Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
tial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned * Version#*
20181705 1
Is a payment required for this project?*
* No payment required What amout is owed?*
* Fee received r $240.00
r Fee needed - send electronic notification r $570.00
Reviewing Office* Select Project Reviewer*
Fayetteville Regional Office - (910) 433-3300 Chad Turlington:eads\ccturlington
Information for Initial Review
1a. Name of project:
AA -00023-19 MacArthur Lake WGX Site Improvements -Site E
1a. Who is the Primary Contact?*
Monica Stephenson
1b. Primary Contact Email:*
monica.a.stephenson.civ@mail.mil
Date Submitted
12/13/2018
Nearest Body of Water
Tuckahoe Creek (MacArthur Lake); 18-23-13-4
Basin
Cape Fear
Water Classification
WS -III
Site Coordinates
Latitude:
35.18161
FA. Processing Information
County (or Counties) where the project is located:
Hoke
Is this project a public transportation project?*
r Yes r No
Longitude:
-79.25954
1a. Type(s) of approval sought from the Corps:
* Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
rJ Nationwide Permit (NWP)
F- Regional General Permit (RGP)
F Standard (IP)
1c. Primary Contact Phone:*
(910)396-4009
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
F- 401 Water Quality Certification - Regular
F Non -404 Jurisdictional General Permit
F Individual Permit
36 - Boat Ramps
W 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1e. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
0 Yes r No
B. Applicant Information
1d. Who is applying for the permit?
W Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Fort Bragg Military Reservation
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
2175 Reilly Road, Stop A
Address Line 2
CKY
Fort Bragg
Postal / Zip Code
28310-5000
2e. Telephone Number:
(910)396-4009
2g. Email Address:*
monica.a.stephenson.civ@mail.mil
State / Frovinoe / Region
North Carolina
Country
USA
2f. Fax Number:
(910)432-6908
r Yes r No
r Yes r No
C. Project Information and Prior Project History v
1. Project Information
1b. Subdivision name:
(if appropriate)
1 c. Ne arest mu n icipal ity / town:
Fort Bragg/Fayetteville
2. Project Identification
2a. Property Identification Number:
2b. Property size:
Fort Bragg
93
2c. Project Address
Street Address
2175 Reilly Road, Stop A
Address Line 2
qty
State / Rovinee / Region
Fort Bragg
NC
Postal / Zip Cade
Country
28310-5000
USA
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Tuckahoe Creek (MacArthur Lake); 18-23-13-4
3b. Water Resources Classification of nearest receiving water:*
WS -III
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12 -digit HUC in which the project is located.
Upper Cape Fear(HUC #03030004)
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Existing site is an earthen boat launch on a 93 acre lake located in training areas Y2 and Y4 (Fort Bragg Military Reservation). The lake is primarily used to conduct military training
activities. Recreational activities are permitted (subsequent to training activities) and administered by the Fort Bragg Hunting and Fishing Center and Morale, Welfare, and Recreation
Programs.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
f Yes r No r Unknown
4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
SiteE.pdf
297.39KB
4e. Attach an 8 1/2X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
SiteE_Soils_Final.pdf 3.23MB
4f. List the total estimated acreage of all existing wetlands on the property:
93
4g. List the total estimated linear feet of all existing streams on the property:
4500
4h. Explain the purpose of the proposed project:*
Upgrade existing earthen boat slips to accommodate sustained tactical vehicle use during military training exercises.
—Narrative for waiving PCN requirement due to exceeding 20' width"`
Site E is for near shore operations and the initial launch point for tactical conveys during contested crossing training exercises. The additional 5' width will provide greater stability to the
launch point from the initial weight transfer of each vehicle entering the bridge platform. The bridge system will be maneuvered into place by boat, the additional width will also give the
engineering team additional room to maneuver the bridge ramp into place without excess damage the adjacent lake shore.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The 502nd Multi -Role Bridge Company will reinforce an existing boat launch point on MacArthur Lake. The upgrade and construction process will give the 502d MRBC experience on
conducting bridging operations and river crossings in a military capacity. Approximately 250 sq.ft. of lake bed will excavated 6" and backfilled with rip rap and gravel to harden the lake
bed for vehicular launch points. The existing dirt approaches Will be reinforced with 2" of gravel. The approaches will be 40' Lx 25' W. A High Mobility Engineer Excavator (HMEE) Will be
used to dredge the lake bottom. The M400 skid steer loader will move, backfill, and grade the gravel and rip rap.
4j. Please upload project drawings for the proposed project.
BOAT_RAMP_E (1).pdf 272.62KB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No f Unknown
Comments
USACE Wilmington District vitied the project Site -E
5b. If the Corps made a jurisdictional determination, what type of determination was made?
r Preliminary r Approved r Not Verified r Unknown r IIA
Corps AID Number:
5c. If Sa is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes C No
7b. If yes, explain.
If yes, explain.
The first boat slip will be improved in January 2019. There are 7 other sites that will be improved over the course of 2019 as training activities require.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
NA
DProposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
F Wetlands r Streams -tributaries [ Buffers
W Open Waters r Pond Construction
4. Open Water Impacts
4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area
Site -E
Construction
P
MacArthur
Fill
Lake
0.02
Site -E
Construction
P
MacArthur
Excavation
_11
Lake
0.02
4g. Total temporary open water Impacts: 4g. Total permanent open water impacts:
0.00 0.04
4g. Total open water impacts:
0.04
4h. Comments:
Note: The total project impacts are 0.005. 4f. Impact area, 4g. Total permanent open water impacts, and 4g. Total open water impacts does not allow
the correct acres of impact to be entered.
E. Impact Justification and Mitigation U
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Project was designed to minimum standards to safely accommodate tactical vehicles. The current site is an eroded earthen boat slip. Improving the
existing launch will minimize/halt existing site sedimentation issues.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Lake levels will be lowered to increase dry ground access for construction and reduce equipment working in the lake. Dredged lake bottom will be
removed and placed on degraded access trails and will not be placed on adjacent lakeshore or wetlands. No tree removal will be required. EAsting
adjacent vegetation will be left intact to greatest extent possible to minimize erosion potential. Training enabler/rehabilitation programs will hydro seed
the adjacent trail and lake shoulders (post training exercise) to stabilize the surrounding areas.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
The total amount of impacts to wetlands does not meet the threshold to require compensatory mitigation. Impacts are only to open waters.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
If no, explain why:
There are no protected riparian buffers in Hoke county on Ft. Bragg. No watersheds on Ft. Bragg are within the NC Riparian Buffer Protection Rules.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r- Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r- Yes r No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater
program?
r Yes r No
3. Stormwater Requirements
3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause
degradation of downstream surface waters.*
r Stormwater Management IT Antidegradation
Plan Calculations
3b. Stormwater Management Plan
3c. Antidegradation Calculations:
Comments:
NA. The boat ramps do not add to the amount of impervious surface within this watershed therefore do not require any stormwater requirements.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
r Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
r- Yes r No
Comments:
This project NEPA requirement is a REC and is not a major or significant impact that requires an EA or EIS. A REC does not need to go through the
State Clearing House.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r- Yes r No
3b. If you answered "no," provide a short narrative description.
The boat ramps may likely improve baseline conditions by improving water quality downstream through stabiliang the lakes banks thus, reducing
potential erosion into MacArthur lake.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No
Se. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
r Unknown
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Collaborated and coordinated with Fort Bragg DPW Endangered Species Branch biologists and the Environmental Branch Section 7 biologist to
potential impacts to Endangered Species. No Designated Critical Habitat epsts within the project area. Impacts determined were a "no effect" and no
further consultation was required with the USFWS.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Collaborated and coordinated with Fort Bragg Wildlife Branch fisheries biologist to determine no impacts to essential fish habitat.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Collaborated and coordinated with Fort Bragg cultural resource staff to determine that no impacts would occur to historic or archeological resources.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA designated 100 -year floodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
The project environmental baseline is not likely to be increased with impervious surface, therefore the impacts to flooding within the floodplain remain
unchanged.
8c. What source(s) did you use to make the floodplain determination?*
Fort Bragg officials used the FEMA Flood maps to determine floodplain determination.
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
David A. Heins
Signature
Sign
Date
12/11/2018
SOIL
WATER
X
SOIL
3"
3"
RAMPAPPROACH
DETAIL X
SCALE 10:1
WATER
3/8"-1" GRAVEL
RIP RAP
APPROACH
RAMP
40'10'
25'
TOP VIEW
SCALE 1:2
2"
APPROX. 7°
BOAT RAMP
SITE E 865TH FEST-A
DRAWN BY:DATE:SCALE:SHEET:CLASS.:
1LT SPECIALE ANDREW 20181102 1:90 1 OF 1 FOUO
BOM (APPROX)
GRAVEL 9 CU. YARDS
RIP RAP 2.5 CU. YARDS
E
BaB
CaB
BaB
W
CaB
BaD
BaD
CaB
JT
JT
CaB
BaD
JT
BaD
BaB
BaD
BaD
FuB CaB
FuB
DhA
JT
CaB
BaD
CaB
FB 28
FB 29
FB 30
FB 34
FB 31
FB 32
MANCHE
S
T
E
R
R
D
FB 33
Maneuver TrailManaged TrailsFB 29
FB 31
Maneuver TrailManeuver TrailManeuver Trail
Ma
n
e
u
v
e
r
T
r
a
i
l
FB 34
FB 33Managed Tra
i
ls
Maneuver TrailManeuver
Trail Maneuver TrailManeuver TrailManeuve
r
T
r
a
i
l
Maneuver TrailMan
a
g
e
d
T
r
a
i
l
s
0 0.15 0.3 0.45 0.60.075 Miles ´DPW, Environmental Management BranchMap Created By: Erich L. HoffmanDate:Dec 4, 2018
PN AA-00023-19 WGX Site E
Text
Legend
MASTER_SOILS_AREA_NCW