HomeMy WebLinkAbout20050431 Ver 2_CAMA Major Permit Renewal (2)_20181211Permit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to T.A. Bramble. PO Box 785. Niwot. CO 80544
Permit Number
174-06
Authorizing development in Dare County at 200 Tower Lane, Colington Island, adj. to
Albemarle Sound, Kill Devil Hills as requested in the permittee's application dated letter dated
11/5/18.
This permit, issued on December 11, 2018 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
ie suolect to tines, imprisonment or civu action; or may cause me permn to De nuu ana vola.
1) This renewal shall be attached to Permit No. 174-06, which was issued to the permittee on 11/7/06,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
05-0431.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2006-40222-128.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified personsvwithin twenty (20) days of the issuing
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Braxtod /U Davis, Director
ision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee