HomeMy WebLinkAboutNCG030571_Email RE Problem with Renewal COC_20181214Georgoulias, Bethany
From:
Georgoulias, Bethany
Sent:
Friday, December 14, 2018 10:27 AM
To:
jim.zell@assaabloy.com
Cc:
jeff.duke@assaabloy.com
Subject:
RE: Renewal COC for NPDES Stormwater Permit No. NCG030571
Jim —
Thanks so much for alerting us to the problem with this original COC. We went in to find that several other COCs were
similarly affected that same afternoon, and we've been touching base with permittees so they can get a corrected copy.
Thanks again,
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental (duality
919 707 3641 office
bethany.geor oulias _,ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: httb://dea.nc.ciov/about/divisions/enerciv-mineral-land-resources/stormwater
Email corre,sl,)om1ence to am1 from this t res,s is ,subiect to the Nodh Carolina Public Recants
Law am1 n7 .y be �1isclose�1 to thin1 is dies.
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Monday, December 10, 2018 2:45 PM
To: jim.zell@assaabloy.com
Cc: jeff.duke@assaabloy.com
Subject: Renewal COC for NPDES Stormwater Permit No. NCG030571
Dear Permittee:
Please see the attached new Certificate of Coverage No. NCG030571 for renewed coverage under Stormwater General
Permit NCG030000 for this facility. This permit is reissued pursuant to the requirements of North Carolina General
Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental
Protection Agency, dated October 15, 2007 (or as subsequently amended.)
You must print a copy of the new NCG030000 General Permit from our Stormwater General Permits web page. In
addition to the full permit, the 2018 print package on the website includes revised Discharge Monitoring Report (DMR)
forms and Qualitative Monitoring Report Forms.
The General Permit authorizes discharges of stormwater, and it specifies your obligations with respect to discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all
changes in the reissued permit. Your facility has six (6) months from receipt of the permit to update your Stormwater
Pollution Prevention Plan (SPPP) to reflect any new permit requirements.
When does electronic DIVIR (eDMR) reporting start, and does it affect this permit?
If activities at this facility ever require analytical monitoring, eDMR will affect you. We are setting up our database with
the outfalls that permittees submitted on-line and permit parameters. Permittees will receive notification when our
eDMR system is ready for permit -holders to register and begin reporting monitoring data electronically. If you have any
questions about the status, please contact Bethany Georgoulias at (919) 707-3641.
Your coverage under the General Permit is transferable only through the specific action of DEMLR. This permit does not
affect the legal requirements to obtain other permits which may be required by the N.C. Department of Environmental
Quality (DEQ), nor does it relieve the permittee from responsibility for compliance with any other applicable federal,
state, or local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit please contact The Stormwater Program at (919) 707-9220.
Sincerely,
The NC DEQ Stormwater Program