Loading...
HomeMy WebLinkAbout19890127 Ver 1_Complete File_19890101+sz -,_ DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. his office has no objection to the issuance of the permit(s) for the proposed Nroject with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). _ That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. - That turbidity levels in shall not be increased by more than 10 NTU's as a..result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project.- Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General.Certification A) ctm C) No. 1179 issued on January 25,, 1977, for sewer line construction No. 1272 issued on November 10, 1978, for bulkhead construction. No. 1273 issued on November 10, 1978, for discharges of liquid effluent from diked upland disposal areas. D) No..1431 issued on October 16, 1980, for boat ramp construction. E) No. 1664 issued on September 8, 1983, for Rip-Rap Placement. F) No. 1665 issued on September 19, 1983, for incidental bridge construction. ZZ, WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT Comments concernYng an application for State Federal CAMA Permit(s) from W 4 f NKD{.iiTA 31#•• /t...•Al'91::i/.t' 01 REV DATE 03/23/ 8-'.;' ACTION :'. ADD FILE ACTION :a: ADD, ENTER DATA, I°;I::.C .: ADDED .I..:: 00599 FR D jr:y..T.A ' '' i I F,.. R` 0 ^, ?:1''• • . ?..... ,.• . .a .. ,.. .•, •,'t t!,. t #• r• t? ::: t'•? .: ., GARDENS-WASHINGTON t•• , .......COUNTY : ?: i#::. r? . .i, # #::• ? 1 #??.•?• REGION: ;: . . , A;:.:.t. , t,# #i:: is T.:. DA 9 JOINT NOTICE : N TYPE CERTIFICATION RECOMME ND DATE..*-.",' i '! i"fi!'',.{:'i. 404 #• ' N : 40i RED: ISSUE: •t' RECEIVED: 09032(.'') CAt''tA ONLY: GC: BULKHEAD DENY: INITIAL REPORT1 DI° ! Cr"rMt"r : 'r .:Et:P : :;zed#::`RI:::Q : N HOLD: FINAL REPORT: @9035.;; RECEIVING STREAM: JACK'S CI•''I::.#::.#. CLASS: ?.: BASIN: t ,.°.tI:*' COMMENTS: SITE LOCATED ON N+::;32 . HAVENS GARDEN, WASHINGTON #°`Rt:iPT:i:'A#... TO t ::t:lNS.T•:. 13+:0' OF S.i1..E#...#'•:#°##:::AD 5' i"'i#••#W ld:#:T#••# b:!O t:#l:i#::N S..fRl.Jt::;T!.!RE, 1500 t: '#.J`'i`?.S OF SAND AS FILI COPIES: Wr^tRta.. ..t: #i::NTR;••t#.......M:#:4...i...S....Tit: H ?•] MAR A f r Memorandum To: Jim Mulligan From: David Gossett Subj: Application for CAMA Major Permit and/or Dredge & Fill Permit City of Washington Beaufort County Date: 20 March 1989 Attached is an application for a CAMA Major and/?t a Dredge & Fill Permit which was received by me on 17 March 1989. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me. DIVISION OF COASTAL MANAGEMENT Lat: 35' 30' 30" N FIELD INVESTIGATION REPORT Long: 77 ° 61' 30" W 1. APPLICANT'S NAME City of Washington 2. LOCATION OF PROJECT SITE City of Washington, Beaufort County, NC 32, Pamlico River, Havens Gardens, photo # 73-582, 12-17-84, P-17, P-18, Q-17, R-17, S-17, T-16, T-17 3. INVESTIGATION TYPE: DREDGE & FILL X CANA X ?. , 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 3-17-89 (B) WAS APPLICANT PRESENT No Ake- 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 3-17-89 ? OFFICE Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN City of Washington LAND CLASSIFICATION FROM LUP Conservation, Community DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP None (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS PUBLIC TRUST WATERS ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES NO X (D) INTENDED USE: PUBLIC X PRIVATE COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING None PLANNED None (F) TYPE OF STRUCTURES : EXISTING Pier, picnic shelter PEED Bulkhead (G) ESTIMATED ANNUAL RATE OF EROSION + 5' SOURCE DC M staff observation 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS None (B) NON-VEGETATED WETLANDS: (C) OTHER: Cpen water (D) TOTAL AREA DISTURBED: AREA DREDGED FILLED OTHER N/A N/A + 6,500 sq.ft. + 6,500 sq.ft. 8. PROJECT SUM14ARY: The applicant is proposing to construct a bulkhead at Havens Gardens to stop ongoing erosion. sC Environmental settin The City of Washington owns a + 4 acre tract of land where Runyon Creek enters the Pamlico River on NC 32 in Beaufort County. The land which is known as Havens Gardens was developed in the early 1980s as a public park. Located at the park are various picnic shelters, parking lots and a public pier which is utilized for siteseeing and fishing. The park is vegetated with various upland grasses and trees. No wetland vegetation is present. When the park was developed various size pieces of concrete were placed along the shoreline to retard ongoing erosion. However since that time the erosion has continued, therefore, along the entire shoreline there is a defined erosion scarp. If the erosion is not stopped the various public facilities may soon be in danger. Project proposal The applicant is proposing to place a wooden bulkhead along 1,300' of shoreline. The bulkhead will average 5' beyond the NWL, which is the approximate distance which has been lost to erosion during the past twelve months. When completed the bulkhead will be backfilled with materials from an upland source. No wetland vegetation will be excavated and/or filled. Environmental impact The project as proposed should have a minimal environmental impact. Some short term turbidity will exist during bulkhead construction. David L. Gossett - Washington Office - 20 March 1989 co, tiasCs co %6,11, 0 a0 Sbots ?' - 11• Fabler a`ia S'Ih ?Q teak able ?? C ? • cnor ?lsa ire a?e?' o??ele??sla Seq'''Se?e??s ?e co`?eSs isa441?ca?lo? ``CP?p.? •tb e?? Pc cca 11?' C°?5??, S •113 P r?Sea?e Sa 13 ??9 e????ca?'o? • S?sa??ool CG va?'?y X15 0? Pa?,N la?eal ? ?-? earl°?, • USA .?p?p? ? ?•G ? ccsa? t 4?e? elo?4c Tie `? Fob o j Seddon ?tea? ?e a?'14''o V,scrai'y ?pa-h o??eCl ?vl?ll ets S Ply o??s?r Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filing, paving, land clearing, and stormwater con- trol. If the requested infonr ation is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name City of Washington Address P.O. Box 1988 City Washington State N. C. Zip 27889 Dayphone 919-946-1033 Landowner or Authorized agent b. Pro'ect name (if any) Havens Gardens Bulkhead c. If the applicant is not the landowner, also give the owner's name and address. N/A If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? New Work c. Will the project be for community, private, or commercial use? Community d. Describe the planned use of the project. Bulkhead to stop erosion 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract ± 4 acres b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 2 LOCATION OF PROPOSED 4' PROJECT d. Soil type(s) and texture(s) of tract Sandy Loam a. Street address or secondary road number East Main Street & Park Drive e. Vegetation on tract Common Bermudagrass b. City, town, community, or landmark Washington c. County Beaufort d. Is proposed work within city limits or planning jurisdiction? Yes e. Name of body of water nearest project Pamlico River, Jacks Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT f. Man-made features now on tract Pier, Parma of, a Picnic Shelters g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed * Community Rural Other h. How is the tract zoned by local government? (R-6) Residential - 6 i. How are adjacent waters classified? S-C a. Describe all development activities you propose (for j. Has a professional archaeological survey been example, building a home, motel, marina, bulkhead, carried out for the tract? No If so, by whom? or pier). Bulkhead r 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. N/A a. Type and number of buildings, facilities, or structures proposed N/A b. Number of lots or parcels N/A c. Density (Give the number of residential units and the units per acre.) NIA d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N /A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N/A h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? k. Describe existing treatment facilities. NQn a 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). None m. Water supply source City of Washington n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). N/A Access channel (MLW) or (NWL) Length Width Depth Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas b. Amount of material to be excavated from below water level in cubic yards N/A c. Type of material N/A d. Does the area to be excavated include marshland, swamps, or other wetlands? N/A e. High ground excavation, in cubic yards N/A ?,i ? n f. Dimensions of spoil disposal area N/A g. Location of spoil disposal area h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? NIA If so, where? j. Does the disposal area include any marshland, swamps, or water areas? N/A k. Will the fill material be placed below mean high water? N/A 1. Amount of fill in cubic yards N/A m. Type of fill material NIA n. Source of fill material N/A o. Will fill material be placed on marsh or other wetlands? N/A p. Dimensions of the wetland to be filled NIA q. How will excavated or fill material be kept on site and erosion controlled? N/A r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? N/A s. Will wetlands be crossed in transporting equipment- to project site? If yes, explain steps that will be taken to lessen environmental impacts. N/A T 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap ± 1300 b. Average distance waterward of mean high water or normal water level 5' c. Shoreline erosion during preceding 12 months, in feet __V d. Type of bulkhead material Salt Wood e. Amount of fill, in cubic yards, to be placed below meanhighwater anuroximately 1500 cubic yards f. Type of fill material Sand 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the ad- jacent waterfront (riparian) landowners. These in- dividuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Manage- ment and should be advised by the applicant of that op- portunity. P J . Name Department of Transportation Address Pactolus Hwy Washington, N.C. 27889 Name Norfolk Southern Railroad Address Hwy 33 Chocowinity. N.C. 27817 Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review. agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. . A This is the,42, d y4- 4l Cc/1 , 19 9 Landowner or