Loading...
HomeMy WebLinkAbout19890186 Ver 1_Complete File_19890101:"i ?.sWFv V State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms William W. Cobey, Jr., Secretary July 5 , 1989 . Director Mr. Louis S. Brown, Mayor Town of Navassa Navassa, North Carolina 28404 Dear Mayor Brown: Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Public Access Area Town of Navassa Davis Creek Brunswick County Attached hereto are two (2) copies of Certification No. 2356 issued to the Town of Navassa dated July 5 1989. If we can be of further assistance, do not hesitate to contact us. Sincerely, R. Paul Wilms Attachments cc: Wilmington District Corps of Engineers Wi ington Regional Office r. William Mills Mr. John Parker P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer .k NORTH CAROLINA brunswicx county CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to the Town of Navassa pursuant to an application filed on the 2nd day of June, 1989 to construct a public boating access area on Davis Creek. The Application provides adequate assurance that the discharge of fill material into the waters of Davis Creek in conjunction with the proposed public access area in Brunswick County will not result in a violation of applicable. Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted, in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction related discharge (increases such that the turbidity in the Stream is 25 NTU's or less are not considered significant). 2. That all wet concrete poured below mean high water shall be poured at low tide and that the forms shall be completely dewatered prior to pouring the concrete. At no time shall wet concrete be allowed to directly contact surface waters. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 5th day of July, 1989. WQC# 2356 DIVISION OF ENVIRONMENTAL MANAGEMENT R. Paul Wilms, Director I a E Ap DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concerning an applicationfor State Federal CAMA Permit(s) from 7 /J. A. PERMIT: This office cannot comment on this project until after the clo.se of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a.manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases.of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by mor.e than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a.result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for ° this project. - Such action to process the certification has been initiated. Proposed Certificationill be acted on or after ?/GG 1 to / ''' The proposed project is.certified. under General.Certification A) No. 1179 issued on January. 25, 1977, for sewer line construction B) C) D) No. 1431 issued on October 16, 1980, for boat ramp construction. No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas.. WATER QUALITY ECTION DIVISION OF ENVIRONMENTAL MANAGEMENT ?: , DIVISION OF ENVIRONMENTAL MANAGEMENT Date: To: From: Through: June 7, 1989 Bill Mills Operations Branch James H. Gregson-?4? Wilmington f iDonald Safr7"onal Wilmington iona ice 8 T JUN 0 9 iqm Subject: Regional Office Review and Recommendations Application for Permit for Excavation and/or Fill Project # 8906-B Town of Navassa / Estuarine Access Area Brunswick County PROJECT DESCRIPTION: The applicants propose to construct a public access area, to include a boat ramp with 700 sq. ft. below MHW, a 1.48 acre parking area, two pier, boardwalk, and dock. ADJACENT WATER BODY: Davis Creek CLASSIFICATION: SC-Swamp / Primary Nursery Area The project has been reviewed to determine impacts to water quality. The following comments have been provided. The project will require a 401 Water Quality Certification and should include the following conditions for the construction of the boat ramp. a. That all wet concrete poured below MHW be poured at low tide and that the forms be completely dewatered. No wet concrete shall be placed in the surface waters. b. That construction be done in such a manner that turbidity increases not exceed 25 NTU outside the project area. A stormwater management plan for this project was approved on 5/29/89. This office has no objection to the project as proposed. JHG:trw cc: DCM - C. Robert Stroud WiRO, CF DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name Town of Navassa - Estuarine Access Area 2. Location of project site Davis Creek - Off SR 1430 - Near Town of Navassa - Brunswick County - New Photo 12A - 44 - Grid D-E, 9-10 3. 4. 5. 6. Investigation type: Dredge & Fill X CAMA X Investigative procedure: (A) Dates of site visit 3-16-88 4/14/89 5/24/89 (B) Was applicant present e? s _ yes no Processing procedure: Application received 5/19/89 Office Wilmington Site description: (A) Local Land Use Plan Navassa Land Classification from LUP Rural - Industrial Development constraints identified in LUP None (B) AEC(s) involved: Ocean Hazard Estuarine Shoreline Coastal Wetlands x Public Trust Waters Estuarine Waters x Other (C) Water dependent: Yes No Other Both (D) Intended use: Public X Private Commercial (E) Type of waste water treatment: Existing N/A Planned N/A (F) Type of structures: Existing N/A Planned Boat ramp with pier/piers azebos. gravel parking lot --- (G) Estimated annual rate of erosion N/A Source 7- Habitat description: AREA (A) Vegetated wetlands: (B) Non-vegetated wetlands: Pier coverage/boat ramp (C) Other: Highground (parking) (D) Total Area Disturbed: Dredged Filled Other Appx. 700 sf Appx. 1,460 sf Appx. 64,600 sf (1.48 acres) Appx. 700 sf Appx. 66,060 sf (1.5 acres) X X 8. Project Summary The applicants propose to construct a public access boat ramp with parking facilities. They will also construct two pier systems to provide ample water access for fishing etc. Parking facilities will also be provided. A Town of Navassa Page Two 9. Proiect Description The project is located on Davis Creek just downstream of the railroad crossing leading to High Rise Company, Inc. Davis Creek is a meandering body water that is bounded on the north by wetlands and on the south by wooded swamp type vegetation. The width of the creek within the project area varies from approximately 40' to 48'. There are scattered wetland species located on the southern bank. The species are fresh water in nature and were not identified. The waters are classified as SC-Swamp and are designated as a primary nursery area by the Division of Marine Fisheries. The highground adjacent to the creek above the flood plain is vegetated by oak-hickory climax hardwoods. The flood plain is vegetated with cypress and gum. The Corps of Engineers have identified all significant "404" wetlands on the site. The applicants propose to improve the highground portion of the tract by maintaining and upgrading the existing access road and by creating a multi-use parking area for approximately 65 vehicles. Of this number 22 will be pull through for vehicles with boat trailers. The other 43 will be for simple parking. A boat ramp will be installed at the northwest corner of the parking lot. The ramp will be approximately 14' wide x 90' long. Approximately 50' will extend beyond the high water contour. However only approximately 10' will extend into the low water channel. This channel is the only navigable portion of the creek at this point. Trees and shallow mud banks prohibit the use of the stream landward of the low water contour. The width of the stream at low water in the boat ramp vicinity is approximately 43'. A 50' x 5' pier will. serve the ramp. In addition to the boat ramp two pier/boardwalk/dock complexes will be constructed. Each of these will also have a gazebo. One pier/dock system will have 2-50' piers extending waterward to end in 2-50' "T" heads. One of these will have a 10' x 10' gazebo at the downstream end. The two structures will be connected by approximately 105' of boardwalk along the toe of the bank. The other pier/dock will have 2-50' arms connected at an angle and one will terminate in a 10' x 10' gazebo. The pier/docks will be 6' wide. 10. Anticipated Impacts The "404" wetlands on the tract have been identified by the Corps of Engineers. These areas will be avoided by the development. The pier system will provide simple access for bird-watching, fishing, etc. The boat ramp will provide water access for vessels. As we understand the project will be constructed in phases. The entire development concept is presented for review. Provided that the project is completed as proposed, no significant impacts are anticipated. Submitted by: C. Robert Stroud, Jr. Office: Wilmington Date: May 23, 1989 V/N jBinit i jji3 jo adAl • j V /N ualum u2it4 uuatu mojaq p0oejd aq o1 `spzu,i oigno ui `jji} 3o lunotuy a v N jeizaz?ui peaLPllnq 3o od/i.L P VIN ?aaJ ui 'stpuouu ZI Ouipaoaud 2uunp uoiso.a ouijauoi4S •o v 7N janaj 1a1em jetuuou .o ualem uj2iuj ueauu jo pzemuaiem aouulsip a2ezany •q V 7N duzdu zo peaupjjnq jo tp2uarj •u •slouduii jeluauzuo.in -uo uassaj o1 ua jt;1 ;)q 111m Imp sdDis alp uiejdxa `sa,i lj -UIT-ialis loa(oud aip o1 luotu. -dinba 2upuodsuu.l ui posso.o aq spuepom II?!k\ q'isw Ii7T ,0S suave lii3 puuldn MHIN mojaq .o puepam ui paould jji3 (A11a[ pol uzez Ieoq `.mid `.alum -?eazq) zatpp uiseq luog (-IMN) io (M-IN) jauump ssaood upd<1 ippiM 1432ua-I •(L uoiloaS ui pa.anoo a.u tjoitjm `speatIlInq 2uipnjoxa) sailiniloe jjiJ zo uop -eneoxa pasodozd jo osodznd atjl mojaq aquosa(j •e AMM ?ZZI3 }QI?IF? ? ?- ? 9 i(aopazp oijneup,iuj .o , `aogp ouq `auij&uup `ajdwexo .oj) pasn aq jjim lu;)wdinba uoponulsuoo jo ad,(1 1et1/)& •.i ipallozzuoo uoisoza pue 311s uo 1da-4 oq jeiualetu jjil .o paleneoxa Ilim moH VTN- pajjil aq o1 puepam aup to suoisuatuiQ ON ispuupam .atpo uo ujsueuu uo paoejd aq jeiu0lew jji} jjiM V /N juualetu Ilia jo ooznoS V /N jeuazetu jji} }o odA L VIN spzeA oigno ui jjil jo lunouuy ON iualum 112111 ueauz mojaq paoujd ag jeini-euz jji3 aip Illlk\ V/m isua.e zalem zo,`pulgdtuems `puejgsuetu due apnjoui eaue jesodsip atp saoQ V N iauatjm `os }I VIN ?iaoueuoiuiuut aznlnj uo} ajqujiene aq uaue pesodsip e jjiM •zaumo atjl uuou3 uoissnuuad 2utlueA u011aj e tjoulle '1ou Ij v7m izooU ajguligetj 1s.ij atjl JO janaj eas ueaui anoge uoilunaja atjl aq Ilim lutjm `1uoijueaoo ay uo si loafo.d atp jj. •o •ssaaoe mau apiA b -oid io s,iemssoooe tjoeaq oijgnd patjsijgelsa ulez d -uteuu o1 uz el aq Him letp sdals atp aquosap `luatudoj0nap zuozlueaoo si loatoud otp Ij •u o Y /M aounos Alddns ua1eA\ •tu .u uu • 3jouna aoej.zns j uTgszxa '(,,umop tjsem„ .o `luanjpa Imo.atutuoo/jutzlsnpui `zalemalsem A.eliues >j `jjounz aoe.}zns4)jdwexo .ol) a1e1s atjl jo s.alum o1 s,?R etjSsip 3o adAi pue uopeooj aquosaQ •j •sailijioe} luauuleazl 2upsixa aquosaQ ?j Pazy s ijenozdde jeooj .o a1e1s paniaoaz sauIijioel asatp anuH [ V7N--ieaze psodsip ay o1 aj1i1 unujo noA oQ •q VIN eaue psodsip pods }o uoiluoo-j •2 77 N uazu jesodsip pods 3o suoisuawuQ • j V7T- spzu,( oigno ui `uopeneoxa puno.2 u21H •a dw-ems ispuepam. uatpo uo `sdtnums `puej -tjs.etu apnjoui paleneoxa aq o1 uazu atp saoQ •p iT s pus pnw pualeuu to ad,il •o sp • no OZ sp.e,i oigno ui janaj ualum mojaq tuozl palenuoxa aq o1 piualetu jo lunouuy •q VIN 9011ijtoul luatu1e0.1 ualum olsum zo/puu jesodsip a2emas pasodo.d aquosaQ S;DX jjU;)Wa2uueW jeluatuuoatn -ud to uoisiniQ 0141 01 poiijwgns uaaq uujd iuatu32uuetu .alumuuuols e sptl `ajquotjdde }I ea.as UTIJP - TIPW ggTm amu.z geoq aqa.zouoo , 09 x , f7T • xoa y •saoulzns paned zo3 pasn aq oz `ala.ouoo .o `ljetjdse `auols zanud `j.utu se tlons `spualetu 0141 1si-I •t .u .2 '_. G8' •sdoijooi -1o's2uipling 3uauzanpd se tjons csaat?jZns algeaturadj3lA;d 'itlN0 ii n?f?Ih?llWlA 19?Icr ;n?'?Cl 301??0 -uil Aq paianoo aq of ioly& tprq u-eatu W34V:I9aNwl I'; 1c? asn X-4TUrrmmu7 laaJ SL uIT!m 13pxl ate jo a28iuaoiod ate anirJ .•3 !asn I-epn woo 6961 9?"IJV2xpn `Aiiunwwoo zoj aq ioafoxd ate ll!1X1 'a is3o-1nosanj pup-j Jo uolslnlQ ate oz p0111u qns ?o MaM uaaq upld loiluoo uolsoia pup uopeiuatulpas itpoq .io '?jom mou 'ioaford 2ups! p mtj 'olgpalldd-e jj •sul2aq AIlnpa16 ?uTymslp ` u16uaiulutu Mlnljo16 pasodoid ate sj q puel axojaq shp 0£ isual xe u-eld jo.uuoo uoppi VIN Z-dlN-N 3G U'uOd t13p11e pup -U;)Wlpas pup uotso-1a up anla001 ismu soorncsa-d ajajduioo oslp 'Bui ew e pl!nq of upld noA 31 pup-j Jo uolslnlQ atjl 'pupt 3o aro-e auo uOT4PDTTM uptp arotu g-1nisip Illm ioafo-1d posodoid atli jj •a uelo ssaooy VwV u • u T o s8 Beau uz->I.zB pup pBO.z aouB•xqua .zoj sa.IOB Z sogazB om u .z Boq a a.z u o xTuM • x?y poq.imslp io pappzo aq of pare jo ozlS 'P -pauoq. quo zpa- uM . a.aa ui as TauW (-1a1d ro.'ppatpjlnq VIN ( axap- xad si!un ate pup 'Pullplu 'jaioui 'otuotj 16 ?ulppnq 'aldwuxa -1oj) salun jepuop!sax 3o -1aquinu atp QAIq) AIlsuaCI a asodo-1d noA salIlnpae juatudojanap 1116 aq!-1osaQ •'e N slaored -1o siol 3o ia)gwnN •q UTNju pa BozpuBi? JO; pB a?azouoo L qTM Pal? uzfze T Jut Mot, rr ?1?]]U'd Qj's1? I• ' ' TJB^I pasodo-1d saxn?anris PUB pBOa ssaooy Z.YJ May F t!?" Y ' ?QN? QN?I Nom's 6}jW . -1 -1o 'salill!aej 's2ulpl!nq 3o iogwnu pup adAl •-e iuauidOlanap pupldn Naa J0 TaatjM? aB0 313310 sznBQ Aup sapnloui ioaf0-1d ate }! uopoos slip aiajdtuo3 joofo-1d isaxpau -1aaem jo Apoq jo otulatq a ' C • 0 • N BssBtiBN -- soX 1uopoipslxnf ?uiuueld xo siiuiij Aim ultplm :I-1om pasodo-1d sl •p ' ' ?uno0 ?oZMsun.iq L1unoo o patloB??B ituotjn? ?.g `os ?j .3'M BssunuN ;o s4TwT7 uMO,L apzsul ?j-1euipupj xo.'Lilunuxuxoa `umoi `?!o •g . @T4@T aas - ON pop-ii ate -1o3 ino paniipo S uaaq k),uns jeoi2ojoaptjaxe I-euolssajo-1d p spj.j [ •p -1ppuooas xo ssarpp-c iaaj ragtunu peox lo s za?BM ? ? ipaTMI3 s-1a?pm luaaefpp 3-116 mojg l . _ Tuzo.zaunuo0-TBZ.z?.snpul iau3unx-10no2 Ipool Aq pauoz ia16-1a ay sl moj j N 't ? ? ? X? `??" ????l??d ?' xat4iaauniio0- • snpuT jpxnN 'NOI Ind X07 oud ?? hiunLuwoZD podojanaQ - -- - jpuolIlsuprZ uollpn-1asuoD quaui oT (•uejd asn puel Ipooj ate ilnsuoo) ialls 3116 jo uou -@AaQ uTOOuz7 uapaauS pTBUOQ - IN q l s B paqBUOp uzaq puB7 BssBnBN ;O uMOJ oq qm p l " -poljlssplo upjd MCI pup--I dkx-vo a ssaxppp pup atuuu s-xaumo ate a4 Fe no z m-unui }j •o anl.? osle '-1aumopuul ate iou si iupolldde ate -mmomwcslT- iowi uo mou samipa3 ap-ew-upN •j • Bazy ssaooy auzaBnqsq yY1y0 s a.zq Ua .z -laud x33.-10 sznBQ (Aue J!) 3uieu 103(0-1d •q _ 101611 uO uoilela8an •a iu&e pozlxotpny -1o -1aumopup-j x u u Tq puu apBaN1 Bg 'iZ-TL£ auotld ?ipQl +70782 d!Z ZE ad?S.? X016-1i 3o (s)amixai pup, (s) ItoS •P • 0 • N DIBIS BssBQ.BN Alto 1 S- uinipQ I'eopran 0110poarJ I16uoll BssBnPN ;o uMOZ ssaxppy -BN 10 janal pas U13OW anogp ioeii jo uopenajH a zo BNI uMO zg • S szno7 attiuN .e N (s)JOI jpnp!nlpul jo aziS •q sa.zoy Zi7.8 I016-1l axllua jo azlS 16 - I;N'?'?IZdd?' , _ 5?D tis:- sroa[ord Iju o HgIVA QNV QNVZ x04 paiajduioa aq asnui 6-9 pup -j suialj (ajgpaljd -dB iou) y/tq alum 'joafoxd inoA 01 lu16naja-1 IOU • asn TBuOTgBa.zoa.z si uotxeuuojul parsanba-1 alp jj •loriuoo xaIpmuuOIs 103 31@010 sznBQ O ssaooy. quo.zj.z04BM puu '2ul-1ealo puel '2ulnud =Suillij `uo11ene3xa 'uoia apzAO.z oq Baay ssaooy GUTHew sg vWVo -onllsuoa Ouipnjoul `s0111npae iuauidojanap paipolop •ioofo.id ate 3o asn pauueld atp oquos3Q •p -up Ile aq!-1osap Allnja-1eo •iulyd xo odAl aseald ?01JJO IVNOID38 NO10NI;0IM MR430MA IVISy00 30 3013.J0 6861 ?? Awl M xagwnu auotld p 3Q aaeixdoxdde 0111 IO3 xanOO juoxj apisui ails uo deui Oy aaS •Sxaaui,?ug 3o sdxoD ,iuuy •S•n aria pue no,i ISaxeau 0o1_440 Juaw0.0euejnl leIseO:DIo uoisiniC[ atp of sjeualew uopBoildde paaaldwoo atlx puaS Iu02e pazixotllny xo xaumop 6I -- 30 Ep aqa si S1111 •ioafoid 3o 2umimow dn-moljoj pue uopeoild -du iiwxad snit of paaejax uopewxOjui 2upunjena TAII ' uopoauuoo ui spuel pauoiIuawaxOye all uo xaIua 01 saioua?3e mainax jexapa3 pue axels JO Saniieiuasaxdax of uoissiuuad iuujO 'iouj ui op pue `luuA of pozixoy e we l ietp A pxao xatpxnj l •we12oxd tlons yim iuaisisuoo xauuew e ui paaonpuoo aq jlpy" pue we120xd Iuawa2eueN jeISe03 panoxdde s,euijoxu3 yxoK jo aauiS oy tpm saijdwoo AIinpoe pasod -oxd atjj 'a2pajmou4 Aw Jo lsaq atll of Ietp AJ111ao l •11wxad atjl ui paumiuoo suoilouasax pue swop -ipuoo of ioafgns aq liim aoafoxd atll •uopeoijdde Dill ui paquosap iuawdojanap 0111 Ajuo molle jjim uoueoilddu siy of asuodsai ui panssi imuod AuV ffi Z NW2I?S L?I? O L I?IOI? *(OT 01 I-d£II •S'0•3•N) Toy d0110d jeauawuoxinug euiioxe0 TION oy tpim aoueildwoo 2upuawnoop iuawaieis e tjoui -1e 'Spunj oilgnd 3o axnaipuadxo ailI sanjonui aoafoxd atp 3I •spun,j oijgnd 3o asn ay uo iuauiaie;s y •seaxe Iajui pue luoxj -ueaoo ui sxoofoxd ioj aoiIou pauvall Dgv pau.01s y •uopeoiidde atp 2uissaooid jo sisoo Oy xanoo oa auawdolanaQ diiunwwo ) pue saaxnosa?l juxmuN }o iuaw ?xedaQ Dill of ajquAud apew OOI $ ao3 'Ioatlo V V/is SOIup Suinssi pue 'aaiiiwxad 'sxagwnu iiwxad apnjoul •aouxi ioafoid oily uo ?jxom ioj panssi 911waad juaapa3 ao Dims snoinaad to isil d ssaxppy -aweN OSLO-lgh9Z ON Tuela-I •OCZ X09 Od •oul .,•00 aslZj y6!H ssaxppy suowwiS Apu'd J" aweK 10h9Z ON 'uo16ulwl!M 'IZOZ X09 Od •oul ••oO leju9wdolana0 ul00u1, ssaxppy uapaaus pleu00 •JN awuN (P)6ZZ-£II 'S J Aq paxinb -ax si uoueoylou 5111-L •iiew p ylloo xo paxaIS12a1 ? q wails of uopeoijdde liuuad atp jo Ado:) e 2uip -uas Aq Aimmioddo sull 3o sxaumopuel luaoefpe Oy asinpe Isnw iuemjdde atlL •auawa2euBjN juiseoD JO uoisiniQ 0141 of loafoxd pasodoxd Dill uo siuaw -woo iiwgns of tloitlm ui Sep 0£ anetl slenpinipui asa111 saaumopuel (ueiaedia) woapa;em waoefpe ay jo sassaappe a;ajdwoo pue saweu axp jo ;sij y •iuawa2eueW jeIuawuoxinug Jo uoisiniQ aila tjjim uopellnsuoo ui padojanap uaaq anetj Aew xey 'olgeoijddu p 'uejd juauia2euuui iajuAiwjojs y •a?il aip pue 'Mi-ewpuej 'sxagwnu (21S) peox A.iunoo apnjoul •aiis atp of uaxe Oy tpim zeipwe3un lauuos -xad bu&a apm2 of palimop Apuaioipns aq zsnw ii pue siuawaxinbax field }o axed e si dew uopeool xo aais y (•sOuimuxp n2iej jo asn s,?ioua?e Ietll 2ui -pie201 sxaaui2ug }o shoo 4uuy •S•n aql IoeIuo3) •iueoildde oLp ? q papinoid axe soidoo Aiijunb tj2itj 9I }i Aluo aigeidaoou are sield xa2xel xatixo io siuud auil-anlq •paidaooe aq llim soidoo Aiijenb tj2itl Aluo pup, pazza3aid axe s2uimaip leui2po Duty aiou asualcj (uopduosap pajieIap e xo3 £OZOU oln-d uoissiwwoo soomosa-d juiseoo ox x030) •xaded zmilm IT x z/i g uO dui pejq ui Oleos of umexp (S2uimexp jeuopoas SSOxo pue main ueld 2uipnjoui) field ?jaom a;exnoou uy •Ioa(oxd ;)qi Ono /a-rn of xaumo o-Lp woxj uois -siwxad uzmpm snid 'Dpp swiejo xaumo aqp tloitlm xapun iuawnusui nyo xo paap atla jo Adoo e pxum -xo} uaga 'Aindoxd pies jo xaumo oy aq of ?uiwpgo iou si iuuoildde atli }l •Aixadoxd paaoajje atp of Opp swielo lueoilddu atp pplm xapun iuowiuisui xatjao xo (Aluo uopuoildde aaeis yim) paap ails }o Ado:) y :p miwgns oq isnw Swaai 2`1103 aila 'wxo3 uopeoijdde paIaldtuoo Olp of uopippe ul N911 NI. Z?dNOX laa'? 8 .. , . 1-' ID It" ONY„ •.,?? e l 1139JWY` rrar ??\ rsr ? v s 1 ?i<si ?... J M dw .+.$ II ; 1 V'1 9pi1 ' O. _ r 1 sssi t I 4 ? `\ t r T; q- Dori wn a, ma O wp..a/ol? .,ogou.M .' Q' r t't LAJ L, irrC't ? ? --? J \ r n / ?cssi doy.?g? r tl.l ICI ? ? ? cc? .i;l I?I;t Y?? ? tV? CI ?\ 1. \ 1 ? ' IONYISI .a CI ' ? ? o'? 1'. C[I luow/rol? y+Y ? ? toi•vot"+1S i 1N139 r`; J? 1in ?` 1 n - r,??M ?r r0lnlti _ _IY 10 1 3ltJY3 ?, vWl / \ lo 9irl °r 'off ^ \ I - 1`VS YSSYAYN ; - - m-I owI°W • ? t I n.r Oy / I \ ?I H 1 \ tp? 61 i i g ? ? etrl ' Z1 '?_? ? ? ~- star rciK, vur oerO,r'f cUl aL, of itrl l tt •trl I" 1bi ?, e a ... VyM - J Cttl D. ??? elii `y!' ttrl_ OZ.rC r yf ?/?? t w ? a.. 1. . 1 tul AV - t: ? p \? f ? ? ? yvb 7 ?\ d j` IR J - IJ 1 Site •rl•. W • f?i 4 \ K N r O s •i: f•' 1r ?r--__ ??? h , fly:,,:' =f••-?^? '`y. a _.?_.. \, 'r?: .Iw, .?:. Ali':..` •?-?f :?? ? '' ,•3' .'?? o ?-• p •>, oo i{",,,y •y;%:111;x' ?'A 00 ' ••,•• , (p? G O fin., '.?)T. '; r•f 'r:. 1 WLAJ(4 .x!4:,.0 L.e ° } ?': 0:.: ` .;p0 ? O %;: ,Y;i-.- <> o ?•°_ o 'Arr. o ?' >7 r• ?`,•• : o ?F """y????LL a? a ::::?r:??•l?' v?i.3i'/' °'•.D .? :'it :. ?'<?.,?'i ?1 / ?r?P ?: ? .? ? 'r:i, 0 11(:au( :Li°i''i,yr{Irr:. ~?:i:'.' :d?:;?/:.•'• ?+`•.. 7vxlf M,Rrf ':: - (, .r:..•• ••;j:;,•S;: - r. 1.,.1' / •1: RAM for Irr •':;`,?. i \ _ 1• a .)f?^?\ To IV kC„ON4L OFF CE 1 k k I . 4 s L 1 .? . d ? y 'i e. ? y YY Y k} ?i rw ?? Y y s? t a i.. YY n ; Wi F Cp / ?.`. to,V jp. !? h u? O'N h.X ?9I y r• s ti a1 J •- to I i N i z a I 45' FROM T.08. TO T 013 I I \ I ?r 1 \ WETLANDS s ?---- --- &AZ,t E30 I ,6 1 4 J . '? 33 9 00 v TIDE. 10 2, ki[Gm \ Q \ UNE BEARING DI 12 29 S 44' 26' 27" E 30 S14'49'06"W 31 S 38' 51' 04" E 14 ?? ^~ S 40? 526 6' E / \-- GA. G G f24l ELE - PA A 12 l ?os?'Cr. \ ? oho ? ? CIF ? . ? s ? b / C) 6 .WA'E. IN ...... CB CW N'1'Y N IIID TONAND.AVIS CREEA (CANTNNEI:L TO BE x0.1 CPS. 0.11 -B. I'll NUNOFY APTBE CDNSTPB".B i0 ONS ITP. RETENTION OF RON... SSAMY. N.- HILL HE PTU eT SNALF.. ALL SLOPES N F. )to I CULVERT IS PROPOSE. TOLCNOSS iPEMTY. THE VELOCITY AT THE DISCHARGE DURING A 10 1- STUNN. VELOCITIES x 1 ET PER SEWN. UxIxC I PBNxISSIBLE VELOCITIES NO SPECIAL IS WES] AND CONSTRUCTION O NEAS.PES AND C N"' 'U... .. ENTRANCES NSE ONY.A AT STAND O(RCMSS ON LI. D15TUPOW ALL OE GNASSW NI'fIIIN BO DAYS NDANCE IT., THE SCHEDULE ON THIS OR RDLLED INCLUDING AT SIDE SLOPES, WNEIDPRBD CONPLETE. __ 4u ,Mail r "\ I ( BwBG GUASI ,b) E AWAOA -A LAI \I \ a? I a I II vi ' _O LOW FLAT SWAMP I 0 I ;o m L+ .G.. TER LmE 'S II I, lo E G! CES AND CONSTRUCTION ENTRANCEE I I•'EEN NucBO I THE CONSTRUCTION OP I I R y / I y o Lc nE -LENS. UR.H C0.1-TIBN. .? ' S SHALL BE USED TO HALT EROSION THE PLAN ARE NOT EYPBCTf VB. ,? / I J III I\ / G I ri'EVLANDS I''01p• J \` \ ^ \ v WETLANDS E K I. a. HpSINL 1 I \ ` I I ?, c"""" 1 X13 H 1n' 'e'1O3' .}1'IS J 1 3, IS? oa .?• ? , ;3116 I I I 1 1 - a/,ice 4 N\_ n\ •wl \' ',- - _ I I I I I ] \ / i Ae.a'L BOAT RAMP I I I W v U? --.__-_ _ •Eiiv; \ \\ WETLANDS Vj lV ] [ US Cf _ ? _ / ? a \ 1,: oc at•aTwn •w4 \ ` ? \ i. ram -z[ acvniDU `V J Em[ i \ INV. II.L 14 /TLeI `-E / 1 \ \ / / / / \ \\\? .." \\S\•E• \ G E00 1--?. ?( 40 LF OF IL' f \ \ \\ \\ \ \\?` \ / LL, VVV IGP OK GP,P ` \ \N-- ?'6\ \ / \\ \ \ \ \\ LL \ AE az o- 4 GH-t Sk_ _ _ \ \\\`'. ??'J Iaa 10'3YE 5130." Jy LEGEND _ - \ \ \ ,` (•! _- -?^ EXISTING CONTG11K5 // \ \ \ \ \ \\ \\ \\ \'- \s, YsN'E \ 5 O n - NEW CONTOUK x \ P I\, ' 0 z \ PA ING A Il - TEMPOKARY SILT FENCE I , ?\ PPJJCCI I I I Q 4?e ?,\ WoomM WALKWAY ' \ _ i wER va \ - I / I / \ \ e • EXISTING T"-r To BE SAVED \ 11F5 I I i I \ A G4s LINE PCE55LIKE CEUEF VAA.VE I \-G?vT'I \ \ \ 1 , ANDREW b KUSKE \ ? G _ _ I u s 33 ,a a3 w ?rau. ..I_oxc n ?... G + ..8904v4 GRASS MIX- TEMPORARY SEEDING REQUIREMENTS \ s3 a m N {"Ir# rl?' °^": 1 ?„ •O nA?C PPM. T wE GxT° P 1. EPN. ATE I P Ow H4 • RECONNENOEO ASDN BERMW IUUULLEDI 10 % 90 a 3 % _ LBS./PEP 3 UM AVi -SPP x4 n [ R[IG1N1 „I ]U a _ 5e % a3 % 4D0 5_O IL SEP I ' .PR :S pA t' LLE01 E X n % 03 % 3 LBS/IEP SPRING ? SVYNER (CSC.E _ JO %_ 93 % 03 % 1000 W (L AIR I>' JUE 3 TEMPORARY FERTILIZER REQUIREMENTS -?- 1 ' ???35??-? ___ »? 009 P[P 1000 50.0! 0 BSEP(P 1000 20 (E ?Iid l S G so?ILE k r!)dSTAI SCALE, I"- Sheet 2 of 3 /.:I?I" T0."l .III"•. __._..... _-_..__-_ N ?I ,3 p .6 ClaZ$bo * x c? ?3' FROM 7.aa. 6oet romp 1O T.0b• 1 I NOT ? t p tv T?oF. j?lc;N , F?FVq T 3,• ??F fON Q 2eb FC£VATlot? 0 1 UNE 29 30 S 44•?BaRIlyO 31 S ?4• z>• /sr s 3?, 49.06•• F 5? 044 ?,I $ 4 zg. ier lZs? •2B D, fir, l o ?` Qu ° 0 n 1 g Ri n g O 0 v M y rho , v? C-) J /?5J ?QyFl`vF l'??` - (?'A?T:P FiuE(? I?iE.< ?j y?--_??? ) .. ?. I J ?? - ?, ? i . s'n-c. ??.'.. _. IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 June 26, 1989 SUBJECT: File No. CESAW-C089-N-010-0347 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Mills: Enclosed is the application of Town of Navassa for Department of the Army authorization and a State Water Quality Certification to construct public boatramp facilities, with piers and gazebos, on Davis Creek, Navassa, Brunswick County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification may be required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request by August 26, 1989, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 251-4467. Sincerely, a W. Ho lis Vhih ef, Regulatory Branch Enclosure Copies Furnished (without enclosure): Mr. John Parker Mr. James Herstine North Carolina Department of Wilmington Regional Office Natural Resources and North Carolina Division of Community Development Coastal Management Post Office Box 27687 7225 Wrightsville Avenue Raleigh, North Carolina 27611-7687 Wilmington, North Carolina 28403 k4 0 Lt HOWARD T. CAPPS' W ASSOCIATES Landscape Architect • Land Planner R May 18, 1989 INV ,?;; U+ 4u;J Y t)?Vi:; l Mr. Ernest Jahnke U. S. Army Corps of Engineers Regulatory Branch P. 0. Box 1890 Wilmington, North Carolina 28402 Dear Mr. Jahnke: RE: Permit Application for Davis Creek Estuarine Access Application Louis S. Brown, Mayor of Navassa, has requested that I forward this Permit Application for your review. We have also sent a copy of the application by Registered Mail to the adjacent property owners (see attached). As you know, the Town of Navassa has received a CAMA Estuarine Access Grant to implement this facility and the community would.like to start implementation of the project as soon as all permit requests are approved. If you need any additional information, please let me know. Sincerel Howard T,/ Capps/f'ASLA \ HTC : j a Enclosure CC: Mayor Louis S. Brown Haskell Rhett Bob Stroud (letter only) 321 N. Front Street • Wilmington, North Carolina 28401 • 919/763.7708 HOWARD T. CAPPS 0 ASSOCIATES Landscape Architect • Land Planner 0 May 18, 1989 Mr. Bob Stroud Division of Coastal Management Department of,Natural Resources and Community Development 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Dear Mr. Stroud: RE: CAMA Permit.Application for Davis Creek Estuarine Access Area Louis S. Brown, Mayor of Navassa, has requested that I forward this CAMA Permit Application for your review. We have also sent a copy of the application by Registered Mail to the adjacent property owners (see attached). As you know, the Town of Navassa has received a CAMA Estuarine Access Grant to implement this facility and the community would like to start implementation of the project as soon as all permit requests are approved. If you need any additional information, please let me know. Sin 7714Y Howard T. Capps, HTC: ja Enclosure CC: Mayor Louis S. Brown Haskell Rhett / Ernest Jahnke (letter only) V--' 521 N. Front Street • Wilmigion. North Carolina 28401 - 919/763.7708 ?? ay,.? .rd's North Carolina Department of Cultural Resources James G. Martin, Governor Patric Dorsey, Secretary March 30, 1988 Mr. Howard T. Capps, ASLA Howard T. Capps & Associates P.O. Box 4095 Wilmington', N X . 28406 Re: Navassa Waterfront Access Plan, HTCA #101-002, Brunswick County, ER 88-7924 Dear Mr. Capps: Division of Archives and History William S. Price, Jr., Director Thank you for your letter of March 9, 1988, concerning the above project. We have conducted a review of the project and are aware of no properties of architectural, historic, or archaeological significance which would be affected by the project. Therefore, we have no comment on the project as currently proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act of 1966, the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800, and to Executive Order 11593, "Protection and Enhance- ment of the Cultural Environment." Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Ms. Renee Gledhill-Earley, environmental review coordinator, at 919/733-4763. Sincerely, David Brook, Deputy State Historic Preservation Officer DB:slw cc: Haskell Rhett, Coastal Management Planner 109 EastJones Street • Raleigh, North Carolina 27611 (919) 733-7305 STATI State of North Carolina Department of Natural Resources and Community Development Division of Parks and Recreation 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor Dr. William W. Davis S. Thomas Rhodes, Secretary Apr i 1 12 , l 988 Director Mr. Howard T.;Capps Capps and Associates Post Office Box 4095 Wilmington, North Carolina 28406 Dear ,Mr. Capps : Subject: Town of Navassa Waterfront Access Plan, HTCA #101-002 The Natural Heritage Program is the State's central repository of information about the locations of rare and endangered species, exemplary and unique natural areas, and other important natural. ecosystems. The inventory of those resources is incomplete, and no comprehensive resource survey has been done in the area of the proposed project. We have no records indicating the presence of rare species or other special natural features in the project vicinity. However, this lack of information should not be interpreted since there is potential for the presence of significant ecological resources associated with Sturgeon Creek and Davis Creek. The park plans should attempt to avoid impacts on potentially important natural habitats--such as relatively undisturbed wetlands and mature forest habitat. We enclose additional information about our program's data services. We appreciate your request for project review. Sincerelv, Charles Roe, Head N.C. Natural Heritage Program CR:jh Enclosure H/27 P.0 Box 27687 i2le,e, tionh Carolina 27611-7687, Telephone 919733-4181 An Eoual Opporrunirv Affirmar%e Acnor Emplover ^? `J ??v GoP e?o 1 l? ct lC, cJ'? P? tea?al1? astal 5 113 ? CIO cG• a?;?ltia ?tea?G S' 113 ? Get?"`4,ca"oo G set Ova ? X15 •e??a?ed? o ?aG O S o ?``` tac?"?ces ? et ? ot? ? se?e?S o(ol lce?a?n Q , of Ott' ? G G a?ecs ?;llio? Pcc s bye ,h? ?Q? ;off' tb° aye ? I3N?G Nc??olwets Q eC`N' ?ana?e ? G°as?a? °? ?at?ta 0 0{ e?c ?t;?cy V' `JJv V ?e92 a G°m? a at` 1 ' 5013 G et?C :cc,t%o ea?ea ores c?e?t G?eao c`at's o4 tie eels ot ec?,op t?s o S P?y G°O,sc?ccc S ?O'o Please type or print. Carefully describe all an- d. Describe the planned use of the project. ticipated development activities, including construc- CAMA Estuarine Access Area to provide tion, excavation, filling, paving, land clearing, and waterfront access to Davis Creek for storm*ater control. If the requested information is recreational use. not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects. 1/ • ? bct 'F, 4 1 APPLICANTS 42 Acres f entire tract 8 Size a. . o b. Size of individual lot(s) N/A a. Name Louis S. Brown, Mayor Elevation of tract above mean sea level or Na- Address Town of Navassa tional Geodetic Vertical Datum -5' to 23' City Navassa State N.C. d. Soil type(s) and texture(s) of tract Lip 28404 Day phone 371-2432 Bay Meade and Blanton x Landowner or Authorized agent e. Vegetation on tract Hardwood and ever- b. Project name (if any) Davis Creek Park green trees _ (CAMA Estuarine Access Area) f. _ Man-made features now on tract No known c. If the applicant is not the landowner, also give man-mad features on site the owner's name and address.. g' What is the CAMA Land Use Plan Classifica- Land being donated to Town of Navassa of the site? (Consult the local land use by Mr. Donald Sneeden, Lincoln Deve- plan.) lopment Conservation Transitional Developed Community 2. LOCATION OF PROPOSED Rural Indus.-CommerciaDther ??? PRQJECT' h. How is the tract zoned by local government? ° °` Industrial-Commercial i. How are adjacent waters classified? SC swamp waters a. Street address or secondary road number j. Has a professional archaeological survey been SR 1430 carried out for the tract? No -see letter b. City, town, community, or landmark If so, by whom? attached Inside Town Limits of Navassa, N.C. c. County Brunswick County t vP d. Is proposed work within city limits or planning jurisdiction? Yes -- Navassa, N.C. e. Name of body of water nearest project Complete this section if the project includes any Davis Creek (Cartwheel Creek) up land development. a. Type and number of buildings, facilities, or 3;DESCRI (NPI;ANNEDK structures proposed Marl access road and ECT US OF PR OS I PRO marl parking area with concrete pad for E . ET J OP handicapped parking b. Number of lots or parcels N/A a. Describe all development activities you propose c. Density (Give the number of residential units (for example, building a home, motel, marina, and the units per acre.) N/A bulkhead, or pier). Marl parking area, waterfront board- d. Size of area to be graded or disturbed Approx. walk, concrete boat ramp, two gazebos 2 acres for entrance road and parking area as outlined in CAMA Access Grant e. If the proposed project will disturb more than Application one acre of land, the Division of Land If you plan to build a marina, also complete Resources must receive an erosion and sedimen- and attach Form DCM-MP-2. N/A tation control plan at least 30 days before land b. Is the proposed activity maintenance of an ex- disturbing activity begins. If applicable, has a isting project, new work, or both? sedimentation and erosion control plan been New project submitted to the Division of Land Resources? c. Will the project be for community, private, or Yes commercial use? f. Give the percentage of the tract within 75 feet Community use of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. 3.8% g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. Annrox. 14' x 50' concrete boat ramp with marl parking area, h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? Yes i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? Approved LAMA Estun ine Acress k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state:(for example?surface runoff, sanitary wastewater, industrial/commercial effluent, or "wash down"). Existing surface runoff. m. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to main- tain established public beach accessways or pro- vide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A '6 . EXCAVATION AND FILL' INFORMATION a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas 50' 14' -4' MSL I 1 0 b. Amount of material to be excavated from below water level in cubic yards 20 cu. yds. c. Type of material mud and silt d. Does the area to be excavated include marsh- land, swamps, or other wetlands? swamp e. High ground excavation, in cubic yards N/A f. Dimensions of spoil disposal area N/A g. Location of spoil disposal area N/A h. Do you claim title to the disposal area? N/A Area i. If not, attach a letter granting permission from the owner. Will a disposal area be available for future maintenance?,/. N/A If so, where? N/A Does the disposal area include any marshland, swamplland,lor water areas? N/A Will the fill material be placed below mean high water? No Amount of fill in cubic yards N/A Type of fill material N/A Source of fill material N/A Will fill material be placed on marsh or other wetlands? No Dimensions of the wetland to be filled NA How will excavated or fill material be kept on site and erosion controlled? By use of silt fences m n. o. P. q• r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? harkhoP Will wetlands be crossed in transporting equip- ment to the project site? No_ If yes, explain the steps that will be taken to lessen en- vironmental impacts. SHO»1???. . I 017 a. Length of bulkhead or riprap N/A b. Average distance waterward of mean high water or normal water level N/A c. Shoreline erosion during preceding 12 months, in feet N/A d. Type of bulkhead material N/A e. Amount of fill, in cubic yards, to be placed below mean high water N/A f. Type of fill material N/A 2 1 8 t, .ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name Mr. Donald Sneeden Address Lincoln Developmental Co., Inc. PO Box 2021, Wilmington. NC 28401 Name Mr. Andy Simmons Address High Rise Co., Inc. _PO Box 730, Leland, NC 28451-0730 Name _ Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. . N/A A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the day of 19 /?_- - downer or Authorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corns of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. PS Form 3800, June 1985 rTt n i?L i U a \ "t 11 o n \ rn In l`Z r PS Form 3800, June 1985 ^7 ?7_ 7 '17 N J7 7 h?, m v -n _j 1? ?I'D?i °I ?+ I?`' Ism Lr' i Z Site Qj: \ •.}1,µi . {•.;' .,.`•.,. O 17 • {': ;•:: •,•:.:?'?;,: . ?,.'. 1 /?: ?•rs, it r<' t s?Jii.? :. :f:j. r•i4?•.,•?..: ': ,?;r `.•i:•'.Kfi fi?!..y, 3< •.T• .i•,?: r• ?f:? iii::..J.:.%. J.'1.::: •' i::C' ? t•?r 1t','? rb• ? ,? ~,: _ p,': _?`y? ?':?7:5?:.:C,, r: tea.+,t1 x ?., + ? r ?• ;i?i??.? 1. ; ,? •???. 1?! ?{ y?,-r, I•?:•''••? ?•J' V?j: w:, ?i•f. v ytJ? 'f.,•<?{.::' ?;^34 ?yf ?! ?.rA: , _ ?4:i r %: .• / qe~J ;a. a .. Fr+t ^: •'?.':H ?:`'' L' <'r.:?•",.;; r:.<;•3 • 'r ?f. M r•...?<<, ? 0 0 i• p a ww7 T - W • ;` <- O? o ^ O IN3 -.Y. •. 'til.. 1 rr"Y?? '11 O +V,k,• •Y yr)ii. o 0o a ? i ? .!: + • ° • O. ?; ? t. ;r,,tf o . 3' ? 71 ?,{ • ? ,kti it ? 0 ? '{ ? 0 •??:..,:.;:,:? w. / vll '• '. s ,ltr :r;ij3?it4 `• •'Q,/• • i?'G •? - .1,(;5'. nl.?:.? `" : ••,, t + J ?'?("P 0• o !j.3s.,y:: ?? ? . M'r, ?.,i SI . ?, ? ': .:lF?.; 4, , 0 , ! • •: ••, ,3 °??.?'?I,i:; j :??:.•.:; .l'.1'. •.. ,,r: r h?. `1 •r't?.,-.. r!• ,.r :r+? 'e' ?}. }yey?i..r},. .: f<.wtAr,?` l t) ?:.+, ''•:r'?':' 'i:jL t. IM4fr ?F.j ?1:•,• .?q'j'/s;'t.+:"/•;''It.,``t?:•:•y. . '. a.?' i 3:.. 3. • ?i.'.. ? `f`?:•.. ST j?',: t,; l,.t. :r;N•;,yy Jt {i: :}•. 'T•:•%.i'': ?'1<.,is:i'' :r}?f?54'lrr.%'.?' st.:..z9?'^}'? .:Y,l.. '? y1, 1 /'•? .• ',.r: ? .1. 1J >.•?1?yv ,%, 7f x? ',(tr i'+:'? -y 11 , 1 ?Q Y r y N. ,? •. »+ VJA/ 1 8 CL: w h? c Y 9 m?? ,` e h ?? ? lily ` Q Y 2 ? Y \a? 1 I / r ?cba °sKO_ Riff Vt i 07 10 ? L T .f. O? 1 ?yy 0 G?gPI ? v= 0 v C' y yp ? V? vr? ti w = -c ti r O 2X R !tt r Af r ?c ?C oti 2 rV 4 .? i? O V O m m ?3 r / 11- VICINITY MAP NITS r40 a II n$I,I 4'IU L I pY L,.,. TEMPORARY SILT FENCE \ b EROSIbM CONTROL ' A. MARRATIVEt THE SITE IS LOCATED IN BRUNSWICK COUNTY NEAR NAVABBA, DIRECTLY OFF SR 1170 TOWARD DAVIS CREEK (CARTWHEEL CREEK). THE TOTAL SITE ACREAGE IS 8.42 ACRES OF WHICH APPROXIRATELY•2 ACRES WILL BE DISTURBED TO CONSTRUCT A GRAVELED ACCESS ROAD, GRAVELED PARKING AREA, CONCRETE SOATRAMP, WOODEN WALKWAYS AND TWO GAZEBOS. THE SITE IS WOODED, HAS MAINLY SANDY SOILS AND HAS NATURALLY OCCURRING SLOPES VARYING FROM LESS THAN 1% -0 111. RUNOFF HAS BEEPP?? CALCULATED USING c) L L a V O RA,,,A.L THE RATIONAL METHOD, A ]0 YE., DESIGN STO , . DATA FOR THE WILMINGTON AREA. B. PRB-CONSTRUCTION RUNOFF, THE RUNOFF FROM THE SITE BEFORE CONSTRUCTION IS ESTIMATED TO BE 15.2 CPS. 0 pre • .7 (6(n/hr) 8.42 acre. 0 pre 15.2 CPS C. POST-CONSTRUCTION RUNOFF, THE RUNOFF FROM THE SITE AFTER CONSTRUCTION IS ESTIMATED TO BE 20.2 CPS. 0 Poet • .1 16 in/hr) 8.42 acres O'posIt • 20.2 CFS 0. EROSION CONTROL MEhSURES: THE RUNOFF AFTER CONSTRUCTION WILL INCREASE BY 5 CPS. NO ON SITE RETENTION OF RUNOFF IS PROPOSED OR DEEMED NECESSARY. RUNOFF WILL BE BY EITHER OVERLAND FLOW OR ROADSIDE SWALE. ALL SLOPES WILL BE 7 to 1 TO ENSURE STABILITY. ONE CULVERT 15 PROPOSED TO CROSS THE ACCESS ROAD ON THE PROPERTY. THE VELOCITY AT THE DISCH GE ENO 1S 1.9 FEET PER SECOND DURING A 10 YEAR STORM. VELOCITIES IN THE SWALES ARE LESS THAN 2 FEET PER SECOND DURING. LO YEAR STORM EVENTS. DUE TO PERMISSIBLE VELOCITIES NO SPECIAL OUTLET OR SLOPE PROTECTION IS RBOBI.E.. TEMPORARY MEASURE. WILL INCLUDE TEMPORARY SILT FENCES AND CONSTRUCTION ENTRANCES WHERE SHOWN ON THE DRAWINGS. PERMANENT MEASURES INCLUDE ESTABLISHMENT OF A PERHANENT STAND OF GRASS ON ALL DISTURBED AREAS. E. EROSION CONTROL NOTES 1. ALL DISTURBED AREAS SHALL BE GRASSED WITHIN 30 DAYS OF DISTURBANCE IN ACCORDANCE WITH THE SCHEDULE ON THIS PLAN. 2. ALL EROSION SHALL BE CONTROLLED INCLUDING AT SIDE SLOPES, BEFOpE THE PROJECT IS CONSIDERED COMPLETE, 3. ALL TEMPORARY SILT FENCES AND CONSTRUCTION ENTRANCES HALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION OF S II TE PROJECT. I'HEY SHALL OE REMOVED UPON COMPLETION. 4. MORE STRINGENT MEASURES SHALL BE USED TO HALT EROSION IF THOSE INDICATED ON THE PLAN ARE NOT EFFECTIVE. I 1 \ 1 22 \ `TBMF0KAK.Y CONSTKUCTIO" M,(1fITANCE USE 4/TNICY.NE" 01 6KAVEL WNFXL SROWW. CITY OF WILMINGTON WATER PPE EASEMENT (DO. 90 PG. 205) Ow. CND, .1 0 IAN - N POWER POLE ELEVATION 241Y NOTGS: ALT. 10006RAPHIG f SUK,VG4 INFOKMATION 15%? WANOVEK. DE616N SEN.VICE9! PA. ER NKK SWf .YlWMA E 1300.51' C\L ?I I I f \ s }o 1 I ?Y COAL PULE 14 15 ICI ' r ` ( \ 566'Nyy.W \ 17/.05 \ r \ 0 AILAMTIC COAST LINE RMLROAB SPUR LINE ' ( . PI PG IOU) - 3a 2a' I I BM D N C-) LOW FLAT SWAMP A m APPROM, 1GH WATER LINE A APPAO% EDGE OF CREEK I 9I / 1 n III I ? - GI I WbTLANDS i010p \ 1 ?wETLANDS &AZ.F-nO LINE HEARING pSTACE 3 A \ I I I A V 1r 12 N 17' 7B' I5" W .] : 1 I 4 '? + J, I \ 11 0.0 31 N 17 1R'IS" W .W 34 N 19. 04' 15.21 0 N , 19 M \ \ ?I 331 171 I M INV. 14.0 I I 1 I , \ u 4 1 / / / •9 "` / I S.B SA 1 A.BN SPME IAh \ \ WENDS P!P ELEV / / / 40 :13- i 16 "R%TEO T 11, \ i C V0 ? 4 \ POWER LINE / \ \ INV. 14,L 40 LF OF le KCP OK CRAP LEGE D EXI5TING CONTOUKS fgl NEW CONTOUK ?.1-+-'-'?M.4, T6MP0KAKY SILT FENCE 7ffTnTffrrrnm WOODEN WALKWAY • EfLISTINGTKFB To 5E SAVED A GAS UNE PC655UICE FEL16F VALVE ze1 ? , / f \ \ n l 6 / 1l `M1 POWER LINE \ \ \ I \T IM \ peace u1v, TrUCADADW Qrrn1NC RCONIRENENTS COMMON NAME PROPORTION BY WEIGHT MIN. PURITY MIN. GERM. RATE Of OWING - RECOMMENDED SEASON BERMUDA 11NHULLE111 70 % 9B % 55 % SIBS./PER AUTUMN-SPRING WINTER RYEIGRAIN) 10 % 95 % B3 % 1000 BO FT SEP I - APR I5 BERMUDA (NULLED) TO 5 LBSJfIN SPRING • SUMMER FESCUE IO % 93 % B5 % 1000 SG FI APR IB • JUL 15 TEMPORARY FERTILIZER REQUIREMENTS _ FERTILIZER LIME B'B'B M LB9. FEfl IOOO SO. FT 40 LES. PER 1000 50 'T. A\ 1??? 11 \ 1 7 / r+' \ \ ? \` ` dP4J k?f M '\ \ \ 1 ? \ \ 1 •, PAE i NG ?A?. I I I ! j I I ' !L. ' II . Y ? 1 8' 3i / y 1 I! 111) I ... nr 15 EGA LE I 1"- 50' a b O WI BOAT RAMP NOTE 1. LOW TOE ELEVATION 2: 2. HINS'0E ELEVATIO14 3' LLL ONE 1 BEARING 0197AWCE 21 5 44'11'11•E 50.57 IO S14. 49'06'W 1161 5t 33a•31'OCE 1257 y 4 s' 2e' E ( 1° r ? Py ? bQ U. \ . QeD?? \ PWOQW? \ ANDREW 8 KUSKE CONSULTING ENGINEERS -hH.OTOM. N C. 8'+04°0 ,`Up111 ,I?AkLlr °• 19LL '•• PHg11P 1+';+'? a W •? V 15 `V `V 1/ I a? L7 R-4 ' `. Q O Z C a0. C N 4 C ^C `• C G z o •? V Sheet 2 of c. .. NOTICE OF FILING OF Ququr? APPLICATION FOR CAMA MAJOR DEVELOPMENT 0, P,an,_ar,q 3ranch PERMIT AND WATER QUALITY CERTIFICATION ;- The Department of Natural Resources and Community Development hereby gives public notice as required by NCGS 113A-119(b) and 143-215 3(a) (1) (c) that the Town of Navassa of Brunswick County filed an application on May 19, 1989 for a permit from the Division of Coastal Management to develop in an Area of Environmental Concern and for certification from the Division of Environmental Management that a discharge of fill material in project wetlands will not violate applicable water quality standards. According to said application applicants propose to construct a public access boat ramp with parking facilities. They will also construct two pier systems to provide ample water access for fishing, etc. Parking facilities will also be provided. A copy of the entire application and additional information may be examined (or copies furnished upon request and payment of reproduction costs) during normal business hours of the Division of Coastal Management and/or the Division of Environmental Management, Regional Office 7225 Wrightsville Avenue, Wilmington., North Carolina 28403. The Division of Environmental Management proposes to take final action on this water quality certification on or before June 15, 1989. The issuance of the CAMA Major Development Permit and the Section 401 Certification may deviate from this projected date depending upon the nature of the comments submitted find subsequent hearings that may arise. All persons desiring to make comments should do so in writing to Mr. George Everett, Director, Division of Coastal Management, P. O. Box 27687, Raleigh, North Carolina 27611 prior to June 30, 1989 for consideration in the CAMA permit decision, and to Mr. Bill Mills, Division of Environmental Management, P. O. Box 27687, Raleigh, North Carolina 27611 prior to June 30, 1989 for consideration in the water quality certification decision. Later comments on the CAMA application will be accepted and considered up to the time of permit decision. Project modifications may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. Publish on June 15, 1989