Loading...
HomeMy WebLinkAbout20090427 Ver 1_More Info Letter_20090709??A NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director Resources Dee Freeman Secretary July 9, 2009 CERTIFIED MAIL: 47007 3020 0001 8861 0876 Carl Spruill 161 Wellman Street Norfolk, VA 23502 Subject Property: 73 Waterfront Road REQUEST FOR MORE INFORMATION Dear Mr. Spruill: DWQ Project # 09-0427 Tyrrell County On April 15, 2009, the Division of Water Quality (DWQ) received your application dated March 19, 2009 to impact 0.10 acres of waters and 0.02 acres of wetlands for the purpose of replacing an existing bulkhead and add additional slippage to an existing pier. The DWQ placed your project on "Hold" for additional information on May 19, 2009 and received your consultant's response on May 22, 2009. On June 30, 2009 the DWQ issued you a second "Request for More Information" letter requesting that you provide an engineered model or situational calculations to verify the "Bay of Fundy" effect and its associated impacts requiring the specific bulkhead alignment as well as engineering calculations to verify that the minimum amount of rip rap is used to provide protection to the proposed structure. The DWQ received your consultant's response to our June 30, 2009 letter on July 6, 2009. This response only provided assertions that the "Bay of Fundy" effect causes the erosion issues on your property but did not provide any of the engineered models or situational calculations to support his theory. The information requested in our June 30, 2009 letter is required for the DWQ to make the determination that your project will not violate Water Quality Standards. North Carolina Division of Water Quality Internet: www.ncwaterqualitv.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NorthCarohna Naturally Page 2 of 2 Therefore, unless we receive the additional information requested in our June 30, 2009 letter, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Your project will remain on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Please respond in writing to the DWQ within four weeks of the date of this letter with the requested information. If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Kyle Barnes of the Washington Regional Office at 252-948-3917or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Le rely en H. ullins -A cc: 4010versight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy CAMA: Doug Hugget/Morehead Hood Richardson, 110 west Second Street, Washington, NC 27889 Filename: 09-0427