Loading...
HomeMy WebLinkAbout19890048 Ver 1_Complete File_198901011 DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concerning an application_for,State FFOeral CAMA Permit(s) A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. /\This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. - That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under Gen eral Certification A) No. 1179 issued on January 25, 1977, for sewer line construction B) No. 1272 issued on November 10, 1978, for bulkhead construction. C) No. 1273 issued on November 10, 1978, for discharges of liquid effluent from diked upland disposal areas. D) No. 1431 issued on October 16, 1980, for boat ramp construction. E) No. 1664 issued on September 8, 1983, for Rip-Rap Placement. F) No. 1665 issued on September 19, 1983, for incidental bridge construction. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT from ;i1 ?? L ter' /?r. c? J f DIVISION OF ENVIRONMENTAL MANAGEMENT Date: To: From: Through: Subject: May 30, 1989 Bill Mills 1 i E Operations Branch R E i? V James H. Gregson Ttk Wilmington Re *oval Offi e JUN O Donald Safr t WhIER , 1 i' SE?CTIO,I Wilmington - Regional e PER 710?,S-6RniVryr Regional Office Review and Recommendations Application for Permit for Excavation and/or Fill Project # 8905-K Capt'n Ottis' Seafood Carteret County PROJECT DESCRIPTION: The applicant proposes to expand the docking facilities by constructing a 40' pier with 6 slips. ADJACENT WATER BODY: Harbor Channel CLASSIFICATION: SC STATUS: Closed The project has been reviewed to determine impacts to water quality. The following comments have been provided. 1. The project will not require a 401 Water Quality Certification. 2. The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction are to exceed 25 NTU. This office has no objection to the project as proposed. JHG:trw cc: DCM - James L. Mercer WiRO, CF DIVISION OF COASTAL MANAGEMENT *Lat:34043111"N FIELD INVESTIGATION REPORT Long:76042145"W 1. APPLICANT'S NAME Capt'n Ottis' Seafood/Walter D. Brady 2. LOCATION OF PROJECT SITE on the Morehead City waterfront between South 7th & 8th Streets, at 711 Shepard Street, Morehead City, Carteret County; * SEE 1984 AERIAL PHOTO, STRIP 433, FRAME 41202, R-23 CENTER; AND, STRIP #33. FRAME #1201 @ Q-3 5 O'CLOCK. 3. INVESTIGATION TYPE: DREDGE & FILL CAMA X (ONLY) 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 5-16-89 (B) WAS APPLICANT PRESENT YES 5. PROCESSING PROCEDURE: APPLICATION RECEIVED May 11, 1989 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Morehead City (July 25, LAND CLASSIFICATION FROM LUP Developed/Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: (C) WATER DEPENDENT: (D) OCEAN HAZARD ESTUARINE SHORELINE COASTAL WETLANDS PUBLIC TRUST WATERS X ESTUARINE WATERS X OTHER YES X NO INTENDED USE: PUBLIC PRIVATE COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING municipal services PLANNED no expansion (F) TYPE OF STRUCTURES: EXISTING fish house and dock PLANNED re-design of docking space, pier with 6 boat slips (G) ESTIMATED ANNUAL RATE OF EROSION -0- 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS NONE (B) NON-VEGETATED WETLANDS: open water pier & piles 1986 SOURCE bulkhead (C) OTHER: NONE X [footprint] 4000 sq. ft (D) TOTAL AREA DISTURBED: Approximately 4,000 sq. ft. 8. PROJECT SUMMARY: The applicant proposes to expand the docking facilities by constructing a pier 40' long x 4' wide with 6 individual boat slips on the Morehead waterfront at Capt'n_Ottis' Seafood. DREDGED FILLED OTHER *USGS 7.5 MIN TOPO PHOTO REVISED 1983 'BEAUFORT' FIELD INVESTIGATION REPORT - CAPT'N OTTIS' SEAFOOD/WALTER D. BRADY, CARTERET COUN'T'Y PAGE #2 9. NARRATIVE DESCRIPTION: Capt'n Ottis' Seafood is a landmark on the Morehead City waterfront, located at 711 Shepard Street, between South 7th & 8th Streets. The project site is on Harbor Channel, a federally maintained waterway connecting Bogue Sound and the Intracoastal Waterway with the Morehead City waterfront. The federal channel is approximately 470' wide with an established pier-head line. Sugarloaf Island is situated on the south side of the channel across from Capt'n Ottis' Seafood. Capt'n Ottis' Seafood is a commercial business that buys and sells fish for the wholesale markets while providing over-the-counter retail trade. The enclosed fish market has a footprint value of approximately 6,978 sq. ft. with an associated dock measuring about 100' long, running somewhat parallel to the channel. The entire establishment is supported on pilings over the 'SC' surface waters of the harbor. Although many of the commercial fishermen unload their catches at Ottis', only 6 of the offshore commercial fishing boats tie up on a permanent basis. Generally, the boats are moored 3 abreast for unloading their product. The boats range in length from 40' to 651. At present, the docking platform is in disrepair, and the applicant proposes to redesign the mooring space for the 6 boats. The applicant proposes to construct a new pier extending 40' long x 4' wide. The pier will terminate near the edge of the established pier-head line shown on the accompanying workplat drawings. A series of 6 mooring piles will be installed 40' in front of the existing dock to create 6 boat slips, 5 of which will be 15' wide and 1 at 20' wide. The waters depths in this basin area approximate -10' MLW. The federal project depth is -12' to -14' deep on MLW. 10. ANTICIPATED IMPACTS: The proposed project involves no expansion of the 'highground activities', or additional development of Capt'n Ottis' Seafood Market. Construction of the proposed pier and 6 boat slips is intended to accommodate those offshore commercial fishing boats that currently tie up to the existing dock. The proposed project should have no significant impact on the status of water quality within Harbor Channel which is classified 'SC'. The proposed 40' pier (along the east side of the property) appears to be in line with the other existing commercial piers along the waterfront, as well as, the established pier-head line of the federal channel. FIELD INVESTIGATION REPORT - CAPT'N OTTIS' SEAFOOD/WALTER D. BRADY, CARTERET COUNTY PAGE #2 11. CAMA REVIEW: The proposed project appears to be consistent with the Land Use Plan for the Town of Morehead City as updated on July 25, 1986. PREPARED BY: JAMES L. MERCER DATE: MAY 18, 1989 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name 41,P,111 ?/ nT 7-5. 1 s2f5 9zr 1 ) Address;/>/ SJ??pdrj S 1re.et City State A) C, Zip ZeS'57 Day phone c 21/x- , Sut Landowner or Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. _3Y0?3'/l "N 7V 7-4' 511yc/ 2 LOCATION OF PROPOSED PROJECT Bi`il er &,A 083 a. Street address or secondary road number b. City, towncommunitxx, or landmark c. County Gar>ic?7? d. Is proposed work within city limits or planning jurisdiction? Y-8, e. Name of body of water nearest project 1V1 n raectA l,l)U t2.c- -VrT14 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, buildin a home, motel, marina, bulkhead, or pier). ,6 l rr. .S?34c1= s. FLE `.- MAY 11 1989 I -TI If you plan to build a marina, also complete anfi--"""-- attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? c. Will the project be for community, private, or commercial use? d. Describe the lanned use of the project. ?`1SN1IL ?i?(i?S u1ii' , UU boseness tiPte. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract "?h / X b. Size of individual lot(s) c. Elevation of tract above mean sea level or National Geodetic Vertical Datum d. Soil t '(s) and textures of tract c) , l C1 I li?? CLYl?lit'/? e. Vegetation on tract Aleo IZ f. Man-made features now on tract 'e ?? s! X 0 L6 C-, g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) ? Conservation Transitional Developed Community Rural Other h. How is the tract zoned by local pvernment? ?1l22.16 r?cc? '- KX? i. How are adjacent waters classified? j. Hasa professional archaeo,Ig ngical survey been carried out for the tract? - I If so, by whom? I 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). 1) m. Water supply source n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- wate , pi r, boat r p. rock jetty) Fill placed in wetland or below MHW Upland fill areas Length Width Depth b. Amount of material to be excavated from below water level in cubic yards c. Type of material d. Does the area to be excavated include marshland, swamps, or other wetlands? e. High ground excavation, in cubic yards 'J"* Ll!J?8 J11AY 11 7 Dimensions of spoil dispos g. Location of spoil disposal area g. Location of spoil disposal area h. Do you claim title to the disposal area? If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? If so, where? j. Does the disposal area include any marshland, swamps, or water areas? k. Will the fill material be placed below mean high water? 1. Amount of fill in cubic yards m. Type of fill material n. Source of fill material o. Will fill material be placed on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? s Will wetlands be crossed in transporting equipment to project site? If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Lcngth of bulkhead or riprap b. Average distance waterward of mean high water or normal water level c. Shoreline erosion during preceding 12 months, in feet d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed below meanhigh water f. Type of fill material 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or otherlarger plats are acceptable only if 16 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the ad- jacent waterfront (riparian) landowners. These in- dividuals have 30 days in which to submit comments on the proposed project to the Division applicant of that ment and should be advised by . Name -f L9r1/C ?L U.Q-J Sn.-l Address r t. - ' "/< 35 7 w? nrelA ec-,r? sS2 Name Address Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the day of , I i X Lan owne or Au ze a Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to the Application for Permits to Develop in North Carolina's Coastal Area. Be sure to complete all other sections of that application which relate to this proposed project, including upland areas, even if duplicative. All shore-based facilities must be included in application and work plats. 1_: MARINA-CHARACTERISTICS 2 51 c low the type of marina proposed. a. Ch Commercial Public Residential b. Wi 1 he marina be open to the general public? /VO c. If there is residential development associated with the marina w many units or lots are planned? /L d. Check all of the types of service to be provided. Full service, including travel lift and/or rail ockage, fuel, and marine supplies Dockage ("wet slips "L only Number of slips Dry storage Number of boats Boat ramp(s) Other (describe) e. Check below the proposed type of siting. Land cut and access channel O n water with dredging for basin nd/or channel Open water, no dredging required Other (describe) f. Describe the typical boats to be served (for ex- ample, open runabout, charter boats, sail boats, or mixed types). g. Typical boat length h. Maximum boat length (- i. Are any floating buildings planned? 11 O If so, describe. 1' MARINA OPERA?I?i?S ' ? 4 1 a. Check each of the following sanitary facilities which will be included in the proposed project. Office toilets Toilets for trons Number M? Location w- 2 Showers Boat holding tank pumpout Type and location b. Describe treatment type an location for all sanitary wastewater. ' c. Describe solid waste, fish offal, and trash disposal. 4 d. How will overboard discharge of sewage from boats be controlled? e. Give the location and number of "No Sewage Discharge" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste, and petroleum pro- ducts. t< g. Where will residue be disposed of??,gL, h. Give the number of channel markers and "No Wake" signs proposed. Note: Regulatory signs such as these require ad- ditional approval by the N.C. Wildlife Resources Commission. 4 i. Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality. j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts. k. What will be the marina policy on overnight and live-board dockage? 1. Is the proposed m?rina located near any shellfish leases? A 4 If so, give the name and address of the leaseholder. in. If this project is an expansion of an existing_ ?2c marina, what types of services are currently provided? , ?G?/??G;? !I/1c?? ?i/? E??iSG Gff n. How many slips are now available? Gl/?U< /rte/ON 1 O o? t ? M O 'X 0049? Vt. MAY, 11 1989 L-j ait:: a a v 2 • o to r? 7 ? rd s O ? N m o lo OiD ^ Y 7 W h it j f L d'1 ltobp NO '0O 2 MAY 11 1989 ? P° f ' R ?\ - -------------- ... d 5 XL,5 ST . h ` M Y,J O'3 !03 6. ? J?P I n?i ?\ \ FISH Mft tiKET \ ?` (3 kA C- \ 35.3 ?7. L _ 1 k -3 I O `\ \\ 3 1U ` Y l V ' (?u1LDIN cr \M ? ? " rA 43.31 ?? I i no ??G /ni G S