Loading...
HomeMy WebLinkAboutNC0085863_Correction_20181204 Roy Cooper r � � Govenor 1,z'g'►; Michael S. Regan 4 _ 4 Secretary f1B- Linda Culpepper °• Director NORTH CAROLINA Environmental Quality December 4,2018 Shannon V.Becker,President do Amanda Owens,Manager Environmental Compliance AQUA North Carolina,Inc. 202 MacKenan Court Cary,North Carolina 27511 Subject: Correction Change Pages-Permit NC0085863 Waterfall Plantation Water Treatment Plant(WTP) off Mica Mine Lane[NCSR 1923],Wake Forest Wake County Dear Mr.Becker: At the request of your staff,and after further review,NPDES Staff noticed an error in your permit for the subject site. DWR has therefore generated change-pages to address this error. Please insert these change-pages (3 and 4)into your active NPDES permit and discard the old pages. Please note that this permit is not transferable except after notice to the Division. The Division may modify or revoke and reissue this permit. This permit does not affect your legal obligation to obtain other permits required by the Division of Water Resources,the Division of Land Resources, the Coastal Area Management Act or any other federal or local government. If you have questions concerning this permit correction,please contact Joe R. Corporon P.G. [joe.corporon@ncdenr.gov] or call his new direct line(919) 707-3617. i 6./ Linda Culpepper, Director Division of Water Resources Enclosure [issuance final NC0085863] cc. NPDES Permit file Central Files ec. RRO,Attn:Danny Smith;Vanessa Manual; OCU,Maureen Kinney AQUA,Amanda Berger,Manager Environmental Compliance[aaowens@aquaamerica.com] DEQ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617—919 707 9000 Permit NC0085863 PART I A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B .0400 et seq., 15A NCAC 02B .0500 et seq.]; Grade I Physical Chemical WPCS [15A NCAC 08G .0302] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge filter backwash from Outfall 001. Such discharges shall be limited, monitored and reportedl by the Permittee as specified below: EFFLUENT LIMITS MONITORING REQUIREMENTS CHARACTERISTICS Monthly Daily Measurement Sample , Sample (PARAMETER CODE) Average Maximum Frequency Type Location Flow 50050 2/Monthly Estimate 2 Effluent Total Suspended Solids C0530 30.0 mg/L 45.0 mg/L 2/Monthly Grab Effluent (TSS) Total Residual Chlorine 50060 28 µg/L 3 2/Monthly Grab Effluent pH[standard units] 00400 Not<6.0 or>9.0 s.u. 2/Monthly Grab Effluent Turbidity(NTU) _ 00070 Monitor&Report Monthly Grab Effluent Total Manganese(µg/L) 01055 Quarterly Grab Effluent Total Hardness (mg/L) 00900 Monitor&Report Quarterly Grab Effluent Total Nitrogen(TN)4 C0600 Monitor&Report(mg/L) Semi-annually Calculated Effluent Total Phosphorus(TP) C0665 Monitor&Report(mg/L) Semi-annually Grab Effluent Footnotes: . 1. The Permittee is required to submit discharge monitoring reports electronically using the Division's eDMR system program[see A. (2.)]. 2. The Permittee shall determine waste-flow discharge by estimating the rate, duration and number of backwash/rinse events. 3. The Division shall consider compliant all effluent TRC values reported below 50 µg/L.However, the Permittee shall continue to record and submit all values reported by a North Carolina certified test method(including field certified),even if these values fall below 50 µg/L. 4. For a given wastewater sample,TN=(NO2-N+NO3-N)+TKN,where TN is Total Nitrogen, (NO2-N+NO3-N)is Nitrite/Nitrate Nitrogen,and TKN is Total Kjeldahl Nitrogen. Condition: The Permittee shall discharge no floating solids or foam visible in other than trace amounts. Page 3 of 7 Permit NC0085863 A. (2.) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS [NCGS 143-215.1 (b)] Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. NOTE: This special condition supplements or supersedes the following sections within Part II of this permit(Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) Reporting • Section D. (6.) Records Retention • Section E. (5.) Monitoring Reports 1. Reporting Requirements [Supersedes Section D. (2.) and Section E. (5.) (a)1 The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report(eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross-Media Electronic Reporting Regulation (CROMERR),permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing, signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NC DEQ/Division of Water Resources/Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1.1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. See"How to Request a Waiver from Electronic Reporting" section below. Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Page 4 of 7