Loading...
HomeMy WebLinkAbout20181665 Ver 1_PCN Form Submission_20181207DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 tial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Oiange only if needed. BIMS # Assigned 20181665 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office* Central Office - (919) 707-9000 Information for Initial Review 1a. Name of project: Grayson's Pond 1a. Who is the Primary Contact?* Deborah Shirley 1b. Primary Contact Email:* dshirley@sandec.com Date Submitted 12/7/2018 Nearest Body of Water UT to Honeycutt Creek Basin Neuse Water Classification WS -IV; NSW Site Coordinates Latitude: Longitude: 35.9058 -78.6202 FA. Processing Information County (or Counties) where the project is located: Wake Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (NWP) F- Regional General Permit (RGP) F Standard (IP) Version# * 1 What amout is owed?* r• $240.00 * $570.00 Select Project Reviewer* Paul Wcjoski:EADS\pawojoski 1c. Primary Contact Phone:* (919)846-5900 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 29 - Residential Developments r 401 Water Quality Certification - Express W Riparian Buffer Authorization 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* r- Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r- Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? 0 Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r' Yes r- No 2. Owner Information 2a. Name(s) on recorded deed: Honeycutt Property Ventures LLC 2b. Deed book and page no.: Book 16088, Page 586 2c. Responsible party: A. Wayne Turner 2d. Address Street Address 5805 Lease Lane Address Line 2 CKY Raleigh Postal / Zip Cade 27617 2e. Telephone Number: (919)948-7251 2g. Email Address:* wayne@turnerasphalt.com State / Frovince / fbgion NC Country United States 2f. Fax Number: r- Yes r No r- Yes r No C. Project Information and Prior Project History v 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Raleigh, NC F 2. Project Identification 2a. Property Identification Number: 2b. Property size: 1718257128 12.23 2c. Project Address 1.42MB Street Address 1.15MB 9200 Honeycutt Rd 4.22MB Address Line 2 aty State / Rwince / Region Raleigh NC Bbstal / Zip Cade Country 27615 United States 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* UT to Honeycutt Creek 3b. Water Resources Classification of nearest receiving water:* WS -IV; NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12 -digit HUC in which the project is located. 030202010604 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing conditions onsite consist of a wooded parcel with a residential structure, outbuildings, and driveway. On the southern side of the property, in addition to the existing driveway crossing (i.e. 36" CMP culvert), is an existing 42" CMP culvert. A perennial stream bisects the property, with a linear wetland within the riparian buffer, in addition to a jurisdictional non - buffered pond ebsting onsite. General land use in the vicinity of the site is forested land and low density/rural development. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* f Yes r No r Unknown 4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS.pdf 1.83MB 4e. Attach an 8 1/2X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) soils.pdf 314.28KB 4f. List the total estimated acreage of all existing wetlands on the property: Less than 0.10 acre (0.008 acres), open waters approximately 0.88 acres 4g. List the total estimated linear feet of all existing streams on the property: Approximately 717 linear feet 4h. Explain the purpose of the proposed project:* The purpose of this project is provide access for a residential subdivision. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The overall project consists of the construction of a single-family residential subdivision to include a road, five (5) residential lots with private well and septic. Specifically, there are proposed stream and riparian buffer impacts for one road crossing/culvert extension. Proposed road crossing location is utilizing an existing culvert. Equipment typically used for construction and earthwork such as backhoes, bulldozers, excavators, graders, pavers etc. will be utilized for this project. 4j. Please upload project drawings for the proposed project. 181126 - Greysons Pond - Existing Conditions.pdf 1.1 MB 181207 - Greysons Pond - Site Plan.pdf 1.42MB 181207 - Greysons Pond - Profiles.pdf 1.15MB 181207 - Greysons Pond - Erosion Control.pdf 4.22MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No f Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: USACE has not field verified, a JD or AID has not been issued. Preliminary JD package to be sent via email. 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans Steven Ball Soil & Environmental Consultants, PA 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? ED,Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands W Streams -tributaries F Open Waters r Pond Construction 3. Stream Impacts W Buffers 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 46 39 3i. Total stream and ditch impacts: 85 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. V Neuse r Tar -Pamlico F Catawba r Randleman F Goose Creek r Jordan Lake F Other 6b. Impact Type 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * 3e. Stream Type * Type of 3g. S. width * 3h. Impact ❑ 5,917 2,842 �[3f. (?) urisdiction* length* S1 Impact 1 -Road Crossing Permanent Culvert ro Honeycutt Creek Perennial Both 46 (CulvertEdension) Ave age (feet) (linearfee) 32 Impact 1 -Road Crossing Temporary Other UT to Honeycutt Creek Perennial Both 4 39 (Temporary Construction) Average (Feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 46 39 3i. Total stream and ditch impacts: 85 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. V Neuse r Tar -Pamlico F Catawba r Randleman F Goose Creek r Jordan Lake F Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Impact 1 -Road Crossing (Culvert E)tension) P UT to Honeycutt Creek No 5,917 2,842 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 5,917.00 2,842.00 Zone 1 Zone 2 Total combined buffer impacts: 5,917.00 2,842.00 6i. Comments: Supporting Documentation 181206 - Greysons Pond - Impact Map.pdf 325.9KB E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: S&EC completed a wetland delineation and Neuse River Buffer evaluation for the entire property in order to identify natural resources so that impacts could be avoided & minimized to the maximum extent practicable. Impact #1 is a proposed road crossing/culvert extension to a perennial stream. Proposed impacts include 46 linear feet of permanent loss for one 42" culvert that will tie to an existing 42" CMP culvert and 39 linear feet of temporary stream impacts for construction activities. This impact is necessary to construct a road and provide access to the property. An endwall on the downstream side of the culvert is proposed to minimize stream and riparian buffer impacts. Additionally, an existing culvert location is being utilized to minimize stream and riparian buffer impacts. All temporary stream impacts will be brought back to pre -construction elevations and stream banks will be stabilized. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction techniques such as silt fence, silt fence outlets, and a pump around system will be utilized to avoid/minimize impacts to the jurisdictional features onsite. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project will utilize an existing culvert onsite, therefore minimizing impacts. Additionally, the project is proposing permanent loss stream impacts less than 150 LF, which is the threshold of stream impact that typically requires compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) u 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? F- Level Spreader R Vegetated Conveyance (lower SHWT) r- Wetland Swale (higher SHWT) F Other SCM that removes minimum 30% nitrogen F' Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: Per the project engineer, the site will be maximum 19% impervious, including the road. The road discharges to vegetated conveyance ditches with less than 3:1 side slopes. There will be no Curb/gutter section. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B.0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs" document prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that many private developments are unlikely to cause cumulative impacts, including projects such as urban in -fill, most residential subdivisions and small commercial developments as well as agricultural and silvicultural operations. The Greyson's Pond project is a residential development. Additionally, the project is located within the Wake County's jurisdiction, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area, in addition to "diffuse flow' requirements, and could require Best Management Practices that control nitrogen if diffuse flow cannot be achieved; 2) the Water Supply, Watershed Protection Program which limits development densities as well as requires protective riparian buffers and finally 3) the Phase II NPDES Stormwater Permit Program, this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post -construction stormwater management requirements. We anticipate that the NCDWR will advise us if any additional information is needed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r^ Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r^ Yes r No 5d. Is another Federal agency involved?* r Yes r No O Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage Program Data Explorer Search [December 5, 20181. Department of Environment and Natural Resources, Office of Land and Water Stewardship, Raleigh, NC. http://wmv.nenhp.org/ Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* The NOAA Fisheries Habitat Conservation Essential Fish Habitat Mapper website was referenced. No Essential Fish Habitat was identified near the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on November 9, 2018; no historic listings, study list entries, or determined eligible listings were identified within the property boundaries. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? r Yes r No 8c. What source(s) did you use to make the floodplain determination?* NC Floodplain Mapping Program -Flood Risk Information System [Miscellaneous Comments Miscellaneous attachments not previously requested. Signature W By checking the box and signing below, I certify that: I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Deborah E. Shirley Signature Sign Date 12/7/2018 U µSoil Survey MapSheet 20McDaniel SiteWake County, NC Project No. 12654.W1 Project Mgr.: SB Scale: 1" = 1000' 08/24/20150 2,000 4,0001,000Feet   Project Number: DS Project Manager: 1" = 1000'Scale: 11/8/2018Date: Map Title: Source: Figure 1 - USGS Map Grayson's Pond Wake County, NC 2016 USGS Wake Forest, NC Quad ¯0 1,000 2,000 Feet 12654.W5 EIP EIP ECM EIP EIP S 89° 53' 07" W 917.74' S 89° 02' 12" E972.91'N 14° 13' 18" E509.93'N 12° 59' 55" E77.04'S 20° 25' 11" W583.79'7.51' 4.21' (PUBLIC R/W ) POND CREEKLC EX. HOUSE (2,500 SF) 50' NEUSE RIPARIAN BUFFER 50' NEUSE RIPARIAN BUFFER KOUPELA DRIVELONIKER DRIVE (PUBLIC R/W) EX. WELL EX. WELL EX. CARPORT (465 SF) EX. GARAGE (1,020 SF) EX. BUILDING 805 SF (TO BE REMOVED PRIOR TO MAP RECORDATION, DEMO PERMIT WILL BE NEEDED) EXISTING DOCK EXISTING DAM 50.0' WSWB ZONE "2" 20' BUILDING SETBACK FROM WSWB BUFFER 30.0' WSWB BUFFER EX 42" CMP CULVERT 380375 385390395 395375 3753803853903 7 0365370365360 370360 365 370355370 370 365 360 390385380375370375380385390 395352 35750.0' WSWB ZONE "1" EX 36" CMP CULVERT 10.0' 398 392397 N/F BERRY HILL PROPERTIES LLC PIN: 1718.01-15-7465 DB 9676 PG 2291 OFC GROSS N/F WILLIAM E. & ANDREA M. COOK PIN: 1718.01-25-4527 DB 8076 PG 905 SINGLE FAMILY N/F JOHN T. JR. & CHRISTA M. MCELVEEN PIN: 1718.01-25-7505 DB 11488 PG 1105 SINGLE FAMILY N/F CHARLES A. JR. & ELIZABETH M. MANGANO PIN: 1718.01-25-9567 DB 4563 PG 43 SINGLE FAMILY N/F DAVID C. & MELISSA P. PEARCE PIN: 1718.01-35-2548 DB 9142 PG 762 SINGLE FAMILY N/F HOWARD J. & MARY JANE JUNG PIN: 1718.01-35-2088 DB 4923 PG 653 SINGLE FAMILY N/F TERRENCE & CHRISTINE CAMPBELL PIN: 1718.14-34-2835 DB 9599 PG 1732 SINGLE FAMILY N/F BRUCE & MELANI AVERY PIN: 1718.14-34-1646 DB 14077 PG 1079 SINGLE FAMILY N/F RONALD & GEORGIA WILLIAMS PIN: 1718.13-24-2751 DB 8530 PG 13 SINGLE FAMILY N/F BERRY HILL PROPERTIES LLC PIN: 1718.13-04-7941 DB 9676 PG 2291 SINGLE FAMILY N/F JHD PROPERTIES PIN: 1718.01-15-8038 DB 9709 PG 2074 SINGLE FAMILY N/F MARTEN & STEPHANIE DEVRIES PIN: 1718.01-35-3320 DB 12289 PG 1059 SINGLE FAMILY EX STREAM EX WETLAND EX STREAM VICINITY MAP (NOT TO SCALE) SITE GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number EXISTING CONDITIONS PROPERTY LINE RIGHT-OF-WAY LEGEND DB DEED BOOK BM BOOK OF MAPS PG PAGE N/F NOW OR FORMERLY R/W RIGHT OF WAY MIA MAXIMUM IMPERVIOUS ALLOWED EIP EXISTING IRON PIPE ECM EXISTING CONCRETE MONUMENT TREE LINE ADJOINER PROPERTY LINE CE-1 EIP EIP ECM EIP EIP LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 LENGTH 11.46' 18.82' 23.14' 15.02' 17.37' 14.29' 18.43' 21.61' 11.17' 21.54' 24.86' 31.71' 83.54' 13.46' 10.31' DIRECTION S72° 52' 44"E S78° 28' 26"E S86° 13' 42"E N86° 43' 15"E N80° 44' 17"E N74° 20' 01"E N69° 16' 25"E N05° 18' 59"E N00° 44' 02"W N06° 53' 41"W N15° 33' 58"W N26° 08' 40"W N33° 21' 18"W N52° 52' 53"W N83° 28' 26"W (PUBLIC R/W ) POND CREEKLC EX. HOUSE (2,500 SF) 50' NEUSE RIPARIAN BUFFER 50' NEUSE RIPARIAN BUFFER KOUPELA DRIVELONIKER DRIVE (PUBLIC R/W) EX. WELL EX. WELL 500' SIGHT DISTANCE430' SIGHT DISTANCEEX. CARPORT (465 SF) EX. GARAGE (1,020 SF) EXISTING DOCK EXISTING DAM 50.0' WSWB ZONE "2" 20' BUILDING SETBACK FROM WSWB BUFFER 30.0' WSWB BUFFER CURVE TABLE CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 LENGTH 57.53' 175.91' 58.00' 23.16' 196.37' 18.84' 10.09' 50.47' 142.36' 44.67' 22.55' 56.50' 98.76' 78.27' 269.76' RADIUS 61.50' 61.50' 61.50' 14.50' 177.50' 177.50' 127.50' 127.50' 172.50' 127.50' 127.55' 174.32' 129.46' 170.99' 222.50' DELTA 053°35'41" 163°52'51" 054°01'58" 091°30'29" 063°23'07" 006°04'49" 004°32'01" 022°40'42" 047°17'01" 020°04'19" 010°07'52" 018°34'09" 043°42'23" 026°13'32" 069°27'56" CHORD 55.45' 121.79' 55.87' 20.77' 186.50' 18.83' 10.09' 50.14' 138.35' 44.44' 22.52' 56.25' 96.38' 77.58' 253.54' CHORD BEARING N06° 22' 40"W S64° 53' 05"W S44° 04' 19"E N25° 20' 04"W N52° 06' 44"E N86° 50' 42"E S87° 50' 52"E S74° 14' 31"E N86° 32' 41"W N79° 50' 58"E S85° 02' 47"E N79° 09' 02"E N88° 09' 55"W S73° 48' 35"E N55° 09' 09"E EX 42" CMP CULVERT 380375 385390395 395375 3753803853903 7 0365370365360 370360 365 370355370 370 365 360 390385380375370375380385390 395352 35750.0' WSWB ZONE "1" EX 36" CMP CULVERT 10.0' 398 392397 N/F BERRY HILL PROPERTIES LLC PIN: 1718.01-15-7465 DB 9676 PG 2291 OFC GROSS N/F WILLIAM E. & ANDREA M. COOK PIN: 1718.01-25-4527 DB 8076 PG 905 SINGLE FAMILY N/F JOHN T. JR. & CHRISTA M. MCELVEEN PIN: 1718.01-25-7505 DB 11488 PG 1105 SINGLE FAMILY N/F CHARLES A. JR. & ELIZABETH M. MANGANO PIN: 1718.01-25-9567 DB 4563 PG 43 SINGLE FAMILY N/F DAVID C. & MELISSA P. PEARCE PIN: 1718.01-35-2548 DB 9142 PG 762 SINGLE FAMILY N/F HOWARD J. & MARY JANE JUNG PIN: 1718.01-35-2088 DB 4923 PG 653 SINGLE FAMILY N/F TERRENCE & CHRISTINE CAMPBELL PIN: 1718.14-34-2835 DB 9599 PG 1732 SINGLE FAMILY N/F BRUCE & MELANI AVERY PIN: 1718.14-34-1646 DB 14077 PG 1079 SINGLE FAMILY N/F RONALD & GEORGIA WILLIAMS PIN: 1718.13-24-2751 DB 8530 PG 13 SINGLE FAMILY N/F BERRY HILL PROPERTIES LLC PIN: 1718.13-04-7941 DB 9676 PG 2291 SINGLE FAMILY N/F JHD PROPERTIES PIN: 1718.01-15-8038 DB 9709 PG 2074 SINGLE FAMILY N/F MARTEN & STEPHANIE DEVRIES PIN: 1718.01-35-3320 DB 12289 PG 1059 SINGLE FAMILY GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number EROSION CONTROL PLAN - PHASE I CE-7 EX. BUILDING 805 SF (TO BE REMOVED PRIOR TO MAP RECORDATION, DEMO PERMIT WILL BE NEEDED) EROSION CONTROL LEGENDNPDES NEW STABILIZATION TIMEFRAMES (EFFECTIVE AUG 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7DAYS IF SLOPES ARE LESS THAN 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES SILT FENCE AND LOD ARE TO BE AT THE PROPERTY LINE WHERE APPLICABLE. OFFSET FOR CLARITY. PHASE I CONSTRUCTION SEQUENCE: 1.OBTAIN A LAND-DISTURBING PERMIT. 2.SCHEDULE A PRE-CONSTRUCTION CONFERENCE WITH WAKE COUNTY INSPECTOR OR AS INDICATED ON PERMIT CARD FOR A PRE CONSTRUCTION CONFERENCE. 3.INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, SILT FENCE OUTLETS, AND OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4.CALL FOR WAKE COUNTY INSPECTION. 5.UPON APPROVAL OF THE STORMWATER SITE INSPECTION, BEGIN CLEARING, GRUBBING, AND DEMOLITION WITHIN THE LIMITS OF DISTURBANCE. MAINTAIN POSITIVE DRAINAGE TO SILT FENCE OUTLETS. 6.MAINTAIN SEDIMENT AND EROSION CONTROL DEVICES AFTER EVERY RAIN EVENT AND ONCE PER WEEK. REMOVE ANY SILT BUILDUP ON ANY SILT FENCING AS NEEDED TO PREVENT BREECH. SEED OR MULCH (OR STABILIZE WITH STONE/PAVEMENT) ANY DENUDED AREAS WITHIN 14 CALENDAR DAYS OF TEMPORARY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. NO SEDIMENT AND EROSION CONTROL MEASURES ARE TO BE REMOVED WITHOUT APPROVAL OF THE STORMWATER INSPECTOR. 7.CALL FOR WAKE COUNTY INSPECTION. IF APPROVED, TRANSITION TO EROSION CONTROL PHASE II. STABILIZATION NOTE: ANY PORTION OF A SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN SHALL BE PROVIDED WITH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING THE LAND DISTURBING ACTIVITY. ’ STOCKPILE NOTES: GENERAL NOTES 1.CONTRACTOR TO FIELD VERIFY LOCATION & ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2.UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH WAKE COUNTY STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE NOTED. 3. DUE TO THE LOCATION OF THIS PROJECT, IT SHOULD BE NOTED THAT A RULE TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE RIVER BASIN BECAME EFFECTIVE ON JULY 22, 1997. THE NEUSE RIVER RIPARIAN AREA PROTECTION AND MAINTENANCE RULE (15A NCAC 2B.0267) APPLIES TO ALL PERENNIAL AND INTERMITTENT STREAMS, LAKES, PONDS, AND ESTUARIES IN THE NEUSE RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR RIPARIAN AREA. 4.EROSION AND SEDIMENTATION CONTROL MEASURES, STRUCTURES, AND DEVICES SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED TO PROVIDE PROTECTION FROM THE RUNOFF OF THE 25-YEAR STORM. 5.NEWLY CONSTRUCTED OPEN CHANNELS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED WITH SIDE SLOPES NO STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL IF A VEGETATIVE COVER IS USED FOR STABILIZATION UNLESS SOIL CONDITIONS PERMIT STEEPER SLOPES OR WHERE THE SLOPES ARE STABILIZED BY USING MECHANICAL DEVICES, STRUCTURAL DEVICES, OR OTHER ACCEPTABLE DITCH LINERS. EIP EIP ECM EIP EIP LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 LENGTH 11.46' 18.82' 23.14' 15.02' 17.37' 14.29' 18.43' 21.61' 11.17' 21.54' 24.86' 31.71' 83.54' 13.46' 10.31' DIRECTION S72° 52' 44"E S78° 28' 26"E S86° 13' 42"E N86° 43' 15"E N80° 44' 17"E N74° 20' 01"E N69° 16' 25"E N05° 18' 59"E N00° 44' 02"W N06° 53' 41"W N15° 33' 58"W N26° 08' 40"W N33° 21' 18"W N52° 52' 53"W N83° 28' 26"W 50' NEUSE RIPARIAN BUFFER 50' NEUSE RIPARIAN BUFFER 500' SIGHT DISTANCE430' SIGHT DISTANCE50.0' WSWB ZONE "2" 20' BUILDING SETBACK FROM WSWB BUFFER 30.0' WSWB BUFFER CURVE TABLE RADIUS 61.50' 61.50' 61.50' 14.50' 177.50' 177.50' 127.50' 127.50' 172.50' 127.50' 127.55' 174.32' 129.46' 170.99' 222.50' DELTA 053°35'41" 163°52'51" 054°01'58" 091°30'29" 063°23'07" 006°04'49" 004°32'01" 022°40'42" 047°17'01" 020°04'19" 010°07'52" 018°34'09" 043°42'23" 026°13'32" 069°27'56" CHORD 55.45' 121.79' 55.87' 20.77' 186.50' 18.83' 10.09' 50.14' 138.35' 44.44' 22.52' 56.25' 96.38' 77.58' 253.54' CHORD BEARING N06° 22' 40"W S64° 53' 05"W S44° 04' 19"E N25° 20' 04"W N52° 06' 44"E N86° 50' 42"E S87° 50' 52"E S74° 14' 31"E N86° 32' 41"W N79° 50' 58"E S85° 02' 47"E N79° 09' 02"E N88° 09' 55"W S73° 48' 35"E N55° 09' 09"E 1-EW INV=372.0 2-JB RIM=395.0 INV IN=387.4 INV OUT=387.2 3-DI RIM=391.0 INV=389.0 246 LF 15" RCP @ 6.2%162 LF 15" RCP @ 1% EX 42" CMP CULVERT 380375 385390395 395375 3753803853903 7 0365370365360 370360 365 370355370 370 365 360 390385380375370375380385390 395352 35750.0' WSWB ZONE "1" EX 36" CMP CULVERT 10.0' 398 392397 PROP 42" CMP CULVERT EXTENSION 46 LF @ 3% ENDWALL TOP: 370.2 INV: 364.6 (BURY INV BY 0.7') CONNECT TO EX PIPE INV: 366.0 N/F BERRY HILL PROPERTIES LLC PIN: 1718.01-15-7465 DB 9676 PG 2291 OFC GROSS N/F WILLIAM E. & ANDREA M. COOK PIN: 1718.01-25-4527 DB 8076 PG 905 SINGLE FAMILY N/F JOHN T. JR. & CHRISTA M. MCELVEEN PIN: 1718.01-25-7505 DB 11488 PG 1105 SINGLE FAMILY N/F CHARLES A. JR. & ELIZABETH M. MANGANO PIN: 1718.01-25-9567 DB 4563 PG 43 SINGLE FAMILY N/F DAVID C. & MELISSA P. PEARCE PIN: 1718.01-35-2548 DB 9142 PG 762 SINGLE FAMILY N/F HOWARD J. & MARY JANE JUNG PIN: 1718.01-35-2088 DB 4923 PG 653 SINGLE FAMILY N/F TERRENCE & CHRISTINE CAMPBELL PIN: 1718.14-34-2835 DB 9599 PG 1732 SINGLE FAMILY N/F BRUCE & MELANI AVERY PIN: 1718.14-34-1646 DB 14077 PG 1079 SINGLE FAMILY N/F RONALD & GEORGIA WILLIAMS PIN: 1718.13-24-2751 DB 8530 PG 13 SINGLE FAMILY N/F BERRY HILL PROPERTIES LLC PIN: 1718.13-04-7941 DB 9676 PG 2291 SINGLE FAMILY N/F JHD PROPERTIES PIN: 1718.01-15-8038 DB 9709 PG 2074 SINGLE FAMILY N/F MARTEN & STEPHANIE DEVRIES PIN: 1718.01-35-3320 DB 12289 PG 1059 SINGLE FAMILY STREAM CROSSING AND BUFFER IMPACTS TO BE PERMITTED BY USACoE PLUNGE POOL 3 PLUNGE POOL 2 PLUNGE POOL 1390385380375 37 5 380385390395397 395 392392394393395 RIP RAP 4 PROVIDE MATTING IN DITCH PER DITCH REINFORCEMENT TABLE (TYP THIS SHEET) GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number EROSION CONTROL PLAN - PHASE II CE-8 GENERAL NOTES 1.CONTRACTOR TO FIELD VERIFY LOCATION & ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2.UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH WAKE COUNTY STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE NOTED. 3. DUE TO THE LOCATION OF THIS PROJECT, IT SHOULD BE NOTED THAT A RULE TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE RIVER BASIN BECAME EFFECTIVE ON JULY 22, 1997. THE NEUSE RIVER RIPARIAN AREA PROTECTION AND MAINTENANCE RULE (15A NCAC 2B.0267) APPLIES TO ALL PERENNIAL AND INTERMITTENT STREAMS, LAKES, PONDS, AND ESTUARIES IN THE NEUSE RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR RIPARIAN AREA. 4.EROSION AND SEDIMENTATION CONTROL MEASURES, STRUCTURES, AND DEVICES SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED TO PROVIDE PROTECTION FROM THE RUNOFF OF THE 25-YEAR STORM. 5.NEWLY CONSTRUCTED OPEN CHANNELS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED WITH SIDE SLOPES NO STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL IF A VEGETATIVE COVER IS USED FOR STABILIZATION UNLESS SOIL CONDITIONS PERMIT STEEPER SLOPES OR WHERE THE SLOPES ARE STABILIZED BY USING MECHANICAL DEVICES, STRUCTURAL DEVICES, OR OTHER ACCEPTABLE DITCH LINERS. NPDES NEW STABILIZATION TIMEFRAMES (EFFECTIVE AUG 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7DAYS IF SLOPES ARE LESS THAN 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES SILT FENCE AND SILT FENCE/TREE PROTECTION FENCE AND LOD ARE TO BE AT THE PROPERTY LINE WHERE APPLICABLE. OFFSET FOR CLARITY. PHASE 2 CONSTRUCTION SEQUENCE: 1.LAND LEFT EXPOSED SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN THE APPLICABLE TIME PERIOD AFTER COMPLETION OF ANY PHASE OF GRADING OR PERIOD OF INACTIVITY AS FOLLOWS: SEVEN DAYS FOR A STEEP SLOPE; TEN DAYS FOR A MODERATE SLOPE; 14 DAYS FOR LAND WITH NO SLOPE OR INCLINATION. 2.FOR ANY AREA OF LAND DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICABLE, BUT IN NO CASE LATER THAN SEVEN DAYS AFTER COMPLETION OF GRADING. 3.BEGIN ROUGH GRADING SITE PER GRADING PLAN. 4.INSTALL 42" CULVERT IN ACCORDANCE WITH STREAM CROSSING DETAILS ON EROSION DETAIL SHEET. FILL ROAD SECTION FOR CONSTRUCTION ACCESS. CULVERT INSTALLATION SHALL BE CONDUCTED DURING DRY WEATHER. IF RAIN IS ANTICIPATED DURING CONSTRUCTION, A DAM SHALL BE CONSTRUCTED UPSTREAM OF THE CULVERT AND PUMPS SHALL PUMP SEDIMENT LADEN WATER THROUGH GEOTEXTILE DEWATERING (DIRT) BAGS AROUND THE CULVERT INSTALLATION (SEE DETAIL THIS SHEET). 5.INSTALL STORM DRAIN COLLECTION SYSTEM FROM DOWNSTREAM TO UPSTREAM WITH INLET PROTECTION AT EACH INLET, DIVERT RUN-OFF TO INLETS AS ROUGH GRADES ARE COMPLETED. 6.HAUL AWAY ANY EXTRA TOPSOIL AND MATERIAL AS NEEDED TO BALANCE SITE. IF ANY TOPSOIL IS TO REMAIN STOCKPILED, PROTECT WITH SILT FENCING AROUND PERIMETER. 7.SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY TO STORMWATER CONTROL INSPECTIONS THROUGHOUT THE PROJECT. 8.MAINTAIN SEDIMENT AND EROSION CONTROL DEVICES AFTER EVERY RAIN EVENT AND ONCE PER WEEK. REMOVE ANY SILT BUILDUP ON ANY SILT FENCING AS NEEDED TO PREVENT BREECH. SEED ANY AREAS OF THE SITE WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING IN THAT AREA. 9.COMPLETE REMAINDER OF SITE WORK. 10.PERFORM SEEDBED PREPARATION, SEED, MULCH AND/OR ASPHALT TACK AS APPLICABLE TO ANY RESULTING BARE AREAS IMMEDIATELY. 11.INSTALL VELOCITY DISSIPATERS AND OUTLET STRUCTURES AS REQUIRED ON THE GRADING PLAN. 12.WHEN SITE IS FULLY STABILIZED, CALL ENVIRONMENTAL ENGINEER/CONSULTANT FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION. 13.IF APPROVED, REMOVE SILT FENCING, SITE FENCE OUTLETS, AND INLET PROTECTIONS. 14.LAND LEFT EXPOSED SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN THE APPLICABLE TIME PERIOD AFTER COMPLETION OF ANY PHASE OF GRADING OR PERIOD OF INACTIVITY AS FOLLOWS: SEVEN DAYS FOR A STEEP SLOPE; TEN DAYS FOR A MODERATE SLOPE; 14 DAYS FOR LAND WITH NO SLOPE OR INCLINATION. 15.FOR ANY AREA OF LAND DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICABLE, BUT IN NO CASE LATER THAN SEVEN DAYS AFTER COMPLETION OF GRADING. ’ STOCKPILE NOTES: EROSION CONTROL LEGEND STABILIZATION NOTE: ANY PORTION OF A SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN SHALL BE PROVIDED WITH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING THE LAND DISTURBING ACTIVITY. EXISTING GROUND GEOTEXTILE DEWATERING DIRT BAG STREAMWIDTH RANGE 4.0'-15.0' FLOW PUMP FLOW PUMP FLOW PUMP DISCHARGE HOSE PUMP DISCHARGE HOSE PLAN VIEW SIDE VIEW HIGH STRENGTH STRAPPING FOR SECURING SPOUT TO PUMP HOSE SEWN IN SPOUT HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS GEOTEXTILE DEWATERING DIRT BAG FLO W STREAM BANK. PROVIDE STABILIZED OUTLET TO STREAM CHANNEL DIRT BAG TO BE PLACED ON EXISTING GRASS, OR STRAW. NOTES: 1.GEOTEXTILE DEWATERING DIRT BAG DIMENSIONS ARE VARIABLE AND DEPENDENT ON SPECIFIC SITE CONSTRAINTS AND PROPOSED CONSTRUCTION OPERATIONS. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE SIZE AND LOCATION OF THE GEOTEXTILE DEWATERING DIRT BAG FOR APPROVAL BY NCDENR PRIOR TO CONSTRUCTION. 3.THE CONTRACTOR SHALL ENSURE THAT THE DIRT BAG IS OF A SUFFICIENT SIZE AND STRENGTH TO PROPERLY DEWATER THE PUMP HOSE INFLUENT. 4.DIRT BAG SHALL BE REPLACED WHEN FULL OF SEDIMENT OR WHEN FLOW THROUGH BAG IS LIMITED BY SEDIMENT ACCUMULATION.LENGTH RANGE 6.0'-15.0' LENGTH RANGE 6.0'-15.0' GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number EROSION CONTROL DETAILS CE-9 NEW STABILIZATION TIMEFRAMES (EFFECTIVE AUG 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE HGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7DAYS IF SLOPES ARE LESS THAN 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES SEEDBED PREPARATION: 1.CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3.REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.APPLY AGRICULTURAL LIME, FERTILIZER AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE MIXTURE BELOW). 5.CONTINUE TILLAGE UNTIL A WELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOR TO SIX INCHES DEEP. 6.SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7.MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAT 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9.CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. SEEDING MIXTURE AGRICULTURAL LIMESTONE 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) FERTILIZER 1,000 LBS/ACRE - 10-10-10 SUPERPHOSPHATE 500 LBS/ACRE - 20% ANALYSIS MULCH 2 TONS/ACRE - SMALL GRAIN STRAW ANCHOR ASPHALT EMULSION AT 300 GALS/ACRE SEEDING SCHEDULE FOR SHOULDERS. SIDE DITCHES, SLOPES (MAX 3:1) DATE TYPE PANTING RATE AUG 15 - NOV 1 TALL FESCUE 300 LBS/ACRE NOV 1 - MAR 1 TALL FESCUE & ABRUZZI RYE 300 LBS/ACRE MAR 1 - APR 15 TALL FESCUE 300 LBS/ACRE APR 15 - JUN 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUL 1 - AUG 15 TALL FESCUE AND BROWNTOP MILLET OR SORGHUM-SUDAN HYBRIDS*** 125 LBS/ACRE (TALL FESCUE); 35 LBS/ACRE (BROWNTOP MILLET); 30 LBS/ACRE (SORGHUM-SUDAN HYBRIDS) SEEDING SCHEDULE FOR SHOULDERS. SIDE DITCHES, SLOPES (3:1 TO 2:1) DATE TYPE PANTING RATE MAR 1 - JUN 1 SERICEA LESPEDEZA (SCARIFIED) AND USE THE FOLLOWING COMBINATIONS:50 LBS/ACRE (SERICEA LESPEDEZA) MAR 1 - APR 15 ADD TALL FESCUE 10 LBS/ACRE MAR 1 - JUNE 30 OR ADD WEEPINE LOVE GRASS 10 LBS/ACRE MAR 1 - JUNE 30 OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUN 1 - SEPT 1 TALL FESCUE AND BROWNTOP MULLET OR SORGHUM-SUDAN HYBRIDS *** 120 LBS/ACRE (TALL FESCUE); 35 LBS/ACRE (BROWNTOP MULLET); 30 LBS/ACRE (SORGHUM-SUDAN HYBRIDS) SEPT 1 - MAR 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) AND TALL FESCUE 70 LBS/ACRE (SERICEA LESPEDEZA); 120 LBS/ACRE (TALL FESCUE) NOV 1 - MAR 1 AND ABRUZZI RYE 25 LBS/ACRE CONSULT S&EC ENVIRONMENTAL ENGINEERS FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE THAT DO WELL UNDER LOCATION CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12" IN HEIGHT BEFORE MOWING; OTHERWISE, FESCUE MAY BE SHADED OUT. STREAM PUMP AROUND SEQUENCE OF CONSTRUCTION: 1.CONTRACTOR SHALL DETERMINE A PROPOSED SIZE AND LOCATION OF DIRT BAG FOR APPROVAL BY THE INSPECTOR. 2.INSTALL GEOTEXTILE DEWATERING (DIRT) BAG AS APPROVED. 3.INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 4.PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 5.PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER ENTRAPPED AREA. AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAYS WORK. 6.PERFORM STREAM WORK IN ACCORDANCE WITH THE PLANS. 7.EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUPS AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM DIKES FIRST). 8.PUMP AROUND AREA TO BE STABILIZED WITH MATTING AT THE END OF EACH WORK DAY. THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THE GRADING SHEET SHOW THE UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKES FOR EACH DAYS WORK. 9.REMOVE DIRT BAG AND PROPERLY DISPOSE OF CAPTURED SEDIMENT AND DIRT BAG. STABILIZE DISTURBED AREA WITH SEED AND MULCH. PROPER REMOVAL OF DIRT BAG SHALL BE CONSIDERED A SITE SPECIFIC CONSTAINT. GEOTEXTILE DEWATERING (DIRT) BAG (SEE DETAIL ON EROSION CONTROL PLAN PHASE II) UTILIZE A STABILIZED OUTLET FOR CLEAN WATER PUMPING EIP EIP ECM EIP EIP LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 LENGTH 11.46' 18.82' 23.14' 15.02' 17.37' 14.29' 18.43' 21.61' 11.17' 21.54' 24.86' 31.71' 83.54' 13.46' 10.31' DIRECTION S72° 52' 44"E S78° 28' 26"E S86° 13' 42"E N86° 43' 15"E N80° 44' 17"E N74° 20' 01"E N69° 16' 25"E N05° 18' 59"E N00° 44' 02"W N06° 53' 41"W N15° 33' 58"W N26° 08' 40"W N33° 21' 18"W N52° 52' 53"W N83° 28' 26"W POND CREEKLC EX. HOUSE (2,500 SF) 50' NEUSE RIPARIAN BUFFER 50' NEUSE RIPARIAN BUFFER LONIKER DRIVE (PUBLIC R/W) EX. WELL EX. WELL EX. CARPORT (465 SF) EX. GARAGE (1,020 SF) EXISTING DOCK EXISTING DAM 50.0' WSWB ZONE "2" 20' BUILDING SETBACK FROM WSWB BUFFER 30.0' WSWB BUFFER 1-EW INV=372.0 2-JB RIM=395.0 INV IN=387.4 INV OUT=387.2 3-DI RIM=391.0 INV=389.0 246 LF 15" RCP @ 6.2%162 LF 15" RCP @ 1% EX 42" CMP CULVERT 380375 385390395 395375 3753803853903 7 0365370365360 370360 365 370355370 370 365 360 390385380375370375380385390 395352 35750.0' WSWB ZONE "1" EX 36" CMP CULVERT 10.0' 398 392397 PROP 42" CMP CULVERT EXTENSION 46 LF @ 3% ENDWALL TOP: 370.2 INV: 364.6 (BURY INV BY 0.7') CONNECT TO EX PIPE INV: 366.0 N/F BERRY HILL PROPERTIES LLC PIN: 1718.01-15-7465 DB 9676 PG 2291 OFC GROSS N/F WILLIAM E. & ANDREA M. COOK PIN: 1718.01-25-4527 DB 8076 PG 905 SINGLE FAMILY N/F JOHN T. JR. & CHRISTA M. MCELVEEN PIN: 1718.01-25-7505 DB 11488 PG 1105 SINGLE FAMILY N/F CHARLES A. JR. & ELIZABETH M. MANGANO PIN: 1718.01-25-9567 DB 4563 PG 43 SINGLE FAMILY N/F DAVID C. & MELISSA P. PEARCE PIN: 1718.01-35-2548 DB 9142 PG 762 SINGLE FAMILY N/F HOWARD J. & MARY JANE JUNG PIN: 1718.01-35-2088 DB 4923 PG 653 SINGLE FAMILY N/F TERRENCE & CHRISTINE CAMPBELL PIN: 1718.14-34-2835 DB 9599 PG 1732 SINGLE FAMILY N/F BRUCE & MELANI AVERY PIN: 1718.14-34-1646 DB 14077 PG 1079 SINGLE FAMILY N/F RONALD & GEORGIA WILLIAMS PIN: 1718.13-24-2751 DB 8530 PG 13 SINGLE FAMILY N/F JHD PROPERTIES PIN: 1718.01-15-8038 DB 9709 PG 2074 SINGLE FAMILY N/F MARTEN & STEPHANIE DEVRIES PIN: 1718.01-35-3320 DB 12289 PG 1059 SINGLE FAMILY STREAM CROSSING AND BUFFER IMPACTS TO BE PERMITTED BY USACoE PLUNGE POOL 3 PLUNGE POOL 2 PLUNGE POOL 1390385380375 37 5 380385390395397 395 392392394393395 RIP RAP 4 PROVIDE MATTING IN DITCH PER DITCH REINFORCEMENT TABLE (TYP THIS SHEET) ROAD SECTION BURY INVERT 8"MAX 3:1MAX 3:1PROP ENDWALL 42" CMP 46 LF @ 3% EX 42" CMP CONNECT PROP CULVERT TO EX CULVERT GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number GRADING AND STORM DRAIN PLAN CE-4 EX. BUILDING 805 SF (TO BE REMOVED PRIOR TO MAP RECORDATION, DEMO PERMIT WILL BE NEEDED) CULVERT PROFILE HORIZONTAL SCALE 1" =30' VERTICAL SCALE 1" = 3' EIP EIP ECM EIP EIP S 89° 53' 07" W 917.74' S 89° 02' 12" E972.91'N 14° 13' 18" E509.93'N 12° 59' 55" E77.04'S 20° 25' 11" W583.79'S 85° 21' 01" E 317.91'S 02° 41' 30" E246.56'N 01° 08' 31" E63.75'L1 L2 L3 L4 L5 L6 L7 L8 L9L10L11L12L13L 1 4 L15 LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 LENGTH 11.46' 18.82' 23.14' 15.02' 17.37' 14.29' 18.43' 21.61' 11.17' 21.54' 24.86' 31.71' 83.54' 13.46' 10.31' DIRECTION S72° 52' 44"E S78° 28' 26"E S86° 13' 42"E N86° 43' 15"E N80° 44' 17"E N74° 20' 01"E N69° 16' 25"E N05° 18' 59"E N00° 44' 02"W N06° 53' 41"W N15° 33' 58"W N26° 08' 40"W N33° 21' 18"W N52° 52' 53"W N83° 28' 26"W (PUBLIC R/W ) POND CREEKLC EX. HOUSE (2,500 SF) 50' NEUSE RIPARIAN BUFFER 50' NEUSE RIPARIAN BUFFER KOUPELA DRIVELONIKER DRIVE (PUBLIC R/W) EX. WELL EX. WELL 500' SIGHT DISTANCE430' SIGHT DISTANCE108.8' EX. CARPORT (465 SF) EX. GARAGE (1,020 SF) EXISTING DOCK 247.4' 272.3' 216.2' 124.6' 411.2' 391.0' 16.2' EXISTING DAM 50.0' WSWB ZONE "2" 15' SIDE BUILDING S E T B A C K (TYP) 15' SIDE BUILDING SETBACK (TYP) 30' FRONT BUILDING SETBACK 30' REAR BUILDING SETBACK 20' BUILDING SETBACK FROM WSWB BUFFER 30.0' WSWB BUFFER 25' TREE & VEGETATION PROTECTION ZONE 25' TREE & VEGETATION PROTECTION ZONE 25' TREE & VEGETATION PROTECTION ZONE 50' TREE & VEGETATION PROTECTION ZONE 25' TREE & VEGETATION PROTECTION ZONEN 32 ° 20 ' 27 " W288.86 ' S 6 6 ° 0 0 ' 2 4 " E 320 . 3 3 ' N 69° 34' 49" W 34.00'C1CURVE TABLE CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 LENGTH 57.53' 175.91' 58.00' 23.16' 196.37' 18.84' 10.09' 50.47' 142.36' 44.67' 22.55' 56.50' 98.76' 78.27' 269.76' RADIUS 61.50' 61.50' 61.50' 14.50' 177.50' 177.50' 127.50' 127.50' 172.50' 127.50' 127.55' 174.32' 129.46' 170.99' 222.50' DELTA 053°35'41" 163°52'51" 054°01'58" 091°30'29" 063°23'07" 006°04'49" 004°32'01" 022°40'42" 047°17'01" 020°04'19" 010°07'52" 018°34'09" 043°42'23" 026°13'32" 069°27'56" CHORD 55.45' 121.79' 55.87' 20.77' 186.50' 18.83' 10.09' 50.14' 138.35' 44.44' 22.52' 56.25' 96.38' 77.58' 253.54' CHORD BEARING N06° 22' 40"W S64° 53' 05"W S44° 04' 19"E N25° 20' 04"W N52° 06' 44"E N86° 50' 42"E S87° 50' 52"E S74° 14' 31"E N86° 32' 41"W N79° 50' 58"E S85° 02' 47"E N79° 09' 02"E N88° 09' 55"W S73° 48' 35"E N55° 09' 09"E 30'R 20' PROPOSED DRAINAGE EASEMENT C2 C 3 C4S 20° 25' 11" W139.29'S 20° 25' 11" W 29.14' C5 C6C7 C8 C9 S 69° 4 8' 4 8 " W 87.36'C10S 89° 53' 07" W 180.08' C11 C12 N 69° 4 8' 4 8 " E 87.36' C13 C1 4 N 89° 59' 17" E 222.61' C15 N 20° 25' 11" E244.40'S 89° 53' 07" W 212.45'380375 385390395 395375 3753803853903 7 0365370365360 370360 365 370355370 370 365 360 390385380375370375380385390 395352 35750.0' WSWB ZONE "1" 10.0' 398 392397 N/F BERRY HILL PROPERTIES LLC PIN: 1718.01-15-7465 DB 9676 PG 2291 OFC GROSS N/F WILLIAM E. & ANDREA M. COOK PIN: 1718.01-25-4527 DB 8076 PG 905 SINGLE FAMILY N/F JOHN T. JR. & CHRISTA M. MCELVEEN PIN: 1718.01-25-7505 DB 11488 PG 1105 SINGLE FAMILY N/F CHARLES A. JR. & ELIZABETH M. MANGANO PIN: 1718.01-25-9567 DB 4563 PG 43 SINGLE FAMILY N/F DAVID C. & MELISSA P. PEARCE PIN: 1718.01-35-2548 DB 9142 PG 762 SINGLE FAMILY N/F HOWARD J. & MARY JANE JUNG PIN: 1718.01-35-2088 DB 4923 PG 653 SINGLE FAMILY N/F TERRENCE & CHRISTINE CAMPBELL PIN: 1718.14-34-2835 DB 9599 PG 1732 SINGLE FAMILY N/F BRUCE & MELANI AVERY PIN: 1718.14-34-1646 DB 14077 PG 1079 SINGLE FAMILY N/F RONALD & GEORGIA WILLIAMS PIN: 1718.13-24-2751 DB 8530 PG 13 SINGLE FAMILY N/F BERRY HILL PROPERTIES LLC PIN: 1718.13-04-7941 DB 9676 PG 2291 SINGLE FAMILY N/F JHD PROPERTIES PIN: 1718.01-15-8038 DB 9709 PG 2074 SINGLE FAMILY N/F MARTEN & STEPHANIE DEVRIES PIN: 1718.01-35-3320 DB 12289 PG 1059 SINGLE FAMILY 390385380375 37 5 380385390395397 395 392392394393395 EX STREAM EX WETLAND EX STREAM EX 42" CMP CULVERT C9 S 69° 4 8' 4 8 " W 87.36' C10 C12 N 69° 4 8' 4 8 " E 87.36' C13 C1 4 PROP 42" CMP CULVERT EXTENSION 46 LF @ 3% CONNECT TO EX PIPE INV: 366.0 PLUNGE POOL 3 PLUNGE POOL 2 PLUNGE POOL 1 EX STREAM EX STREAM VICINITY MAP (NOT TO SCALE) SITE GREYSON'S POND 9200 HONEYCUTT ROAD LOT-BY-LOT SUBDIVISION Project Drawing Title Seals Client Approvals Revisions Number Description Date Drawn By Checked By Date Issued JOHN A. EDWARDS & COMPANY Consulting Engineers and Land Surveyors NC License F-0289 333 Wade Ave., Raleigh, N.C. 27605 Phone: (919) 828-4428 Fax: (919) 828-4711 E-mail: info@jaeco.com www.jaeco.com HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LN RALEIGH, NC 27617 Subdivision Number SITE PLAN PROPERTY LINE RIGHT-OF-WAY LEGEND DB DEED BOOK BM BOOK OF MAPS PG PAGE N/F NOW OR FORMERLY R/W RIGHT OF WAY MIA MAXIMUM IMPERVIOUS ALLOWED EIP EXISTING IRON PIPE ECM EXISTING CONCRETE MONUMENT TREE LINE ADJOINER PROPERTY LINE CE-2 EX. BUILDING 805 SF (TO BE REMOVED PRIOR TO MAP RECORDATION, DEMO PERMIT WILL BE NEEDED) SITE DATA OWNER: HONEYCUTT PROPERTY VENTURES LLC 5805 LEASE LANE RALEIGH, NC 27617 LOT ADDRESS: 9200 HONEYCUTT ROAD RALEIGH, NC 27615 PIN: 1718257128 ZONING: R-40-W LAND USE: SINGLFAM REFERENCE: DB 16008, PG 0586 WAKE COUNTY REGISTRY TOTAL ACREAGE:12.23 AC AFTER ROW DEDICATION:12.09 AC AREA IN LOTS:12.09 AC AVERAGE LOT SIZE:2.02 AC R/W DEDICATION:0.14 AC PROPOSED PRIVATE STREET:0.74 AC PROPOSED PRIVATE STREET:1,322 LF REQ'D MINIMUM LOT SIZE:40,000 SF PROP. MINIMUM LOT SIZE:40,184 SF REQ'D MINIMUM LOT WIDTH:110' PROP. MINIMUM LOT WIDTH:226' FRONT SETBACK:30' REAR SETBACK:30' SIDE SETBACK:15' CORNER SETBACK:30' SUBDIVISION NUMBER:S-23-15