Loading...
HomeMy WebLinkAboutWM0501331_Issuance of Permit_20181214ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Direcrar Sampson-Biaden Oil Company 3309 Drake Circle Raleigh, NC 27607 NORTH CAROLINA Envlromnenlal Quality December 14, 2018 Subject: Monitoring Well Construction Permit # WM0501331 Handee Hugo's #40 401 Benson Road Garner, NC -Wake County To Whom It May Concern: In accordance with the application received on December 1I, 2018, we are forwarding herewith Monitoring Well Construction Permit No. WM0501331 dated December 14, 2018, issued for the construction of a monitor well system (installation of two monitoring wells) at the subject properties. Please be aware that some counties have well construction programs, and You may be required toobtain a well construction Permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the conditions and limitations as specified therein. Please note the addition of stipulation #3 to the permit enclosed. Sincerely, Rick Bolich, L.G. Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure cc: RRO Files Wake County Health Department Email- k ollardnc.rr.com, Kirk Pollard, Mineral Springs Environmental, PC, 4600 Mineral Springs tane, Raleigh, NC 27616 e:!r0::f^�Q/ North Carolina Department of Environmental Quality i Division of Water Resources i Raleigh Regional Office 3800 Barrett Drive 11628 Mail Service Center I Raleigh, North Carolina 27699-1628 919.791.420O DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Sampson-Bladen Oil Company FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM (Handy Hugo 940) consisting of a monitoring well system (two ((.2) monitoring wells) owned by the Sampson-Bladen Oil Company at mailing address 3309 Drake Circle in Raleigh, NC. The wells will be located on the propperty owned by PGP Garner Plaza, LLC located at 537 Plaza Circle in Garner, NC -Wake County (PIN: 171151260). This Permit is issued in accordance with the application received on December 11, 2018 which is filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter I50B of the North Carolina General Statutes and fled with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (G W-30) shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of the completion of drilling of the borehole. Permit issued the 14" of December, 2018 FOR THE NORTH CAROLINA ENVIR �NTAL MANAGEMENT COMMISSION Rick Bolich, L.G., ssistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. WM0501331 E Q5 .�rww wor.r�Mre.4 V North Carolina Department of Environmental Quality I Division of Water Resources I Raleigh Regional office 3800 Barrett Drive 11628 Mail Service Center I Raleigh, North Caro ina 27699-1628 919.791.4200