HomeMy WebLinkAbout20090695 Ver 1_Approval Letter_20090714NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue
Governor
Coleen H. Sullins
Director
Dee Freeman
Secretary
July 14, 2009
Ward and Robin Whitfield
2101 Sparre Drive
Kinston, NC 28504
DWQ Project # 09-0695
Lenoir County
Subject Property: Lots 23A, 23B, 23B1 Hillcrest Road, Kinston, NC
UT to Neuse River, Neuse Basin, 030408, 27-(85), NSW, C, Sw
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse
River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Mr. Whitfield:
You have our approval, in accordance with the attached conditions and those listed below, to
place fill within or otherwise impact 0.05 acres of wetlands/waters, and 2000 square feet (ft) of
protected riparian buffers for the purpose of streambank stabilization at the subject property, as
described within your application dated June 3, 2009 and received by the N.C. Division of Water
Quality (DWQ) on June 16, 2009. After reviewing your application, we have decided that the
impacts are covered by General Water Quality Certification Number(s) 3689 (GC3689). The
Certification(s) allows you to use Regional Permit(s) 197800080 when issued by the US Army
Corps of Engineers (USACE). This letter shall also act as your approved Authorization
Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233. In addition,
you should obtain or otherwise comply with any other required federal, state or local permits
before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, and Non-discharge regulations. Also, this approval to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
North Carolina Division of Water Quality Internet: www.ncwaterquality.org
943 Washington Square Mall Phone: 252-946-6481 One
Washington, NC 27889 FAX 252-946-9215 NorthCuohna
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Natunally
Page 2 of 3
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount A roved (Units) Plan Location or Reference
Stream na (feet) na
404/CAMA Wetlands na (acres) na
Waters 0.05 (acres) Plat provided with application
Buffers 2000 (s uare ft. Zone 1 Plat provided with application
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. No Impacts Beyond those in Application
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
within six months of the date that the Division of Land Resources has released the project.
Page 3 of 3
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to return
the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-
1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts
or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B
.0233. If you have any questions, please telephone Kyle Barnes of the Washington Regional
Office at 252-948-3917 or Ian McMillan of the 401 Oversight/Express Unit at 919-715-4631.
Sincerely,
/ - , )- "T t_
Coleen H. ms '
Enclosures: Certificate of Completion
GC 3689
cc: Corps of Engineers Washington Field Office
DWQ 401 Oversight/Express Unit
File copy
Steve Barrow, Barrow and Barrow, P.A.
115 Heritage Crossing, Snow Hill, NC 28580