HomeMy WebLinkAbout19890178 Ver 1_Complete File_1989010100 t
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comm 711; ncernln an appl catio for tate Federal C Putt( ) from ? ` ?`?EG
, ry aw 1;d --
r? GD _.?9u
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
)Qroject his office has no objection to the issuance of the permit(s) for the proposed
with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after "
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25,
1977, for sewer line construction
No. 1431 issued on October 16,
1980, for boat ramp construction.
B) No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal r construct ion.
areas.
/
WATER QUALITY SECTION
DIVIS ION OF ENVIRONMENTAL MANAGEMENT
COMMENTS:
SITE LOCATED ON N
PROPOSAL TO C
ORTH SIDE OF'
'
ONST
. ONE :......E DEVELO RUCT A 60
PED
AS 0057
CO
jl.... N NO 2
UNT
TIC FRD DATA
Y: .. : .:..... RKATON: W."
i'..
E:
REC OMM END ..
ISS
DEN UE:
Y: Y RECEIVED: 09020**''
INITIAL REPORT:
FOL
CLASS: D:
SC
BASIN: NEJ,**J
RECEIVED
FFR 1 4 1989
WAFER QUALITY SECTION
OPERATIONS ERANci-
DIVISION OF COASTAL MANAGEMENT Lat:35006135"
FIELD INVESTIGATION REPORT Long:76044124"
*
1. APPLICANT'S NAME Ferny Miller
2. LOCATION OF PROJECT SITE north side of NC Hwy. 55, on Bay River
in Stonewall, Pamlico County; * SEE 1984 AERIAL PHOTO #56-1263
--
(G-3)
3. INVESTIGATION TYPE: DREDGE & FILL X CAMA X
4. INVESTIGATIVE PROCEDURE:
(A) DATES OF SITE VISIT 1-18-89
(B) WAS APPLICANT PRESENT NO
5. PROCESSING PROCEDURE: APPLICATION RECEIVED January 11, 1989
OFFICE Morehead City
6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Pamlico County
___ LAND CLASSIFICATION FROM.LUP Transition
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X OTHER
(C) WATER DEPENDENT: YES X NO
(D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X
(E) TYPE OF WASTE WATER
PLANNED
EXISTING N/A
(F) TYPE OF STRUCTURES: EXISTING man-made boat basin
PLANNED ramp and travel lift
(G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE
7. HABITAT DESCRIPTION:
AREA
(A) VEGETATED WETLANDS DREDGED FILLED OTHER
NONE
(B) NON-VEGETATED WETLANDS:
basin slip - highground
1080 sq.ft
(C) OTHER: sq•
spoil area 20,000 ft.
(D) TOTAL AREA DISTURBED: 21,080 sq. ft.
8. PROJECT SUMMARY: Applicant proposes to construct a 60' x 18'
ramp and travel lift within an existinq man-made boat basin.
FIELD INVESTIGATION REPORT - FERNY MILLER, PAMLICO COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION: The property is located on the north
side of NC Hwy. 55, on the Bay River, in Stonewall, Pamlico
County. Applicant's property is basically a 20 ac.
undeveloped tract consisting mostly of highground, but
bordered by approximately 250' of coastal wetlands along the
Bay River.
The applicant was issued Dredge & Fill Permit #23-75 for
construction of his existing man-made canal and basin. This
new application is for the construction of a boat
ramp/travel lift ramp on the upper end of his existing
basin. The proposed ramp would be 80' x 181,and,would be
-constructed entirely into highground. The.applicant also
proposes a 40' long bulkhead extending into the basin on
each side of the ramp. Spoil will be placed on a 200' x
100' area of highground on the property which has previously
been used for spoil disposal.
10. ANTICIPATED IMPACTS: The proposed project will remove 320
cu. yds. of clay material from below MHW and, 120 cu. yds.
of material from above MHW, for the construction of the
1,080 sq. ft. lift and ramp. Approximately 20,000 sq. ft.
of highground will be disturbed by spoil disposal. The
waters of Bay River are closed to shellfishing by the
Division of Health Services, and are designated as 'SC' by
the Division of Environmental Management.
PREPARED BY: W. DAVID NOBLE
DATE: FEBRUARY 2, 1989
Please type or print. Carefully describe all an-
ticipated development activities, including construc-
tion, excavation, filling, paving, land clearing, and
stormwater control. If the requested information is
not relevant to your project, write N/A (not ap-
plicable). Items 1-4 and 8-9 must be completed for
all projects...
J APPLICANT.
a. Name Fern Miller
Address !-o Y S
City Bayboro State N. C
Zip 28515 Day phone 745 5677
X Landowner or Authorized agent
b. Project name (if any)
Boat Ramp
c. If the. applicant is not the landowner, also give
the owner's name, and address.
LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
N. C. Highway 55
b. City, town, community, or landmark .
Stonewall
c. County Pamlico
d. Is proposed work within city limits or planning
jurisdiction? yes
e. Name of body of water nearest project
Bay River
f, -
3 . DESCRIPTION ANDPLANNED:
USE, OF. PROPOSED PROJECT
a. Describe all development activities you propose
(for example, building a home, motel, marina,
bulkhead, or pier).
Boat Ramp and travel lift slip
If you plan to build a marina, also complete
and attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an ex-
isting project, new work, or both? new
d. Describe the planned use of the project.
To take boats out of the "
water
?- LAND AND,,
4 WATER ?` ?'
CHARACTE
RIS,TICS
a. Size of entire -tract 20 acres
b. Size of individual lot(s) none
c. Elevation of tract above mean sea level or Na-
tional Geodetic Vertical Datum 3 to 6'
d. Soil type(s) and texture(s) of tract
e. Vegetation on tract grass-trees
f. Man-made features now on tract
building
g. What is the CAMA Land Use Plan Classifica-
tion of the site? (Consult the local land use
plan.)
Conservation Transitional
Developed\ Community
Rural Other
h. How is the tract zoned by local government?
commercial
i. How are adjacent waters classified?
j. Has a professional archaeological survey been
carried out for the tract? no
If so, by whom?
1, ,5 UPLAND; DEVELOPMENT
Complete this section if the project includes any
upland development.
a. Type and number of buildings, facilities, or
structures proposed n/a
b: Number of lots or parcels n/a
c. Density (Give the number of residential units
and the units per acre.) n/a
d.
e.
c. Will the project be for community, private, or
commercial use?
commercial f'
JAtd 1 1.1969. J
Size of area to be graded or disturbed
1600 sq ft
If the proposed project will disturb more than
one acre of land, the Division of Land
Resources must receive an erosion and sedimen-
tation control plan at least 30 days before land
disturbing activity begins. If applicable, has a
sedimentation and erosion control plan been
submitted to the Division of Land Resources?
no
Give the percentage of the tract within 75 feet
of mean high water to be covered by im-
permeable surfaces, such as pavement,
buildings, or rooftops. none
g. -List the materials, such as marl, paver stone, b. Amount of material to be excavated from
asphalt, or concrete, to be used for paved below water level in cubic yards 320
surfaces. n/a c. Type of material clay
d. Does the area to be excavated include marsh-
h. If applicable, has a stormwater management land, swamps, or other wetlands? no
plan been submitted to the Division of En- e. High ground excavation, in cubic yards 120
vironmental Management? n/a f. Dimensions of spoil disposal area 100x200
i. Describe proposed sewage disposal and/or waste g. Location of spoil disposal area High ground
water treatment facilities. n/a near project
h. Do you claim title to the disposal area? yes
j. Have these facilities received state or local If not, attach a letter granting permission from
approval? no the owner.
k. Describe existing treatment facilities. i. Will a disposal area be available for future
n/a maintenance? yes
If so, where? same site
j. Does the disposal area include any marshland,
1. Describe location and type of dikcharges to swamplland,lor water areas? _ no
waters of the state (for example?surface runoff, k. Will the fill material be placed below mean
sanitary wastewater, industrial/commercial high water? no __.__
effluent, or "wash down"). 1. Amount of fill in cubic yards 440
n/a in. Type of fill material clay /
n. Source of fill material spoil from project
m. Water supply source n/a o. Will fill material be placed on marsh or other
n. If the project is oceanfront development, wetlands? no
describe the steps that will be taken to main- p. Dimensions of the wetland to be filled n/a
tain established public beach accessways or pro- q. How will excavated or fill material be kept on
vide new access. n/a site and erosion controlled? Si 1 t f .nc .s
o. If the project is on the oceanfront, what will
be the elevation above mean sea level of the
first habitable floor? n/a
6. tkCAV ATION , .AND FILL x
r f .
INFORMATION , -.
a. Describe below the purpose of proposed excava-
tion or fill activities (excluding bulkheads,
which are covered in Section 7).
r. What type of construction equipment will be
used (for example, dragline; backhoe, or
hydraulic dredge)? drag] i n . o
bank hpe n-nd dump trucks to
hnwl G? ni 1 to dump c;i
s. Will wetlands be crossed in transporting equip-
ment to the project site?-nn- If.yes, explain
the steps that will be taken to lessen en-
vironmental impacts.
\ Length Width Depth
Access channel
(MLW) or (NWL) 7 SIURELINE STABILIZATION`.
Boat basin 60 18 8 a. Length of bulkhead or riprap n/a
Other (break- b. Average distance waterward of mean high water
water, pier, or normal water level
boat ramp, c. Shoreline erosion during preceding 12 months,
rock jetty) in feet
d. Type of bulkhead material
e. Amount of fill, in cubic yards, to be placed
Fill placed in ?-
wetland or below f-Ztye of fill mater er
MHW
Upland fill J N 1 1989
200 100
areas
2
r. 8 ADDITIONAL INFORMATION
In addition to the completed application form, the
following 'items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims
title to the affected property. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other instrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
An accurate work plat (including plan view and
cross sectional drawings) drawn to scale in black
ink on 8 V2 x 11 white paper. (Refer to Coastal
Resources Commission Rule 7J.0203 for a detailed
description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 16
high quality copies are provided by the applicant.
(Contact the U.S. Army Corps of Engineers regard-
ing that agency's use of larger drawings.) A site or
location map is a part of plat requirements and it
must be sufficiently detailed to guide agency per-
sonnel unfamiliar with the area to the site. Include
county road (SR) numbers, landmarks, and the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront ('riparian) landowners. These
individuals have 30 days in which to submit com-
ments on the proposed project to the Division of
Coastal Management. The applicant must advise
the adjacent landowners of this opportunity by sen-
ding a copy of the permit application to them by
registered. or certified mail. This notification is re-
quired by G.S. 113-229(d).
A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuin dates.
1976- Dept of Army SAWC077 N 069 039 0103
1978 NC NRCD 23-75
A check for $100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
application.
A signed AEC hazard notice for projects in ocean-
front and inlet areas.
A statement on the use of public funds. If the
project involves the expenditure of public funds, at-
tach a statement documenting compliance with the
North Carolina Environmental Policy Act
(N.C.G.S. 113A-1 to 10). --- -
9 'CERTIFICATION AND PERMI&I
SIONTO ENTER ON.LAND
Any permit issued in response to this application
will allow only the development described in the
application. The project will be subject to condi-
tions and restrictions contained in the permit.
I certify that to the best of my knowledge, the pro-
posed activity complies with the State of North
Carolina's approved Coastal Management Program
and will be conducted in a manner consistent with
such program.
I further certify that I am authorized to grant, and
do in fact, grant permission to representatives of
state and federal review agencies to enter on the
aforementioned lands in connection with
evaluating information related to this permit ap-
plication and follow-up monitoring of project.
This is the day of
19?.
x .u )V _K
Landowner t
Send the completed application materials to the
Division of Coastal Management Office nearest you
and the U.S. Army Corps of Engineers. See the
map on the inside front cover for the appropriate
DCM office and addresses and phone number.
- 14
is
JAN I 1 1989 `
......? ._. ___... ___,.---------- 3
r1?( PMf 7, 77
f JAN Jar 1 1989 tyV
????? l//C/N/TY /WWR
U i .iL?LfLIT500
..«?........ ................. SC4Lf: /". P000'
o /QOO -000
SAY
= • R VE
SA YBOI,'O
? / ?• _s S/TE
` STONFIWAL L
gRFq<
I
l
?j SITE
:Q L
;o gyp.
/ ? s 6532 • ? _?
'
Q? SC4LE: 400
?? '•,.•
NG?•,••
Q`
,•? 0
•
Q
•
POO 400
?o
UG H F
P •••
`
.OO
SCHOOL
w
N N. C. f/K'Y. 55
LOC,4T/ON V,4P
A. HUGH HANKS, ?R. A PLAN FOR
PROFESSIONAL ENGINEER, R1-.S L Eft '
AW11
FZ-RNY L
ORIENTAL, N.C .
-
NOK 22, 19,98 Sf1T. l 'of 3 STONEly,4L L , N. C.
SCALE: ,Is Shown ORWN. BY -j?:4 NO. 3, TOWNSHO0 RXIM/CO CO, NC
? I (I
SQ
?P
9OX Rlwr
FERNY
MILLER ?I
64SIN
DEPT. OF ARMY PERM/T NOV /97
` SAWC077-N-069-039-0/03
NC NRCD PERMIT 23-75 1
J
MTh/s si/e !s no/ Pmposed
Iota%d /n marsh o1 0.1 / ?.- rlvwl L/I/ 5/0
I on460vl Romp
FERNY
MILLER
FERNY
A&LER
JAI 1 1 1BB9`
.I
?ESSE
MILLER
N. C. 11wr.. 55
iz 5? 32 i?
N
T' •
'•:._ UGH _..••'
A HUGH H?4RR/S, ?R A PLAN FOR
PROFESS/ON,4L ENG/VEER, R.L.S. Fj RN) L. /ICI/L L EF?
ORIENTAL, N, 0
NOl! 22, 19,919 SHT. 2 of 3 STONEIYAL L , N. C.
SCALE: /" = /oo' ORWN. BY 7?;4 NO. 3, TOWAISH/P P41WL/C0 CO. , N. C.
6bo/ Romp
S/DE l//EI?Y
80'
Boo/ Romp
Ba,/0heod
?-- 40'
Bos/n
Shonr/he
TO' KIEW
941100410'
B'
Onrdye
Dep/h
Oepye{ ,
Ex/s//ny
B41sh
Bo/%m
V
B4S/N
6iade
Sea, Lere/ NGVO
E•r/shny Bosh Bo/%m Ci %
DEPT. OF ARMY PERM/T SAWCO77-N-069-039-0103 NOVEMBER /9 6 of !?
NC NRCD PERM17 23-75 ••`%p,ROLIIv
END VIIEly ? CatONq?
r :O ?.
SCALE: /" = /O' Z S6 ? P
JAN I
-----------------
A PLAN FOR
A. HUGH HARR/S, ?R.
PROFESS/ON/a1- ENGINEER, R.L.S. FERNY L. 1W11- L Ef?
ORIENTAL, N. C.
NOV 22, 1998 L,9RJIIIY 3 of 3 STONEWALL , N. C.
SCALE. 20 BY NO. 3, TOWNSH/P 84AZ/C0 CO. , NC