HomeMy WebLinkAbout20050431 Ver 2_CAMA Major Permit Renewal_20131220Permit Class Permit Number
RENEWAL _174-06
STATE OF NORTH CAROLINA
fi "', Department of Environment and Natural Resources
�.. i..: •�.s° 1•' t .�.. ,3 and
Coastal Resources Commission
UEC 2 C 2013 Vern't)bor-o 431
r,,.. . < for
Major Development in an Area of Environmental Concern
pursuant to NCGS l 13A-118
X__ Excavation and/or filling pursuant to NCGS It 3-229
Issued to T.A. Bramble, PO Box 785 Niwot, CO 80544 _
Authorizing development in_ Dare County at 200 Tower Lane, Colington Island, adi. to
Albemarle Si trod, Kill Devil Hills , as requested in the permittee's letter dated
This permit, issued on December 20, 2013 , is subject to compliance with the application (where consistent
with the nermit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to he null and void
1) This renewal shall be attached to the original of Permit No. 174-06, which was issued on 11/7/06,
the minor modifications issued oil 8/31/07, 9/5/12 and 9/30/13, and copies of all documents shall be
readily available on site when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force tinder this renewal unless
specifically altered herein.
(See attached sheet for Additional Conditions)
This permit action may be. appealed by the permittee or
other qualified persons within twenty (20) clays of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval
All work shall cease when the permit expires oil
December 31, 2018
Signed by the authority of the Secretary of ulsNrc one ure
Chairman of the Coastal Resources Commission.
sr�13'raxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal — --
Management Program. Signature of Permittee
Ip[£