Loading...
HomeMy WebLinkAboutNCG210429_Ltr re Compliance Inspection Report_20181109Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY November 9, 2018 Grice & Co., LLC Attn: Philip Edward Grice 986 Byrdville Freeman Road Delco, NC 28436-9536 Subject: Compliance Evaluation Inspection NPDES General Stormwater Permit NCG210000 Certificate of Coverage NCG210429 Grice & Co New Hanover County Dear Mr. Grice: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E.(TOBY) VINSON Interim Director RECEN NOVn(3 2`7 DENR-LAND QUALI ^� STORMWATER PE!1ii; ; lNr On November 1, 2018, Brian Lambe from theWilmington Regional Office of the Division of Energy, Mineral, and Land Resources (DEMLR), conducted a compliance evaluation inspection for Grice & Co located on 800 Sunnyvale Drive, New Hanover County, North Carolina. The following observations were noted during the DEMLR inspection: The facility is no longer operated by Grice & Co, LLC. Yearly fee has not been paid for two years. Please submit a rescission form to this office. Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to $25,000.00 per day for each violation. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact Dan Sams or me at 910-796- 7215 or brian.lambe@ncdenr.gov Sincerely, n Lambe Environmental Specialist Land Quality Section Attachments: 1. BIMS Inspection Checklist 2. Rescission form cc: WiRO Files — Land Quality Central Files — DEMLR Wilmington Regional Office 127 Cardinal Drive Ext, Wilmington, NC 28405 . Phone:910-796-7215 Permit: NCG210429 SOC: County: New Hanover Region: Wilmington Contact Person: Phil E Grice Compliance Inspection Report Effective: 08/09/13 Expiration: 07/31/18 Owner: Grice & Co LLC Effective: Expiration: Facility: Grice & Co LLC 800 Sunnyvale Dr Title: Wilmington NC 28412 Phone: 910-620-4392 Directions to Facility: From the intersection of river rd (sr 1100) & sunnyvale dr travel approx .40 mi east on sunnyvale dr the site ison the left. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/01/2018 EntjTime: 01.00PM Exit Time Primary Inspector: Brian P Lambe /--� jl Secondary Inspector(s): t Reason for Inspection: Routine` Inspection Type: Permit Inspection Type: Timber roducts Stormwater Discharge COC Facility Status: El Compliant Not Compliant Question Areas: Storm Water (See attachment summary) 02:00PM Phone: Compliance Evaluation Page 1 Permit: NCG210429 Owner - Facility: Grice & Co LLC Inspection Date: 11/01/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Grice is no longer operating at this facility. TIMA Capital is operating a log staging facility in order to export pine via the port. TIMA will need to submit NOI. Grice & Co, LLC will need to rescind permit. Page: 2 Permit: NCG210429 Owner - Facility: Grice & Co LLC Inspection Date: 11/01/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? ❑ El El 0 # Does the Plan include a "Narrative Description of Practices"? El El El 0 # Does the Plan include a detailed site map including outfall locations and drainage areas? El El EJ N # Does the Plan include a list of significant spills occurring during the past 3 years? D ❑ # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? ❑ # Does the Plan include a BMP summary? ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0❑ # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? El 0 ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ D El 0 Comment. - Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 El ❑ Comment Permit and Outfialls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? [] # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? [] ❑ ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? ❑ ❑ ■ Comment: Page 3