Loading...
HomeMy WebLinkAbout20171584 Ver 1_Mitigation Information_20181213ID#* 20171584 Select Reviewer:* Mac Haupt Initial Review Completed Date 12/13/2018 Mitigation Project Submittal -12/13/2018 Version* 1 Is this a Prospectus, Technical Proposal or a New Site? * Type of Mitigation Project:* W Stream r Wetlands r Buffer r Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Andrea Eckardt Project Information Existing 20171584 (DWR) (nunbers only no dash) I D#: * Project Name: Dugger Creek Mitigation Site County: Watauga Document Information r Yes r No Email Address:* aeckardt@Wldlandseng.com Existing 1 Version: (nun-bersonly) Mitigation Document Type:* Mitigation Bank Instrument File Upload: Yadkin Valley UMBI Draft 12.12.2018.pdf 188.1 KB Rease upload only one RDF of the corrplete file that needs to be subrritted... Signature Print Name:* Andrea Eckardt Signature:* Version June 2016                                                                                                                                           Page 1  AGREEMENT TO ESTABLISH THE YADKIN VALLEY UMBRELLA MITIGATION BANK  IN THE YADKIN  RIVER BASIN WITHIN THE STATE OF NORTH CAROLINA    U.S. Army Corps of Engineers (Corps) approval of this Instrument constitutes the regulatory  approval required for the  Yadkin Valley Umbrella Mitigation Bank to be used to provide  compensatory mitigation for Department of the Army permits pursuant to 33 C.P.R.  332.8(a)(1).  This Instrument is not a contract between the Sponsor or Property Owner and Corps or any other  agency of the federal government. Any dispute arising under this  Instrument will not give rise to  any claim by the Sponsor or Property Owner for monetary damages. This provision is controlling  notwithstanding any other provision or statement in  the Instrument to the contrary.  This Umbrella Mitigation Banking Instrument (UMBI) is made and entered into on the       day of______________, 2019, by Wildlands Holdings IV, LLC, hereinafter Sponsor, and the Corps,  and each of the following agencies, upon its execution of this UMBI; the  Environmental  Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS), the National Marine Fisheries  Service (NMFS), the North Carolina Wildlife Resources Commission  (NCWRC), the State Historic  Preservation Office (SHPO) and the North Carolina Division of  Water Resources (NCDWR).  The  Corps, together with the state and federal agencies that  execute this UMBI, are hereinafter  collectively referred to as the Interagency Review Team  (IRT).  WHEREAS the purpose of this agreement is to establish an umbrella mitigation bank (Bank)  providing compensatory mitigation for unavoidable wetland and/or stream impacts separately  authorized by Section 404 Clean Water Act permits and/or Section 10 of the Rivers and Harbors  Act permits in appropriate circumstances;  WHEREAS the agencies comprising the IRT agree that the Bank sites are suitable  mitigation  bank sites, and that implementation of the Mitigation Plans are likely to result in net gains in  wetland and/or stream functions at the Bank sites, and have therefore approved the Mitigation  Plans;    THEREFORE, it is mutually agreed among the parties to this agreement that the following  provisions are adopted and will be implemented upon signature of this UMBI.  Section I:  General Provisions  A. The Sponsor is responsible for assuring the success of the restoration, creation,  enhancement and preservation activities at the Bank sites, and for the overall operation and  management of the Bank. The Sponsor assumes the legal responsibility for providing the  compensatory mitigation once a permittee secures credits from the Sponsor and the District  Engineer (DE) receives documentation that confirms the Sponsor has accepted responsibility for  providing the required compensatory mitigation.  B. The goals of the Umbrella Bank sites are to restore, enhance, create and preserve  wetland and/or stream systems and their functions to compensate in appropriate circumstances  for unavoidable wetland and/or stream impacts authorized by Section 404 of the Clean Water  Version June 2016                                                                                                                                           Page 2  Act permits and/or Section 10 of the Rivers and Harbors Act permits in circumstances deemed  appropriate by the Corps after consultation, through the permit review process, with members  of  the IRT.    C. Use of credits from the Bank to offset wetland and/or stream impacts authorized by  Clean  Water Act permits must be in compliance with the Clean Water Act and implementing  regulations, including but not limited to the 404(b)(1) Guidelines, the National Environmental  Policy Act, and all other applicable federal and state legislation, rules and regulations.  This  agreement has been drafted in accordance with the regulations for Compensatory Mitigation for  Losses of Aquatic Resources effective June 9, 2008 (33 CFR Parts 325 and 332) (Mitigation Rule).  D. The IRT shall be chaired by the DE of the U.S. Army Corps of Engineers, Wilmington  District (District). The IRT shall review documentation for the establishment of mitigation bank  sites. The IRT will also advise the DE in assessing monitoring reports, recommending remedial  measures, approving credit releases, and approving modifications to this instrument. The IRT’s  role and responsibilities are more fully set forth in Sections 332.8 of the Mitigation Rule. The  IRT  will work to reach consensus on its actions.    E. The DE, after consultation with the appropriate federal and state review agencies  through the permit review process, shall make final decisions concerning the amount and type of  compensatory mitigation to be required for unavoidable, permitted wetland and/or stream  impacts, and whether or not the use of credits from the Bank is appropriate to offset those  impacts. In the case of permit applications and compensatory mitigation required solely under  the Section 401 Water Quality Certification rules of North Carolina, the NCDWR will determine  the amount of credits that can be withdrawn from the Bank. Any credits used to offset impacts  solely authorized by Section 401 cannot be used for other impacts authorized under Section 404  of the Clean Water Act or Section 10 of the Rivers and Harbors Act.    F. The parties to this agreement understand that a watershed approach to establish  compensatory mitigation must be used to the extent appropriate and practicable. Where  practicable, in‐kind compensatory mitigation is preferred.  Section II:  Geographic Service Area  The Geographic Service Area (GSA) is the designated area within which the Umbrella Bank is  authorized to provide compensatory mitigation required by DA permits.  The GSA for this Bank  shall include the Yadkin Watershed Hydrologic Unit Code (HUC) 0 3040101 in North Carolina.  Credits are to be used in the same HUC in which they were generated, and credits within each  HUC  should be tracked on separate ledgers.   Version June 2016                                                                                                                                           Page 3  Section III:  Mitigation Plan  Any Mitigation Plan submitted pursuant to this agreement must contain the information  listed in 332.4(c)(2) through (14) of the Compensatory Mitigation Rule.    A. The Sponsor will perform work described in each site‐specific approved Mitigation  Plan(s).    B. The Sponsor shall monitor the Bank Sites as described in the approved Mitigation Plans,  until such time as the IRT determines that the performance standards described in the  Mitigation Plans have been met.    C. Mitigation Plans submitted for inclusion in this bank must meet the requirements of any  District guidance that is current at the time the new site is submitted to the District, including any  updates made to monitoring requirements, credit releases, long term management, or any other  provisions that are required and/or specifically addressed in the Mitigation Plan. The addition of  any site to this instrument shall be considered as a modification to this instrument, and  processed  in accordance with the procedures set forth in the Mitigation Rule.    D. The members of the IRT will be allowed reasonable access to the Property for the  purposes of inspection of the Property and compliance monitoring of the Mitigation Plan.    Section IV:  Reporting  A. The Sponsor shall submit to the DE, for distribution to each member of the IRT, an  annual report describing the current condition of the Bank Sites and the condition of the Bank  Sites in relation to the performance standards in the Mitigation Plans. The Sponsor shall  provide  to the DE any monitoring reports described in the Mitigation Plans.    B. As part of each annual monitoring report, the Sponsor shall also provide ledger reports  documenting credit transactions as described in Section VIII of this UMBI.    C. Each time an approved credit transaction occurs, the Sponsor shall provide notification  to  the DE within 30 days of the transaction. This notification shall consist of a summary of the  transaction and a full ledger report reflecting the changes from the transaction. Additionally,  signed copies of the Compensatory Mitigation Transfer of Responsibility Form shall be  submitted  to the CORPS Project Manager for the permit and the CORPS Bank Manager for the bank  site.    Section V:  Remedial Action  A. The DE shall review the monitoring reports, as required in the Mitigation Plans, and  may, at any time, after consultation with the Sponsor and the IRT, direct the Sponsor to take  remedial action at the Bank sites.  Remedial action(s) required by the DE shall be designed to  achieve the performance standards as specified in the Mitigation Plans. All remedial actions  required under this section shall include a work schedule and monitoring criteria that will take  Version June 2016                                                                                                                                           Page 4  into account physical and climactic conditions.    B. The Sponsor shall implement any remedial measures required pursuant to the above.    C. In the event the Sponsor determines that remedial action may be necessary to achieve  the  required performance standards, it shall provide notice of such proposed remedial action to  all  members of the IRT.  No remedial actions shall be taken without the concurrence of the DE,  in  consultation with the IRT.    Section VI:  Use of Mitigation Credits  A. Description of credit classifications and provisions pertaining to the use of those credits  shall be provided in the Mitigation Plan(s) to be included in this bank. Credit classifications  (e.g.,  cold water stream, cool water stream, warm water stream, coastal wetlands, non‐riparian  wetlands, riparian non‐riverine wetlands, and riparian riverine wetlands) will be in accordance  with current District guidance at the time the Mitigation Plan is submitted to the District. In  general, these classifications will be used to determine if a particular credit qualifies as “In‐  Kind”  mitigation. Exceptions to the use of “In‐Kind” mitigation may be allowed at the  discretion of the  permitting agencies on a case‐by‐case basis.    B. Wetland and stream compensation ratios are determined by the DE on a case‐by‐case  basis based on considerations of functions of the wetlands and/or streams impacted, the severity  of the wetland and/or stream impacts, the relative age of the mitigation site, whether the  compensatory mitigation is in‐kind, and the physical proximity of the wetland and/or stream  impacts to the Bank Site.    C. Notwithstanding the above, all decisions concerning the appropriateness of using credits  from the Bank to offset impacts to waters and wetlands, as well as all decisions concerning the  amount and type of such credits to be used to offset wetland and stream impacts authorized by  Department of the Army permits, shall be made by the DE, pursuant to Section 404 of the Clean  Water Act and implementing regulations and guidance. These decisions may include notice to  and consultation with the members of the IRT through the permit review process if the DE  determines this to be appropriate given the scope and nature of the impact.    Section VII:  Credit Release Schedule  A. All credit releases must be approved in writing by the DE, following consultation with  the IRT, based on a determination that required performance standards have been achieved.    B. A credit release schedule shall be provided in the site‐specific Mitigation Plans that are  included in this bank. The release schedule will list all of the proposed credit releases and any  performance standards associated with those releases.    C. In general, the initial allocation of credits from any site included as part of this bank shall  be available for sale only after the completion of all of the following:  Version June 2016                                                                                                                                           Page 5    1. Execution of this UMBI by the Sponsor, the DE, and other agencies eligible for  membership in the IRT who choose to execute this agreement, to include the  approval of  any modifications to this agreement when new sites are added to it;  2. Approval of a final Mitigation Plan;  3. Confirmation that the mitigation bank site has been secured;  4. Delivery of executed financial assurances as specified in the site‐specific Mitigation  Plan;  5. Delivery of a copy of the recorded long‐term protection mechanism as described in as  specified in the site‐specific Mitigation Plan, as well as a title opinion covering the  property acceptable to the DE; and  6. Issuance of any DA permits necessary for construction of the mitigation site (if  necessary).    The Sponsor must initiate implementation of the approved Mitigation Plan(s) no later than the  first full growing season after the date of the first credit transaction (i.e., construction of the  initial physical and biological improvements proposed in the approved Mitigation Plan(s) must  be started by the end of the first full growing season following the initial sale of any credits from  the Bank). This provision does not apply to preservation‐only sites that do not include any  physical or biological improvements. Subject to the Sponsor’s continued satisfactory completion  of all required performance standards and monitoring, additional restoration mitigation credits  will be available for sale by the Sponsor as specified in the final Mitigation Plan.    Section VIII:  Accounting Procedures  A. The Sponsor shall develop accounting procedures acceptable to the DE for maintaining  accurate records of debits made from the Bank. Such procedures shall include the generation of  a ledger by the Sponsor showing credits used at the time they are debited from the Bank. All  ledger reports shall identify credits debited and remaining by type of credit and shall include for  each reported debit the Corps ORM ID number for the permit for which the credits were utilized  and the permitted impacts for each resource type.    B. When credits from the bank are sought by a permit applicant, the Sponsor shall prepare  a  reservation letter for the applicant to include with the Corps permit application, that  documents  the number and type of credits available to be debited from the bank, and the  amount of time (if  any) that those credits will be held for that applicant (with an expiration date  for the letter of  availability).    C. Each time an approved credit transaction occurs, the Sponsor shall notify the DE within  30 days of the transaction with a summary of the transaction and a full ledger report showing the  changes made. Signed copies of the Transfer of Mitigation Responsibility form shall also be  submitted to the Corps permit Project Manager and the Corps Bank Manager for that bank.    D. The Sponsor shall prepare an annual ledger report, on each anniversary of the date of  Version June 2016                                                                                                                                           Page 6  execution of this agreement, showing all credits used, any changes in credit availability (e.g.,  additional credits released, credit sales, suspended credits, etc.), and the beginning and ending  balance of remaining credits. The Sponsor shall submit the annual report to the DE, for  distribution to each member of the IRT, until such time as all of the credits have been utilized, or  this agreement is otherwise terminated.    Section IX:  Financial Assurances  A. Financial assurances for the Bank site(s) will be detailed in the site‐specific Mitigation  Plan(s).  The Sponsor shall provide financial assurances in a form acceptable to the DE,  sufficient  to assure completion of all mitigation work, required reporting and monitoring, and  any  remedial work required pursuant to this UMBI. The financial assurance value should be  based on  the cost of doing the mitigation work, including costs for land acquisition, planning and  engineering, legal fees, mobilization, construction, and monitoring. For preservation only Bank  Sites, no financial assurances will generally be required unless there are specific activities  necessary to ensure the successful preservation of resources on the site, in which case  appropriate financial assurances may still be required.    B. All financial assurances shall be made payable to a standby trust or to a third‐party  designee, acceptable to the Corps, who agrees to complete the project or provide alternative  mitigation. Financial assurances structured to provide funds to the Corps in the event of default  by the Bank Sponsor are not acceptable.    C. The form and amount of financial assurances must be stated in the site‐specific  Mitigation Plan(s) in order for the Mitigation Plan to be approved. This must include the name  of  the specific provider of those assurances and the method by which the financial assurances  will  be provided in the event that they must be utilized. Original copies of the financial  assurance  documents must be provided to the DE prior to the initial release of credits.    D. A financial assurance must be in the form that ensures that the DE receives notification  at  least 120 days in advance of any termination or revocation.    Section X:  Site Protection  A. The Sponsor shall grant a Conservation Easement (CE) in form acceptable to the DE,  sufficient to protect the Bank Site(s) in perpetuity. The CE shall be perpetual, preserve all natural  areas, and prohibit all use of the property inconsistent with its use as mitigation property,  including any activity that would materially alter the biological integrity or functional and  educational value of wetlands or streams within the Bank Site, consistent with the Mitigation  Plan.  The purpose of the CE will be to assure that future use of the Bank Site will result in the  restoration, protection, maintenance and enhancement of wetland and/or stream functions  described in the Mitigation Plan. The name and contact information for the Corps approved  easement holder and a draft copy of the CE will be provided in the site‐specific Mitigation  Plans(s).    Version June 2016                                                                                                                                           Page 7  B. The Sponsor shall deliver a title opinion acceptable to the DE covering the mitigation  property. The property shall be free and clear of any encumbrances that would conflict with its  use as mitigation, including, but not limited to, any liens that have priority over the recorded CE.    C. Subsequent to the recording of the CE, the Sponsor may convey the Bank Site property  either in fee or by granting an easement to a qualified land trust, state agency, or other  appropriate nonprofit organization approved by the Corps. The Sponsor is responsible for  ensuring that the CE is re‐recorded so that it remains within the chain of title. The terms and  conditions of this conveyance shall not conflict with the intent and provisions of the CE nor shall  such conveyance enlarge or modify the uses specified in the easement. The CE must contain a  provision requiring 60 day advance notification to the DE before any action is taken to void or  modify the CE, including transfer of title to, or establishment of any other legal claims over, the  project site.    Section XI:  Long‐term Management  A. The Sponsor shall implement the long‐term management plan as described in the site‐  specific Mitigation Plan(s). Unique Places to Save (UP2Save) will serve as the Grantee and long‐ term manager and will be the party responsible for long‐term management. UP2Save is a 501(c)3  non‐profit located at 500 Westover Drive #8850, Sanford, NC 27330 and can be reached at (910)  707‐3622 or info@uniqueplacestosave.org.  B. The long‐term management plan will include a list of annual maintenance, monitoring,  and/or repair activities for each mitigation site, the associated annual cost for each activity,  and  the required total amount necessary to provide all future site management. The long‐term  management plan should explain how the funds will be managed and provided to the designated  long‐term manager (e.g., an endowment managed through a separate account holder). The long‐  term management plan should include a contingency section that addresses how the  responsibility and funding for the long‐term site management will be passed on to a new  manager in the event that the selected long‐term management entity is no longer able to  provide for management of the site.  Section XII:  Default and Closure  A. It is agreed to establish and maintain the Bank site(s) until (i) credits have been  exhausted  or banking activity is voluntarily terminated with written notice by the Sponsor  provided to the  DE and other members of the IRT; and (ii) it has been determined and agreed  upon by the DE  and IRT that the debited Bank site has satisfied all the conditions herein and in  the Mitigation  Plan. If the DE determines that the Bank site is not meeting performance  standards or complying  with the terms of the instrument, appropriate action will be taken. Such  actions may include, but are not limited to, suspending credit sales, adaptive management,  decreasing available credits,  utilizing financial assurances, and terminating the instrument.    B. Any delay or failure of Bank Sponsor shall not constitute a default hereunder if and to  the  extent that such delay or failure is primarily caused by any act, event or conditions beyond  Version June 2016                                                                                                                                           Page 8  the  Sponsor’s reasonable control and significantly adversely affects its ability to perform its  obligations hereunder including: (i) acts of God, lightning, earthquake, fire, landslide, or  interference by third parties; (ii) condemnation or other taking by any governmental body; (iii)  change in applicable law, regulation, rule, ordinance or permit condition, or the interpretation or  enforcement thereof; (iv) any order, judgment, action or determination of any federal, state or  local court, administrative agency or government body; or (v) the suspension or interruption of  any permit, license, consent, authorization or approval. If the performance of the Bank Sponsor  is affected by any such event, Bank Sponsor shall give written notice thereof to the IRT as soon as  is reasonably practicable. If such event occurs before the final availability of all credits for  sale,  the Sponsor shall take remedial action to restore the property to its condition prior to such  event, in a manner sufficient to provide adequate mitigation to cover credits that were sold prior  to such delay or failure to compensate for impacts to waters, including wetlands, authorized by  Department of the Army permits. Such remedial action shall be taken by the Sponsor only to the  extent necessary and appropriate, as determined by the IRT.    C. At the end of the monitoring period, upon satisfaction of the performance standards, the  Sponsor may submit a request to the DE for site close out.  The DE, in consultation with the IRT,  shall use best efforts to review and comment on the request within 60 days of such submittal. If  the DE determines the Sponsor has achieved the performance standards in accordance with the  mitigation plan and all obligations under this MBI, the DE shall issue a close out letter to the  Sponsor.    Section XIII:  Miscellaneous  A. Modification of this UMBI shall be in accordance with the procedures set forth in 332.8 of  the mitigation rule.    B. No third party shall be deemed a beneficiary hereof and no one except the signatories  hereof,  their successors and assigns, shall be entitled to seek enforcement hereof.    C. This UMBI constitutes the entire agreement between the parties concerning the subject  matter hereof and supersedes all prior agreements or undertakings.    D. In the event any one or more of the provisions contained in this UMBI are held to be invalid,  illegal or unenforceable in any respect, such invalidity, illegality or unenforceability will not  affect  any other provisions hereof, and this UMBI shall be construed as if such invalid, illegal or  unenforceable provision had not been contained herein.    E. This UMBI shall be governed by and construed in accordance with the laws of North  Carolina  and the United States as appropriate.    F. This UMBI may be executed by the parties in any combination, in one or more counterparts,  all of which together shall constitute but one and the same instrument.    Version June 2016                                                                                                                                           Page 9  G. The terms and conditions of this UMBI shall be binding upon, and inure to the benefit of the  parties hereto and their respective successors.    H. All notices and required reports shall be sent by regular mail to each of the parties at their  respective addresses, provided below.  Version June 2016                                                                                                                                           Page 10  Sponsor:  Mr. Shawn D. Wilkerson  Wildlands Holdings IV, LLC   1430 S. Mint St., Suite 104  Charlotte, NC 28203    Corps:  Mr. Steve Kichefski  U.S. Army Corps of Engineers  Regulatory Division  151 Patton Avenue Room 208  Asheville, NC 2881    USEPA:  Mr. Todd Bowers  Wetlands Section ‐ Region IV Water  Management Division  U.S. Environmental Protection Agency  61 Forsyth Street SW  Atlanta, Georgia 30303  USFWS:  Mr. Byron Hamstead  U.S. Fish and Wildlife Service  160 Zillicoa Street  Asheville, NC 28801  NCWRC:  Ms. Andrea Leslie  North Carolina Wildlife Resources  Commission  645 Fish Hatchery Rd, Building B  Marion, NC 28752  NCDWR:  Mr. Mac Haupt  Division of Water Resources  North Carolina Department of  Environmental Quality  1617 Mail Service Center  Raleigh, NC 27699‐1617      NCSHPO  Ms. Renee Gledhill‐Earley  State Historic Preservation Office  4617 Mail Service Center  Raleigh, NC 27699‐4617  NMFS:  Mr. Ken Riley  National Marine Fisheries  NOAA Habitat Conservation Division  101 Pivers Island Road F/SER47  Beaufort, NC  28516  Version June 2016                                                                                                                                           Page 11  IN WITNESS WHEREOF, the parties hereto have executed this Agreement entitled “AGREEMENT  TO ESTABLISH THE YADKIN UMBRELLA MITIGATION BANK IN THE YADKIN RIVER BASIN WITHIN  THE STATE OF NORTH CAROLINA”:    Sponsor:      By:        Date:          Shawn D. Wilkerson    U.S. Army Corps of Engineers:      By:        Date:         Version June 2016                                                                                                                                           Page 12    IN WITNESS WHEREOF, the parties hereto have executed this Agreement entitled “AGREEMENT  TO ESTABLISH THE YADKIN UMBRELLA MITIGATION BANK IN THE YADKIN RIVER BASIN WITHIN  THE STATE OF NORTH CAROLINA”:  U.S. Environmental Protection Agency:      By:        Date:              U.S. Fish and Wildlife Service:      By:        Date:              N.C. Division of Water Resources:      By:        Date:              N.C. Wildlife Resources Commission:      By:        Date:              NC State Historic Preservation Office:      By:         Date:              National Marine Fisheries Service:      By:        Date:            Version June 2016                                                                                                                                           Page 13    List of Appendices    Appendix A:  Geographic Service Area Map  Appendix B: Mitigation Plan (Each plan should include construction costs, maintenance and  monitoring costs, draft copy of financial assurance documents, draft copy of site protection  instrument, and a long term management plan as appendices to the plan.)