HomeMy WebLinkAbout20181470 Ver 1_CAMA Major Permit No. 133-18_20181213Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 133-18 Issued to William H Mayo III 53 Mill Rd Aurora NC 27806 Authorizing development in Beaufort County at on Bond Creek at 53 Mill Road. near Aurora , as requested in the permittee's application dated 9/4/18, including attached workplan drawings (4) all dated 9/4/18 This permit, issued on December 13, 2018 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation if these terms may be subject to fines, imprisonment or civil action; or may cause the permit to oe nun ana vola. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction 3) The bulkhead shall be constructed prior to any backfilling activities. 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or omer qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 in issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. wpea oy IDC aumulay u, ulu — —,z w... -- Chairman of the Coastal Resources Commission. Braxton C. TYals, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee William H. Mayo III ADDITIONAL CONDITIONS Permit No. 133-18 Page 2 of 3 5) The fill material shall be clean and free of any pollutants except in trace quantities. 6) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 7) No backfill material is to be placed within 30 feet of the normal water line, except that which will be used to backfill the area behind the permitted bulkhead. Sedimentation and Erosion Control 8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Boathouse 9) This permit authorizes only the boathouse over the existing slip and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 12) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 13) This permit does not authorize any additional formalized boat slips. General 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 15) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 16) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. William H. Mayo III Permit No. 133-18 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW -2018-02067) issued 12/13/18. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 2018-1470 issued 12/11/18. NOTE: Future development of the pennittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc satisfied the Section 401 application processing fee requirements of the Division of Water Resources.