HomeMy WebLinkAboutWQ0040525_Application (FTSE)_20181214BROOKS
ENGINEERING ASSOCIATES
V RtllnBlon4veel / ieM1nIIb XCID011 mvwdmoMeo.eom / tl[l4OM
Letter of Transmittal
Tim Heim
NCDEQ Asheville Regional Office
2090 Us Hwy 70
Swannanoa, NC 28778
need tele none no. nPeehx, no Y.V. t ox
Project Name:
Beth -Hann Subdivision
473718
® Mail ❑ Deliver
From: Date:
Mark C. Brooks. P.E. December 3, 2018
cc: (need telepbone no. if Fedex, no P.O. Box)
❑ Overnight* ❑ Other
*must use street address & mclude phone number
Document Description:
Date:
Copies:
Form FTA 04-16 Application for Sewer Extension
12/03/18
Original & 1 copy
Form FTSE 10-18
12/03/18
Original & I copy
Form DEV11-17
12/03/18
Original & 1 copy
Check for
$480
Comments:
Please let us know if anything missing. Thanks.
Nauuurcov
0EC - 6 2018 '
1 g 'onnl pp�ratlons
Wetor rzt .-1 c�
17 Arlington Street, Asheville, NC 28801 • Phone (828) 232-4700 • Fax (828) 232-1331
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A
NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. ---
Projects not eligible for review via the fast track process (must be submitted for full technical review)
➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100;
➢ Projects that do not meet any part of the minimum design criteria (MDC) document;
➢ Projects that involve a variance from the requirements of ISA NCAC 2T;
➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps;
➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
➢ Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required
items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time
and reduce the amount of requested additional information, Failure to submit all required items will necessitate additional
processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit
one original and one copy of theapplication and supporting documentation.
A. One Original and One Copy of Application and Supporting Documents
® Required unless otherwise noted
B. Cover Letter (Required for All Application Packages):
® List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ If necessary for clarity, include attachments to the application form,
C. Application Fee (All New and Major Modification Application Packages):
® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal.
➢ Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions, attachments to the application may be made.
® If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with
the North Carolina Secretary of State.
❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of
Deeds in the county of business.
® The Project Name in Item 1I.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North
Carolina licensed Professional Engineer.
® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b).
Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is
provided from a person who meets the criteria in I SA NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) Of Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
D Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one
year prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-
215.67(a).
• Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 8.5-inch x I1-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project
area and closest surface waters.
➢ Location of the project (gravity sewer, pump stations & force main)
➢ Downstream connection points and permit number (if known) for the receiving sewer
® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field.
G. Existing Permit (All Modification Packages):
❑ Submit the most recently issued existing permit.
❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit
modification (i.e., permit description, flow allocation, treatment facility, etc.).
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is
compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or
proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping
units, associated appurtenances and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of a0 the pump
stations' storage capacities and the rotation schedule of the portable power source or pump, including travel
tlmeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification)
Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina
Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by
the sewer extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an
application for a franchise has been received and that the service area is contiguous to an existing franchised area or
that franchise approval is expected.
Operational Agreements (Applications from HOAIPOA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA).
❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations, and By-laws.
® Developers of lots to be sold
® Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems wehsite
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778
Clay, Graham, Haywood, Henderson, Jackson,
(828) 2964500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office
225 Green Street Suite 714
Anson, Sladen, Cumberland, Harnett, Hoke,
Water Quality Section
Fayetteville, North Carolina 28301-5094
Montgomery, Moore, Robeson, Richmond,
(910)433-3300
Sampson, Scotland
(910) 486-0707 Fax
Mooresville Regional Office
610 E. Center Avenue
Alexander, Cabanus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704)663-1699
Stanly, Union
(704) 663-6040 Fax
Raleigh Regional Office
1628 Mail Service Center
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27699-1628
Granville, Halifax, Johnston, Lee, Nash,
(919) 7914200
Northampton, Orange, Person, Vance, Wake,
919 788-7159 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Pander
(910) 796-7215
(910) 350-2004 Fax
Winston-Salem Regional Office
450 W. Hanes MITI Road
Suite 300
Alamance, Allegheny, Ashe, Caswell, Davidson,
Davie, Forsyth, Guilford, Rockingham, Randolph,
Water Quality Section
Winston-Salem, North Carolina 27105
Stokes, Burry, Watauga, Wilkes, Yadkin
(336) 776-9800
INSTRUCTIONS FOR FORM: FTA 0446 & SUPPORTING DOCUMENTATION Page 3 of 3
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: (to be win eted by DWR)
All items must be committed or the unionization will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: 4710 HOLDINGS. LLC (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑❑ Individual ®❑ Corporation ❑❑ General Partnership ❑❑ Privately -Owned Public
Utility
❑❑ Federal ❑❑ State/Comty ❑❑ Municipal ❑❑ Other
3. Signature authority's name: VICTOR WORKMAN per 15A NCAC 02T .0106(b)
Title: MEMBER
e
4. Applicant's mailing address: 15 PLEASANT HILL DRIVE
City: ASHEVILLE State: NC Zip: 28804-_
DEC 6 201E
5. Applicant's contact information:
Phone number (828)230-6058 EmailAddress: WVICTORWORKMAN(a1GMAIL.CdM ).;:,. _.
H. PROJECT INFORMATION:
1. Project name: BETH-HANAN SUBDIVISION
2. ApplicatiorvProject status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000_ and issued date:
If new construction but part of a master plan, provide the existing permit number: WQOO_
3. County where project is located: MADISON
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.824935° Longitude:-82.561855'
5. Parcel ID (if applicable): 9747-43-6719
(or Parcel ID to closest downstream sewer)
HL CONSULTANT INFORMATION:
1. Professional Engineer: MARK BROOKS, PE License Number: 026539
Firm: BROOKS ENGINEERING ASSOCIATES
Mailing address: 17 ARLINGTON ST
City: ASHEVILLE State: NC Zip: 28801
Phone number: (828) 232-4700 Email Address: MBROOKS(a)BROOKSEA.COM
IV. WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION:
1. Facility Name: MARS HILL WASTEWATER TREATMENT Permit Number: NCO057151
Owner Name: TOWN OF MARS HILL
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. PennitNumber(s): WQ_ Downstream (Receiving) Sewer Size: _inch
System Wide Collection System Permit Numbers) (if applicable): WQCS_
Owner Name(s):
FORM: FTA 04-16 Page 4 of 5
VI, GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Ul fity, has a Certificate of Public Convenience and Necessity been attached?
❑❑ Yes ❑ ❑No ❑EN/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
E❑ Yes ❑❑No ❑N/A
3. If the Applicant is a Home/Property
Owners' Association, has an Operational Agreement (FORM: BOA) been attached?
❑❑ Yes ❑ ❑No ❑EN/A
4. Origin of wastewater: (check all that apply):
E❑ Residential Owned
❑❑ Retail (stores, centers, malls)
❑❑❑❑ Car wash
❑ Residential Leased
❑❑ Retail with food preparation/service
❑❑❑ Hotel and/or Motels
❑ School / preschool / day care
❑❑ Medical / dental / veterinary facilities
❑❑❑ Swimming Pool /Clubhouse
❑❑ Food and drink facilities
❑❑ Church
❑❑❑❑❑ Swimming Pool/Filter
Backwash
❑ Businesses / offices / factories
❑❑❑ Nursing Home
❑❑ Other (Explain in Attachment)
5. Nature ofwastewater: 100%Domestic/Commercial _%Commercial
%Industrial (See 15A NCAC 02T .0103(20))
L,Is there a Pretreatment Program in effect? ❑❑❑ Yes ❑❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑❑ Yes ❑E No
➢ If yes, provide a cow of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.01140
Daily Design Flow q°
No. of Units
Flow
SINGLE-FAMILY LOT
360 gal/UNIT
29
10,440 PD
DUPLEX
360 gal/UNIT
18
6,480 6D
gal/
GPD
gal/
GPD
gall
GPD
gal/
GPD
Total 16,920 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e, minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use
mesa; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals
as defined in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall
be determined using available Fl data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater ge=ost by project: 6 920 PD (per 15A NCAC 02T .0114)
➢ Do not include future flows or ros ly permitted allocations
If permitted flow is zero, indicate why:
❑❑ ❑Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑❑ ❑Flow has already been allocated in Permit Number: _
❑❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑❑ Other (Explain): _
FORM: ETA 04-16 Page 5 of 5
VIL. GRAVITY SEWER DESIGN CRITERIA (If Applicable) -02T.0305&MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8 2,150 PVC
➢ Section D & ID of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section DI contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VID. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: BETH-HANAN PUMP STATION
2. Approximate Coordinates (Decimal Degrees): Latitude: 35-8242° Longitude:-82.5616^
3. Design flow of the pump station: 0.017 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 58 gallons per minute at 67.77 feet total dynamic head (TDH)
5, Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
3
2010 s
PVC
Power reliability in accordance with 15A NCAC 02T .0305(h)(I):
®❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)-'
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all time pump stations'
storage capacities and the rotation schedule of the portable power some or pump, including travel timeframes, shall be
provided in the case of a multiple station power outage.
FORM: FTA 04-16 Page 6 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & ISA NCAC 02T .0305(t)):
1. Does the project comply with a0 separations found in 15A NCAC 02T.0305(f) & (a) ®❑ Yes❑
❑ No
➢ 15A NCAC 02T 0705lfl nnmaivc.ninimm�, oa,.o.ou,..,a •6s. Juan ue.,.,..aava r . oe,,,e. ,..
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines(horizontal - reclaimed over sewer
2 feet
*'Any private or public water supply source, including any wells, WS-1 waters of Class I or
Class lI impounded reservoirs used as a source of drinking water
100 feet
*'Waters classified WS (except WS-I or WS-V), B, SA, ORW, HOW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 Feet
Drainage systems and inaterc5ptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
D 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications veboago
➢ If noncompliance with 02T.0305(f) or (9), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ME]Yes❑ El No
El N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .02009 RE]Yes[] ElNo
❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑❑ Yes❑ ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(61(additionl permits/certifications)? ®❑ Yes[] ❑ No
Per 15A NCAC 02T.0105(e)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402 "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑❑ Yes[] ® No ❑ N/A
FORM: FTA 04-16 Page 7 of 5
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
x.
FORM: FTA 04A6 Page 8 of 5
CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Desim Criteria (latest version) as applicable?
®❑ Yes ❑❑ No
If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents
for review. Approval of the request Is required prior to submittal of the Fast Track Application and supporting
documents.
2. Professional Engineer's
name
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Fares Mains (latest version). Although other professionals may have developed certain
portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a
condition of this permit be violated. I also understand that if all required parts of this application package are not completed
and that if all required supporting information and attachments are not included, this application package will be returned to
me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well
�//,'a1sciiviill lamalties up to $25,000 per violation. !) �
Signature:_ ��/"" " /, 1,e°l Date:
FORM: ETA 04-16 Page 9 of 5
,' State of North Carolina
DWR EC, - 6 2018 Department Environmental Quality
Division of Water Resources
Division of water 8esources Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: 4710 HOLDINGS, LLC
Project Name for which flow is being requested: BETH-HANAN SUBDIVISION
More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of theproposed wastewaterJlow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: /1%a rc M*11 /I/6✓ iP
b. WWTP Facility Penult #: NC0A3">Ls/
All flows are in MCD
c. WWTP facility's permitted flow •
d. Estimated obligated flow not yet tributary to the WWTP , yg
e. WWTP facility's actual avg. flow
f Total flow for this specific request . / 7 /
g. Total actual and obligated flows to the facility , 34 y
h. Percent of permitted flow used y g O
D. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B) (C) (D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump Pump Average
Approx. Not Yet Total Current
Station Station Firm Daily Flow-*
Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm / pt),
Avg. Daily Daily Flow, Obligated Available
Number) No. MOD MGD
Flow, MOD MOD Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6
FTSE 10-18
III. Certification Statement.
('�,�Ipacityjelated
certi to the best of my knowledge that the addition of
volume of wastewater to be permittertha this project has been evaluated along the route to the
eiving wastewater treatment facility and that the flow from this project is not anticipated to cause any
sanitary,seweroverflows or overburden any downstream pump station on route to the
receiving treatment plant under normal circumstances, given the implementation of the planned
improvements identified in the planning assessment where applicable. This analysis has been performed
in accordance with local established policies and procedures using the best available data. This
certification applies to those items listed above in Sections I and It plus all attached planning assessment
addendums for which I am the responsible party. Signature of [his form certifies that the receiving
collection system or treatment works has adequate capacity to transport and treat the proposed new
wastewater.
Signature
Title ofSign ing Official
Page 2 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature
Page 3 of 6
FTSE 10-18
Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA)
Section I
a. W WTP Facility Name: Enter the name of the W WTP that will receive the wastewater flow.
b. W WTP Facility Permit M Enter the NPDES or Non -Discharge number for the W WTP receiving the
wastewater flow.
C. WWI? facility's Permitted flow, MOD: From W WTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not vet tributary to the WWTP. MOD: This includes flows allocated to other
construction projects not yet contributing flow to the collection system. Flows allocated through interlocal
agreements or other contracts not yet contributing flow to the collection system are also included. For
POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be
using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial
flow tributary to your W WTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and
reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and
is not yet been made tributary to the W WTP, in accordance with local policies and procedures employed by
the reporting entity.
e. W WTP facility's actual avg. flow. MOD: Previous 12 month average.
f. Total flow for this specific request. MOD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d+ e+f]
It. Percent of permitted flow used: Equals [(g / c)* 100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5
MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a
proposed flow expansion of 0.015 MOD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MOD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MOD
E = 0.102 MOD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
FTSE 10-18
Section 11
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the
pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed
flow for this project with other obligated flows that have been approved for the pump station but are not yet
tributary (C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria.
Design Average Daily Flow is the faro capacity of the pump station divided by a peaking factor (pf) of not less
than 2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Design
Approx.
Not Yet
Total Current
Firm
Average
Current Avg.
Tributary
Flow Plus
Pump Station
Capacity
Daily Flow
Daily Flow,
Daily Flow,
Obligated
Available
(Name or Number)
MOD
(Firm / pf)
MOD
MOD
Flow
Capacity*
Kew Creek PS
0.800
0.320
0.252
0.080
0.332
-0.012
Valley Road PS
1.895
0.758
0.472
0.135
0.607
0.151
Page 5 of 6
FTSE 10-18
Planning Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section II where available capacity is <
0.
A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there
is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to
activating the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the
flow without capacity related sanitary overflows and must take all steps necessary to complete the project or
control the rate of flow to prevent sanitary sewer overflows.
The planning assessment tray identify a funded project currently in design or construction, or a planned project in
the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the
certainty of successful timely project completion for any expansion, flow management diversion or infiltration
and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance
compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts far 24 % and 0.080 MGD of the
committed flow in Pump Station Kaw Creek; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD
per year; and that
c. A funded capital project that will provide the required planned capacity, namely
is in design or under construction with planned
completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow
to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure.
Page 6 of 6
FTSE 10-18
STATE OF NORTH CAROLINA O K; - b 2018
COUNTY OF NADISON Permit No.
DEVELOPER'S OPERATIONAL AGREEMENT
This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this day of
, by and between the North Carolina Environmental Management
Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and
4710 HOLDINGS, LLC , a corporation/general partnership registered/licensed to do
business in the State of North Carolina, hereinafter known as iheDEVELOPER.
WITNESSETH:
1. The DEVELOPER is the owner of the certain lands lying in NADISON COUNTY County, upon
which it is erecting and will erect dwelling units and other improvements, said development to be known
as Daxa-aANAN SOBDIVISION (hereinafter the Development).
2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143-
215.1 to construct, maintain, and operate the Disposal System.
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter
47C or 47F of the North Carolina General Statutes.
5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the
Declaration, the (Unit Owners' Association) (hereinafter
Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State
of North Carolina, for the purpose, among others, of handling the property, affairs and business of the
Development; of operating, maintaining, re -constructing and repairing the common elements of the lands
and improvements subject to unit ownership, including the Disposal System; and of collecting dues and
assessments to provide funds for such operation, maintenance, re -construction andrepair.
6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed,
maintained and operated in accordance with law and permit provisions in order to protect the quality of the
waters of the State and the public interest therein.
NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties
hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions andlaw.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. ha order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws andDeclaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for
the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's
successor.
FORM: DEV 11-17 Page 1 of
L
A
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes andinsurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part
of the yearlybudget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit mayrequire as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the continued
proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the
Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of apermit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated b each of the parties named below:
FOR THE ENVIRONMENTAL adds MANAGEMENTCOMMISSIONName of EV��,,L��O99/////aa/'� VA ///I/��p9q
Linda Culpepper (Signature)
Interim Director, Division of Water Resources 1, J o l�Cl� j, Wd, /� `I��,
Print Name and Title /\
1/-AP-!'
(Date) (Date)
FORM: DEV 11-17 Page 2 of 2