HomeMy WebLinkAboutWQ0040342_Application (FTSE)_20181206'
Central Files- APS SWP
10/8/2018-
Pe-rimit Number WQO040342
Permit Tracking Slip
Program Category
Status Project Type
Non -discharge
In review New Project
Permit Type
Version Permit Classification
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
A Individual
Primary Reviewer
hermit Contact Affiliation
dean.hunkele
T Jason Clark
PE
Coastal SWRule
902 Market St
Wilmington NC 28401
Permitted Flow
Facility
Facility Name Major/Minor Region
Woodlands at Echo Farms Trace 3C Public Sewer Minor Wilmington
Location Address County
New Hanover
Owner
Owner Name
Cape Fear Public Utility Authority
a.+-,'1cU:s/ ve n is
Orig Issue App Received Draft initiated
10/5/2018
Facility Contact Affiliation
Owner Type
Government - Municipal
Owner Affiliation
James R. Flechtner
PE
235 Government Center Dr
Wilmington
Scheduled
Issuance Public Notice Issue Effective
Reguiat.ed Activities Requested /Received Events
Additional information requested
Additional information received
NC 28403
Expiration
NORRIS & TUNSTALL
CONSULTING ENGINEERS P.G.
902 Market Street
Wilmington, NC 28401
(910) 343-9653
(910) 343-9604 Fax
John S. Tunstall, P.E.
T. Jason Clark, P.E.
September 28, 2018
NC DEQ
Division of Water Resources
Water Quality Regional Operations Section
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Gravity Sewer Extension Fast -Track Permit Application
Woodlands at Echo Farms —Tract 3C (Public)
4114 Echo Farms Blvd
Wilmington, NC
N&T Project No. 16083
Dear Sir or Madam:
1429 Ash -Little River Road
Ash, NC 28420
(910) 287-5900
(910) 287-5902 Fax
J. Phillip Norris, P.E.
Thomas J. Scheetz, E.I.
��
t
U��AaaOV11V
OCT 0 5 2018
Wate['QUallsity Regional
0pere, 01-I Sep.
Wilaiingtr!; F- r-, -iona; Offioo
Enclosed is one (1) original application form with one (1) copy, two (2) copies of the Sewer
Narrative, one (1) original Flow Tracking /Acceptance Form (FTSE 08-13) from the Cape Fear
Public Utility Authority with one (1) copy, two (2) 8'/ x 11 color USGS Topographic Maps, two
(2) site plans (ledger size) and a $480.00 check for the processing fee.
Please review this information for approval and contact us with any questions or comments you
may have. Thank you for your assistance on this project.
Sincerely,
NORRIS & TUNSTALL
CONSULTING ENGINEERS, P.C.
't �I
1
i
T. Jaso I Clark, P.E.
TJC/asn
16083 09-28-18-s-swr-itr (Tract 3C Public)
Enclosures
NCBELS License C-3641
State of North Carolina
INEW TOM
r Department of Environmental Quality
Division of Water Resources
" 15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 &SUPPORTING DOCUMENTATION
Application Number: ��Q� �Q J 'low (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1.
Applicant's name: Cape Fear Public Utility Authority (company, municipality, HOA, utility, etc.)
2.
Applicant type: ❑ Individual El Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
El Federal ❑ State/County ❑ Municipal ® Other
3. Signature authority's name: Matt Tribett, P.E. per 15A NCAC 02T .0106(b)
Title: Engineering Manager
4.
Applicant's mailing address: 235 Government Center Drive
5.
City: Wilmin tg_on State: NC Zip: 28403-
Applicant's contact information:
f
r,
Phone number: (910) 332-6415 Email Address: Matthew. Tribett@ccfpua.orgOCT
05
2018
H. PROJECT INFORMATION:*
1.
Project name: Woodlands E - 0. w ��✓�~``°°wLL
� ands at Echo Farms Tract 3C
`•"'gar -a+
2.
Application/Project status: N.Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3.
County where project is located: New Hanover
4.
Approximate Coordinates (Decimal Degrees): Latitude: 0.34' Longitude: -0.77'
5.
Parcel ID (if applicable): R07006-002-00 1 -000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: T. Jason Clark, P.E. License Number: 030869
Firm: Norris & Tunstall Consulting Engineers, P.C.
Mailing address: 902 Market Street
City: Wilmin on State: NC Zip: 28401-
Phone number: (910) 343-9653 Email Address: jclark@ntengineers.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: M'Kean Maffitt (Southside WWTP) Permit Number: NC 0023973
Owner Name: Cape Fear Public Utility Authority
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ(DEQ Doesn't Know) - CFPUA Pump Station #27
System Wide Collection System Perrmit Number(s) (if applicable): WQCS
Owner Name(s): Cape Fear Public Utility Authority
FORM: FTA 04-16 Page 1 of 5
VL GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ®No ❑N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
E]Yes ❑No [:]N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
El Yes ❑No EIN/A
4. Origmn of wastewater: (check all that apply):
Z Residential Owned ❑Retail (stores, centers, malls) ❑Car Wash
❑ Residential Leased El Retail with food preparation/service ❑Hotel and/or Motels
D School /preschool /day care ❑ Medical /dental /veterinary facilities ❑Swimming PoollClubhouse
El Food and drink facilities ❑Church ❑Swimming Pool/Filter Backwash
❑ Businesses /offices /factories Nursing Home ❑Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(20))
Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under 15A NCAC 02T .0114(f1? ❑ Yes Z No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0.114(f�r)
Daily Design Flow a,b
Na. of Units
Flow
Townhomes (3 Bedrooms)
360 gallUnit
49
171,640 GPD
gal/
GPD
gall
GPD
gal/
GPD
gal/
GPD
gall
GPD
Total
17,640 GPD
a See _15A NCAC 02T .0114(b). (d)e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01.14] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
S. wastewater generated by project: 17,640 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously .permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected -
El Other (Explain):
FORM: FTA 04-16 Page 2 of 5
r
VH. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 15416 PVC
➢ Section II & III of the 1VIDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & M� DC (Ppmp Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)( ):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. a SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1 µ
l . Does the project comply with all separations found in 15A NCAC 02T .0305(f) &
➢ 15A NCAC 02T_0305(f) cnntaing minimum cenaratinnq that shall he nrnviderl fnr sewer cvctemc-
Yes [:] No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
"Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
"Waters Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
-high water or tide elevation and wetlands see item IX.2
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
-Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
-Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
[Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ "Stream Stream classifications can be identified using the Division's NC Surface Water Classifications weber
➢ If noncompliance with 02T.0305(f) or ,g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) E]Yes 0 No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? Yes ❑ No
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? Z Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 _& Buffer Permitting_ Branch
5. Does project comply with 15A NCAC 02T.0105(c((6) )(additional permits/certifications)?
Per 15A NCAC 02T.0105 (c)(6i, directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
Ir X * , CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest versl'on), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is requi=prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
046n C tva(k attest that this application for
(Professional Engineer's name from Application Item III.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
.............................,`. ........................
North Carolina Professional Engineer's seal, signature, and date: e ° see
•' S �'-
O
r �
SEAL
• �_
O ; �
O .
=_ 9 '
r
ega,fie ••
ON
''''fj//tll►tllll I i11t1,,,`\,�`, 11 i
:........................................................................................
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, �r�-�'{-G�-'tn1 `rff—d � Rp(f P PU t'�- j�K� , fl/1(pP.-t attest that this application for
(Signature Authority' name &title from Application Item I3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition -
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25.000 per violation.
Signature: Date:
FORM: FTA 04-16 Page 5 of 5
SEWER NARRATIVE (PUBLIC)
WOODLANDS AT ECHO FARMS -TRACT 3C
4114 Echo Farms Boulevard
Wilmington, North Carolina
For
Echo Farms, LLC
c/o Matrix Development Group, CN 4000, Forsgate Drive
Cranbury, NJ 00512
(732) 521-2900
March 2018
Prepared by:
NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C.
902 Market Street
Wilmington, North Carolina 28401
(910) 343-9653
(910) 343-9604 (Fax)
License # C-3641
N&T Project #16083 (Tract 3C -Public)
SEWER SYSTEM NARRATIVE (PUBLIC)
WOODLANDS AT ECHO FARMS —TRACT 3C (PUBLIC)
This public gravity system is designed to serve townhomes. A total of 1,416 LF of 8"
PVC sewer line will be extended in Tract 3C. Flow from this tract flows to Pump Station
#27.
This system will be served by the Cape Fear Public Utility Authority.
Pump Station ##27 is owned and operated by the Cape Fear Public Utility Authority.
An expansion of Pump Station #27 is required and has been submitted to the Cape
Fear Public Utility Authority for review.
U
State of North Carolina-
`r 1` 1 Department of Environmental Quality
Division of Water Resources
Yr.
'I'vi on of Wafer Resoumes Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Echo Farms, LLC
Project Name for which flow is being requested: Woodlands. Echo Farms Phl-Tr 3C .(pub).
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: M'Kean Maffiuthside) WWTP
b. WWTP Facility Permit #: NPDES NC 0023973
All f lows are in MGD
c. WWTP facility's permitted flow 12.000
d. Estimated obligated flow not yet tributary to the WWTP 2.004
e. WWTP facility's actual avg. flow 8.044
f. Total flow for this specific request 0.017640
g. Total actual and obligated flows to the facility 100066
h. Percent of permitted flow used 83.9%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm
Flow**
Current Avg.
Tributary
Flow Plus
(Name or
Capacity, *
(Firm / p f),
Daily Flow,
Daily Flow,
Obligated
Available
Number)
MGD
MGD
MGD
MGD
Flow
Capacity***
27
0.378
0.151
0.151
0.112
0.262
-0.111
The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 00
Downstream Facility Name (Sewer): Cape Fear Public Utility Authority
Downstream Permit Number: Not Available
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I Matthew Tribett, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Signing Official Signature
'3/mil//
to
Page 2 of 6
FTSE 04-16
v
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
PS 26 & 27 Upgrades is in design or under construction with
planned completion in 3rd qtr 2021 (latest) ; and/or
d. The following applies:
The developer of this project is required by agreement to complete an upgrade of PS 27
prior to activating the sewer for this project. The average daily design capacity .of PS 27
will be increased to a minimum of 0.387 mgd.
Capacity created by the upgrade has been obligated .to the developer by the agreement.
The flow requested for this project is a portion of that obligation.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
Signing Official Signature Date
Page 3 of 6
FTSE 04-16