HomeMy WebLinkAbout19890273 Ver 1_Complete File_19890101
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comments concerriYng an application for State Federal CAMA Permit(s) f om /
??, t?-? ?;;
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
This office has no objection to the issuance of the permit(s) for the proposed
/\project with the following conditions,:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases.of 25 NTU's.or less are not considered
significant).
That the instream turbidity not be increased.by .more than 50 NTU's as a
result of the proposed activity.after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a,..result of.the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project.- Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after
The proposed project is certified
under General.Certificatiom.
A) No. 1179 issued on January 25,.
1977, for sewer line construction
B) No. 1272 issued on November 10,
1978, for bulkhead construction.
D) No. 1431 issued on October 16,
1980, for boat ramp construction.
E) No. 1664 issued on September 8,
1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas. ,
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
RECEIVED
APR 2 61989
°' , ..: i=t:. F4 .<`.},j • REV
QUAL7: S,EC?.t
WATER
•
ACTION ... t
..DtF F.#. .,.i...?::.
;.:, ;:,(.t'::: ,.: ,
.:
.. t 4 ,A`fir?:: .:t..?
?" ;::,`?' #.;:,.,,. .t , FORMAT > ?'. s::.°?,;??- #? • ??3?E;,#BR?iV•?H ; t,:. ,:., .
ACTION ADD, EN TER DATA, REC . ADDED IS 00610 F RD DATA
#"' i'ti {..! ,.. O: ::J ;:J 1 ? 'I '# i" !'.. #..:..J , :. } r..) S •: i O#'••. , STEV E COUNTY: °' (`F #":......., t..? .....GI.... .
TYPE: CERT IFICATION RECOMMEND DATE..--.! YYMMD-'i.')
404 PN: 40i REQ: ISSUE: Y RECEIVED,
CAMA ONL Y: Y GC: DENY: INITIAL REPORT
RECEIVIN G STREAM: P IERCE CRE EK CLA SS: SA BASIN: NEU
COMMENTS :
SITE LOC ATED AT LOT 35, DOLP HIN SUBDTV. IN ORIENTAI
PROPOSAL TO ' CONSTRU CT A 48' DOCK WITH P ILIN GS LOCATED 6 OFF THE END OF THE
PROPOSAL TO ?..: ':..! r •. ,: T.,
..r ::.. ?°: i:!
4:F 42'
PI
ER WITH
f••i ....
.. :.. 3...
AT THE Wy`•'t # k::.: '; W..:{ !". i.. E
ND
NO WETLA NDS IMPACTE D
< ONE AC RE DEVELOPE D
COPIES: WARD-CENTRA L-MILLE-D CM
DIVISION OF COASTAL MANAGEMENT Lat:35002122"
FIELD INVESTIGATION REPORT Long:76°40101"
* *
1. APPLICANT'S NAME Steve Stanton
2. LOCATION OF PROJECT SITE Lot 35, Do
Creek. Oriental, Pamlico County4 *S
3. INVESTIGATION TYPE: DREDGE & FILL_
4. INVESTIGATIVE PROCEDURE:
(A) DATES OF SITE VISIT 4-4-89
(B) WAS APPLICANT PRESENT NO
in Point Subdivision, Pierce
1984 AERIAL PHOTO 52-1237
CAMA X (ONLY)
5. PROCESSING PROCEDURE: APPLICATION RECEIVED
OFFICE Morehead C:
it 13, 1989
6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Oriental
Transition/
LAND CLASSIFICATION FROM LUP Conservation
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X OTHER
(C) WATER DEPENDENT: YES X NO
(D) INTENDED USE: PUBLIC
PRIVATE X COMMERCIAL
(E) TYPE OF WASTE WATER TREATMENT: EXISTING NONE
PLANNED town system
(F) TYPE OF STRUCTURES: EXISTING bulkhead
PLANNED ier
(G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE bulkhead
7. HABITAT DESCRIPTION:
(A) VEGETATED WETLANDS
NONE
AREA
DREDGED FILLED OTHER
(B) NON-VEGETATED WETLANDS:
NONE
(C) OTHER:
public trust waters - pier 396 sq.ft.
(D) TOTAL AREA DISTURBED: Approximately 400 sq. ft.
8. PROJECT SUMMARY: Applicant proposes to construct a 48' dock wi
the pilings located 16' off the end of the pier, at Lot 35, __
Dolphin Point Subdivision, Pierce Creek, Oriental, Pamlico Cou
s
FIELD INVESTIGATION REPORT - STEVE STANTON, PAMLICO COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION: Applicant's property is a .6 acre
undeveloped, bulkheaded, wooded lot (Lot #35), in Dolphin
Point Subdivision, Oriental, Pamlico County. The
applicant's property is located on Pierce Creek and the
proposed project is a 42' x 6' pier with a 24' x 6' 'L' at
the waterward end. The applicant is also proposing to place
two (2) mooring pilings 16' off the end of the pier. Also,
one (1) tie piling is proposed 12' off of the eastern end of
the pier. Water depths at the end of the pier are -6' NWL.
Total distance for the pier is 64' from the bulkhead.
10. ANTICIPATED IMPACTS: The project, as proposed, will occupy
396 sq. ft. of public trust waters. The waters of Pierce
Creek are classified as 'SA' by the Division of
Environmental Management and are closed to shellfishing by
the Division of Health Services.
PREPARED BY: W. DAVID NOBLE
.DATE: APRIL 14, 1989
APR 1 .3 1989
t??--- e
Please type or print. Carefully describe all
development activities, including construction, excava- ____-
tion, filling, paving, land clearing, and stormwater con- If you plan to build a marina, also complete and
trol. If the requested information is not relevant to your attach Form DCM-MP-2.
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects. b. Is the proposed activity maintenance of an
existing project, new w rk, or both?
New l.Jo r ,
1 APPLICANT
a. Name 1" t ? -ky p_ 1S +L N }II I.
Address 5 I? U t?I u L a K& C-f.
City PQt;000 State (a ad
Zip 1155 Day phone 301-0239-369
a39-34
Y" Landowner or Authorized agent
c. Will the project be for community, private, or
commercial use?
Qt'
d. Describe the planned use of the project.
r i U0. t? m r-Q4 e.
b. Project name (if any)
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or seco dary road nurr4?ber
LOT 35 061PkIti Folot
b. City, town, co unity, or landmark
Or.e?al
c. County POA m l cc)
d. Is proposed work within city limits or planning
jurisdiction? e
d sect
e. Name of bo of water nearest p
Pierces Cfte V,
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier). P 1 er
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract ? 0 Acres
b. Size of individual lot(s) :?// 0 &r-e,
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
"d - /D
d. Soil type(s) and texture(s) of tract
C[19 4- S AA110
e. Vegetation on tract 6wf-e +q 0rY\
f. Man-made features now on tract ?J k heal
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed (/Community
Rural Other
h. How is the tract zo.,ni?ed by 1 cal ovemment?
AeS?N?ial
i. How are adjacent waters classified?
?'drhr" ,-ere(
j. Has a professional archaeological survey been
carried out for the tract? If so, by whom?
on u'f K1JJ6I )
APR 1 3 1959
5 UPLAND DEVELOPMENT ""`--JL '_
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or m. Water supply source
structures proposed
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
b. Number of lots or parcels public beach accessways or provide new access.
c. Density (Give the number of residential units and the
units per acre.)
d. Size of area to be graded or disturbed
e.
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management?
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
j. Have these facilities received state or local approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down").
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources?
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor?
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
Length Width Depth
70
b. Amount of material to be excavated from below
water level in cubic yards
c. Type of material
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
e. High ground excavation, in cubic yards
f. Dimensions of spoil disposal area
g. Location of spoil disposal area
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from the
owner.
i.
Will a disposal area be available for future
maintenance?
If so, where?
Does the disposal area include any mn rshlarid,
swamps, or water areas?
k. Will the fill material be placed below_ mean high
water?
1. Amount of fill in cubic yards
m. Type of fill material
n. Source of fill material
o. Will fill material be placed on marsh or other
wetlands?
p. Dimensions of the wetland to be filled
q. How will excavated or fill material be kept on site
and erosion controlled?
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
s. Will wetlands be crossed in transporting equipment
to project site? If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap
b. Average distance waterward of mean high water or
normal water level
c. Shoreline erosion during preceding 12 months, in
d. Type of bulkhead material
e. Amount of fill, in cubic yards, to be placed below
mean high water
f. Type of fill material
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 16 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the ad-
jacent waterfront (riparian) landowners. These in-
dividuals have 30 days in which to submit comments on
the proposed project to the Division of Coastal Manage-
ment and should be advised by the applicant of that op-
portunit r-- o-:
?
i( APR 13 1989
Name ND rd ??06 )655
Address 13 Chair1A-)V 1oA) Ac e
ne 1 ?t/C' a751Sl
?'h6L
Name 171,4X Vt- K 6r1111e_
Address / D hiuc h r
ioer Be,,-a( 4tiC ?2S569-
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
-9 perm
==-
C 5d5q
S
A check for $W made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project. / Q
?/.
This is the ?kday of '19
X -/ 'la k Gt'r"
Landowner or Authorized agent eG?J? 6t4404_0
3 N 1 q {?ilQm k1,1C55 T jaz?e
Psiew 1 K[C C?Zg 5G a-.
N`
APR 13 1939
¦
rAPR 1 3 1989
---------------------------•-
-33
40'MBL`
kp -
\
o
EA° O ? \ Q
30'M9L • ?y Api yi
?
4 N
\
NIP* 05.53'E
I•
i
?
NP6.59'd6"E rp
P676
b I
V
h
o
V ,?
o o
ti
I O coo
p p?.s/o •M9L ? . ? \ ??` ?
AREA \/ ? '? r?•v • ., ',,'; .
0.508 oCM
r' w
/yg? \ 75' CAMA AEC ; , ?? .•
40'Red
I ?
/O M9L
I
o BP
- ,/yg0 ,, ? 34
2 . Ag
5
-t?r
t j Pil
?a
o
.0 , 5 . Pierges
Chapel
wey Pt
f' -
oUght
sue: Windmill Point
Cooper
=' Point
4 \ ?z
epCe?_'J? q
..?...
Whittaker Point
I
.Platfi •m?
i
f
345 -----.---(Mf-7!?IMON) it
5c 5.i I NW
SCAL - 1 24 000
\
`
Vim
`-
? - McCotter Bay
ek ..
em IN itehUtSt
Point
APR 1 3 1989
1t tom- ?..._ _? L? --f 3
---------------
1 t GV
347 - -?"- 40/ 348 - - - l 349._ -_.
1
._._.1 MILE
1000 0 1000 2000 a00J 5000 (,0,.) 70",' FEET
1 .5 P I KILC•tt.-•.E
CONTOUR IIITERVAL 5 FEET
NATIONAL GEODETIC JERTICAL DATUM OF 1929
N 1:
I? 1 I SHORELINE SHOWN REPRESENTS i. APPPOAt M.n`E L '•E OF MEAN HIGH v'ATER
NO APPRF'JAP.LE FI -0 IC TIOFa !'• S AREA
w
nFpm
l u4 T
APR 1 3 1989 q
s L,
?o
o
r??
?o
s_ ?Q
ti
'N: p
.bx
EQ Q- S
4
Qee
9>e- yo
Zito
c? -v
r
p W N
?bfl
s° r
"O
'U
to
n
P?eice Crecy
L `_ tr 40 ?
tihh 1?9 0 O
.06
-r
Li L.-IL.Z
a4'
o i 16 A u _,)_ 44
Proposed Dock Fo(
Scq(e l''= S' Steve Sf4NtoN
Lot 35 Dolph«t Poigi
COASTAL MARINE CONTRACTORS
Quality Craftsmanship
3414 Preakness Place
New Bern, N.C. 28562
Owner: Mark Hardeman
f APR 1
C 1
(919) 638-6407
}5 ?. S?IIs
i,r. Do lis . _
Dockteos Sec4iou
Dol ph?N Porno
L oj 35
To( s4eve
Subdiv i5toK
SfaNfo N