Loading...
HomeMy WebLinkAboutNCG160217_Ltr re Compliance Inspection Report_20181009Energy. Mineral and Land Resources ENVIRONMENTAL QUALITY October 9, 2018 Boggs Materials, Inc. Monroe Asphalt Plant 2318 Concord Hwy Unionville, North Carolina 28111 Subject: Compliance Evaluation Inspection Boggs Materials, Inc. NPDES Stormwater Certificate of Coverage- NC Union County, North Carolina Dear Mr. Boggs: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director .,_ OCT STO Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Monroe Asphalt Plant and the Stafford Street Asphalt Plant on October 3, 2018. Please note that in the stormwater inspection report summary we ask that you fully implement the SWPPP, maintain documentation, and conduct sampling at the next measurable rain event at both facilities. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at Lily.Kay@ncdenr.gov. Sincerely, 4-ki- Lily Kay, CSI Environmental Specialist Enclosure c: Stormwater Permitting Branch State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Permit: NCG160218 SOC: County: Union Region: Mooresville Contact Person: Chris Boggs Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/03/2018 Primary Inspector: Lily C Kay Secondary Inspector(s): Compliance Inspection Report Effective: 03/17/16 Expiration: 09/30/19 Owner: Boggs Materials Inc Effective: Expiration: Facility: Boggs Materials, Inc - Stafford Street Asphalt Plant 225 Stafford St Extension Title: Certification: Unionville NC 28110 Entry Time: 12:30PM Exit Time: 03:OOPM Phone: 704-289-8482 Phone: Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG160218 Owner - Facility: Boggs Materials Inc Inspection Date: 10/03/201$ Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: This industrial stormwater permit will supercede any open erosion and sediment control and construction stormwater permits. This office will close and dead file any open E&SC plans. As discussed, fully implement the SWPPP, maintain documentation, and conduct sampling dusing the next measureable rain event and email me the results as soon as they are received by the Permittee. If you have any questions, contact my office at Lily. Kay@ncdenr.gov or by phone at (704)235-2137. Page: 2 Permit: NCG 160218 Owner - Facility: Boggs Materials Inc Inspection Date: 10/03/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Fully implement the SWPPP and maintain documentation. Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Conduct sampling at the next measureable rain event. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative ouffall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ ❑❑❑■ ❑■❑❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ❑❑❑■ ❑ N ❑ ❑ ■❑❑❑ ❑■❑❑ ■❑❑❑ ❑■❑❑ Yes No NA NE ❑■❑❑ ❑■❑❑ Yes No NA NE ■❑❑❑ ❑❑0D Page: 3 Permit: NCG160217 SOC: County: Union Region: Mooresville Contact Person: Chris Boggs Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/03/2018 Primary Inspector: Lily C Kay Secondary Inspector(s): Compliance Inspection Report Effective: 03/17/16 Expiration: 09/30/19 owner: Boggs Materials Inc Effective: Expiration: Facility: Boggs Materials, Inc - Monroe Asphalt Plant 2318 Concord Hwy Title: Certification: Unionville NC 28110 Entry Time: 12:30PM Exit Time: 03:OOPM Reason for Inspection: Routine Inspection Type Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Phone: 704-289-8482 Phone: Phone: 704-663-1699 Compliance Evaluation Page: 1 Permit: NCG160217 Owner - Facility: Boggs Materials Inc Inspection Date: 10/03/201 B Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This industrial stormwater permit will supercede any open erosion and sediment control and construction stormwater permits. This office will close and dead file any open E&SC plans. As discussed, fully implement the SWPPP, maintain documentation, and conduct sampling dusing the next measureable rain event and email me the results as soon as they are received by the Permittee. If you have any questions, contact my office at Lily. Kay@ncdenr.gov or by phone at (704) 235-2137. Page: 2 Permit: NCG160217 Owner - Facility: Boggs Materials Inc Inspection Date: 10/03/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Fully implement the SWPP and maintain documentation. Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The facility has never taken a sample. A sample must be taken as soon as possible Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ E ❑ ❑ ■❑❑❑ ❑❑❑■ ■❑❑❑ ❑❑❑■ ❑■❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑■❑❑ Yes No NA NE ❑■❑❑ ❑■❑❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ Page: 3