Loading...
HomeMy WebLinkAboutNCG050349_Ltr re Compliance Inspection Report_20181130It©Y COOP€`R (2a"rnar MCHAEL S. RECAN seaw-Y WILUAM E. (TOBY) VINSON, }R fiftrhn Dfrecl NORTH CAROLINA En*vmnei,dW QuaUt} November 30, 2018 Berry Global, Inc. Attention: Shay Wingate, EHS Manager 3414 Wesley Chapel Stouts Rd. Monroe NC 28110 Subject: Compliance Evaluation Inspection Berry Global, Inc. NPDES Stormwater Certicate of Coverage- NCGO50349 Union County, North Carolina Dear Mr. Wingate: " H13 DENR-LAND QUALITY STORKNA,TER PERMITTING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Berry Global, Inc. Monroe facility on November 29, 2018. Please note that in the stormwater inspection report summary we ask that you maintain documentation of employee training and qualitative monitoring. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at tamera.eplin@ncdenr.gov. Enclosure c: Stormwater Permitting Branch Sincerely, j es Moore Assistant Regional Engineer �aF� North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCG050349 Effective: 06/01/18 Expiration: 05/31/23 Owner: Berry Global Inc SOC: Effective: Expiration: Facility: Berry Global Inc. County: Union 3414 Wesley Chapel Stouts Rd Region: Mooresville Monroe NC 28110 Contact Person: Anthony Ugone Title: Phone: 704-289-1526 Directions to Facility: From Highway 74 East onto Wesley Chapel -Stouts Road. South about 1/2 mile. The facility is on the left hand side of the road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/29/2018 Entry Time: 02:OOPM Exit Time: 03:30PM Primary Inspector: Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG050349 Owner - Facility: Berry Global Inc Inspection Date: 11/29/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: This facility had very good housekeeping in that there were no resin pellets on the ground. Shay Wingate, the EHS manager, has done extensive research into the facility's stormwater and any environmental concerns on the property. The stormwater ditchline near the rail cars has been rocked to remove any resin pellets that may wash off the property and no pellets were observed at the time of inspection. Petroleum contaminated soils from previous practices were observed and removed from the site. Three groundwater monitoring wells were installed and are monitored regularly. Semi annual qualitative monitoring and employee training records are not currently maintained and must be retained for at least three years. If you have any questions, please contact me at Lily. Kay@ncdenr.gov or by phone at (704) 235-2137. Page: 2 Permit: NGG050349 Owner - Facility: Berry Global Inc Inspection Date: 11/29/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ E ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Employee training has not been documented. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Althouqh qualitative monitorinq has been conducted, documentation needs to be maintained Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Althouqh analvtical monitoring is not required with this Dermit, the facilitv conducted stormwater sampling to determine if there were any potential hazards in their discharge. All results were within any discharge limitations required in other general stormwater permits. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Two outlets were observed, one in the front near the rail cars and one in the back near the dumpsters. One outlet coming from the parking lot to the back of the facility has been sampled and the results indicated that that discharge point does not need to be monitored. However, some erosion under the flarred outlet to the ditch was observed and must be stabilized. Page: 3