Loading...
HomeMy WebLinkAboutNCG170418_Ltr re Compliance Inspection_20181022ROY COOPER co NffCHAEL S. REGAN Secretary WILLIAM E. (TOED) VINSON, JR. Interim Mremr Berry (Polymer Group) Attention: David Smith 111 Excellence Lane Mooresville, North Carolina 28115 NORTH CAROLIN 4 EnvtronmenftdQuaUW October 22, 2018 Subject: Compliance Evaluation Inspection Berry (Polymer Group) NPDES Stormwater Certificate of Coverage- NCG170418 Iredell County, North Carolina Dear Mr. Smith: RECEIVED OCR' 3 0 2010 DENR-LAND QUALITY STORMWATER PERMITTING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Berry (Polymer Group) facility on October 10, 2018. Please note that in the stormwater inspection report summary we ask that you complete and fully implement the SWPPP. The report should be self-explanatory, however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely, �aes Moore Assistant Regional Engineer Enclosure c: Stormwater Permitting Branch North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources Mooresville Regional Offlce 1 610 East Center Avenue, Suite 301 ( Mooresville, North Carolina 28115 704.663.1699 Permit: NCG170418 SOC: County: Iredell Region: Mooresville Compliance Inspection Report Effective: 10/02/14 Expiration: 07/31/19 Owner : Polymer Group Inc Effective: Expiration: Facility: Polymer Group 111 Excellence Ln Contact Person: Tyler Robinson Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/10/2018 Entry Time: 04:00PM Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Mooresville NC 28115 Phone: 704-660-6204 Phone: Exit Time: 05:00PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG170418 Owner - Facility: Polymer Group Inc Inspection Date: 10/10/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility has removed all petroleum tanks and only has dumpsters outside. A "No Exposure Certification" inspection will be conducted if the facility requests one. The SWPPP has been fully implemented and documentation of employee training and semiannual qualitative monitoring is kept on site. If you have any questions, contact my office at Lily.Kay@ncdenr.gov or by phone at(704)235-2137. Page: 2 Permit: NCG170418 Owner - Facility: Polymer Group Inc Inspection Date: 10/10/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The facility maintains the SWPPP and a detailed record of documentation for all tasks in the SWPPP. (Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: The facility does conduct semiannual qualitative monitoring, but the roadside ditchline must be excluded as it is comingled with stormwater from the road and is not representative of the facility conditions. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 1:10 ❑ Comment: Page: 3