Loading...
HomeMy WebLinkAbout19890188 Ver 1_Complete File_19890101 r. IF ` sa STATE 4 ? d State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street 9 Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms William W. Cobey, Jr., Secretary Director February 21, 1989 Mr. Bill Rowland, President Natural Power, Inc. 3000 Gresham's Lake Road Raleigh, NC 27615 Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Gas Line Crossing Natural Power, Inc. Crabtree Creek Wake County Dear Mr. Rowland: Attached hereto are two (2) copies of Certification No. 2317 issued to Natural Power, Inc, dated February 21, 1989. If we can be of further assistance, do not hesitate to contact us. Sincerely, R. Paul Wilms cc: Wilmington District Corps of Engineers Raleigh Regional Office Mr. William Mills Mr. John Parker J. Fred Davis, Jr., Inc. P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer w NORTH CAROLINA Wake County CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to Natural Power, Inc. pursuant to an application filed on the 31st day of January, 1989 to construct a gas line crossing of Crabtree Creek from the Raleigh Landfill to Ajinomoto, USA. The Application provides adequate assurance that the discharge of fill material into the waters of Crabtree Creek in conjunction with the proposed gas line crossing in Wake County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction related discharge (increases such that the turbidity in the Stream is 50 NTU's or less are not considered significant). 2. That coffer dams used in the construction of the crossing shall be completely removed once construction is completed. 3. At no time shall wet concrete be allowed to come into direct contact with surface waters. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 21st day of February, 1989. DIVISION OF ENVIRONMENTAL MANAGEMENT /Z/?- ? ? R. Paul Wilms, Director WQC# 2317 4 y A a?sr?lEo State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms William W. Cobey, Jr., Secretary Director February 21, 1989 Mr. Bill Rowland, President Natural Power, Inc. 3000 Gresham's Lake Road Raleigh, NC 27615 Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Gas Line Crossing Natural Power, Inc. Crabtree Creek Wake County Dear Mr. Rowland: Attached hereto are two (2) copies of Certification No. 2317 issued to Natural Power, Inc, dated February 21, 1989. If we can be of further assistance, do not hesitate to contact us. Sincerely, w ` u R. Paul Wilms cc: Wilmington District Corps of Engineers Raleigh Regional Office Mr. William Mills Mr. John Parker J. Fred Davis, Jr., Inc. P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer NORTH CAROLINA Wake County CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to Natural Power, Inc. pursuant to an application filed on the 31st day of January, 1989 to construct a gas line crossing of Crabtree Creek from the Raleigh Landfill to Ajinomoto, USA. The Application provides adequate assurance that the discharge of fill material into the waters of Crabtree Creek in conjunction with the proposed gas line crossing in Wake County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction related discharge (increases such that the turbidity in the Stream is 50 NTU's or less are not considered significant). 2. That coffer dams used in the construction of the crossing shall be completely removed once construction is completed. 3. At no time shall wet concrete be allowed to come into direct contact with surface waters. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 21st day of February, 1989. DIVISION OF ENVIRONMENTAL MANAGEMENT ItI-12 R. Paul Wilms, Director WQC# 2317 J. FRED DAVIS, JR.i INC. 705 Georgetown Road Post Office Box 18051 Raleigh, NC .27619 (919) 832-7704 TO: William C. Mills, P.E. Dept. of Environmental Management 512 N. Salisbury Street Raleigh, N.C. 27611-7687 LETTER OF TRANSMITTAL Date 01-30-89 Job No. Att: 1 iam i s, F.E. Re: 401 Permit Application Crabtree Creek Crossing between City of Raleigh Landfill and Ajinomoto, USA, Inc. We are sending you: X Attached Under Separate Cover Shop Drawings X Prints Plans Samples Copy of Letter X Other Change Order Specifications IEC4 JAN 3 ' 6'69 WATER QUALITY SECTION Cyfa RFC i0NS BRANCH. Date These are transmited as checked below: X For Approval X For Your Use As Requested For. Review & Comment Corrected Prints Copied for Distribution Approved as Submitted Return Approved as Noted Submit Return for Corrections Other Prints Returned After Loan to us Resubmit Copies for Apprbval Remarks: If you have any questions or need any additional information, please do no esi a e o ca copy To. File Signed: -------" NATURAL POWER INC., A NORTH CAROLINA CORP., AJINOMOTO, USA, INC., CRABTREE CREEK CROSSING PROCEDURE (1) Construct cofferdam #1 to centerline of Crabtree Creek. (2) Gas line main shall then be laid to the centerline of Crabtree Creek. (3) Construction of cofferdam #2, over the remaining portion of Crabtree Creek, shall occur simultaneously while cofferdam #1 is being removed. (4) After cofferdam #2 has been completed, the gas line main shall be laid through the remaining portion to cross the creek. (5) Cofferdam #2 shall be removed and all grades and contours shall be returned to their original condition. (6) The U. S. Army Corps. of Engineers shall, if necessary, inspect the site for approval. ` Widen 64 Csrow .19 24 10e fAt °• 2217- 2667 O FAP s 10 7273 2397 64 2414 pA 0g 7 s 2, 261 I 241! 10? . 617 II » Qs9? .. R.? ,T,.? f ?7A '• .y I 7 NEW HO4o I (UNINC.)1 POP.6,74? r I ??'Nn N I ?a?b i i I I? I y; a ?o 10 o ?J 244 I ? i ? q.,A? 2677 3 2676 FAU I .1.2 14? '8 r 343 •09 %1* '? I 24.24 Fir :;000 2317 -,%.- V!3. 2617 2 GO?JS'TrLJL'C???S ?LC.ES'S z APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina GS 146-12 Department of the Army Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113.229, 143.215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. I. AA plicant Information ?A.Name NATURAL POWER, INC., A NORTH CAROLINA CORP. 3000 Gresham' s Lake Roacrst Middle . Address Street, P. 0. Box or Route Raleigh N.C. 27615 876-1877 City or Town State Zip Code Phone 11. Location of Proposed Project: [-A.-County Wake City, town, community or landmark Southeaster_ n Raleigh, Aiinomoto Drive, City of 2. Is proposed work within city limits? Yes X No Raleigh Landfill Creek, river, sound or bay upon which project is located or nearest named body of water to project Crabtree Creek III. Description of Project ?A. 1. Maintenance of existing project 2. New work X 1,8. Purpose of excavation or fill Access c annel length width depth -2:- Boat-trams: lengthwidth depth --j. PH -ama length_,__width-depth l'4. Other Installation of LFG length 300+//width 30' depth varies - 4' average p//AC. 1. BulkheaR nRh? a N/A Average distance waterward of MHW (shoreline) N/A 2. Type of bulkhead construction (material) N/A Excavated material (total for project) 1. Cubic yards 1350 approx. 2. Type of material k-f. Fill material to be placed below MHW (see also VL A) 1. Cubic yards 1350 approx. 2. Type of material IV. Land Type, Disposal Area, and Construction Equipment: ?A. Does the area to be excavated include any marshland, swamps or other wetland? Yes X No "I B. Does the disposal area include any marshland, swamps or other wetland? Yes X No Disposal Area 1. Location In areas of excavation (covering pipeline) /2. Do you claim title to disposal area? No - i y o a eig , ons as corporation ?D. Fill material source if fill is to be trucked in variable as it becomes available How will excavated material be entrapped and erosion controlled? All in accordance to Wake County and State of N.C. soil erosion control methods. r Type of equipment to be used Trucks, bulldozers, excavators, etc. ?G. Will marshland be crossed in transporting equipment to project site? If yes, explain No, crossing to occur by approach from each side w/ coffer dams. D& F-81 Rev. 10/78 V. Intended Use of Project Area (Describe) A.-1.-Private---- -3:--C-emmercial ?3fNousiag-Development or Industrial 4. Other Area to be used for crossing o Cra tree Cree 404 B. 1. Lot size(s) N/A 2. Elevation of lot(s) above mean high water N/A 3. Soil type and texture N/A 4. Type of building facilities or structures N/A 5. Sewage disposal and/or wastewater treatment A. Existing Planned B. Describe N/A 6. ILand Classification' (circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: -A. Does the proposed project involve the placement of fill materials below mean high water? Yes X No 1. Will any runoff or dischar a enter ad' t A N/A Department of Army Corps of Engineers or State permits for k4) Length of time required to complete project: '?o?? Z M?1.rHS g lace" waters as a result of project activity or planned use of the area following project completion? Yes X No 2. Type of discharge Surface 3. Location of discharge Runoff at coffer dam location Present rate of shoreline erosion (if known): List permit numbers and issue dates of previ work in project area, if applicable: WIAV 11. /f/A4. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. Attach an accurate work plat drawn to scale on 8%z X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. 111A C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served N/A 1'1A D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. N/A X. In addition to the completed application form, the following items must be provided: XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program. XII. Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and I nd clearing. DATE ? 4 .a• "-A Applicant's S D&F-62 SEE REVERSE SIDE FOR, MAILING INSTRUCTIONS Rev. 10/78