Farms Ph 1-Tr 3 C (p riv More than one FTSE may be required for a single project if the owner of the is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: M'Kean Maffitt (Southside) WWTP b. WWTP Facility Permit #: NPDES NC O023973 All f lows are in MGD c. WWTP facility's permitted flow 12.000 d. Estimated obligated flow not yet tributary to the WWTP 2.000 e. WWTP facility's actual avg. flow 8.044 f. Total flow for this specific request 0.004680 g. Total actual and obligated flows to the facility 10.048 h. Percent of permitted flow used 83.7% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / p f), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** 27 0.378 0.151 0.151 0.094 0.245 -0.094 t ne r irm capacity of any pump station is ciennea as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority Downstream Permit Number: Not Available Page 1 of 6 FTSE 04-16 t III. Certification Statement: I Matthew Tribett, CFPUA Eng..Mgr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Date Page 2 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM PAA Submit a planning assessment addendum for each um station ' Capacity is < 0. pump listed in Section II where Available Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for and MGD of the Available Capacity (E) in Pump Station and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely PS 26 & 27 Upgrades is in design or under construction with Planned completion in _ 3rd qtr 2021 (latest) ; and/or d. The following applies: The developer of this project is required by agreement to complete an upg 3,rade of PS 27 tenor to activating the sewer for this project The average daily design capacity of PS 27 will be increased to a minimum of 0.387 m d. _Capacity created by the upgrade has been obligated to the developer by the agreement. The flow requested for this project is a portion of that obligation Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant like lihood elihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. k)"gning UVicial Signature rJ Date Page 3 of 6 FTSE 04-16 SEWER NARRATIVE (PRIVATE) WOODLANDS AT ECHO FARMS — TRACT 3C 4114 Echo Farms Boulevard Wilmington, North Carolina For Echo Farms, LLC c/o Matrix Development Group, CN 4000, Forsgate Drive Cranbury, NJ 00512 (732) 521-2900 ``�`, ��tttt tturrrNrrr���''i `��\` • S S • • • � �i • i • SEAL r• f • 086 •._ IN r���rrJr r►+r t t� 1 N N 1N����� March 2018 Prepared by: NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) License # C-3641 N&T Project #16083 (Tract 3C -Private) SEWER SYSTEM NARRATIVE (PRIVATE) WOODLANDS AT ECHO FARMS —TRACT 3C (PRIVATE) This private gravity system is designed signed to serve townhomes. A to PVC sewer line will be extendedtotal of 298 LF of 8 in Tract 3C. Flow from this tract • #27. ct flows to Pump Station This system will be seared by the Cape Fear Public Utility Authority. Pump Station #27 is owned and operated by the Cape Fear Public Utility Authority. An upgrade of Pump Station #27 is required and has been submitted to the Cape Fear Public Utility Authority for review.