Loading...
HomeMy WebLinkAbout20181661 Ver 1_Shoreline Stabilization_20181205Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* 20181661 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* AmyAnnino:eads\amannino Select Reviewing Office:* Asheville Regional Office - (828) 296-4500 Submittal Type:* Shoreline Stabilization Does this project require a request for payment to be sent? * r Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: F New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Theresa Blosser Who is subrritting the information? Email Address: theresa.n.jay@gmail.com Project Information Project Name: 5082 Lighthouse Court Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes(' No r Unknown County (ies) Burke Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent Burke County Shoreline Permit.pdf 467.34KB Shoreline Stabilization Form NC Water Resources 7.75MB and Environmental Quality.pdf Burke County Tree Removal Permit.pdf 1.54MB Only pdf or larz files are accepted. Describe the attachments: I've attached the Burke County Shoreline Permit, Burke County Tree Removal Permit, and your application with photos and signature. If you need further information, please let me know. Thanks for your assistance! Theresa Blosser 804-514-4917 V By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: %O,qedr.? Olnf&c it Submittal Date: State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 – Water Quality Certification, Shoreline Stabilization FORM: SSGP 02-2017 FORM: SSGP 02-2017 Page 1 of 3 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins DWR – 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Karen Higgins DWR – 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Jay and Theresa Blosser Mailing Address: 105 Beechmont Drive Telephone Number: Theresa Cell: 804-514-4917 Jay Cell: 804-514-4366 E-mail Address: theresa.n.jay@gmail.com B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. See end of Form 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) See end of Form 4. Location of the property (where work is to be conducted) FORM: SSGP 02-2017 Page 2 of 7 County: Burke Nearest Town: Morganton, NC Subdivision name or site address (include phase/lot number): Southpointe, Lot 79, Phase 1 Directions to site - please include road names and numbers, landmarks, etc.: From Morganton, Take Hwy 126 towards Lake James. At Lake James, turn Left into Southpointe Subdivision. Follow Southpointe Drive. Turn Right onto Lighthouse Court. Lot 79 is on the right, between a 2 story red brick house on the right side and a painted brown brick house on the left side. Latitude (in decimal degrees) 35.767 Longitude (decimal degrees -81.835 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Undeveloped 6. Property size (acres): 1.05 7. Lake/ river/ ocean adjacent to property: Lake James 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shoreline Stabilization Rocks will be placed in a pile at the shoreline with little to no disturbance of the soil. A small tractor will be used to dump rock on one spot next to the shoreline. Rocks will be place by hand onto the shoreline. A few trees will be removed to allow the tractor to access the rock dumping location. Mulch will be placed along the path following the stabilization. Shoreline Stabilization is necessary due to eroding shoreline which is causing trees to fall and soil to be washed into the lake as the banks are undercut from rain. 9. Will work be conducted from land? Rip Rap will be installed from Land. Tree removal is by barge (Bennick). Some Marked Trees in the 65’ setback area have been approved to be removed by Bradley Kirkley (Burke County) to allow access to our dock and to protect our dock and house from falling trees. 10. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Stone will be added along 136 linear feet of shoreline with enough width to allow a gradual slope up to the non-eroded area. Temporary impacts in square feet: 902 Square Feet Access Path; However, only a few trees will be removed and Soil should have minimal disturbance. Any disturbance in soil will be repaired with Mulch after the project is completed. FORM: SSGP 02-2017 Page 3 of 7 11. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land-ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Marked Trees will be removed. This includes mostly pines and a couple of kalmia. Please see attached tree removal permit from Bradley Kirkley/ Burke County Zoning Administrator. No Excavation, no Backfill, No retaining walls. Only rip rap will be added. 12. Temporary impacts (temporary clearing, construction corridor) in square feet: There will be no temporary clearing. A few small trees along the corridor will be removed. They are not required to be replanted. Ground surface mulch will be restored after completion. 13. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): A few Smaller Trees along the 14’ Construction Access Corridor and about a dozen larger pine trees that are threatening our dock will be removed by Bennick Grading and Excavation, as agreed to by Bradley Kirkley with Burke County. Signature December 04,2018 Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date *Agent's signature is valid only if an authorization letter from the owner is provided. 14. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation FORM: SSGP 02-2017 Page 4 of 7 15. Photo below shows Construction Access Path with trees to be removed. Mulch to remain in place and be refreshed after completion of shoreline stabilization. FORM: SSGP 02-2017 Page 5 of 7 Proposed Change with Rocks added, see below FORM: SSGP 02-2017 Page 6 of 7 FORM: SSGP 02-2017 Page 7 of 7 Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 12/5/2018 12:33:05 PM (Message Start Event) Accept by Montalvo, Sheri A 12/10/2018 11:26:57 AM (NON -DOT Project) The task was assigned to Montalvo, Sheri A. The due date is: December 10, 2018 5:00 PM 12/5/2018 12:33 PM