HomeMy WebLinkAbout20181707 Ver 1_UNC_OEC_Nov2018_20181213NOV 8, 2018Outdoor Education Center Pond RetrofitPO BOX 2294 LIC # C1842KERNERSVILLE, NC 27284OFFICE: (336) 996-9974 jewellengineering.proSHEET NO.18-206-008625 S LAKESIDE DR. LIC # P1133RALEIGH, NC 27606(919) 960-1552 kbeng.orgPRELIMINARYNOT FORCONSTRUCTION17-18069-011.0SHEET INDEXSHEET DESCRIPTION1.0COVER SHEET & VICINITY MAPEROSION & SEDIMENT CONTROL PLAN1.1NOTES, ABBREVIATIONS, AND LEGEND3.03.15.05.1POND RETROFIT GRADING PLANPARKING LOT OUTLET PLANEXISTING CONDITIONS2.0-2.16.07.0STREAM RESTORATION PLANPOND RETROFIT SCHEMATIC PLANEROSION & SEDIMENT CONTROL DETAILS4.0DEMOLITION PLANVICINITY MAP - NOT TO SCALEPROJECT LOCATION - NOT TO SCALE5.2POND RETROFIT PLANTING PLAN5.3POND RETROFIT DETAILSProject Location & Sheet Index7.1STREAM RESTORATION PLANTING NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 1.1Notes, Abbreviations and Legend STANDARD SITE ABBREVIATIONS DEFINITION OF TERMS: CONTACT PHONE NUMBERS: BEFORE YOU DIG! CONTACT ONE-CALL CENTER 1-800-632-4949 OR 811 ROADWAY SIGN FLOW VALVE PHONE PED. LIGHT POLE TREE LINE POWER POLE GW GUY WIRE FENCE AS NOTED GUARD RAIL EXISTING CONTOUR WITH ELEVATION EDGE OF PAVEMENT EDGE OF CONCRETE CONCRETE DECIDUOUS TREE LP T PPCPCONTROL POINT BUILDING OUTLINE CONIFEROUS TREE WOOD FENCE RIP RAP BOUNDARY LINE BOUNDARY CORNER FOUND AS NOTED TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMPORARY PROTECTION FENCE LEGEND PROPOSED CONTOUR WITH ELEVATION170 AND UNC UTILITY LOCATE AT 919-962-8394 OVERHEAD ELECTRICAL NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Site Layout 2.0 COPYRIGHT © BALLENTINE ASSOCIATES, P.A. THIS DOCUMENT IS THE PROPERTY OF BALLENTINE ASSOCIATES, P.A. ALL RIGHTS RESERVED. ANY REPRODUCTION OF THIS DOCUMENT OR POSSESSION WITHOUT PRIOR PERMISSION OF BALLENTINE ASSOCIATES, P.A. WILL BE SUBJECT TO LEGAL ACTION.GRAPHIC SCALE1 inch = 20 ft. NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 3.0Erosion and Sediment Control Plan EROSION CONTROL NOTES: 1.CONTACT UNC EHS AT (919) 883-7163 OR (919) 962-5507 TO SCHEDULE AND HOLD A PRE-CONSTRUCTION MEETING BEFORE INSTALLATION OF ESC MEASURES AND AGAIN ONCE ESC MEASURES ARE IN PLACE. 2.THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE NORTH CAROLINA SEDIMENTATION CONTROL ACT OF 1973. CONTRACTOR SHALL COMPLY WITH THE UNC ESH EROSION AND SEDIMENTATION CONTROL GUIDELINES FOR CONSTRUCTION PROJECTS. THESE SPECIFICATIONS ARE GENERALLY MORE STRINGENT THAN THE SPECIFICATIONS OUTLINED IN THE STATE GUIDELINES. 3.FOR APPLICATIONS NOT SPECIFIED IN THE UNC EHS EROSION AND SEDIMENTATION CONTROL GUIDELINES FOR CONSTRUCTION PROJECTS, CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES ACCORDING TO THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY AND APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES. CONTRACTOR SHALL PREVENT STANDING WATER WITHIN PROJECT LIMITS. 4.PERMITS HAVE BEEN/WILL BE OBTAINED FROM NCDEQ AND THE US ARMY CORPS OF ENGINEERS FOR THIS PROJECT. CONTRACTOR SHALL COMPLY WITH ALL PERMIT CONDITIONS. 5.CONTRACTOR SHALL INSPECT SITE AT LEAST WEEKLY AND AFTER EACH 0.5" RAIN EVENT AND REPAIR VISIBLE EROSION. CONTRACTOR SHALL REPAIR AND REPLACE EROSION CONTROL DEVICES AS NECESSARY. CONTRACTOR SHALL MAINTAIN INSPECTION RECORDS AND RAIN GAUGE ON SITE. 6.CONTRACTOR SHALL INSPECT THE PROJECT AFTER EACH OF THE FOLLOWING PHASES AND DOCUMENT THE INSPECTION IN WRITING: A.INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; B.CLEARING AND GRUBBING OF EXISTING GROUND COVER; C.COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS; D.INSTALLATION OF STORM DRAINAGE FACILITIES; E.COMPLETION OF CONSTRUCTION OR DEVELOPMENT; F.ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 7.CONTRACTOR SHALL INSTALL ALL TEMPORARY EROSION CONTROL DEVICES WITHIN THE PROJECT AREA AS INDICATED ON THE PLANS PRIOR TO CLEARING, DEMOLITION, GRADING, AND/OR CONSTRUCTION. IF ADDITIONAL STAGING/STOCKPILE AREA IS REQUIRED, THE AREA MUST BE APPROVED BY THE ENGINEER AND SILT FENCE MUST BE INSTALLED BEFORE USE. 8.ANY LAND CLEARING, CONSTRUCTION, OR DEVELOPMENT INVOLVING THE MOVEMENT OF EARTH SHALL BE IN ACCORDANCE WITH THE APPROVED ESC PLAN. THE SUPERINTENDENT IN-CHARGE OR CONTRACTOR SHALL BE ON SITE ON ALL DAYS WHEN CONSTRUCTION OR GRADING ACTIVITY TAKES PLACE. 9.CONTRACTOR SHALL ENSURE THAT DRAINAGE IS DIRECTED INTO TEMPORARY SEDIMENT DEVICES THROUGHOUT THE CONSTRUCTION PERIOD. 10.AS EACH PORTION OF CONSTRUCTION IS COMPLETE, CONTRACTOR SHALL INSTALL PERMANENT STABILIZATION. AT END OF PROJECT, WHEN AUTHORIZED BY THE ENGINEER, CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL PERMANENT STABILIZATION, AND RESTORE THE SITE AS SHOWN ON PLANS, OR AS CLOSELY AS POSSIBLE TO ORIGINAL CONDITIONS. 11.CONTRACTOR SHALL PROVIDE SOIL STABILIZATION FOR ALL DISTURBED AREAS BASED ON TIME FRAMES SHOWN ON STABILIZATION TIME FRAME CHART WITHIN THE SPECIFIED CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. AREAS THAT WILL BE UNWORKED FOR MORE THAN 7 OR 14 DAYS MUST BE STABILIZED USING MULCH, PLASTIC SHEETING, OR AN EROSION CONTROL BLANKET. AREAS THAT WILL BE UNWORKED FOR MORE THAN 14 DAYS MUST BE SEEDED, TACKED, AND MULCHED. 12.ROLLED EROSION CONTROL PRODUCTS, SUCH AS NETS, BLANKETS, OR MATS, MUST BE FREE OF PLASTIC OR SYNTHETIC MATERIALS, EVEN IF LABELED "BIODEGRADABLE" OR "PHOTODEGRADABLE". THESE PRODUCTS MUST BE MADE WITH NATURAL FIBERS. 13.CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCOMMODATION AND MAINTENANCE OF BASE AND STORM FLOWS IN ALL AREAS OF THE PROJECT SITE THROUGHOUT THE CONSTRUCTION PERIOD. 14.CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO PREVENT SEDIMENT FROM LEAVING SITE. STREETS AND PAVED PARKING AREAS SHALL BE SWEPT REGULARLY USING A DRY METHOD TO KEEP THE TRACKED SEDIMENT FROM ENTERING THE STORM DRAINS AND STREAM. 15.DE-WATERING OF STRUCTURES WITH SEDIMENT-LADEN WATER DIRECTLY TO STREAMS OR STORM DRAINAGE SYSTEM IS PROHIBITED. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO ENSURE THAT SUCH PROHIBITED ACTIVITIES DO NOT OCCUR. 16.PERMANENT GROUND COVER IS REQUIRED ON ALL DISTURBED AREAS OF THE CONTRACT. MULCHING SHALL BE PROVIDED FOR ALL AREAS REQUIRING SEEDING. 17.WHEN VEGETATION IS ESTABLISHED, CONTRACTOR SHALL CALL FOR FINAL SITE INSPECTION BY THE ENGINEER. SITE AREA DESCRIPTION PERIMETER DIKES, SWALES, DITCHES, SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES GREATER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 TIMEFRAME 7 DAYS 7 DAYS 7 DAYS 14 DAYS 14 DAYS TIMEFRAME EXCEPTIONS NONE NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH NONE, EXCEPT FOR PERMIETERS AND HQW ZONES. STABILIZATION TIMEFRAMES LIMITS OF DISTURBANCE TOTAL AREA = 2.1 ACRES SUGGESTED CONSTRUCTION SEQUENCE FOR POND RETROFIT: ROADWAY SIGN FLOW VALVE PHONE PED. LIGHT POLE TREE LINE POWER POLE GW GUY WIRE FENCE AS NOTED GUARD RAIL EXISTING CONTOUR EDGE OF PAVEMENT EDGE OF CONCRETE CONCRETE LP T PPCPCONTROL POINT TREE WOOD FENCE RIP RAP BOUNDARY LINE BOUNDARY CORNER FOUND AS NOTED TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMP PROTECTION FENCE LEGEND OVERHEAD ELECTRICAL CROSS-SECTION FOLLOWING DIMENSIONS: GREEN ECO-STAKE OR APPROVED EQUAL WITH THE THE WOOD STAKE SHALL BE THE NORTH AMERICAN 12.00 IN (30.48 CM) 0.40 IN (1.02 CM) 0.60 IN (1.52 CM) (TAPERED TO POINT) 0.40 IN (1.02 CM) 1.25 IN (3.18 CM) 11.00 IN (27.94 CM) TOTAL LENGTH LEG THICKNESS LEG WIDTH HEAD WIDTH LEG LENGTH HEAD THICKNESS TYPICAL TRENCH STAKE 2' 2" PLAN VIEW EROSION CONTROL MATTING NOTES 1.BANKS SHALL BE SEEDED (PERMANENT & TEMPORARY) PRIOR TO PLACEMENT OF MATTING. 2. WOODEN STAKES SHALL BE PLACED IN A DIAMOND SHAPE PATTERN PER THE PLAN VIEW. 3. TRENCH STAKES AND WOOD STAKES SHALL BE PLACED A MAXIMUM DISTANCE APART OF 3'. 4.EROSION CONTROL MATTING (ECM) SHOULD BE USED TO AID PERMANENT VEGETATED STABILIZATION OF SLOPES 2:1 OR AREAS SPECIFIED IN THE PLANS. 5.ECM SHOULD BE USED WHEN MULCH CANNOT BE ADEQUATELY TACKED AND WHERE IMMEDIATE GROUND COVER IS REQUIRED TO PREVENT EROSION DAMAGE. 6.6” MINIMUM OVERLAP IN THE HORIZONTAL EROSION CONTROL MATTING MAINTENANCE NOTES 1.INSPECT ECM AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. REPAIR IMMEDIATELY. 2.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE ECM. 3.ANY AREAS OF THE ECM THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5.MONITOR AND REPAIR THE ECM AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. BOTTOM OF CHANNEL EROSION CONTROL MATTING SHALL BE PLACED IN 12 INCH DEEP TRENCH, STAKED, BACKFILLED AND COMPACTED TOE OF SLOPE WOOD STAKE TOP OF STREAMBANK EROSION CONTROL MATTING SHALL BE PLACED IN 12 INCH DEEP TRENCH, STAKED, BACKFILLED AND COMPACTED 2' TRENCH STAKE WITH NAIL 2' TRENCH STAKE WITH NAIL TRENCH TOP OF BANK WOOD STAKE TRENCH TOP OF BANK TOE OF SLOPE EROSION CONTROL MATTING TO BE EXTENDED TO TRENCH AT TOE OF SLOPE EROSION CONTROL MATTING NOTES:FLOW SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND PUMP AROUND PUMP BASEFLOW IMPERVIOUS SHEET IMPERVIOUS DIKE 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL OR POND. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. THE PUMP AROUND PUMP SHOULD ADEQUATELY CONVEY FLOWS FROM 36" RCP AND SPRING AREA. 5. PROVIDE STABILIZED OUTLET TO STREAM BANK. FILTER FABRIC FOR DRAINAGE TYPE 2 (NON-WOVEN) SPECIAL STILLING BASIN EXISTING GROUND EXISTING CHANNEL/ POND AREA TEMPORARY FLEXIBLE HOSE SPECIAL STILLING BASIN (SEE PROJECT SPECIAL PROVISIONS) DEWATERING PUMP IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) TEMPORARY PIPING IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) SANDBAG/STONE WORKING AREA TOP OF STREAM BANK 1. INSTALL SPECIAL STILLING BASINS AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR FLOW DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION AND POND RETROFIT WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 12" MIN. CLASS A STONE FLOW EXISTING RIPRAP IN CHANNEL DOWNSTREAM OF POND PROVIDE STABILIZED OUTLET TO STREAM BANK TYPICAL PUMP AROUND OPERATION 4'-10" FINISHED GRADE WIRE OR ZIP TIES TO SECURE SAFETY FENCE TO POST STAKES: 66" T-POST DRIVEN 18" BELOW GRADE 48" HIGH DENSITY ORANGE POLYETHYLENE SAFETY FENCE STAKE SPACING 12' ON CENTER TEMPORARY PROTECTION FENCE UNC DRIVEWAY EXISTING GROUND 25' MIN.18' MIN.6" MIN.TYPE II FILTER FABRIC UNDER 2"-3" COURSEAGGREGATE 25' MIN. EXISTING UNC DRIVEWAY NOTES: 1.A STABILIZED ENTRANCE PAD OF 2"-3" COURSE AGGREGATE SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO AN ENTRANCE DRIVEWAY. 2.FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4.ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE SWEPT AND REMOVED IMMEDIATELY. 5.WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6.NCDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. CONSTRUCTION ENTRANCE WHERE ENTRANCE IS ON NATURAL GROUND FILL SL O P E FLOW TEMPORARY SILT FENCE NOTES: 1.FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2.WOVEN FILTER FABRIC TO BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3.STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE. 4.TURN SILT FENCE UP SLOPE AT ENDS. 5.DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6.SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7.DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 8.INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FENCE. 9.ATTACH THE FABRIC TO EACH POST WITH THREE TIES WITH THE TOP TIE WITHIN 8” OF THE TOP OF THE FABRIC. 10.WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 11.CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. TEMPORARY SILT FENCE MAINTENANCE NOTES: 1.INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2.SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. STEEL POST 8' MAX 2'-0"STEEL POST WOVEN FILTER FABRIC 30" MIN24" FILTER FABRICANCHOR SKIRT 8" MINIMUM TEMPORARY SILT FENCE UNDISTURBED GROUNDWIDTH VARIES - SEE PLANS - 12' TYPICAL NOTES: 1.CONTRACTOR SHALL COORDINATE WITH UNC GROUNDS FOR HARDWOOD MATS INSTALLATION. 2.HARDWOOD MATS TO BE INSTALLED BY UNC GROUNDS AS SHOWN ON THE CONTRACT DOCUMENTS OR AS DIRECTED BY THE ENGINEER. 3.ACCESS ROUTES TO BE VERIFIED BY THE ENGINEER AT THE EROSION AND SEDIMENT CONTROL MEETING. REVISIONS TO THE ALIGNMENT THAT MINIMIZE TREE DISTRUBANCE ARE ENCOURAGED, AND REQUIRE REVIEW AND APPROVAL BY THE ENGINEER. 4.THE CONTRACTOR SHALL ENSURE THAT EQUIPMENT IS KEPT ON MATS AT ALL TIMES WHERE MATS ARE PRESENT. 5.UPON COMPLETION OF PROJECT, SHREDDED HARDWOOD BARK MULCH SHALL BE SPREAD TO A MAXIMUM DEPTH OF 3". HARDWOOD MAT DETAIL - CROSS SECTIONLODLODMIN 6" THICK 3-PLY HARDWOOD LAMINATED CONSTRUCTION MAT OR EQUIVALENT 6" MIN THICK LAYER OF SHREDDED HARDWOOD BARK MULCH REPLINISHED AS NEEDED DURING THE CONSTRUCTION PERIOD INLET PROTECTION DETAIL NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Erosion & Sediment Control Details 3.1 NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Demolition 4.0 OCT 15, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Pond Retrofit Schematic Plan 5.0 OCT 15, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Pond Retrofit Grading Plan 5.1 TREE PLANTING AND GUYING OCT 15, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Pond Retrofit Planting Plan 5.2 LEGEND Feet 0 20 40 PIPE INVERT/ FLOOR OF STRUCTURE ELEV=321.0 SEE FLASHBOARD DETAIL 3/5.3 POND OUTLET HEADWALL WITH FLASHBOARD NOTES 1.SUBMITTAL DRAWINGS FOR PRECAST STRUCTURE ARE REQUIRED. 2.DIMENSIONS ARE BASED ON A SKETCH FROM OLDCASTLE PRECAST. 3.DESIGN IN ACCORDANCE WITH NCDOT STANDARD DRAWING 838.80, MODIFIED FOR DOUBLE BARREL APPLICATION. VIEW A VIEW B PLAN VIEW STRUCTURE FOR 2 - 42" RCP 2' HIGH FRONT WALL TO FUNCTION AS A WEIR WITH A 3' OPENING. SIDES OF OPENING TO BE GROOVED TO ACCOMODATE FLASHBOARD. 6" 12" 6" FLOOR 6" STEM 3'-8" 6'-8" 12" 6"19.4' 13.5' 13.5' 20.5" 3'-4" 45° FLASHBOARD DETAIL WOODEN FLASHBOARDS TO BE INSTALLED, INCLUDING ONE WITH A 2-1/2" PVC PIPE SEALED IN A HOLE IN THE FLASHBOARD, WITH A DOWNTURNED 90-DEGREE ELBOW EXTENSION ATTACHED. ELEVATION OF THE BOTTOM OF THE FLASHBOARD HOLE/PVC PIPE TO BE 9 INCHES ABOVE BOTTOM OF FLOOR OF HEADWALL/WEIR STRUCTURE. VIEWING PLATFORM PROFILE VIEWING PLATFORM VIEWING PLATFORM SECTION A-A SECTION B-B NOTES 1.STRUCTURAL DESIGN IS YET TO BE DEVELOPED AND WILL INCLUDE PIER SUPPORT LOCATIONS AND DIMENSIONS, DETAILS FOR DECK AND RAILS. 2.FIVE-FOOT CLEARANCE WIDTH BETWEEN HAND RAILS TO BE PROVIDED. MIRAFI N-SERIES OR SCHEDULE 40 PVC DRAINAGE AGGREGATE OR CRUSHED GRAVEL FW-SERIES FILTER FABRIC PERFORATED PIPE FRENCH DRAIN FOR NATURAL SPRING 4" DIA MIN COMPACTED EARTH GRAVEL PATH 4" COMPACTED ABC AT WIDTH OF EXISTING TRAIL SEDIMENT PATH AT LEAST 10' WIDTH 3:1 O R F L A T T E R 3:1 OR F L A T T E R NATURAL GROUND 18" MAX DEPTH EXCAVATED SEDIMENT TO BE PLACED ALONG PATH SHOWN ON SHEET 3.0 TO PROVIDE A VEGETATED PEDESTRIAN WALKWAY AT LEAST TO THE ZIPLINE PLATFORM. ADDITIONAL LENGTH AND WIDTH MAY BE ADDED WITH ENGINEER APPROVAL IF ADDITIONAL AREA IS NEEDED FOR RELOCATING POND SEDIMENTS, UP TO A MAXIMUM DEPTH OF 18". UP TO 10-4" PVC PIPES UNDER TRAIL MAY NEED TO BE INSTALLED IN LOW AREAS TO CONVEY FLOWS FROM FORESTED AREA UNDER THE TRAIL. PIPE INVERT/ FLOOR OF STRUCTURE ELEV=320.8 POND OUTLET ENDWALL NOTES 1.SUBMITTAL DRAWINGS FOR PRECAST STRUCTURE ARE REQUIRED. 2.DIMENSIONS ARE BASED ON A SKETCH FROM OLDCASTLE PRECAST FOR DESIGN IN ACCORDANCE WITH NCDOT STANDARD DRAWING 838.80, MODIFIED FOR DOUBLE BARREL APPLICATION. VIEW A VIEW B PLAN VIEW STRUCTURE FOR 2 - 42" RCP 6" 12" 6" FLOOR 6" STEM 3'-8" 6'-8" 12" 6"19.4' 13.5' 13.5' 20.5" 3'-4" 45° OUTLET PROFILE MINIMUM 1-FOOT DEPTH OF FILL OVER PIPES SECTION A-A EXISTING 36" RCP INV AT END OF FES = 326.55 FT REPLACE IN-KIND EXISTING HEADWALL LENGTH =~ 26 LF. APPROXIMATE FINISHED GRADE IN FRONT OF WALL POND INLET HEADWALL NOTES 1.SUBMITTAL DRAWINGS FOR PRECAST STRUCTURE ARE REQUIRED. NOV 8, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Pond Retrofit Details 5.3 OCT 15, 2018Outdoor Education Center Pond RetrofitPO BOX 2294 LIC # C1842KERNERSVILLE, NC 27284OFFICE: (336) 996-9974 jewellengineering.proSHEET NO.18-206-008625 S LAKESIDE DR. LIC # P1133RALEIGH, NC 27606(919) 960-1552 kbeng.orgPRELIMINARYNOT FORCONSTRUCTION17-18069-01Parking Lot Outlet Plan6.0Feet02040Feet0510 OCT 12, 2018Outdoor Education Center Pond RetrofitPO BOX 2294 LIC # C1842KERNERSVILLE, NC 27284OFFICE: (336) 996-9974 jewellengineering.proSHEET NO.18-206-008625 S LAKESIDE DR. LIC # P1133RALEIGH, NC 27606(919) 960-1552 kbeng.orgPRELIMINARYNOT FORCONSTRUCTION17-18069-01Feet0510Feet0510Stream Restoration Plan7.0 LIVE STAKE LIVE STAKE DETAIL PLAN VIEW CROSS-SECTION TOP OF STREAMBANK 2.1' 1' MAX 3.0' ANGLE CUT TO 45 DEGRESS LIVE CUTTING 0.5" - 2" DIA BUDS FACING UPWARD SQUARE CUT TOP 30" IN LENGTH MINIMUM TOP OF STREAMBANKTOP OF STREAMBANK TOE OF SLOPE TOE OF SLOPE SLOPE BANK PER PLAN SHEETS 2'-3' BETWEEN STAKES, DEPENDING ON LOCATION, SEE NOTE 7 BELOW 1' MAX TREE PLANTING AND GUYING LEGEND Feet 0 5 10 OCT 15, 2018 Outdoor Education Center Pond Retrofit PO BOX 2294 LIC # C1842 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 jewellengineering.pro SHEET NO. 18-206-008 625 S LAKESIDE DR. LIC # P1133 RALEIGH, NC 27606 (919) 960-1552 kbeng.org PRELIMINARY NOT FOR CONSTRUCTION 17-18069-01 Stream Restoration Planting 7.1