Loading...
HomeMy WebLinkAbout20181393 Ver 1_USACE Permit_20181204U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-00885 County: Guilford/Rockingham/Stokes U.S.G.S. Quad: NC-Belews Lake/Ellisboro/Summerfield GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Piedmont Natural Gas Attn: Ned Dietrich Address: 4720 Piedmont Row Rive Charlotte, NC 28210 Size (acres) —125 Nearest Town Stokesdale Nearest Waterway Troublesome Creek River Basin Cape Fear/Dan River USGS HUC 03030002/03010103 Coordinates 36.254480 N, -79.947307 W Location description: The pro*ect area includes a 60 -foot wide permanently maintained corridor beginning at a new tap of the existing Williams -Transco pipelines near the intersection of US 158 and US 220 (36.238103 N, -79.922468 W) in Stokesdale, Guilford County, extending west across Rockingham County to its termination at the Duke Energy Belews Creek Steam Station (36.277656 N, -80.056404 W) in Stokes County, North Carolina. Description of projects area and activity: This verification authorizes the construction of the Piedmont Natural Gas - Belews Creek Pipeline (Line 446), including approximately nine miles of 24" natural gas pipeline, consisting of nineteen (19) distinct crossings (projects): 1) Site 1 (Wetland 26) requires the temporary discharge of dredged or fill material into 0.058 acre of herbaceous wetlands for pipeline construction access and installation; 2) Site 2 (Belews Lake) is a Horizontal Directional Drill crossing and no discharges of dredged or fill material are authorized; 3) Site 3 (Stream 26) requires the temporary discharge of dredged or fill material into 68 linear feet of stream channel for pipeline construction access and installation; 4) Site 4 (Stream 21) is a Jack and Bore crossing and no discharges of dredged or fill material are authorized; 5) Site 5 (Wetland 27) requires the temporary discharge of dredged or fill material into 0.019 acre of wetlands for pipeline construction access and installation, including the permanent conversion from forested to herbaceous wetlands; 6) Site 6 (Stream 25) requires the temporary discharge of dredged or fill material into 68 linear feet of stream channel for pipeline construction access and installation; 7) Site 7 (Stream 20/35) requires the temporary discharge of dredged or fill material into 97 linear feet of stream channel for pipeline construction access and installation; 8) Site 8 (Stream 19) requires the temporary discharge of dredged or fill material into 77 linear feet of stream channel for pipeline construction access and installation; 9) Site 9 (Wetlands WV & 20; Streams 16 & 17; Pond 4) is a Horizontal Directional Drill crossing and no discharges of dredged or fill material are authorized. However, this crossing requires the permanent conversion of 0.033 acre of wetlands from forested to herbaceous wetlands; 10) Site 10 (Stream 12) requires the temporary discharge of dredged or fill material into 126 linear feet of stream channel for pipeline construction access and installation; 11) Site 11 (Stream 13) requires the temporary discharge of dredged or fill material into 61 linear feet of stream channel for pipeline construction access and installation; 12) Site 12 (Stream 14) requires the temporary discharge of dredged or fill material into 97 linear feet of stream channel for pipeline construction access and installation; 13) Site 13 (Stream 33) requires the temporary discharge of dredged or fill material into 79 linear feet of stream channel for pipeline construction access and installation; 14) Site 14 (Streams 31, 32, & 34) requires the temporary discharge of dredged or fill material into 166 linear feet of stream channel for pipeline construction access and installation. Note that no discharges of dredged or fill material are authorized in Stream 31, as there is an existing driveway culvert in this location; 15) Site 15 (Wetlands 9, 10/11, & 12; Stream 7/8) requires the temporary discharge of dredged or fill material into 92 linear feet of stream channel and 0.068 acre of wetlands for pipeline construction access and installation. Wetland impacts include the permanent conversion from forested to herbaceous wetlands; 16) Site 16 (Stream 6) requires the temporary discharge of dredged or 611 material into 96 linear feet of stream channel for pipeline construction access and installation; 17) Site 17 (Wetland 6/7; Streams 3, 4, & 5) is a Horizontal Directional Drill crossing and no discharges of dredged or 611 material are authorized. However, this crossing requires the permanent conversion of 0.235 acre of wetlands from forested to herbaceous wetlands; 18) Site 18 (Wetland 5; Stream 2/29) requires the temporary discharge of dredged or fill material into 60 linear feet of stream channel and 0.097 acre of wetlands for pipeline construction access and installation. Wetland impacts include the permanent conversion from forested to herbaceous wetlands; 19) Site 19 (Wetland WX & 1; Stream 1) requires the temporary discharge of dredged or fill material into 106 linear feet of stream channel and 0.031 acre of wetlands for pipeline construction access and installation. Wetland impacts include the permanent conversion from forested to herbaceous wetlands. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 9/28/2018 (received 10/2/2018), and additional information received 11/2/2018 and 11/19/2018, and the enclosed plans "Line 446 — Belews Creek Pipeline Erosion Control Plan", Sheets 67 through 89. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at 919-554-4884 extension 30 or David.E.Bailey2Ausace.army.mil. Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Corps Regulatory Official: Date: 2018.12.0410:44:44-05'00' Date: 12/4/2018 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.g.M.mil/cm apex/f?p=136:4:0. Copy furnished: Suzanne Herron, PE, CPESC, Energy Land & Infrastructure, PLLC, 1420 Donelson Pike, Suite A-12, Nashville, TN 37217 Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Forms. The requirements of these forms, including any special conditions listed on the forms, are hereby incorporated as special conditions of this permit authorization. 2. Temporary discharge of excavated or fill material into wetlands and streams will be for the absolute minimum period of time necessary to accomplish the work (see "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 85), and such authorized crossings will be restored per the following: a. All authorized temporary wetland impacts will be returned to pre -disturbance grade and contour, and re -vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 87, and re - vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 89. In wetland areas where pipeline installation via trenching is authorized, wetland topsoil must be segregated from the underlying subsoil, and the top 6 to 12 inches of the trench must be backfilled with topsoil from the trench. b. All authorized temporary stream impacts will be returned to pre -disturbance grade and contour, stabilized per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 86, and re - vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 89. 3. The permittee shall use a contracted environmental compliance officer(s) who will remain on-site throughout the construction period. This individual will ensure compliance with all general and specific Department of the Army and North Carolina Division of Water Resources permit conditions and certifications. Once construction begins within crossings subject to this authorization, compliance reports must be submitted to the Corps of Engineers, Raleigh Regulatory Field Office and North Carolina Division of Water Resources on a bi-weekly basis, until construction within these areas is complete. 4. When directional boring or horizontal directional drilling under waters of the U.S., including wetlands, the permittee shall closely monitor the project for releases of drilling fluids. Any discharges of drilling fluids into waters of the U.S., including wetlands, shall be reported to the Corps of Engineers, Raleigh Regulatory Field Office and the North Carolina Division of Water Resources within 24 hours. All crossings of wetlands, streams, or other waters undertaken using Horizontal Directional Drill methods must abide by the attached "Horizontal Direction Drilling (HDD) Contingency Plan" (pages 1 through 7). Digitally signed . GoverBAILEnment, o .E. =Doo, 83736 ou=PK DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Corps Regulatory Official: Date: 2018.12.0410:45:03 -05'00' Date: 12/4/2018 Expiration Date of Verification: 03/18/2022 Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Natural Gas, Attn: Ned Dietrich Action ID: SAW -2018-00885 Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline County: Guilford/Rockingham Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03030002, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.432 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.432 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 10/31/2018 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1 j the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Date: 2018.12.04 10:45:17 -05'00' 12/4/2018 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Natural Gas, Attn: Ned Dietrich Action ID: SAW -2018-00885 Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline County: Rockingham/Stokes Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03010103, Roanoke River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.053 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: See Comments/Additional Conditions section below Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.053 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 10/31/2018 was included with the preconstruction notification. • Wetland credits may be provided in HUC 03010103, 03010104, or 03010102. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd. tugwell@usace. army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Date: 2018.12.04 10:45:33 -05'00' 12/4/2018 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Line 446 Wetland Impacts for the PCN Stokes, Rockingham, and Guilford Counties ' Roanoke River Basin ** Cape Fear River Basin Total: 2,160 21,470 21,108 0.05 0.49 0.48 Acres Acres Acres 5F in Roanoke 2287 River Basin 0.053 Acres 5F in Cape Fear 18821 River Basin 0.432 Acres PermanentImpact- Permanent (P) Area within Area within ROW Conversion Impact Site Wetland ID Lat Long Resource Type Type of Impact Notes Temporary Permanent Temporary (T)) Easement (SF) Easement (SF) from Forested to Non -forested (SF) Wetland is within existing ROW. Disturbed herbaceous assemblage Impact Site 1 W26 * 36.27710847 -80.04999838 T Non -Tidal Open cut, dewatering with a few scattered shrubs/saplings. 21160 362 0 Wetland structure, temporary crossing Wetland continues to northeast and eventually directly abuts an intermittent tributary. Open cut, dewatering Impact Site 5 W27 * 36.26997357 -80.0177573 P, T Non -Tidal structure, temporary crossing, Wet hardwood forest. Directly abuts 0 844 844 Wetland access clearing/ROW conversion Streams 22 and 23. W* T Non -Tidal HDD Bore 0 0 0 Wetland Impact Site 9 Wet hardwood forest. Small W20 * 36.25833145 -79.97833151 T Non -Tidal HDD Bore depressional floodplain wetland. 0 1,443 1,443 Wetland Separated from Stream 17 by distance of —25 feet. Open cut, dewatering W12 ** 36.25473915 -79.94785152 P, T Non -Tidal structure, temporary crossing, Wet hardwood forest. Directly abuts 0 1,687 1,687 Wetland access clearing/ROW Stream 7. conversion Non -Tidal Access clearing/ROW Wet hardwood forest. Directly abuts Impact Site 15 W10/11 ** 36.25468143 -79.94759674 p Wetland conversion Stream 7. 0 172 172 Open cut, dewatering W9 ** 36.25445242 -79.94741603 P, T Non -Tidal structure, temporary crossing, Wet hardwood forest. Directly abuts 0 1,118 1.118 Wetland access clearing/ROW conversion Stream 7. HDD Bore. Wetland in project corridor is a wet hardwood forest Non -Tidal community. Wetland in existing Impact Site 17 W617 ** 36.25035371 -79.9367198 P ROW conversion ROW is a beaver pond consisting of 0 10.258 10,258 Wetland open water and mixed herbaceous/scrub-shrub vegetation. Directly abuts Streams 3, 4, and 5. Open cut, dewatering Impact Site 18 W5 ** 36.24824553 -79.93156634 P, T Non -Tidal structure, temporary crossing, Wet hardwood forest. Directly abuts 0 4,221 4,221 Wetland access clearing/ROW Stream 2. conversion WX ** T Non -Tidal ROW conversion 0 1,251 1,251 Wetland Impact Site 19 W1 ** 36.23991632 -79.92456802 P, T Non -Tidal Access clearing/ROW Wet hardwood forest. Directly abuts 0 114 114 Wetland conversion Stream 1. ' Roanoke River Basin ** Cape Fear River Basin Total: 2,160 21,470 21,108 0.05 0.49 0.48 Acres Acres Acres 5F in Roanoke 2287 River Basin 0.053 Acres 5F in Cape Fear 18821 River Basin 0.432 Acres Line 446 Stream Impacts for the PCN Stokes, Rockingham, and Guilford Counties * Roanoke River Basin Total: 0 1193.2 ** Cape Fear River Basin Feet Feet ^ Subject to Jordan Lake 50 -foot buffer rule Avg Length Within Length Within Permanent (P) Avg TOB Impact Site Stream ID Stream Name Lat Long or Temporary Perennial (P) or Width Bank Impacts Notes Temporary Permanent Intermittent (1) Height Easement Easement (T) (ft) (ft) (ft) (ft) Impact Site 3 S26 Unnamed Trib of 36.27514545 -80.03027276 T P 15 5 Open cut, dewatering structure, 0 67.5 Belews Crk * temporary crossing Impact Site 4 S21 Unnamed Trib of 36.27286359 -80.02200739 N/A 1 3 2 Bore - no impact 0 0 Belews Crk Impact Site 6 S25 Unnamed Trib of 36.26525844 -80.0097791 T P 25 5 Open cut, dewatering structure, Highly disturbed by cattle. 0 68.3 Belews Crk * temporary crossing Impact Site 7 S20/S35 Unnamed Trib of 36.260359 -79.999276 T P 15 7 Open cut, dewatering structure, 0 96.9 Belews Crk * temporary crossing Impact Site 8S19 Unnamed Trib of Little 36.25866886 -79.98991995 T P 14 7 Open cut, dewatering structure. 0 77 Ho ans Crk * temporary crossing S16 Unnamed Trib of 36.25839645 -79.97866651 N/A P 3 3 Bore - no impact 0 0 Impact Site 9 Ho ans Crk S17 Unnamed Trib of 36.25832381 -79.97843172 N/A P 6 6 Bore - no impact 0 0 Ho ans Crk Upper reach in existing ROW is Impact Site 10 512 Unnamed Trib of 36.25912529 -79.97224976 T P 8 6 Open cut, dewatering structure, intermittent. Lower reach in 0 126.3 Hogans Crk * temporary crossing forested area is perennial. Impact Site 11 S13 Unnamed Trib of 36.25896925 -79.96886502 T P 12 2 Open cut, dewatering structure, 0 60.9 Ho ans Crk * tempora crossing Impact Site 12 S14 Unnamed Tribof 36.25897358 -79.96767842 T 1 7 4 Open cut, dewatering structure, 0 96.9 Ho ans Crk * temporary crossing Impact Site 13 S33 Unnamed Trib of 36.259739 -79.962679 T P 20 8 Open cut, dewatering structure, 0 79.1 Ho ans Crk * temporary crossing S34 Unnamed Trib of 36.261515 -79.955965 T 20 15 Open cut, dewatering structure, Flows to S32 via Hwy 68 culvert. 0 62.8 Impact Site 14 Ho ans Crk * temporary crossing S32 Unnamed Trib of36.261509 -79.954914 T 6 7 Open cut, dewatering structure, Flows from culvert under Hwy 68. 0 103.3 Ho ans Crk * temporary crossing Impact Site 20 S31 Unnamed Trib of 36.26179 -79.954757 N/A P 9 5 No new impact Existing culvert 0 0 Ho ans Crk Impact Site 15 S7/8 A Unnamed Trib of 36.25467754 -79.94766573 T P 4 3 Open cut, dewatering structure, 0 91.9 Troublesome Crk ** temporary crossing Impact Site 16 S6 A Unnamed Trib of 36.25223873 -79.94185597 T p 6 4 Open cut, dewatering structure, 0 96.2 Troublesome Crk ** temporary crossing S5 Unnamed Trib of 36.25057158 -79.93738176 N/A 1 7 3 Bore - no impact Upper reach in existing ROW is 0 0 Troublesome Crk ** impounded by beaver dam. Impact Site 17 34 Unnamed Trib of 79.93689481 -79.93712622 N/A 1 8 3 Bore - no impact 0 0 Troublesome Crk ** S3 A Troublesome Crk ** 36.25032582 -79.93689481 N/A P 15 4 Bore - no impact Upper reach in existing ROW is 0 0 impounded by beaver dam. Impact Site 18 S2/S29 A Unnamed Trib of 36.24830449 -79.93197609 T 3 1 Open cut, dewatering structure, Culvert road crossing between 0 60.4 Troublesome Crk ** temporary crossing S2a and S29a. Impact Site 19 S1 A Unnamed Trib of Haw 36.24004255 -79.9247786 T P 3 1 Open cut, dewatering structure, Culvert road crossing between S1 i 0 105.7 River ** temporary crossing and S1'. * Roanoke River Basin Total: 0 1193.2 ** Cape Fear River Basin Feet Feet ^ Subject to Jordan Lake 50 -foot buffer rule Line 446 Lake/Pond Impacts for the PCN Stokes, Rockingham, and Guilford Counties Area within Area within Permanent (P) or Permanent Impact Site Wetland ID Lat Long Resource Type Type of Impact Notes Temporary Temporary (T) Easement Easement (SF) (SF) Belews Impact Site 2 36.276229 -80.039101 N/A Lake Bore HDD Bore 0 0 Lake Impact Site 9 Pond 4 36.258386 -79.97916 N/A Pond Bore HDD Bore 0 0 LEGEND Looe ED TEMP—CON-10 el\TEExLEGa­ o o DM—DIS—E _wD- o-I-E�xGGa - EE c_ M.. sl\ I-E­ EE o sl\T�DD Msl\TE NLETeaD,ELDDN n .ME sEGIMExTDE axG o MT. T Poa ar N LaD Ix o SoaEauxG Q Taexcx eaEAxEa ® GRAPHIC SCALE (IN FEET) — ______ ♦ �\,/ , \ - � oM11e-11Tii eeaMnxExTseEowc Q _ -.♦v, ; I � I � � � I � --- � f � I / i ; � , v ' 1inch=100 R. / ' El ♦\``` _ --♦� �'�'i MT MPox a, �EMExT -\\ ---" ; `\ – _ \ -- - - - - _ l 1 PEaMnxNrt En1%'D_ ® Txaoucn wa _ ,_-c-- \I 1 `♦ __ \♦ / 1 l I \I - _ __- \ _ \ — f � , \` \ _ �1I,— -`, I \\ "TIxGSmEnM THROUGH FASEMUlT �♦ I \� ; \, _______ _-' , / , — ' \ ��- a' I - - - - - I / / �/ _____________ _ \ � �♦ �__` �\ — ,_____ �_-�_ i i / ' � �� ___ / _ \\ II...... \ \ `♦ it i / 1 ` 4\ C 1 OI p �� / _,- •.__ `\� ___ I / _'�� \\` ` �/ I I/ / \�y pW ` ',\\\]'\ _ _- �__ >,,,♦�__� \ � _,� �s ____ -- \ i ♦ \ ` 1 r , i a IA \N \SII ♦ \ I ` ♦ . ♦ ice_-. \ \ —--------- / . = ^ 1 >I /yam ---TT --- Yo lo , _ _ -- - Fly i \ \\ �--- ---', \,`. \♦`\ ;\ __ - __ ' //' '�� `� ' ,�.—' i/ _l �_ j �: - - -- ` - _J,e�,'// _ _--__ _ T Imo' , ; �I i �I ' i I , i I ------------ 1\ / 1 _ \ I 1 II I _ I - - -- ' WETLAND 26B —.'— --' _ __ \ SND r \\ TEMPORARY / _ _ - _ \ E kA 6A11 \\ RUCTION O \` b. \\• `` �p♦ \\ WETLAND�613 EASEMENT TEMPORARY \ — �8''_ / \ 0`\\ $F O 11 - / ` v ,' ' / ._ ,"98 �. \ O `v O v \ yP / / % ;. v `. 1 ; -- IMPACT: TEMPORARY ' ... la Rlti CROSSING USING MATS OPOSEDFIG SF PROPOSLj + N u \ \_' m , RECEIVER(\$kiD� PERAANENjl N8A5--,,_N SITE -R S$B �e At p- ' �� v '( \ _ -- DR)LL� \ Y (STING GRAVELM PARKING AREA Y Y , \ -------------- ''-/// bING I I I ' SB - eo 5 JN �P �s, I — — — — / , '---- EXP CT;D rtF�l A _------- ;� TGE /p — e°�o i� �(ST/�20+A0-i��44)ID,6jET# \o �p� --�_ ��----- ----'"-------�. vvE 4'By4CKl S ; -" - - -------- _-_-- ,8&5pf' /�� �'I I > e$, - - DSaUE �OSIVS f�� ILS - ---' 82j yl- DUDE iNE�+Y¢S� � � � /\ -' 'ROY�I/�7Q % - - — ---- �- — --♦_ / / \ \ / ' \ 1 ' _------------- _ // —--- -' JIAILROAD SPUR --- _ ----- OSD-GAS �— /8e\`_------- PROP(/ \ I TRACKS / _ / TAMP _------- i 40! LINE -- / / /------ / _ ' /--EASEMENT Y/i e,,-----" v/ / WETLAND 26A eip \\ \ \\ \`\ \\ \ \ \\ '-------' PERMANENT EASEMENT TEMPORARY IMPACT: \ ao _-'----�__ OPEN CUT FOR GAS LINE, /// / --------- DEWATERING STRUCTURE / ♦�( in o/' / \ �� // ; / ',' // N `1 / ' ' W N l W fP W CD c4 ry {M1 {{{Nyyyy \ 1 / i I __ Y / F ' --/ / ; I ' %// _ rn ;.—C/ONST,RUCt10N - _ ---- \ / / ,r I ; ; _� ' ; . ' / , ;; '/--ACC�SALWNG f Q _, //; ---- ------ _ --- _ ) I _ > \; \ (/ / / _ /---EXfSTfFIGjRO%1W a \ : 'III , i / / - / / `\ \ l ' \ \ `♦ ' - ------ ,, , -------- ----------- , PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATETO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° �9' 4 - I- W 420 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I F%dmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET 67 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 010]000 n21 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE/wm '!!>GINEE•� MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD .. ,= KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f C— 446— 0001062 1 CHECKED BY CPD DATE SIGNATURE 1114— WKG �G PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PING-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, INC 28210 LEGEND L21M ED TEMP—CON-10EN­ GI­EGR­ o o 1IN—OIG—E _wD- o -I-E HnG - EE c_ 0 511I-EaT- o 0 511TPoGH MsI1TEGGHINLETPROTEGRGN n .ME sEOIMEx.nT ERx G o MT. .N Poa ar �MGaG Ix - ®.NPoaa.W uxoRlxG =, Q .Rexcx o T PoaN� aExGHRxGc>-- ______- GRAPHIC SCALE (IN FEET) -- -- --_-_ : -- vERMnxExTSEEowc 1 inch= 100 fl. crvuo cox TETRxcxwr lT OPoRiPBLE To T TEMFlMNtYE45EMENi iHRauGx WEnnNo �`____ `"` -' ' _.•�' tl^. 1 \II \ , —___ i '/'/ i "� // / I - �_ I TIROUGN WETNNO TxROUGx / /.x'o.e�/. FASEMENi "______ —— ___ .'--- — — --- — — — — — I N e m l', �1 N o a Q �� _� pUlE1= ENERGY' CIi ANb GRAB FULL PJERMANENT Iv �' m m m P 1v / - AOW'2_7�_6'— /PA�REMtkT 29+00-LAIEE).1NSTAtL. A �`r`rvA `v 'v v v v --- 11� i� V '1 , / —' ,(STA v\Vw ----' °° 'i II - -1115 — ------ 'SILT FENCE AS-THE AREA 1S CLEARED; I , 1 ----- - INSTALL SLOPE BREAKEkS AT E/t BAI�S� 'I -- - //15 ------'; A ` '` 1 1 �' 4 5 ; ----- INSTAL ME ICA /I XC OR BURL � / A h I I 1 IMPACT SITE 2: ' `v / I -I FIBERNET OR ENGINE,BR APPROVES' i / ' i 1 ''1 v A VAA v BELEWS LAKE EQUIVALENT AND AP ROVED -SEED' ' MIXTURE SOON AB PIISSIB R' AS � -- I I , / / , WITHIN 7 DA ---------------- - —__--_' � ' • I b_ - - — -- — _ -- --- -��'=�¢-'1,'11iTi 1\\1 �\1\\i�rl,:�, /— — '- -' --_------- --- -,/60'/PROPOSED / 155 ----- ------ --- --"' ------- �- —------------------------ _ / 4RMANENTI / ----- ----- --' /~l- b o o �' %' / b/; ' a \\\\\ b b -' -_; _ o. 0 a-, _ /' o o e� I o o o o Q-' --'o /o,% -6----a' =',g 1''''; -/' /;;; o 0 0 \ o\ { \ o -Q_------o o -- - _ --I' 0%*' +' : / i : i ' + + + — + \ \+ + + + + ----+----- _ _ \ Ai°g TiMA / 1 I 1 / , I\ lttEXIT------ 1 II 1 S I " eo J a /S 'I 10R¢Pb$lb ry0 �\ • �� w �t E. )1111.5 LA \ \ ``\\\•,\ .�'--- _ 1 7 -------------------- g?0/ 40"TEMP / ' 7?Tg;'' ENT'' / I — � flEL� $ iAIZF— -------�-------, _ � — — — — — — ------------ \ --, \\ -- `—'-------- - \ -'-- I / -_ to W =+ Wcq WN ZQ W J =y N N W N Q Za J f to f=1 Q PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 �.��N INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=pQ'�FESS/° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 — B E L E W S CREEK PIPELINE SHEET 68 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED II-- W�n420 ' I Piedmont EROSION CONTROL PLAN 1 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 -TUREIwn'lus MGR TECH DRAWING NUMBER REVISION %!!>• Natural Gas 1G INEE ,. 144447777, ..`= KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001063 0 DRAWING BY CPD CHECKED BY CPD °ATE SIGNATURE 1114— WKG PRINCIPAL " /III 111111\\`\ , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY PING-DISCIPLINE-RESOURCE CENTER-NUMBER 09/21/2618 WU'\ v ENGINEER CHARLOTTE, NC 28210 LEGEND--- ________ _. \`.�. -------------------- CisSS `_ \`.`.`.`. _ ,''------- ------------- I , I '' PROPOSEd ACR _� ;i; i «l «l %: / ' " ' ; ' P,1tOPb$ b[iAIN PIP'`, L21M ED TEMP—CONE,A��TIR,EN�x ® El�r�xcE�<x p ---- _ - i/ r _--- p \ '' /%''' ='" - - - -' '" --- ; ; ---- ''%/ _------'"'� -- --__ %''''///; /,%. ROAOTO BE CLEAiiF 1 v I5FFCZI T10�tAt ';"-------', GRADED -� o1IM—DIS,uxN�E _wD- ';; ; / ::,-------'"''�--------' /-; ; '.',� GRUBBED 8 / ; ,= ; ,, / , .-"--_---,' ; / ;-----------, - _ \ `,'gwa+�E F.71cl rcoax rPox n R S.—T11-1 c ER ;� %'-" ' ' l (' / i' %fir ' % // / (PROPOSED ACCESS,' / r ' MT.T DxRr �NDxDM IN 1 _- ' I I i ROAD CL�/►RING,A - __- - ; HERE IGRAbING'ENDS — GRAPHIC SCALE FEET) _ 1 „ `I \ `I I II 'I `I\1\\ ` `. _�1—\ _ _________, nE rErwPoxravTxexcx Ruc O mu _ ---_ \`\.\\` I \i _ __--"- ---------- - \ {LADING / ft � -----`. `.. �. '-----� 1 , �l ;I 'I \ �` \\ �`, � 'FOR PROPOSED G / PxMNExTSEEo1xc---- � O G DxExEETxxDxw xDMT 1 mon=loo e. �, \. .� _ - - I I'1 _, __ _ � _,, --------- MODIFICATION§ ' E SHEET DPox x, EMExr `.; .; _. / , ,_ -` ;;; ` `. \ ------ la __---- -- ,xRox�xE�EMExT -, - � °.,�-__ 1{ _-845'-"" \\\` ,\\.. \\ `. ���� ,j/ __ \\ \ ,_- '/� ��___'/// '-\\� .\�� �E-1-�"`\��•a�_ \�\ „% -'-- / -'- _30 \\� I `,ROW2<tl�_` \. _ _ �/ e�.`—__------ IMPACT SITE 2 -- --' BELEWS LAKE b'Sze - - - - ��Oi.O^y��----------- ----------� r __ p EXIS�1 - - - - __________________ 4iCCFSS/Ff0/(P; %r -T `''- '// //9°�h -_ u--- - -- --- I i - _STR7:/BENI�tAL _ I -A -O IZo'ACCT! OP9N-dUT------ .. `. i T-r _ - EI�I�y'I11IIE-' ---- 1 PO - - - \--------- J)R DEWATERMIG \ STCtt1CTURGi,�gU1PNENT ;� ,. -- BELEWS LAKE ,,,'`. I I\ 1_ =,-`c F 1 - _ -------------------''_- -- ' --`-___ _ _--- _- - -,\ `r�'I \ ` \ \ \ \\ --- -- - " - _ _ HODCROSSING - --" ---- - ---- �ROSShN,Fa��T��CEMBo i NO IMPACT __ 1 _ ,_,'oo ,-- ' ,-"-----�_`�`\\-�' - + Z­ \\\I 1` i pI i i0+ - -- O1/i ''Q� .',p �: ^O/ _ - .'/� ' ' /' 805----"_ \\ - - - - 4''O/' i I2 to SAO _\- 0 0 it + t / / o -- - ' // " ' / ' / / 6° / % / / azo'- - -' D' PROPdSED---' �_------- --- I - - /' ;oY r �= ; + a' $y`" ""-,, ERMANEI---- --------- \ - -- - I I {Gw�q} �'- ; n� ; - o _ \ ao = `'`._ I ,`i `I \ �ss�l` 1 /f SF¢ '"- --�---------------�_ �i , / / ',1gO� AA ----- , cx ------- ------ 'S61' as 8 OO / ' IMPAGTSJTE'`3: STREAM 26 , //i/'GASB,' pROPOSED -----"- / / 1100 /� �' %.'::' ' LI 'I � i j'll,' i — i -_ '- i / r i 1—_-_-__ ___ - ' / /'/; y1Aa i 1/ ' ' / i 'FLOW / J `._ ' / i i /'I' I 11 ' I I --_--_ / , � / % III ' ' / / ,�%/ ---'TAMP'' 1 / if ,------------- - -----' -- : ' / / _' :' / r FrASEMENT _ r / �' r r - / J I 1 I 1 r IA I i `—---------'—" _-----'— 1 1 ' I . -' CLEAR AND GR LL PERMANENT------------------ --- /ro ^ro 1°P/n co " \ "-- _-- _ ' EASE T (LAKE -STA 63+00). ^, n \ \ I ' ILT FENCE AS THE AREA IS ' r ---------'----' CLEARED. INSTALL SLOPE-- ` ----------- --------- BREAKERS/WATER BARS INSTALL -' AMERICAN EXCELSIOR CURLEX 1 FIBERNET OR ENGINEER APPROVED '-` --- EQUIVALENT AND APPROVED SEED --------"- \ ,/ \ `�-_ MIXTURE AS SOON AS POSSIBLE OR WITHIN 7 DAYS. ------------ W r W� W =+ NN7 W1D No Za wao �F z Uy J~ Q rL Q PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 ESS/° i�, 4 - NO DATE REVISION(S)DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 - BELEWS CREEK PIPELINE SHEET 69 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD MG AREA CODE 9335 TE SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18SUPERCEDED ��n2201 '�p� �Vdmorrt RaWral EROSION CONTROL PLAN 10/02/18 ISSUED FOR CONSTRUCTION REWSION JKC CPD WKG ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 NATURE/wm MGR TECH DRAWING NUMBER REVISION Gas IHEE•� r„KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001064 1 DRAWING BY CPD CHECKED BY CPD DATE SIGNATURE1114— WKG PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PING-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U,.''\kG ENGINEER CHARLOTTE, INC 28210 LEGEND rEMPcw/rccNx,axcMEN— ® '--� A P OP ., �- \- 'ACCESS sar�xcEw xou p p LM—DISDIR-E-goo- -' ''- ROAD _ � � `� AR-012 srFNE , - --- _', _ __ _ - - -- - -. \ El— o srFEN�E,x�a - sFc Earp sFG M.. IrFN o850- _ e M :II CNalx�rP n� nN n osENIMExrn/,Eax�� / -�. -,\` - -- ->� ------8ss -- - -' ------ `\` , ---- --- ' , � \ � � � � ;'/ <' / i ' - ', - __825_ F-1 TE>wPaa.ars<aEN�=..I - -- __ ; ,,; ; ,------830--- --�. ''___ ��" I i/ BeS.- ' \i /'// '�/ ------835____ ------------ F____ ,- Q raexcx eaEnxEa ® `. ,�'O pC R(�O1 -___ /GRAPHIGSC,4LE (/NF T) 8 \— rE,wPoa.R>•raExcx Ruc o \ \\ �b CoEO, `\ / — '-_ -_---___ PR / _---_ p cNa NP MExr %/ PaMNENrsEOINM as G coNEaE .aNMxw�xoNr _- gS06 G�d \ -'---- - 1 , -------R� ggDl&/// \ / '-`-------------------- Rug \ / `. \ - -i—------- - \ � G -_ -_�-- I - ET -___• \ ` '' ' ----r=`-_-. ' — —_-- -_ ' r/i, :,' / / 855--__ - rEMPoxaa,EPEEMENr rxao�1xwErlaNa //,--------------_- `- _ - _---- / _ ' �n-�� PEaMnxExr EnsEMExr rxaoucn vrEruno maousN EMEMENr _ ` /i' __/_ --``� , I\ , `� 1 --..�N __-_—___________� __ -__ __-___-' W / //i' / i , / /r /\/, `, //*/ ` •. s ' ' / — — — __ _ ,- 0 / '. '/ _ `�___.. _ \` \�\\�\\ \' ` �_ ___�>����___ �- ------------ ------------- 89 , --'— _4p , , 8�g \\ _ \\gym DOKE ENERGY---- - L I / .----- i OYI�' 270'/ __ V A ws0 a 8ip., gis 4W /I I .1 110Low 1 I i � _-- -' O O Z` % - ',\ FL W �\ at II L �cN°_='E ' O! / _"_ + l� O J i , � 1 O. 1 1 \ p '/�ACK,B, _ 1 ' .SACK 8'BOR - oAO�, I� ------- O. `. �' 11 B `I/ / C -�/^ ,��� i/'-, ''' / �� �___ ,% *\• ._-N. / /, 'gyp,/' /_� / / / 1111 \`. 1 ` 11 , O ;FCb I` SF Zo III I p � \ ----' / O ---- ' - _----- EMP'/ --- / �' l q p \ ''65 I (p + -- TCE SB �, 111 __ O ` EAS ME T R /� + ----- -- O --- -- v �� m _ - J I -cob _ 1 / + �E FLOW i� S L 1 1 cos \I �`--' \,I ,STREANf21 4 _- 40` TtMP EASEMENT 1 / _ P° -EASEMENT \ 0 1n o v v / , (INTERMITYENy — / ) SF,' �-ces O - �� f 0g ao r r m ¢ h' o �� y / '' n �- - - - --fl ` �` s m m m m m m 0h Vi' � -- j Ack BJaAR€ _ �ry O� / ' IMPACT SITE / �Ny� y %'NQiMPACT 40' TEINP ' -' iI� V STREPM 21�� A m �ro try'�,'�p,_, EASEMENT --- _- ' , - = TSE a / ----`, �yf� �`, '65' TE P / \ -- _ ro I' TGE b5' TEMP - 1 Y-� i mo EASEMENT -----` '. SEMENT / I V EXISTING` ESTABLISHED 1 V / ACCESS fL TEMPOhARY) ' -- IIII ` I------------------------------ II I -__ i --------_ � V q ' Ui W co it / E = o+ d PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED ' DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE ' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 N C?RO4'',,, INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° i 4 - I- W NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I F%dmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET 70 OF 90 DWG SCALE: AS SHOWN 0 09/21118 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 n420 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 w�TURE/wnlus DRAWING NUMBER REVISION IHEE•� MGR TECH DRAWING BY CPD ..�,.`= KEITH REC&STD COPYRIGHT2014PIEDMONTNATURALGASCORP. STOKESDALE NC f PNG-C-446- 0001065 1 CHECKED BY CPD GnTe slcruruRE/wmus WKG KG PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, INC 28210 LEGEND\-880----- - ;- ' ''----------------------- ---- -- - - - �, -- "-___ �- sllr�xGEWEGaDN o - p GM—DIS,uR-E GG- \-\ _ - --- \'` sOFo Sai FSxCS Wier sFo F.71 SI—ON r1 \ -- \` \` \\ II l__ � JI ` \ i \I - .,\ '` \ "- — ----- --- % i I j I 1\ - - - - - — - \ F S.1— ED G o I I 1 ---;------ , -'------- ---- -- / % \ \ ----------- e MT. iN Wa ar �NGaG lx ®iWWaa.wEuxG aWGIxG 71 \ _ _ - - - - -'-------------- ------- \ '\ 1, :: - -__ - ----------- s-- ----------------" - --- - / - ----------- `- `----------. \\\\ ' O♦aEHCx BNEAxER ® Q rWroaravraexcx RuG O , \ 1 \ 11 // '__' _____ I \- `\ 1 \ \ __ — \ \ �_ ' -- _ ---__ _ ° _ _ ___ _________ _-__---______-_ -__ , \` `\ ' \ \ - �\ .�\. __ _ ��-' '� lam` ` _GR4PHIC SCALE'(INFF�TZ\ / \ ` �\\ ___ __ - ` ____ \\ i `- \\\ ___________ _.7. QD- _ 1 i I ;: -_----------- -- - - "---- _ - _______________ ---_\- _______- `� 1 \ `\ .' .' -` `�`�`\ \ 6 _ -790 . ` `` \ -____________ __________________ - _-__--- ,/ CGxcaSrSraucuw0.5HGUi El Pr RPoHa,�EMExr 1 , 1 ; j -- I , ' i' ---- `` ____ _____ _____________ ___ ___ _____, _ \ 1 �\ ) 1 I `�._�' i' �--- `� `� � \ � p I� `� `�`\ -780'-_ - _ -_ ---_ -- \ — \ \ -` moa i ' --- ( \ 775 ` — ------ - ------ \ \ / \`. ` \ \ , / \ ` ---\, -- --------- '-' -__ - ----_ / --- -------- ----\ h 78 - '-- -_- ------ ------ aWGxwEilaxG TEaN�xExrEasEawrA^O / — _ — ` -_ - OpO 1 \ , / \ ___- �'__ ---\---- -- ----�_- --- - ----__ -- �; `` `\ --------' reaoucH wauxo maoucxEnsEmExr 1 `\ `� \ / `. \�` -' - - ----- - ---- - ,_t -----_ ---_ 0 -- - -; - _.770 ----' _ .785`----'. - \` \ --- `` \O '\ I A / ___ \ . \`.`. ---- -`� `� �� /' \• Oj O I y� /_________ _ ___ _______ _______________ \ - �- \ ` p , \ \ y / ------ \\` \ \ �. i ----- ------------------------ ----- -_-' -- 00 ', \ ' 1 ,-195 - - ------ - - - - .--- - ,800- - - ---_------ _----_-_-_ \ ------ ------ _- \ II 5____ ________ ______-- -- /' \ �o \W€TL�►riol,2�A m i'-\ \\ ` - - .- _ _'-- - - /-85--------- ------ ------------ -- /' __-' S --- ------'' - ------- ---------''-- -------` `\ - o EOMANENT EA EF'YI ) "-' ---'1 . / -' -__ __ /' 6 --------------------------- TIE\ '- -- -x' -' _ _ - / ' TIIEMPbi�Attlk IM /�C,T: \ S�REAto 1b o/ J \` "" 21 \--' ----------------------- .\ \\ ------------ / ------- --'-- DOE (;UT, CUT Fb� dS'1 i NO IMOACTI i m I -- \\ \ -__ - - ----- -----' -"-----' ' 845 -- ----- - ------ - 7/- -- -- - - -- - --L- -- --- - ----- --------- , -_-- L N aEWATE NG'i I ' i I i I IYF �� � \ � \\ •___ _- - Y "---- - - - - - -- - - � - - '- -o-' �% � - - - ----- ------- - ,STRUTURIE,IA,CC�S!(S'1 Vv '' ' ' I ' ' ; - 11 vv� V '` ' ���� � /------'----= " A�' g5 CLEARJINf E'Q�VIPMEMIT '� v1 i i o� --GI 3 -' _ v /� --- "- ---' / .8----------- C OSS NG/hlli►T r' / / / / -----art _ / 880 '"- - v a. R � - — - PLACE, N�1 / 4 _ -wa., ,. ' I 1 \ \ \ ,, .. / 5---------- (}{UIY� ENE�tC}5f a/ \ / -- \ / - ,88 - II O'PROPOSEO%1 �,�Q �. - f� i�• 2%O�' V1. /PEIRN�%11ENT, I ' '�� l' o $ / E!AI o% 1 o I c`, \ o `, o f a1`� `. b o o ji0, P/4CT , / I 1 /d 1 0; vh o VA a 3 ``� �V A o/ l d o I ' o o o.-0: —s' _o . ' ov` O \ o.. ' o _ Al iN ';\ ' V "`��1�1\ C4 '`-M �o __ \ 1 ,N .-P! - M M I m v yj i asp— uhf ar I 1 1 r ' / 1'I / I-1 c \\I I 1 I t ` \ a{A ` ® `I / \ )/ ' / / �` �Oj---------"1 I / I"T�M/P `- Ii13 --�_ __ I1 III '"\-_ - y,I PROPOSED GAS�\1 \I \ 1 EhSEM�NT \ \ , `I \ `r ' ' ' ' 1 i 'INLETy��^^,,�IDi27' ( ITEMFORARY - II ( i / ---- __ \ 0a0 -- 401 TFC P EASEMENT T -_ ;LIN \ `. 5_ PER A�IE�IT -- _ ' � I i \ \ ---- R ACNE T r MP/1CT: \ A'CCESS ROAD --- i i ' - ---- 0- - - i i �ASEMEI T 1r II I \ / i__;'' / 85 - I I , -------I `v IMPAC+,SITL,5: AR-070 ---- \\\ \\ J ---'"_ \ , - \ Il`S i I OI C \\ v` \ `v " by WETLANQ ------ \ I 27A-`, 1 i ; I WETLAND FRO�1�`OF - l{ ----' / / 855---�-- \ OV - -- a\ pp p \ W�TL\AND276 . \ ' ----- - - -----------'"- - p s o \ F�O ES�ED'TO,' Ri NON-FORESTED,SCO 11 i i' 85-----'� � � \ \ 00 \ r , \ \\ \ - - N ' // CON�ILACfOR TO ' / 11NPROVE,�ATH A� I I ' v I �0 i fj- NECESSARY FOR `--- ��_ - lb I` \ - / ---- 1 USE BY/VEHI¢LES - - -," 880 AND -_- --' N EQUIPMENT \ IPM - \\ 5'� �' � / 85 1 my ly 11 /'\\ � - �� \`_\ I i 1 I 1 li I \\\ to, US 1 \ W `--- j -----('--'- 1 \ - d -- Y i 1 ---- -\ P --- \ alp / Z\ \ /I� ----- -= --- -_ - �� I \ i 1 1 1 r i '- "- `--_ - - - `- - ---- abob a' - \ 40 Jib0 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE -TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° i, ° 4 - W �nn 4ti:V"�[��w NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS F%dmorrt 111INaWrall LINE 446 — B E L E W S CREEK PIPELINE SHEET 71 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 * Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 R�Tuae l lNnlus � GIHE;.*,� - MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD ..�,.`= „KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001066 1 CHECKED BY CPD GnTe slcruruRErwmus WKG �G PRINCIPAL \ ” 1rrl IIIIIr"" CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, NC 28210 LEGEND ----------------- -"-"'-- - / ♦♦ \ - - --__--' -' - -' ,cE TEMPouercON-1lausxmexa saiPExcEwEcxom O -�,- / 8�1-/' / o 1IN-DI-R-E �— '' / , %' - \ ` .' ----- // -- \ `s, ", / m o sl\iFR E,Hno - sr� � \ ` ;'' ----- o —1-E.— EE - _ / i -"_-------� � ,\� 'j \\', I' ''s�, ', ' F. slliEDD�Ix�iPxD,E�,IDry ED \ -- / ,- \ /' ; �% ,/ m // _ ---- o\\ ` l / \--- � � \ ___ r \ � 11 l ;/ % ---------- M1. ixExxax Ex ® E-1 iD�PDxN=~TxExcHRxD o -- - \'''�S ,% ate,_ / '' % i -111 / //a$1_-I/ ( 1/ --- = / '1 ` \\ % / -- - ' " / � I / `------- ------ oCU11PI�MExi �� ---- ---- , I ; --- / 1 __-- - - ----- � i \\ \ / PEHMN ExisEolxs crvuo coxcHcrEiHucxwrsxoui �� \\ \� ♦ I 1 m H. i \ \ l `-- ��' / i \ ' / 1__ ;' I 1 \ '__ i ,,----_-, ♦♦I / ; %/ ch ,100 \`♦ \ //,/i / ori ilir I I II 1\ --_ ------- \ MT PDxixHlE ZE o i DPox x, EMErvi iHxaucx wEnnrvD \ . \ \,, / .' --------- -- r ;' \' \--�� - ---- _ = --- ' ------ / '1 / ' '/ III' II II 1 g8$G''� -_-\---_-- PENN -\�•� i `i M'T`sEMwr--X83 ixxoucn wauno � � \�'___ -_---� --___ --_ ��' ,. �� `\\\ S---" __ \ (' I '\ '1 '\ \ ` ________' �_--��-"------- \'e3 ' \�`.' Ems, ,~Rox�xEA�EMExT \'_-_--__ - .� _--'" \ -_"� / _�----------_ -_ � cg'� -♦'\`—--___--"_ `♦\ ``\\\\\ \ `- , \ \ �_--------------- ''// ``\ \ / _ _ ___� \`\ /\ - \` I o' —_ ____ --- � \ \moi / � 'I I a21-_ —-_-,_'- \ — /\ 820\ , - � _ � ♦ 'azo ,- / '`-Sts---'"" ----- - ---- — i � ---- -' , � , \\ aio---- — — - --- - --- ----------- , � / i ____ -__- ✓ _ _____ _ 41 -- ,.805._ n it�_-____ -_- , - _ ------ --820 ___ 1 I / ', \\ •` ,F� _____' ------'-- -------------___\ �___ __'_ ,� _'�. \ I - _____ ------- _______�_- ♦ 0 ` - "� 'i; "deb1 _-_' ,-' 3 ����`��` I \11 I / �' •`♦♦ -�\-- �'\ _, �,��� -,_835. `� \�.\ i --------------' �\ `♦ �` \ \ \ /�: '__-140\ , `` I I I// '/ I I i/I I' ''� /'/''' - -_-' —Z-/ -_________ __�, \\ ♦\ �,\ �\ \\ \ \\ II i -`843. \\'I i� l i ,/ i' \4, / ----`- ``\`\` / I 1 \I I\ ' '' I/ \\ \II \I' ' /// -------/- ♦ -----" "15D\\.\\` \ 1 1 '/ \ \\ 11 y6/ .'\\' .�\ 6 — \ �\ X4STRE760' —/ PROPOSED NIO*OA r, PERMANENT / f pukE ENERGY 0 0 1 ; o j'/ ei I 'I ' o oIl `� l ;o lol kt0 d' I o o`, o O �b o o; O O O o %o % O I / O 0, o ;'; / a O O OI 0, !�' o o, o f o ; o 0 0 v o 0 0 __ o o, o f o \ / A\ �'� N M 1 'a I ' + F+, +`. * / _+,I V �} + 'i + + - + + + 1� + + �______f ___ _ y +, + + ,"�6rJ+ _ + i i + / I // , , +, , / + `I+ �` R Ir FR`f\ ' M / l '\a 10 t0. R' aD 1 Of O I r In M 1 '\ 10 t0 f� ' OD gNNNI M1.Oi to "1` I �� ¢¢ff /.,.. app I/ Yf I N '�. N - Y>7— H N .YI N 1 ,O /'r 'Ir - -� kLOW V - ; - --_ Z as a oe - eo�F e� ` e �, Leos eo,+=LOo zOoi—t.OD, LQ��EOo LOD z90 -OD— 1!!) LOD 00—tOQr xd /1 ' B' may' , - SB ---- ���g� ' li ®- ✓ �� 1 �F "FC 1� 40'_ EINP R PQSE11 GA§ e9 \ 40' TEMP / �O STREAM '$S (PERENNIAL)\ "C R '� '' �. v\ v INE 1 ` EMEI�PACT,SI I+ TEMPORAhY fA6T: 11&0 1 �/ �`S R QMH OPEN CUT\FOR GAS 80--' �♦ LINE, DEWRTERINC+'``� �' c' v V A --- `, rob :v —//' '7�-♦ A v STR�(CTUREi A A\ vv vv ¢� �` ae �'� r 1 1v �/ —� - ----895--".''� ----- \\ \\ \\ \\ � ¢ \\ MENT ` \ -EQUIPMENT `♦ \ \ S - -'' ; i ----- -- -- i it \ ,/ / / \\ \`♦ \ CROSSING/MA7�`♦ - \ // �/\ PLArgMENT 890 \ I / i--------_ \V ( `i \V 8`p - 1 \ -- --GasvI Jj_/875.11/� '----- I , ( / ------88'r0 ♦ \\ / \ li �- \ / I'M W O -_- ------- _ \ \ \ ♦. .8gg/ , \ , m , UP ♦ , ------------ -_ -,_ •\ -------- __,i'__�_____J __` 1 )\ \\\--"—_ \\\♦♦ \\\\\\ `- -`- 111 \—i ""/"- _``- --.. \ ``-` -"_ i e PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=pQ'�FESS/° 4 - I- NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I Piedmont 'Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET 72 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/19 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 %W n420 * Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE/wm GINE; - MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD ..�,\`= KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001067 1 CHECKED BY CPD DATE SIGNATURE/INm WKG e7 � � u (; PRINCIPAL /III IIIIII\\\` , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 V v ENGINEER CHARLOTTE, NC 28210 LEGEND_- oTEMP-CON-10 EN­ M­ - I-E,xGG - psI� I-EGNi�E, p -- ---- - \ ---- - - - \ n F.71s� G.IMNiR\ axG / ----- F.71 / ---- -- - --- \I r ` Q iaexcx RaEnxEa ®O ED i 1 RGG // --- \ ---- - GRA HI ALEI,(INFEET) 111 aMNENisEEOING j -- 1inch= 100% GNGaNG—xGGio oPo—.­T o PoZENMENi , / \,\ ,I � ' I --------�g,5: T G xENE%'DM u iExaRMouc _ / ` \ j \'`\ ' �� FXISLI" EX ixROUGx FAGEMENi - � I , ,, 1 J 1 i /- m \ \ 1 \ \ / it I / \ ` \\ , \\ 1 _-_ / __ - / 1 � _ _ -' / \ '� \\ ; I/ EXISTINCa \ \\\\\1 1 11 \I A<0$OA NI '------AR -- ACCESS RO \ I I m I►\` -' - 8 (PERMANENT) ---'' a --- ------------- �(��II / I \ 65' \ O� EASEMENT6' I '� , 1 COs i' i,/ -------'-- _ --- --- 975-" ' --------- _-g10,. I \40'TEMP v EEMENT'60'PROPOSED ROPOSED'GA -PERMANENT '� S IN--------- - -- - '-- --� ---�= --� � \ r n i �oatF - i� o \ / / 9 _ r --- I .. � - -� N � o -------- - IMPACT 00 V i z�g\�`� / / OPEN CUl aT —" � -- )to 0 a a M a SFCD \�aef sir Sop �r 1� 'r I ',AV �`� � / / / In yx -------- ,'' ; / ; - \ JMPtCCT 81 E/7: I 11 '\ - - - ---- --------pr*_---------- p--------- -, -- - f � � -_ _ ago-- M(2Q/35 � E i LANQ'22 _ _ , , STREAM,/29/35 _ / _-_- -- -- / /' - �� \ - O PqC "off - - - - EASiE N ,'' - -- -' _TEM 0-RARY IMPACT: OPEN _ "'M — --------------- '' CUT FOR GAS LINE, / - - WMTEN IT G STRUCT - - ee0EfiUIPM S� ----- - _- I, MRAE, CROSSING/ -- -------- PLACEMENT ---------- - - / ; ---- '" '_ -- --------------- - \ ENERGY ------- -, ROW 270' I � 41 ------------ , \ , , �I / I / PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS/° 9" 4 - W NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I F%dmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET 73 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 010]000 PROJECT NUMBER 1626546 SIG—RE DRAWING NUMBER REVISION n420 !!•• . Gas INEE�••� MGR TECH DRAWING BY CPD •.`= KEITH REC&STD COPYRIGHT2014PIEDMONTNATURALGASCORP. STOKESDALE f NC PNG-C-446- 0001068 1 CHECKED BY CPD GnTe 10/02/2018 slcruTURElwmus WKG �U,.''1KG PRINCIPAL ENGINEER \ " r'll IIIII"" CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, INC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND ! cope o rEMP—CON-10Ex­ i o EM—DI -E wD- o -1-Eax o F.71 n o :rDaD ,\ \ � 1x ® .NwFDa.a.FrERAxoca�slxD L==, � ,' ) I 0 1 Q .aexcxFarnxEa ®O `-'' - - - - GRAPHIC SCALE (IN F ET) `_-_--"- cu'—.... 100 ft. El maoucx EnsEmExr 920 Z , � �\ • i 935lu i , � , I �'10 — N to -`--- 90map O NO ' ' - -_ ,_ _ p II 'T,SEMF P 1----- EASEMENT T PROP@SED GAS __ __________________ 920---`. \ 0 5'TEMP LINE (I VIVI __ - / 3 _-- ---- O O EAS MENT ----------- WETLAND 1 - �_----- - NOIMCBO , o + SF + �Gc -- '--------------- '1fAINLHEVptVE 905 40* _ \ - _ EASEMENT. "" /o + - _ , - o N , I - - - I - -- ---- / - �: yx0� TCE �2"' Ip ; I o ; �— -`---- ---r ' / PROPOSEDI �) '-------- V.., '� i I � A �, too- 80' .- � , PERMANENT......U f �.m Cj( _ � AWENi 00 a z O , eco:T 00 o I ®e �_ 3+ o o ON1 t �' Z \` + c C% M a;__ __- FC _ : '�oti'�-��od - a ---- �a � i � DUE ........ EAM DOWN SLOPE OF ----\ &�s -- THE PIPELINEy INSTALL AMERICAN ��� 9 v � N ----� SF I V. ��-a r�=-� � ---- --, ��sa�'' / _ ________%- y 1 f;_ % ---= �� EXCELSIOR C RLEX 1 FIBRENET OR a� N ENGINEER APPRdVED EQUIVALENT AND $3 \\ GADO ��� _-/tea°O' PROPOSED . ' APPROVED SEED MIXTURE AS SOON AS- -- �- ��}_�u®a ; ACCESS RO/�D --------- a �-po----''__"- -', -, _------ AR -007 � _ a2 I - -(PERMANENT MANENT FOR � POSSIBLE AFTER PIPE INSTALLATION TO '9sfp 55, I STABILIZE - E THE AREA --- , -----------' DUICEE ENERGY -- - ----- ___- M '� --- ROW 27 MAINLINE VALVE) - F 4 � TSC ---- ------ / 95 I \ `UNPACT S IE 8: \ TREAM 19 `. \ \ : ' REAW18 \\ _- ''------------'' / \\ '--- NOVMPACT -- STREAMA (PERENNIAL) \ \ " - -- -- "- r \ TEMPORARY IMPACT: ' = ' F ,LINE, OPEN CUT OR GAS - DEWATEkING STRUCTURE, EQUIPMENT } CROSSING/MAT , CONTRACTORTO' i , STRIP TOPSOIL AND PLACE MATS ----'----' _-'--. i \ FOR USE BY - - VEHICLES AND / _ \EQUIPMENT ________ _------------- --- .935-_ ""- -------------- \ PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 C?RO4''%, INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ;�F-e"/O i�, 4 - ° � I- W0�n4ti:V NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I F%dmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET ]4 OF 90 DWG SCALE: AS SHOWN 9 09/2,,,8 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION JKC CPD WKG ACCOUNT NUMBER 010]000 Gas EROSION CONTROL PLAN PROJECT NUMBER 162654620 NATURE,wm l�.e INEE•� MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD „ KEITH REC&STD COPYRIGHT2014PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG— C — 446 — 0001069 1 CHECKED BY CPD DATE SIGNATURE1114— WKG PRINCIPAL , ',i IIIi Iii"" CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-DISCIPLINE-RESOURCE CENTER -NUMBER 10/02/2018 WA lllkG ENGINEER CHARLOTTE, NC 28210 LEGEND _______ I A Coo[ TOCE TEMPOA0.aYCONSTINCTION ENTMNCE SR.FENCECHECKMI.1 o LIM—DIS,v E - - ____ \ - " "" o s :F E+ H Q sa.socKEau.IETEE F.71 n W Q ----- r ) _ _ __ r ,_ // ( z N .ME sEOIMEx.nr axD o F.71 zz` \ – — ---- ® .E>wPDa.a.wE>uxoca�slxc �_ FEE 1 � d � Q .asxcx eaEAKEa am H \ �/, / --- _ / ,. GRAPHIC SCALE (IN FEET) o .-1—UG o PEaMnxEx.sEEowc Q `.` I i j I --------- '' � l l /RFYc I/ 1inch=100 fl. - - cTwo coxcaETETaucuwrsxou. � `. / I I i f / - _ I MT El TPoucEErvMD E . \. vn) — xNT ETaaMo -- — ——----- — '_- ----"---" 910a ---_i --- ------ - " I. ,acoU'L' EE`MT --------- // ///�----------- / Sop `_' / —" `-_ _ - 895— 30' PROPOSED _- y — -- ' ;' i' `i _— •_ `` ----------- - ---- l // "\ I I\N ---PERMANENT- \ \ EASEMENY \ ° -- - --- - -- Iv _-'--- _ ----- ll I ° __ ' //.�vI// �v o ' =: p--�S-. _------'---- ° m -/ I': -------_ _ — _ - ' i� ------ -- �WJj - tiuy► < m i' / cp ass /i I •moi ---------_\ 900-__ c _ _ I sal c,O�`Lp�Os— '\I —//! I iOW l li----- .i° -� ---------- -- _ ----- _ — _ ------ — i - PROPO$ED DUKE \ DUKE ENERGY I''� ---------- O—^-- DRILL DRILL EXIT -a. GAS J LINE HDD ROW 7170' �\------------------ __, -__ --- I� o `�, ppp o, o A o ;- a O O o' o 0 O \\O `� O .\ \ ` \\ O O'. O O O `\ O _ o �, O O O /O O i \ _ /++ --O l + + \'-. N M N N N N N Vim+ tp O III N 1 N / �O _ + + I .} + 1 + + + \ + ��+ + +\ M �O \ N \ 1+F! Q` --- N I W P _ Co E \`I N JF1 M \ M \\ M M �yP� b' °"` �}V "N1 + + + + N A a � 10 a s ' + to,/ -" --_—Al CII N N N N N SF _/ '��__ N N TCE N°"E I N N N\ (V I N N N N N II v SFCD-'/ SS sl -------- --_ -- _ N'—1�1---- N N �,'------ S----- ,N Q.\ $F .mao, - }aaa��'aa�»®ate�aFaF - - - _"-_ ' I — .�/aol —aoT aoT �a �ao� �- I o ""r / ---- _" -- J a C / i , "____ _ LL eF 8F SF —rtOB—tOB—t�—rtOB—rtOD aF aFP aF — aF tOB�tO�D y / - LOD -- LOD LOD ipD Lon ` -- =1----------r—tOD.LLbP� _ ----_-----�-—_----- - I I / I I / - 60' PItNOPOSED l PERMANENT I / PR POSED \\ \_/I/ - _ "'LINE j ' PE 6ERMANENT D -PERMANENT -- "' ------- ----- ppp v ^Dor a oa / =� °°o o\ WETLAND 1 LA 0 \ \ _ I \ — -- I _ '- _ - _ o _ _ _ -- ---- �� ---- `\\ ' NO 1i PACY I 975 i EASEMENT - EASEMENT �f OI P- F`�` Z SSD _ p tl A r AND GRUB � r/ ACCESS ROAD 1\ ' AR-005 4Q0 — BULL PERMANENT ASER NI N-r(STA ' STA - _ - Pv it PERMANENT _ N FENC8+00 246+ INS`[ALL,SiLTI E A$ 00 . THE i A - a' CLEAR, GRUB AND '— ' II vv % � � 820 C1 EARE 1 - ARE 1 NS'1'ALL SLOPE ' , 'GRADE SEE - BREAKERS/WATER4� BARS o v --- __ ( I GRADING PLAN, INSTALL--" AMERICAN � XCCELSTOR-CUIRLEX 1 - (� °�'w = a•,.--T —� — — — eyg �� SN T21) \\ EIBERNET OR _ — ENT A ER ROVED NDY►PP OVED -' -_ ----- \ c �� _ MIXTURE TURE WITHIN 7 rlvr _ — — -------- ------------------------------ -- -- —-----------, IIII II � PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING. USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° �9' 4 - I- W NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS F%dmorrt ININaWrall LINE 446 — B E L E W S CREEK PIPELINE SHEET 75 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/19 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 010]000 n421 20 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE/wm !!>�GINE; MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD ..�,.`= KEITH \ REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f C- 446- 0001070 1 CHECKED BY CPD DATE SIGNATURE1114— �G WKG PRINCIPAL � /III 111111"\\ CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PING-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, NC 28210 LEGEND Looe E ED TEMP—CON-10 SIUEExcEwE�uww0Ervmnua o LIM—DIS—E _wD- - -, - o W :T,: �xL�a _ + psl\.F N Ea.� p 1n u1 , N n o sEOMEx F rq�L Lx o , Ia MT.rNwEaanxrsravuacaosslxc GRAPHIC SCALE (IN FEET) ,a M Eauao 11RLh 100. M1. TRE-ea��a . RaD C:,� �E.aeE�: o aMNEa.sEEola ® _ - vy O& S ^ LU MT:ol o SI�Nn = p TEMrowavE .ENI Txaaucx wEnnxo , / _ Lu vEaNnxSNT SnseuENr ® ,'' % " TMaLaLa1ENEaT ca 8g5 ago _ ,- - - i 1.0 cb �.\ a?-- / - --- '---_—_' r \`\ \ �\---------------- /r / !% , / i ' -- \ �� !— f" \\\ . -l' r Jr — / '' "--._ / " / 'rI I I_-'--. - i �� / I 1110 Oy -0 \ -' -' - \ \ \\ `\ / J ' WETLAND 20A ' I .% ------ i' 09y.' / /i JI -- _, PtRMANENT IMPACT. ROW / _----- '------p. ro 00y/ -- _----- -_ ----- - -- - CONVERSIOWDFWETLAND - ; '' ,'' - o \\ '"---- FKOIFOtES�ED TO' -40'/TER �"---- NESYED,EQWPMEITENT '- ---i------ �e � )------ i m � - Iro eeo CRpSSING/ ATPLACEMENT �- SOCD -- I - -. VW TLA NIlL - _ so � - -- �, o + 0 DD ROBBIo/ G ® ---a - oC too p , O IMPACT aN m'' o w260+0 - SF N+a --1--,-' - I DRILL ENTRY z -r / a - '-- ----- - 259+00 _ - II ---- - tM ( DUKE �NEIIYGY / ;" % / ------ /� ��— \ i -- _ v S II RO�270' -STREAM 12 aq0"MPGa lm; SITE 10;-' / Ih ® T -T-- ----- ----- _ O�ENjCUT�AND X40 TEMP 0 IRARY jCROSSING AM 12,E i----------- / NO `QUIiT!Nd VERT / Eco �s��o�' / ; - - IMPACT✓ J / IMPACT SITE-9 --- F / � � ' i � % WETLAND 19 POND A �`� A `v i $TRiAM IT, % / - F o / P�OND4 ---HDD CkOSIS�NG HDD CROSSING'" �N\/ NO IMPAC ; NO IMPACT T���.� - 2 EU�'L NC6+DO:STRAZgENT- ///WETLAND I STREAM 1611 i I -STREAM 17 �WETLFtN0.20%i"� �' /� o a' _ v I // ��;� "890.`_, I 17— slop. •AREA 1$ - -'' ) / ?� \ / 4 \ — 895 CLEAR AICD GRUB FULL PERMANENTo,sp 1 AP R PRO - ►'RO I/ED _ - EASEMENT (STA 284+g0 - STA'254+7- \INSTALIL VP Eo- - - -_ ;' i /^ 1 -.,FLOW ro i SILT FENCE AIS THE AREA IS 64EARED.INSTALL�IIVIERICAN ACCESS 'v i/ / � � � � A i//� EXCELSIOR CURLtX 1 FIBERNET 04 I // ENGINEER APPROVEDEQUIVALENTvAND \ EASEMENT (TEMPORARY) APPROVED.SEEDNUXTUREAS4OONj{1S SIBLE OR WITHIN 7 DAYS. \ ',I CONTRACTOR TO IMPkOVE PATH AS IMPROVE -- �I /I ------ I <- I/ Ii " ll II I I NECESSARY FOR USE BY VEHICLES 0X1 \\ _ ---- AND EQUIPMENT / I I BERNICE ROAD (EXISTING ESTABLISHED ROAD) \\ \\ 1 � I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FEss /° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS ey���p� ■ ledmat RVINIaWral LINE 446 - B E L E W S CREEK PIPELINE SHEET 76 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 10/02/19 ISSUED FOR CONSTRUCTION REWSION JKC CPD WKG ACCOUNT NUMBER 0107000 n201 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 —RE/wm DRAWING NUMBER REVISION l�.e IHEE•� MGR TECH DRAWING BY CPD ..�,.`= „KEITH , REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001071 1 CHECKED BY CPD GnTe slcNnTURE/wmus WKG �G PRINCIPAL ” /Il lllli"" CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PING-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, INC 28210 LEGEND Looe ED TEMP—CON-10 e11 CEG DW o o 1IN—DE—E _wD- o -IENCE - EE C_ 0—IENCEaT- o 0 511.. 511TELNaINLETeaLTELaLN n oSEN—T11\,1 o MT. . Poa ar N Lan 1x -- „ ®s\n xa NEa Q .aexcx eaEnxEa ®O o ►- W = C Hn Z N GRAPHIC SCALE (IN FEET) a cinch =looft. a a O g o + o a eeaMN,EN.seEOINc p .a.­.ol,W xLN. LL © =F H 305+ ® .00 —LO& �, s ~aLNLN'IEnENT r SB SF ,. ' - ------------------------ ----------------- -_ \ --- 1 304 I W g3 _ _ ___________ _ \-------- ______-_ PM l \\'----- —---------- ------------- - _ Et STREAM 14 �`. �agS i \ �S \ -'''' ; ' ,-� - — \\ -„- -' —STREAM v �v_ —� '— _ �(INTE M1T7jENT),_8--�-�--_ \ i— :. `, — — — 7 - R 9 ---- -- Te\ -' TEMPORARY' _---------- - �---- ` " ---� -- \ — — \\ \. \ _ 3+00 ---- 0 \ - O � VEV ass, 1•, CSE \ — _ \ FMPJDRAI�YimP�►g \\t\I\\ \ (l�1 SB -- --- ' \ --------------- 4� �EN C � - - -=-QP -- - — OpRGASLO NE — - - L►TERINCa ' _B -'- -__ \/ - ----------- ------ - - __ -- - ----' - ., - — gp5 ---- -- --- ---- ------- -' ----'" $aso ' —\ - -- f -- ------ EQ ggf L�pGE -'------------- , _ ,— STRUCTURE. -----_---pEWATERING \ 8jo ---- -- `•�`\-..: - S --_-------'"\ _ '- --- `--_- ------- -' — - +0 $ R _ _ ,, -- 1'�' ---- o - , _ _STRUCTORE, - _ - _ _ - Psi -' I EOUK'MENT 1 ` o STONE r �o i`� 1 i EQUIPMENT `.� � ---- _ _ ,- 9� `� ' J ,----- -__ TSC �` -- o ---. CROSSING/M T '� _ _ - `--CROSSING/MAT oio; \ - �' _ =' ; --- -- --o--` -------_ PL,4CEMENT} - _-' --\ o - _ - --- _--- ------ - ,e ------eg5 ---- \ 1 II _, , Mf _D o �\+ o'""_ --o-_ o ' __------ENT-----880------------- - = pp ____8a5____` � 4 'TEMP— „\ ,I i 9os ------ r ASV '', - - l ,, + ,\ + ,-p-___----- ' O — _--------q ---' --------- - ---- ---- --- --=- -- - -- _ --- -v___-890 � � \ �`� `f`1' i � /'v+' � 890 � O- �---'�-g^5 ------ w W { /%' � -- sv,-----------� - 1 -+ ---- ------o-----___ � lot]--- -a---- --- - - _ ' " - - qT0 T � IiL7►� Sri I 1 roro e9a--� -- Wa + ;= __ -6 � _ __ —-a--=-- 'Df- A"- �O � 78 A. �.4 r _ ---_ap-- , I p----�— 'O h0 0 ly -_---iV''SF- // '" p --Twp\� _" x•00 v W ® + p+ ^ _ \ \ S J I ' SAlAJ - - --- / IMPS+_ TME E 11�: ____� _� - -rt - 299+00� \ Cv --'' i' SO; PROPOSED \ --PERMANENT M �/ IMPACT SITE 12: \ \ __ ( \\,\ REAM 14 dRPPC}SEdGJA$ \ `` \ 11 i i ', `II - \ 298+00 I i / i /` �/ �CWE v v A Fes- LbW ' \ � -u� DUKE ENERGY ���p� --' ROW 270' V� i SNP '// M o O o O O N O1fi� o ii/o/ N o N, O/ N/ o \g� \'� \•O \\00 O? ro a W o o N ''IVs 7 7 `.970 \.9j \02 �'8 S-O� , O., �3' O O 'O ------------- 'tj•— -- \ w O O O O m 61 h 10 OA r , _----- 11 \ -------------- --------------- ------ --------- / / 1 I 1 1 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° 4 - I- W NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �yy�p� I ■ �Vdmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET 77 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 n420 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 -TURE/wRlus INEE•� MGR TECH DRAWING NUMBER REVISION DRAWING BY CPD ..�,\`= „KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001072 1 CHECKED BY CPD GnTe slcruTURE/wmus WKG �G PRINCIPAL 1111111\\, CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PING-DISCIPLINE-RESOURCE CENTER-NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, NC 28210 LEGEND Looe ED TEMP—CON-10 FF'Cqe�T�xLeG�eLKDN� o o GN—DI-RE-E _wD- oEE:E-Exc_ IE. -I-EaT- o M.. s".. MsLTED�xNLETexGRLDON n .ME sEOMEx.N xxD o MT. .NPox xr �NLxD 1x ®.NPoxx.Rxoslxc =, ® sD�xxR�Ex Q .xexcx E—NE. ® o.DwTxexLxRxD o GRAPHIC SCALE (IN FEET) r . oxx�e�xex. ii eeaxnxExrseEowc Q cMDT =1000. LoxcxeTTTa xwr lT MT Lx. x E.DI�,Tj LL .ENT TMeLxLx�eNexT 0 sF 40' TEMP pp EASEMENT 308% �x op m a m pG 34 ���oe y O mmC�9 op p o 9 NA r, p�o3°my NA 7p A$ `1 ) -- -- 00 � t0 wym a y A a� N r N '� '� m v --- , S AM 33 a - --- Il a (SERE L) / TEMPORAR PACT: -$ y a - G I„ m Z J Oz OPEN CUT FOR G\ O e 2 9 m - -- LINE, DEWATERING PROPOSED �1\ STRUCTPRE, PERMANENT _ ------ `�� x \\, A EQUIPMENT Vim\ d r.5,` \ 1 CROSSING/MAT PLOP GAS -- "too PLACEMENT L O O O a� z o 00 Fro _w g3�1 a -- \ IMPACT, SITE I3: S SEA~ F�' P. SB O \I 1p N�1 00' 299+00 1H i \ '0 f1 Q _ o i CX pp yPtll�n ,, F m _ z Ci -A A n / �4*0 D Wt`! LZ►NQ77�1 i l / NO IMPACTS — �,gy0 riX �p-# 322+ 3 yLn � m // 4 �-- -- A y WETLAND 16 NOIMPA�T i.% i I �J -------------- - -- '---------, , - �\\ \� � �A - PF F 100 i PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS Piedmorrt LINE 446 — B E L E W S CREEK PIPELINE SHEET 78 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 10/02/19 ISSUED FOR CONSTRUCTION REWSION JKC CPD WKG ACCOUNT NUMBER 0107000 n21 201 1111Natural Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE MGR TECH DRAWING NUMBER REVISION !!>GINEE•� DRAWING BY CPD ..�,.,= „ KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG- C - 446 - 0001073 1 CHECKED BY CPD DATE 10/02/2018 ElGruTUREII-- WKG �U �G PRINCIPAL ENGINEER , CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, INC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER -NUMBER LEGEND Looe ED E""� ® :`�—EDE Sl--- E STREAM 32 CROSSING NOTES: Lo_o LIM—DIE,DeaN/DE -LDD_ 1. MATS WILL BE PLACED ACROSS THE STREAM TO CREATE WORKSPACE WHILE Ms,LTFENDE'TFRE "DD _ sF L -1 s,L THE BORE UNDER THE ROAD IS INSTALLED. M.. SllI DEa T EE 2. ONCE THE BORE IS COMPLETED, THE CROSSING UNDER THE STREAM WILL BE F.71s,LT ori,"�TeDo,ELDD" (1 CLEAR AND GRUB FULL PERMANENT EASEMENT (USE CONSTRUCTED. seD, E"TNLE"ED p HAND TOOLS WITHIN 10' OF STREAM). INSTALL SILT F.71 TE,w—C"DSSIND FENCE AS THE AREA IS CLEARED. INSTALL SLOPE BREAKERS/WATER BARS. INSTALL AMERICAN "Ea<E" ® sLDR"0 EXCELSIOR CURLEX I FIBRENET OR ENGINEER F7 TR"'ol+a".IaE"L"RDD o CO11-1E1T V/ APPROVED EQUIVALENT AND APPROVED SEED GRAPHIC SCALE (IN FEET) MIXTURE AS SOON AS POSSIBLE OR WITHIN 7 DAYS. / ONCE THE PIPELINE IS INSTALLED, THE CURLEX AND mon=looft. o"CD ET"DL"w "DDT 0 GRASS SEED SHOULD BE RE -INSTALLED AS SOON AS peo"TneLETI,TT © POSSIBLE v _=� D�10- ENEDT STREAM 32 (INTERMITTENT) /- 900 _ TEMPORARY IMPACT: OPEN CUT 0 FOR GAS LINE, -"" P✓ DEWATERING---- STRUCTURE, "' EQUIPMENT_, 3 915----------- CROSSING/MAT - STREAM 31 L1 LLI p0 920_________- o PLACEMENT pQ ,. (PERENNIAL) - _ x EXISTING EXISTING GRAVEL O + e11 p -'----' eNn W ^�� CULVERT DRIVE ,_ y'��h --i�1--- �- CX SCE \`\-----------'" Ir p xoQ ?�yy o xo IMPACT SITE 2 : its f. T _, \ -____-_-,823-\ o TCE STREAM 31 TCE SB FLOW %oo �s CX O1 - - SB Op dp --- ---_ %po 330 7 TCE 1 40'TEMP- �NO�M - �S 0 EASEMENT CD fti 90 \ Q �` N TSC 1 \\\ _--___-' PROPOSED GAS 00 1 -j \\ LINE " 329+ -- STREAM 34 SFO (INTERMITTENT) = I PERMANENT \ SF o + ACCESS ROA \ TEMPORARY IMPACT: OPEN \ x -*T \ t O AR -004 CUT FOR GAS LINE, i TEMPO RY \VA AVA� \\ �O 'i1 M oor \V DEWATERING STRUCTURE, 328+0 I ( ) \\\�+1 -M EQUIPMENT CROSSING/MAT R SSING/ENT PLACEMENT c /-%'/' _/_ ____- �\- �__/_-9%O _ ---- ESj -------- S06 IN. EET ❑m Isi ; T gt1Tl _ x Mp32?+00 ' 900 pIIMPACT SITE 14: ------------- ' --i -_J--- --� ------0 STREAM 34 _ \ --- ----- -- __ STREAM 32 ' _ �'------ , ---/'-Bao __`\\_� __ .`\ ---- ats Y / 3�`. 325 324+00 v ID i R{;Ow 3+00 m, \ 32 1 ``, �� \ i �______ 820 �`\ T \ / i-�-�'' \\ �'`_ �` 32 + ,•' i' .^\ ,kl �\'__/_ _ �J /.., I % ` i 3 ' I `\ 0 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATETO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS/° °°° 4 - �201 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �yy�p� ■ �Vdmorrt 121Natural LINE 446 — B E L E W S CREEK PIPELINE SHEET 79 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 10/02/18 ISSUED FOR CONSTRUCTION REWSION JKC CPD WKG ACCOUNT NUMBER 010]000 44447777, Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE DRAWING NUMBER REVISION ! MGR TECH DRAWING BY CPD ... �,.\= KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001074 1 CHECKED BY CPD DATE SIGNATURE 1114— WKG �G PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY PING -DISCIPLINE -RESOURCE CENTER -NUMBER 10/02/2018 �U ENGINEER CHARLOTTE, NC 28210 LEGENDTEM uPrEecwuiauery SImnua \\ / o LIN-DIS—E _wD- o s I -E sF o sI I -E ND - osI I -E T- o o sI .. % + \\ N SITS—INLETaamE N / a \\ s�IM�,TDLrEAaAD ED MT. D��a.�,ar,o�slND �__� T fA �, ��' 0 9a�aA� pT11- T—ICI o _ -- _ \_;' --------'' ., - ---' --- 9+0 -'" PERMANENT EASEMENT GRAPHICSCALE(IN FEET) CU11 —MEx. // ­­xTSENOI \ ---_ aes - -_ W4TLAND 12A PERMANENT PERMANENT IMPACT: ROW \\\ ---' EASEMENT TEMPORARY CONVERSION OFWETLANDFROM 1iDcn=100 a. \ G,wo �or,��TETA��kwA�„DST ❑ - J 9Po , IMPACT: OPEN -CUT FOR GAS FORSTED TO NON-F"ESTED. ; `. FP Tj waTne�E TO ` LINE DEWATERING TD.I�T EMEHT _ FTC - \------------ -_ ----- STRUCTURE, EQUIPMENT --905_- �� `I -9Oy' -r \ ---- , \ C�tQSSING/MAT PLACEMENT. WETLAND 9A-PERMANENT- aE� TMRo x ENENT �ZO. ------ aTo__- EASEMENT TEMPORARYvvv Ai _9TS_ -'-”--�, WETLAND 12B PERMANENT-- / IMPACT: OPEN CUT FOR GAS \\\ p___"_"-" ��� _ \ EASEMENT PERMANENT / LINE, DEWATERINQa / _- �\ \ �'��___ ___azo- �9 �-'---_ �� -IMPACT: ROW CONVERSION , STRUCTURE, EQUIPMENT - -' -- o��_- x00 ---� E�� �� �` -'�OF WETLAN13 FROM FO�tfST€8---_- __,� CROSSING/MArPL*CEMENT. ---- T -F R STED. ----- \\ O N '- \ -- T ---____-_ WETLAND 9B PERMANENT--------------- ; ,%gyp•�`.� EASEME NT PERMANENT = _ -80 \ x00 P $ ._ -------- IMPAC :,ROW CONVERSIONOF,' u` +1 \ \ WETLAND 14- FORESTTO--, 65' TEMP / WETLAND`FROM NO IMPACT X890-_ STp,E_D_.--VEMdE.NT NON-FOREo+ o+ ppp 40',TEMP)gPACT SITE 15: EASEMENT � 1 V STREAM 7/8 885-_ ; Oti�p _WETLAND 15 \T / X880 10\WETAND9A p, NO IMPACT,+VN e I AWETLAND'�0/11 % T p $LADD 126 _, -_,-_ _- 880 -- ___ ---' p + \WEo � - TSA 1 - + . i , -- ---- "x00 - --- -"' . 1 . Wi I I I r i �`��� ACD / ,,. --_ %' "- >v� s� -\� \-- -- - - - -' -- - .I .� F g----- i _ " 4% - �60' a. w" SF Q__ - PROPOSED = " - ---' -- S \ \ w _" ' - _ _ --g10" PERMANENT -- - `__ -_ 374+00 B °o _ -- _ o O -- - - - - - - - 875 --- --'" _ - _-- ----- - WETLAND 8/ 13 I --_----_' "-- ` T \ NO'IMPAC eao - STREAM 9 NON O IMP o + �� ,'- �S ACT/ o "- -- -- ---- - ,-------- - _ O 0 1 � \ , / _ ' -- "---- ,_ STREAM I FCD NoiMPACTOp M �'+ �� OPEN CUT FOR GAS'LINEy_- 1 o o T 1 DEWATERING Tj'fU ARE _ M -� -� 372±00 EQ IPMENT CROSSING/MAT----- Op DUKE ENERGY °° ��„�_----- -10 ' $F --_-- '� � ,/ ;PLACEMENT,�STREAM,-' _ _ -_ ---\ --___�-_ \�I ' - _____SRS ---- _ _ i - ROW X270 - M WETLAND 16 gFCD; = ” -��° iF -`"� BU FERS TO BE,APROI�IDED�- _- ------- - -_ NO IMPAC �� 8 __ PER JORDO�1 LAKE EUF6t`R - _ --- -------- _ , RULE (SEE gEYAIL'9, SHEET 81 � �„ � 0 CL'EAR ANb GkUB'F LIQ PERMANENT EASEMENT \ _, -- "_ (WSE HAN6TQ04S WITw11N,10' OF STREAMS AND ; TLAND �1N�ALL,%SILT FENCE'AS THE Al2EAtIS'CLEARE� �IN 8}LL'MATS BETWEENI►D APPROVED ST TIONS; 76+b0'AISDJ39+00 Al�W P\o\WETLAND ---------'-------__qq ,"___ . SEED,1)III�TUAND STRAW AS SO6N , ASPOSSIBLE.ONCE,THPIPELINE IS I \\ 'INSTALLED,TWE 1 WETLAND MIX,,'GRASS SEED ; ' W 1 -'' �`AWQ�¢FRAWSHOULd ' �I%��' I BE RE-IN$'rALLED AS \ ----" SOON AS POSSIBLE.; '-- 1 1 ' I I -- I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS/° 9' 4 - I- W NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I F%dmorrt 'Natural LINE 446 — B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET $0 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 NATURE/wm DRAWING NUMBER REVISION n420 l�.e Gas IHEE••� MGR TECH DRAWING BY CPD •.�,.,= „ KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG- C - 446 - 0001075 1 CHECKED BY CPD DATE 10/02/2018 SIGNATURE 1114- WKG �U,.''\�G PRINCIPAL ENGINEER , CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER -NUMBER LEGEND \\ A kA A \ Lem ED TEFP—CON-10EN, ® SaTSExDEwEDxwN p \ \ \ \ o, END OF EXISTING OsNT—DIS UFSN\cE --ADD- \\ \ $ \\ $� GRAVEL ACCESS ROAD o sl\TF x E xDx — sF c- r sl\TI-E o o I \ 'I`1 s®i sl\Tsocxml�TaxGRcnory n o sExlxEx.n„ xx x o \ 1 , I ' I \\ -------' I —J GRAPFIIC SCALE (INFEET)( oTD Pox xr N DxDs lxo ® TDwwxnrzvvr<nnxx r'`, wosswc `ln3 (y \ ,\ `` \ \ \ \ - / 1 inch = 1 ft. p TxEx xxx��x oTD DxN� x xDxRxD o p \\ \ I h \ '' - I " ---- j w V �` i v x+ W -- \ rn a oDxx PrvExT ii E xMNExTSExlxc ❑ p oxTx.DI ,W�xouT O W --LLI `\ _________, STREAM BUFFERS TO �/ / , Z M n V - CONTRAbTOR TO ; / Q ao \ ---- z M \ \ \\$ __IMPROVE AS _-__-- // \ AE PROVIDED PER,' / / / / x H ��� v \ �'� JORDON LAKE BUFFER ; V U) Q v ( v NECESSARY FOR / — F // 'i ETA' RULE _SEE DETAIL 9, U H v }`$ ; USE BY VE#IICLES / _(-I Q 885 SHEET xxouox cTlxox xE� \ I , \ $ AND EQUIPMENT 87 f ,xxouoxE�sENExT Q C ------------I ` 'i i A \STREAM 6 -- ` (PERENNIALI \� mw - \ (INTERMITTENTY CUT FOR GAS LINE, $ \\ -OPEN _ \\ DEWATERING STRUCTURE, EQUIPMEIJTCROSSING(iNAT ----- ` NOIMPACT \\\\ o?Y�'O \ 3 \\--------/ \\ \ PLACEMENT \ ° / k_ \ ------ _--------' `� \ °/ r WETLAND 61! - --------------- bERMAN NTEASEMENT / \ PERMANENT IMPACT: ROW ' --- `' \\ °\ \ /% ` \ \� a.\ --' \ \ i v 3g$ \ �O� EXISTI G \ t - CONVER¢IDN FktOMORESTED% \ \ -' "'y _ \ TO NON FORESTEI p�ov+ / m \ ACCESS, ROD 11 \\\ �\ �� ` rP \ \\ ---"_—,\ STREAM 3 AR-003 \\%� -- SYREAm 5 T (PERENNIAL) \ \ (TEMPORARY) _ o , \ - --- F � 65' TEIRP � \ �R� I � \ I SENT R ITTENT � HDD BORE , ' �� '�� ----= 11iP �� \V I "- --8gs. 60' PROPOSED HpMPA E NOIMPACT III EASEMENT \ EASEMENT \I\t 1 _ \PERMANENT -- i NO IMPACT "- - - - -, 1-1 O O O O OI O i , /OO'I0 O O 0i0 O O -8 O# 1OOOg�iFD r: -- 1 00 o a of -s. -------- W InEMMORZ -" a -------- ------ :, tOpSF �rt R=iF- LOD L 77 L, SF,/FC SFC SF FC SB$� PROPOSED GATLl - LINE---------- o -- - I STREAM BUFFERSTO BE/ /'. IMPAct,SITE 1PROVIDED PER.CORDON' IMPACTSTE 47.------ 7.- ------_--- -ENERGY -,pOO ------------------------------'UFfERRUL'(SEE__,-'��D�E STR6A733--_-_-$TR�AM6 LAKE BiE ------------DETAIL 91S SHEET ROW 270 __ STREAM 4 _ — __ ------------ EAM 5 WETLAND 6/7 0 --- _ II i l I I \1} v \\X, CLEAR AND GRUB\30�EMENT CENTERED ON \ GAS LINE. USE HAND/ TOOLS IT WHIN40- OF ---- ---------- WETLANDS vv� — WETLANDS Ahlb DONOTREMOVE-ROTS. INSTALL INSTALL SILT FENCE iS,THE AREA IS EARED. _ eyy- TCE °e�$ ; --- v _ \� INSTALL APPROVED UPLAND AND WET�ND _ __ -� OGBURN MILL ROAD \\ \j - - 810 I� \ \ �% -� SEED'MIXTUiE AND STRAW AS SOON AS _ E MAT----------- POS,SN3LE.,60 NOT,FLAQS �tCROSSBTo—"-'---' <� WETLAND FOR/kCCES,� \\g� _8js •__ \\\ ___ 1 /! it I,' —/�/ �/� \J /I - EXISTING GRAVEL ACCESS ROAD v i 4 \ \\ i MATCHLINE A-A --_ — SCALE 1"=100' PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=0Q'�FESS/° �9' ° 4 - �nn�[�1 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS %dmorrtENGINEER RaWral LINE 446 — B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET 81 OF 90 DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL DWG DATE 09/21/18 SUPERCEDED 10/02/19 ISSUED FOR CONSTRUCTION REWSION JKC CPD WKG ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 —URE/wm DRAWING NUMBER REVISION Gas �!!•,GIHEEp`,•� MGR TECH DRAWING BY CPD ..�,.,= KEITH REC&STD COPYRIGHT2014PIEDMONTNATURALGASCORP. STOKESDALE NC f PNG-C-446- 0001076 1 CHECKED BY CPD DATE 10/02/2018 slcruTUREiwmus WKG WA lllkG PRINCIPAL ENGINEER , CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND Looe ED TEMP—CON-10 FF'Cqel�r�xLEG�ELxo�N o o LIM—DIS—E _wD- o-I-E�xoo« - EE c_ M.. sI I-E­ EE M.. sI\ .. SlIS 1-TexGRLDDN n - .ME :rLxD 1x xoslxD =, ; o s a� ExR \ oTxEx xxx� Ex 1 ; \ GRAPHIC SCALE (IN FEE Q rDwvoxnnvmexcx Ruc O __ --' _ 1 \ 0 sm ocxx��el�xexr exMNExrseEOlxD p / - \\ \' - 1 Ln=loos. / ❑ ,------'-- -------- \ \ \ ®( meouox ensE-1 Al 1 J a -CLEAR AND GRUB 30' EASEMENT CENTERED ON a n \\ \ N v GAS LINE. USE HAND TOOLS WITHIN 10' OF WETLANDS AND DO NOT REMOVE ROOTS. INSTALL SILT FENCE AS THE AREA IS CLEARED. INSTALL APPROVED UPLAND AND WETLAND SEED MIXTURE AND STRAW AS SOON AS POSSIBLE. DO NOT PLACE MATS ACROSS-855.; WETLAND FOR ACCESS.-870. 8>s STREAM ByFER3 T� 1 0 \ \ \ \\ o \ "-gyp \\. BE PROV,RF/D o p of \ \ \ \ JORDO LAKE ! �_ ___ ___-_- l ----- / , %�t --a8 \ _ \ : `; `: .,_ BLFF�IY�ULE (3EE \\ i o o I�el a xQO ---------- /40 //y; S' �ET/�H 9; SHEET 87• \ o o / N M SF a ,yg9 / -' - _ ---' - '- \ Q� 90 -- Tf" ,---_----- 'eo '* 3 STREAM /,_------- o // / - ---- SF `.. (PERENNIAL) _---- , /' HDD BppGT/QLOD NO IM / O/�/� & < _ _ TA-� a.o co o + // SF /-v �` gab / /IMPAC> SITE 18''/ �'I ya - v I ir8 i STR AM 2/2Y QO ----- - -'"��\ m m sol m `° I I FL Low I' WETLAND k ND 5B ( A\ y,, 2(29 - ;�ETLAND'SA PERMANENT (INTERMITTENT)�` \ 1 EASEMENT TEMPORARY _-- / f I Y1 Q IiCPF LINE, OUT/FOR I ' ) ' IAG IVVIPACT:',OPEN CUT FOR GAS SB - -- 11 L)Ne, DE�IIATERING _ 25'SETBACK Ff�QM� � -`; O I STRUCTURE - 1 _ STRUCTURE, EQUIPMENT \ TOWER PROPOSED GAS $ 1 i �I €QJIPMENI� I �� - ! CULVERT ¢RpSSING/MAT PLACEMENT. \ x --- CROSSING/MA ��,, LINE — ppP i' 'PLACEMENT \ � 60' PI#OPOS / '�- t / WETLAND $B PERMANENT E$� \ Oo �',"-' bq` % - " -_ / ' / :PER ANENIC _/ V / ; EASEMENT PERMANENT / - _,- �_'-' _� _ -_'-_-'-! � M \\ IMPACT: ROIAICONVERSIDNOF_----'_-----'; _ ' ,WETLANQ RQMFORESTED-FEY I ` - - - R , I - - - - , �.v NAIS-��$EST� �PS4 -------- = s� _ -_ , -- TCE I I,% f ----_--_-_--_--_-- .__ -----,-,---- , _—------ '�:'--- '_' ` I CESS RpAD�j � '' __ '--_ --_-_,__-��------ ------- Aw�� /� --- 002 - - v------ ARS / / \ �---`" ' - -- \0(TEMPORARY) / \ \ j \ ------ - \) / ` ` \-_-_-_--_---- , i ��d 'EXMTJNUAC¢ESS -TFIROi13�H.�UARRY/ - _''- \--_—_-_--, EXISTING VULCAN \ /, MATERIALS \ `I-------- ----- _ -- QUARRY�',. QUARRY \ \ i PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS/° 9' 4 - W 420 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS F%dmorrt 111INaWrall SHEET $2 OF 90 DWG SCALE: AS SHOWN LINE 446 — B E L E W S CREEK PIPELINE DWG DATE 09/21/18 SUPERCEDED 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 n21 Gas EROSION CONTROL PLAN PROJECT NUMBER 1626546 NATURE/wm MGR TECH !! •• . INE; .*,� DRAWING NUMBER REVISION DRAWING BY CPD ••`= KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001077 1 CHECKED BY CPD DATE SIGNATURE,I-- WKG PRINCIPAL , "i IIIi Iii"" CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY 10/02/2018 �U,.''\�G ENGINEER CHARLOTTE, INC 28210 PING-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND p TEMP—CON-10 EN a x� ------------ ydE? EMENt _ 7 Z G­­­ p , M—Ds—E A o -- - �dM _ v �ERMAN� FRd f0 StEO 1 p GI T F x E,xOOa — SF L / / \ \ g510N ` pN.F� - \ p sa 1-E.— p _ ` --"� )k"4 ph OTo.N / / N s0s saTsocx re— ` 1 / / _____ Fs sI� 0MIxLETPamEOr,Ox .ME GEGIMExTN­ o `-- -- ; • \ 11 \ ,/ __--, T TMGaar NGaG Ix —------' -- I PH Q Tasxcx G I LE (IN FEET) , Q TEraPGaurvTaexcx RuG O �� \� `.� `�\ `,` I I cQx cuusx PucEMExr l-� --___- 1,4Q=1oQa- �.' A / cTwo coxwEreTau11-111T waTnG�e TOIL, .11 8.9 , I i , TEMPoxaa. EPEEMExT ----- --- l\ _--- _ i� _ �r0 0 - -'JACK & BORE v%/ - M 1 TxaOGOxwET NO EaM xExT EaGEM x----------- ----------- "T --- W p\_ St1 1t TxaoaGx ETaxo \ ---- m °N' .10—T" �EMExT - r---` E av ----- mss'_ m ° \ - ( ` .._ - (P�� FOR GRG aE� ---` OPEE ulpo RE1 , / / - --- --' II „ TC o g RVIPMEIIT, % -0-------- ----- 'rte ----- // 4�\ ��'ll SF O 1 ; u— -- s —°jo ROS 01 \ 0x ----- i/------------- --------- Oy ----- V y .1 �l \ es ;°`i b O '6F;'TEMP 4, _ _ - 5 I SAS - --- _ _ sx S Oxo mm ^--------ago I 1 1 q8, �INEN7`, -21 PROPOSED-GAS` V LINE Qsa , c 04 v IIII C4 rl \ - WETLAND 3- \V i1 �00v NOIMPACT EXISTI ENT FENCE -40--TEMP---- ' %?S� v EASEM � , , , , SFC a O >� (`x00 PROPOSED 6ASS- - EAG 1p`� _ `, p4 , 00LINE 03 r4 O 40'TEMP— , o EASEMENT-\_ _ i�0. 71 i�----- i , , , --- `II � ----` `------ — `' ' � �` ` - \ \ '- `' �� - -s01-PRJdp ED �60 D ROPOSE , , \ - : - --- --_--_- ---- -- PERMANENT - ` i i ------ -------------------- -- -'---- --- --_--"_- '- 900 �i ( - , ,\\ 7 ,� ' ' /• \il ,� '-'890 ------ ___-- -_____________-� ------------------ 880,°' ' ._____ _-__ _ -------- �� ``' \� \\ `: �-• it I i 1 _� / i ------- j _'___ _ S PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATETO INSURE THERE IS NO RISK OF PNG-G-446-0001008 �.,`;�N ,C?ROS'',,,, INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 33 `=0a'�pFESS /� ° !9 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 B E L E W S CREEK PIPELINE SHEET 83 OF 90 DWG SCALE: AS SHOWN 3 = Q TE SIG—RE/INIT- 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 REGIONAL �jp�lmwwi DWG DATE 09/21/18 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 ENGINEER Piledmord �� E—RE,INRI 111INaturall EROSION CONTROL PLAN0.� PROJECT NUMBER 1626546 MGR TECH Gas INEon slcDRAWING NUMBER REVISION G ,,.` DRAWING BY CPD REC&STD STOKESDALE NC KEITH s GnTe slcruTURE,wmus COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. f PNG- C - 446- 0001078 1 CHECKED BY CPD WKG PRINCIPAL CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY 10/02/2018 �U,�''\ � G ENGINEER CHARLOTTE, INC 28210 PNG-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND I ' \ 1 \ TEMPOR-CONSTWILTPYEN-NOE s1�raEx�E�xE�aaNo,-- o xMoFNa>ux�E �N- sF _ -\ 1 `` a s _ 17-71 EXISTING DRIVEWALTEIf�DMBS--_-,,, _- p saTEai�; M` ® s�rcoca x�.aacrECTcx (l F sEOMENraT xN o U1 / / �v v ;' ;' TO MOBILEHOME ;, ----- -- / 11 ° I—ice � -i'A PARK `t 3F , -- ----- rENPoanvwETARC—ciNc s as SM. xLo�E a O raexcx eaEn�a ® o I „ , _� ---- -- ` \\ \ `_ ,' \\ ` 9r ! , ^/ /GRAaFiIC SCALE(INFEET) ______- \ o rNoaa aExxax o— I �� ./ H v' \ ; ._ a1Nc ___ r wo CON-TETRUCI T o caT arETo1�T ® iENPawty EasEMErvi , `_., \ ------ \ \ __ --__— - - /A//// ' j / - 1 I J ACCESS ROAD THRcGIZEEMENT -- —\ j \ WETLAND 7A AR -001 / v PERMANENT EASEMENT - - _ i ��;�° ��1 (PERMANENT) III zc," PERMANpNTVMPdCT: ROW \r' =--soo-�-`} o �/� CLEAR, 'GRUB 8 ' CON�/ERSIOM RdM FORESTEC, //Ir> ¢�eV/a°'; �D GRADE ACCESS `. ✓/� i�� u ROAD, TO,NON-FORESTED ^� �' ry' \ �a ✓ I 6y11 ' PROPOSED qui `� \\ JgCK$BpR �9ERMANE,NT 7C _ . - --' .wry \ p P / \♦ i r ?--ra yp' / — - \ `1 DOl � / f AL Oy ry - j; ♦� \a " �O / `� '1 i \ ` BOO` \ o` lolk 1 FCD A 1 <8 I i i,- ✓� x�ll -'1/ 4P% '-.?'.Sr +' -_ STREAM 7 --- �� .+ • ' --- ey (PERENNIAL); -- ��, °O -- 7— I PROPOSED G*S ` -- 1 I I - 1 IEXIISTING GAS �t E 6 _ OPEN-�UrT FOR GAS 5 p s LINE, I /� PIPELINE EASEMENT i., `�• 'SAS EIHp LINEfDEWATERfNG I; \ � ��'` � � 'pa 1 zQ �." � 1— �"� 1% J EHT1 pSTRICTURE, -i 40' TEMP o°� -_-r o oo I�l ' y E IPMENT �� �o VIA �., v _ 1 ------- F ; -'EASEMENT >� = Doti' --- ' ��4� ` \ /, I �iz 11,E __. 8C/ENT o yo l s ' I ' �` ♦ ia"' l = ----- - _-_ _�ws, s k- ` 4 V 1iv1PACSTREAM9t �� –__. ___--- – 1 �\ \ �__ I 1 \\\-------------- `1 .17/// , !✓—��-1E_XIS_T STREAM WETLANDTA— _ CULVERT.-'" o�' ' ° y — �� X/ --- WETLPND WXA - - -- \ _ / S?'/ ----- , it _ — --- -- r ` 1 I �` RQ RANSCO \ FENCE - WETLAND WXB= j \ ` < V = -- ` ---------- _ \ METIEWSTATIOfN & PNG `x I _ OPP STATION SITE. REFER ___� _ `�a\ _ _ ____ TO LINE 446 OPP $fATION I I I �`-- .� a - ---- I \ `:` ' PLANS-IR#0215358 FOR*C)(\\ m \ \• COMPLETE GRADING P,LA / Ig \\\ WETLAIl uo `I coo NO �IVIIPACT, _. �s STA PROJECT r S-\ WET` NDWXAPERMANENT--- ilr.. EASEIII(ENT�EMPORARY 111 `�♦ / \I�\ IM AClts O1�C PEUT FOR GAS J", p7 1,° - il ____`_LINE, dEWAT*MG - �•� `EIPMENT/ : - FLOW 0 STRUTURE,Q�J g��8`I rr �� `--_ CROSSING�MAr PLACEMENT- --- — _ �WETLAN W)(B PERMANENT EASEENT PERMANENT �-,' ,�VMPACT:R0YI�CONVERSION OF ;I' WETLAND FROWFQRES�ED TO ------- 92' A; NON*dRESTEb. _ :1 1` ' ,b -- --- STI;EA/ BUFFERS\\ --------------- OVIDkD / ~` TO BE Pf2---- PERJORDOFf LAKE'' l 1 ------ --FFER R LE(S ) 1 111 1 \ `( _ - --- - DET�UL9� SHEET 87 / / i 1 1 --- \ \ _ pIi eos _ --- -- ------- \ -- ,'`-'----- ,\----------- ;895=_, `--\^ __ `--' -, :885• `--_ -_ _ _ -__, — — — — — — —— —_— _ — — ' -----' ; - '--------- _ . _ _--'" ----- __, PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVEDDO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) 111 \\A C?ROS'',, PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001008 PNG-G-446-0001009 `=Oa'�OFESS,O�y a = NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS I Pl�illOilt LINE 446 — B E L E W S CREEK P I P E L I N E EROSION CONTROL PLAN SHEET $4 OF 90 DWG SCALE: AS SHOWN D 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 DATE 0107D00 S1—FIE IN—E REGIONAL ENGINEER DWG DATE 09/21/18 SUPERCEDED 1 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER PROJECT NUMBER 1626546 on E slc NnTUaE,1NmnE MGR TECH DRAWING NUMBER REVISION �! °F;y rG Natural Gas ?, !�°•. GINE,. �� •.•,,, KEITH CPD REC&STD STOKESDALE NC PNG-C-446- 0001079 1 DRAWING BY CHECKED BY CPD onTe 10/02/2018 SIGNATURE/INIIIPLS WKG �),�,��''\ v\ G PRINCIPAL ENGINEER � ",n I111nu"` COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, INC 28210 f RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER -NUMBER ® PROJECT DESCRIPTION THIS EROSION AND SEDIMENTATION CONTROL PLAN WILL DISCUSS A PROPOSED PROJECT TO CONSTRUCT A NATURAL GAS PIPELINE IN GUILFORD, ROCKINGHAM, AND STOKES COUNTY NORTH CAROLINA. THE PROPOSED PROJECT WILL CONSTRUCT A 24" GAS LINE APPROXIMATELY 9.26 MILES. THE LINE 446 OPP STATION (IR# 0215378) AND BELEWS CREEK M & R STATION (IR# 1626547) PROJECTS WILL BE CONSTRUCTED IN CONJUNCTION WITH THIS PROJECT. PLANS FOR THOSE PROJECTS WERE PREPARED SEPARATELY AND ARE CONTAINED IN THEIR OWN PLAN SETS. THE LIMITS OF DISTURBANCE FOR THE LINE 446 OPP STATION IS APPROXIMATELY 5.5 ACRES AND HAS BEEN INCLUDED IN THE LIMITS OF DISTURBANCE FOR THE LINE 446 BELEWS CREEK PIPELINE PROJECT. BASED ON THE AREA OF THE PERMANENT AND TEMPORARY EASEMENTS, THE DISTURBED AREA FOR THE LINE 446 BELEWS CREEK PIPELINE PROJECT IS APPROXIMATELY 115 ACRES. THE SITE IS COMPRISED OF VARIOUS TERRAINS AND USES, INCLUDING RESIDENTIAL, COMMERCIAL, INDUSTRIAL, JURISDICTIONAL WATER CROSSINGS, EXISTING UTILITY EASEMENTS, AND EXISTING ROAD RIGHT-OF-WAY. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN JANUARY 2019 AND BE COMPLETE BY DECEMBER 2019. PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES ADDITIONALLY, THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES, INCLUDING: 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT - PRACTICE 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/ EXITS WILL BE PLACED AT VARIOUS POINTS ALONG THIS LINEAR PROJECT TO PROVIDE A BUFFER WHERE VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST. THEY ARE DESIGNATED ON THE PLANS WITH A GRAVEL SYMBOL. WATER WILL BE SUPPLIED TO THE AREA SO THAT WHEELS CAN BE CLEANED OF ADDITIONAL SEDIMENT. 2. TEMPORARY STREAM CROSSING - PRACTICE 6.70 TEMPORARY STREAM AND WETLAND CROSSINGS PROVIDE A WAY FOR CONSTRUCTION VEHICLES TO CROSS STREAMS WITHOUT MOVING SEDIMENT INTO STREAMS, DAMAGING THE STREAMBED OR CAUSING FLOODING. TEMPORARY STREAM AND WETLAND CROSSINGS ARE PLANNED FOR THIS PROJECT. 3. SILT FENCE - PRACTICE 6.62 SILT (SEDIMENT) FENCE RETAINS SEDIMENT FROM SMALL DISTURBED AREAS BY REDUCING THE VELOCITY OF SHEET FLOWS TO ALLOW SEDIMENT DEPOSITION. SILT FENCE IS TO BE PLACED AT THE EDGE OF THE EASEMENTS ALONG THE PROJECT. SILT FENCE IS NOT TO BE PLACED ACROSS STREAMS, DITCHES, WATERWAYS OR WETLANDS. 4. DEWATERING DEVICEISEDIMENT FILTER BAG - CONCEPTS FROM PRACTICE 6.60 THE DEWATERING DEVICE AND SEDIMENT FILTER BAG ARE USED TO DETAIN SEDIMENT -LADEN RUNOFF TO ALLOW SEDIMENT TO SETTLE OUT OF WATER BEFORE IT IS DISCHARGED. THESE STRUCTURES WILL BE USED TO ALLOW SEDIMENTS TO FILTER OUT OF WATER THAT HAS BEEN PUMPED OUT OF AN AREA OR HAS BEEN USED FOR HYDROSTATIC TESTING. THESE STRUCTURES WILL BE PLACED AS NEEDED AND ARE NOT SHOWN ON THE PLANS. DEWATER DEVICES AND SEDIMENT FILTER BAGS WILL NOT BE PLACED IN A STREAM. 5. ROLLED EROSION CONTROL PRODUCTSITEMPORARY MATTING - PRACTICE 6.17 TEMPORARY MATTING WILL BE USED WHERE NECESSARY TO REDUCE SOIL EROSION AND ASSIST IN THE GROWTH, ESTABLISHMENT AND PROTECTION OF VEGETATION. 6. TEMPORARY SEEDING - PRACTICE 6.10 7. PERMANENT SEEDING - PRACTICE 6.11 8. SLOPE BREAKERS - PRACTICE 6.23 1. OBTAIN EROSION AND SEDIMENT CONTROL PLAN APPROVAL AND OTHER PERTINENT PERMITS. 2. SCHEDULE MANDATORY PRE -CONSTRUCTION MEETING WITH NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION, WINSTON-SALEM REGIONAL OFFICE (336-776-9800) 48 HOURS PRIOR TO CONSTRUCTION TO DISCUSS EROSION CONTROL PLAN. HOLD PRE -CONSTRUCTION MEETING. 3. A RIPARIAN BUFFER SHALL BE ESTABLISHED AND MAINTAINED 50 -FOOT LANDWARD OF ENVIRONMENTALLY SENSITIVE AREA BOUNDARIES THROUGHOUT THE LIMITS OF DISTURBANCE. LANDWARD LIMITS OF THE BUFFER SHALL BE CLEARLY DEMARCATED WITH ORANGE SAFETY CONSTRUCTION FENCING AND PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED. GRUBBING OR BELOW GROUND VEGETATION REMOVAL SHOULD BE LIMITED TO THAT NECESSARY FOR INSTALLATION OF EQUIPMENT CROSSINGS AND TRAVEL LANES WITHIN BUFFER. ADDITIONAL GRUBBING PRIOR TO PIPELINE INSTALLATION SHALL BE REVIEWED AND APPROVED BY THE ENGINEER AND ON-SITE ENVIRONMENTAL INSPECTOR. 4. ENVIRONMENTALLY SENSITIVE AREAS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: STREAMS, CREEKS, WETLANDS, LAKES, AND PONDS. 5. INSTALL CONSTRUCTION ENTRANCES AND ACCESS ROADS PER PLANS AS NEEDED. IMPROVEMENT OR REPLACEMENT OF EXISTING CULVERTS FOR ACCESS ROADS IS LIMITED TO THE EXISTING DIMENSIONS IN WETLANDS AND STREAMS AS SHOWN ON PLANS. ANY OTHER DISTURBANCE MUST BE APPROVED BY NCDEQ - DWR AND USACE. 6. INSTALL PERIMETER EROSION AND SILTATION CONTROL (E&SC) MEASURES SUCH AS SILT FENCE AND SILT SOCK PRIOR TO CLEARING AND GRUBBING WHERE PRACTICAL AND CONCURRENTLY WHEN CLEARING IS REQUIRED TO INSTALL PERIMETER MEASURES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CLEARING SHALL NOT OUTPACE THE INSTALLATION OF PERIMETER CONTROLS. 7. INITIATE CLEARING AND GRUBBING WITHIN LIMITS OF DISTURBANCE. GRUBBING SHALL BE MINIMIZED WHERE PRACTICAL WITHIN 50 -FEET OF ENVIRONMENTALLY SENSITIVE AREAS. COMPLETE GRUBBING AS NECESSARY AS PIPELINE INSTALLATION APPROACHES THE BUFFERS AND MINIMIZE DURATION OF BARE SOIL CONDITIONS. 8. INSTALL REMAINING E&SC MEASURES SUCH AS DIVERSIONS, SILT FENCE CHECK DAMS, J -HOOKS, WATER BARS, CONSTRUCTION ENTRANCES, TEMPORARY BRIDGES AT STREAM CROSSINGS, TIMBER MATS, ETC. AS CLEARING AND GRUBBING IS COMPLETED. 9. ALL WATER BARS SHOULD INCLUDE AN OUTLET. 10.CONTRACTOR TO INSPECT ALL E&SC MEASURES WEEKLY AND AFTER RAIN EVENTS OF 0.5 INCHES OR MORE IN A 24 HOUR PERIOD. DO NOT ALLOW SEDIMENT BUILD-UP TO EXCEED 50% CAPACITY OF MEASURES. STORE REMOVED SEDIMENT IN UPLAND STOCKPILES AREA AND APPLY TEMPORARY SEEDING. 11.SILT FENCE WITHIN 50 FEET OF ENVIRONMENTALLY SENSITIVE AREAS (STREAMS AND WETLANDS) WILL BE REINFORCED WITH STEEL MESH. 12.DOUBLE ROWS OF SILT FENCE WITHIN 50 FEET OF ENVIRONMENTALLY SENSITIVE AREAS, OR AS SHOWN ON PLANS, SHALL INCLUDE A PRIMARY ROW OF REINFORCED SILT FENCE AND A SECONDARY ROW OF UNSUPPORTED SILT FENCE. COMPOST FILTER SOCK OR REINFORCED SILT FENCE CAN BE SUBSTITUTED IN SECONDARY ROW BASED ON FIELD CONDITIONS. 13.CONTRACTOR SHALL SEQUENCE AND CONDUCT LAND DISTURBING AND CONSTRUCTION ACTIVITIES IN A MANNER THAT MINIMIZES THE AMOUNT OF BARE SOIL EXPOSED AT A GIVEN TIME DURING THE PROJECT. 14ANITIATE TEMPORARY SEEDING OF DISTURBED AREAS PER THE GENERAL SEEDING SPECIFICATIONS. IT IS RECOMMENDED THAT SLOPES OF 4 TO 1 OR GREATER BE TEMPORARY SEEDED AND STABILIZED WITHIN ONE DAY OF GROUND DISTURBANCE AND PRIOR TO EXPECTED RAIN EVENTS. 15.CLEARING IN WETLANDS MUST BE CONDUCTED WITH AS MINIMAL DISTURBANCE AS POSSIBLE. TIMBER MATS, LOW -GROUND PRESSURE EQUIPMENT, OR OTHER MEASURES MUST BE UTILIZED TO PREVENT THE MIXING OF TOPSOIL AND SUBSOIL. SUBSURFACE DISTURBANCE OR STUMP REMOVAL WILL ONLY BE CONDUCTED WITHIN THE TRENCH LINE WITHIN WETLANDS. STUMP REMOVAL OR LIGHT GRADING MAY OCCUR ON THE WORKING SIDE OF THE ROW ONLY IF REQUIRED FOR SAFETY REASONS AND WITHIN WETLANDS AFTER CONFIRMING WITH THE ENVIRONMENTAL INSPECTOR. THE WORK WILL BE PERFORMED FROM TIMBER MATS PLACED ALONG THE WORKING SIDE OF THE ROW. IN CERTAIN AREAS, SUCH AS WETLANDS AND FIELD SUPPORTING CROPS, SEGREGATE TOPSOIL FROM THE SUBSOIL. 16.HAND CLEARING ONLY IS REQUIRED ALONG STREAM BANKS AND WITHIN 20 FEET OF THE TOP OF BANK OR PER AUTHORIZED PERMITS, LEAVING ROOT SYSTEMS IN PLANS. STUMPING, ETC. IS LIMITED TO TRENCH LINE ONLY OR AS NEEDED TO SAFELY INSTALL TEMPORARY BRIDGES, CROSSINGS, AND TRAVELLANES 17.DURING TRENCH EXCAVATION, SPOILS WILL BE PLACED ON THE "NON -WORKING" SIDE OF THE ROW AND STOCKPILED UPGRADIENT OF TRENCH, WHEREVER PRACTICAL. SPOILS WILL BE TEMPORARY SEEDED AND STABILIZED WITHIN 7 DAYS OR BEFORE EXPECTED RAIN EVENTS. STOCKPILE AREAS TO BE CONTAINED BY PERIMETER CONTROLS SUCH AS SILT SOCK OR SILT FENCE. 18.TEMPORARY TRENCH BREAKERS WILL BE INSTALLED WITHIN THE TRENCH TO SLOW THE FLOW OF SUBSURFACE WATER OR STORMWATER RUNOFF THAT ENTERS THE EXPOSED TRENCH. WHEN WATER IS PUMPED OUT OF THE TRENCH, DISCHARGE MUST BE PUMPED THROUGH FILTER BAGS PRIOR TO LEAVING THE SITE. 19.PIPELINE WILL BE INSTALLED PER ALIGNMENT SHEET SPECIFICATIONS (PAD TRENCH BOTTOM, LOWER IN PIPE AND TIE-IN PIPE, TAKE SURVEY SHOTS ALONG THE "AS -BUILT" SECTIONS OF PIPE, PAD AND BACKFILL WITH SUBSOIL). PERMANENT TRENCH BREAKERS WILL BE INSTALLED AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR OR OWNER'S REPRESENTATIVE. 20.AT WETLAND AND STREAM CROSSINGS, TRENCH BREAKERS WILL BE INSTALLED SUCH THAT THE HYDROLOGY OF THE FEATURE IS NOT IMPACTED AS A RESULT OF PIPELINE INSTALLATION. FOLLOWING INSTALLATION OF TRENCH BREAKERS THE TRENCH WILL BE BACKFILLED. 21.PIPELINE INSTALLATION WITHIN ENVIRONMENTALLY SENSITIVE AREAS SHOULD BE CONDUCTED IN A MANNER TO MINIMIZE DURATION OF OPEN TRENCH AND THESE AREAS SHOULD BE BACKFILLED AND STABILIZED AS SOON AS PRACTICAL. CONTRACTOR TO MONITOR WEATHER WHEN WORKING IN THESE AREAS AND UTILIZE ADDITIONAL E&SC MEASURES AS NECESSARY. 22.AFTER TRENCH IS BACKFILLED, STABILIZE AND RESTORE TO ORIGINAL GRADE. STABILIZE AND TEMPORARY SEED WORK AREA AS SOON AS PRACTICAL AND PRIOR TO UNEXPECTED RAIN EVENTS. 23.CONSTRUCTION ACTIVITIES REQUIRING HORIZONTAL DIRECTIONAL DRILLING OR CONVENTIONAL BORES WILL BE PERFORMED IN ACCORDANCE WITH ALIGNMENT SHEET SPECIFICATIONS. 24.ALL AREAS WILL BE RESTORED TO ORIGINAL GRADE, CONTOUR, AND CONDITION (VEGETATION, PAVING, DITCH LININGS, ETC.) IN ACCORDANCE WITH APPLICABLE PERMITS. CULTIVATED AGRICULTURAL FIELDS DO NOT REQUIRE TEMPORARY OR PERMANENT GROUND COVER STABILIZATION. 25.IN AREAS WHERE SEGREGATION OF THE SUBSOIL AND TOPSOIL IS NECESSARY, THE TOPSOIL WILL BE REPLACED LAST. AFFECTED AREAS WILL THEN BE "CLEANED UP" BY RESTORING ORIGINAL GRADE AND APPLY TEMPORARY SEEDING, FOLLOWED BY FINAL GRADING, PERMANENT SEEDING AND MULCHING TO RESTORE THE ROW AS CLOSE AS POSSIBLE TO PRE -DISTURBANCE CONTOURS AND CONDITIONS. NO MULCHING WITHIN WETLANDS IS ALLOWED. INFRASTRUCTURE, PLLC NC LICENSE# P-1289 WILLIAM K. GUALTIERI 09/21/2018 NORTH CAROLINA SEAL 023464 PROFESSIONAL ENG/ARCH STAMP 26.UPON ESTABLISHMENT OF FINAL VEGETATIVE GROUND COVER (80% COVERAGE), CONTACT NCDEQ LAND QUALITY SECTION, WINSTON-SALEM REGIONAL OFFICE (336-776-9800) FOR FINAL SITE INSPECTION. 27.UPON APPROVAL FROM NCDEQ LAND QUALITY SECTION, WINSTON-SALEM REGIONAL OFFICE INSPECTORS, REMOVE SILT FENCING AND OTHER EROSION CONTROL MEASURES. AREAS DISTURBED DURING THIS PROCESS SHALL BE RESEEDED WITH PERMANENT SEEDING AS APPROPRIATE. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND/OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. ALL STREAM CROSSINGS WILL BE OPEN -CUT UNLESS OTHERWISE NOTED ON PLANS. 3. SEDIMENT FILTER BAG SHOULD BE USED WHEN WATER IS BEING PUMPED FROM THE TRENCH. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. CONSTRUCTION ENTRANCE LOCATIONS ARE SHOWN AT APPROXIMATE LOCATIONS. FINAL LOCATIONS WILL BE DETERMINED IN THE FIELD. 7. ALL TIMBER BRIDGES/MATS CROSSING STREAMS, WETLANDS, OR CONVEYANCES MUST BE CLEANED AT THE END OF THE DAY OR IMMEDIATELY AFTER CROSSING IF SEDIMENT IS DEPOSITED BEFORE OR DURING A RAIN EVENT. SEDIMENT REMOVED FROM BRIDGES MUST BE PLACED IN A CONTAINED AREA AWAY FROM JURISDICTIONAL WATERS OR DRAINAGE STRUCTURES. 8. EROSION EEL OR APPROVED EQUAL TRENCHLESS METHOD SHALL BE UTILIZED INSIDE WETLANDS IN PLACE OF SILT FENCE. 9. TREES IN WETLANDS INSIDE THE CORRIDOR MAY BE REMOVED TO GROUND LEVEL. GRUBBING OF STUMPS IN WETLANDS SHALL BE LIMITED TO THAT NEEDED TO INSTALL THE PIPELINE. 10. STRIPPING TOPSOIL WITHIN WETLANDS ALONG THE UTILITY CORRIDOR IS NOT PERMITTED. 11. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES OVER 15%. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCH PER 24 HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CONSTRUCTION ROADS AND PARKING AREAS SHOULD BE INSPECTED PERIODICALLY FOR THE CONDITION OF SURFACE. TOPDRESS WITH NEW GRAVEL AS NEEDED. CHECK ROAD DITCHES AND OTHER SEEDED AREAS FOR EROSION AND SEDIMENTATION AFTER RUNOFF -PRODUCING RAINS. MAINTAIN ALL VEGETATION IN A HEALTHY, VIGOROUS CONDITION. SEDIMENT -PRODUCING AREAS SHOULD BE TREATED IMMEDIATELY. 3. TEMPORARY STREAM CROSSINGS SHOULD BE INSPECTED AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. 4. MAINTENANCE ON SILT FENCES, SHALL BE PERFORMED AS NEEDED. CAPTURED SOIL MATERIAL SHALL BE REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE AND/OR WHEN EVIDENCE OF FILTER CLOGGING IS OBSERVED. 5. INSPECT DEWATERING DEVICES AND SEDIMENT TRAPS AFTER EACH USE AND EACH SIGNIFICANT RAINFALL EVENT AND MAKE NEEDED REPAIRS IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN NEEDED. ROCK DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. 6. INSPECT ROLLED EROSION CONTROL PRODUCTS (RECP) AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAIN FALL EVENT. MAKE REPAIRS IMMEDIATELY. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED AND EROSION MUST NOT OCCUR BENEATH THE RECP. ANY AREAS OF RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO PROPERLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONSTRUCTION ENTRANCES SHALL BE UTILIZED AT ALL INGRESS/EGRESS LOCATIONS FROM PUBLIC ROADS. CONTRACTOR SHALL TAKE NECESSARY ACTION TO MINIMIZE THE TRANSPORT OF MATERIAL FROM THE CONSTRUCTION SITE ONTO R.O.W. PERIODIC TOP DRESSING WITH FRESH STONE MAY BE REQUIRED. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM SITE TRAFFIC ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 6. STREAM AND WETLANDS SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. TEMPORARY BRIDGES OR MATS SHALL BE USED FOR ALL STREAM AND WETLAND EQUIPMENT CROSSINGS. 7. SILT FENCE SHALL BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAMS AND/OR WETLANDS. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A LOSS OF DRILLING MUD IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT/MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. 12. ANTI -SEEP COLLARS SHALL BE PLACED AT WETLAND BOUNDARIES AND AT 150 FEET (MINIMUM) INTERVALS BETWEEN THE BOUNDARIES (INSIDE THE WETLAND). 13. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THE PROJECT MUST COME FROM A SITE WITH AN APPROVE EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LAND FILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. 14. TRASH/ DEBRIS FROM DEMOLITION ACTIVITIES MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. SOILS CgB2 CLIFFORD SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED FPD FAIRVIEW-POPLAR FOREST COMPLEX, 8 TO 15 PERCENT SLOPES FpE FAIRVIEW-POPLAR FOREST COMPLEX, 15 TO 25 PERCENT SLOPES FrD2 FAIRVIEW-POPLAR FOREST COMPLEX, 8 TO 15 PERCENT SLOPES, MODERATELY ERODED FrE2 FAIRVIEW-POPLAR FOREST COMPLEX, 15 TO 25 PERCENT SLOPES, MODERATELY ERODED NES NATHALIE SANDY LOAM, 2 TO 8 PERCENT SLOPES NED NATHALIE SANDY LOAM, 8 TO 15 PERCENT SLOPES SmC SILOAM SANDY LOAM, 4 TO 10 PERCENT SLOPES GROUND STABILIZATION STABILIZATION TIME FRAME SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTION PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7D SFOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR SLOPES FLATTER THAN 4:1 PERIMETERS AND HOW ZONES) BUILDING WASTE HANDLING NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTE MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM THE STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS DISCHARGES TO FEDERALLY -LISTED WATERS REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMITS THE PERMIT ALLOWS REDUCTION FROM THE 20 ACRE MINIMUM IF THE DIRECTOR OF DWQ DETERMINES THAT OTHER BMPE PROVIDE EQUIVALENT PROTECTION. EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM THE STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS INSPECTION SAME WEEKLY INSPECTION REQUIREMENTS SAME RAIN GAUGE & INSPECTIONS AFTER 0.5' RAIN EVENT INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS". INSPECTIONS REPORTS MUST BE AVAILABLE ONSITE DURING BUSINESS HOURS UNLESS A SITE-SPECIFIC EXEMPTION IS APPROVED. RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. ELECTRONICALLY -AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. IMPLEMENTATION OF NEW PERMIT CONDITIONS PROJECTS PERMITTED UNDER THE PREVIOUS PERMIT CAN CONTINUE TO FOLLOW THE PREVIOUSLY -PERMITTED CONDITIONS COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN FOLLOW CONDITIONS OF APPROVED APPLICATIONS APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY WITH NEW PERMIT CONDITIONS CONDITIONS IN EROSION & SEDIMENTATION CONTROL PLANS" DESIGNATION ON THE PLANS WHERE THE 7 AND 14 -DAV GROUND STABILIZATION REQUIREMENTS OF THE NPDES PERMIT APPLY DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH THE SURFACE-WITHDRAWL REQUIREMENTS OF THE NPDES PERMIT IS LOCATED SEDIMENT BASINS OUTLET STRUCTURES MUST WITHDRAW FROM THE BASIN SURFACE UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE USE ONLY DWO-APPROVED FLOCCULANTS THE PERSON TO CONTACT SHOULD ANY EROSION AND SEDIMENT CONTROL ISSUES ARISE DURING LAND -DISTURBING ACTIVITY: MICHAEL REIKOWSKY PH: (336) 468-0654 EMAIL: michael.relkowsky@duke-energy.com PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 - BELEWS CREEK PIPELINE ACCOUNT AREA CODE 9335 E S1G1L4T0RE1NIT- REGIONAL �d11 oM 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG NUMBER 0107000 ENGINEER Nl VG GENERAL EPSC NOTES PROJECT NUMBER 1626546 E sIGNnTUREiwmn 3 MGR TECH Natuia� Gas DRAWING BY JKC REC&STD STOKESDALE NC CHECKED BY SBH Te NIUREINITI-E PRINCIPAL COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. f APPROVED BY WKG CORP. OFFCHARLOTTE, NC 28210ICE 4720 PIEDMONT 0W DRIVE RESOURCE CENTER REIDSVILLE ENGINEER SHEET 85 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DRAWING NUMBER REVISION PNG- C - 446 - 0001086 1 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER SILT FENCE WI ME 11K ALONG BTREPML PIPp F BRIDGE MAT 2"-3" PUMP 13"X15" PLOWABLE FILL � $AND NOTES PROPOSED TOE -OF -BANK SAND TRENCH BAGS 1. THE CONTRACTOR WILL RESTORE THE TEMPORARY WORKSPACE gg g B CONTOURSOFTHEBEDANDBANKSOFALL T kir 6" MIN SPF— SpF /S;FGS I i $ F—� WATER WAYS IMMEDIATELY AFTER PIPE INSTALLATION AND BACKFILL, EXCEPT WOOD CHIPS • ... ., ... .., .. ., .; ,. ... ... '. .'" '• -.'MIN.. OR EXISTINN G VEGETATION OR EXISTING OVER THE TRAVEL LANE. TRAVEL LANES �2-0 a " _ AND BRIDGES MAV STAY IN PLACE UNTIL WIDTH OF DISTURBANCE - _ HYDROSTATIC TESTING AND CLEANUP ARE TO CHANNEL TO BE PROPOSED GAS FLow o COMPLETE. ALL MATERIALS USED TO MINIMIZED PIPELINE � 2 . SECTIONN A-AA-A O SUPPORT CONSTRUCTION ACTIVITIES WILL BE REMOVED FROM WATERBODIES AND PROPOSED $ F S�F $�F / F $ B WETLANDS, INCLUDING, BUT NOT LIMITED TO, FLUMES, MATS, PLASTIC SHEETING, PERMANENT EASEMENT (WIDTH VARIES) ` J/ ANDSANDBAGS. `CURLEXII OR ENGINEER SILT FENCE WI2. sr EBACKING ALONG STREAM Iso THE STREAM BANK CONTOUR SHALL BE RE-ESTABLISHED. ALL DEBRIS SHALL BE REMOVED FROM THE STREAMBED AND APPROVED EQUIVALENT SF SF BANKS. STREAM BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT / / ' `SPOIL BARRIERS $HALL BE INSTALLED WITHIN 24 HOURS OF COMPLETING THE CROSSING IF t RBAG PRACTICABLE. LEI 3. IMMEDIATELY FOLLOWING _ SILT FENCE RECONSTRUCTION OF THE STREAM BANKS, _ THE CON TRACTOR SHALL INSTALL SEED AND EROSION CONTROL FABRICS ON WATER BODY BANKS, 4. INSTALL AND ANCHOR CURLEX II OR ENGINEER APPROVED EQUIVALENT CORDUROY MATS,TIMBER MATS OR ACCORDING TO MANUFACTURER'S TEMPORARY BRIDGING\ �OR TI MATBRIDGE INSTRUCTIONS. PLAN VIEW STABILIZED CHANNEL FLUME SHOULD BE SIZED TO HANDLE FLOW AND SUFFICIENT IN LENGTH TO ACCOMMODATE STABILIZE FILL WIDENING TRENCH TO PREVENT ��-__------� FAILURE. BOTTOM OF CREEK INSTALL CURLEX II OR ENGINEER 4 z PIPELINE APPROVED EQUIVALENT '_ SECTION B63 II II NORMAL WATER LINE III III CONSTRUCTION SEQUENCE NOTES: III—III ? af' yd"_ -I I I 1.DIN TALLSILTFENCE ` 4oF 2. INSTALL PUMP UPSTREAM OF CROSSING LOCATION. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF WATER LEVEL ANTICIPATED FLOW. ALL INTAKE HOSES WILL BE SCREENED. ( 3. INSTALL UPSTREAM SANDBAG COFFERDAM. INSTALL DOWNSTREAM COFFERDAM. ENSURE A2 FT. MINIMUM TOP CREST WIDTH ON THE COFFERDAMS I If 4. INSTALL TIMBER MAT CONSTRUCTION CROSSING. 5. CONSTRUCT PIPELINE. GRASSSEEDCONT III SEE PLAN VIEW 6. STABILIZE PIPELINE TRENCH USING CURLEX II OR ENGINEER APPROVED EQUIVALENT AND MULCHISEED MIXTURE. OL FAB IC. SEED EROSION CONTROL FABRIC. SEED — TEMPORARY MATTING T. ONCE TRENCH AREA IS STABILIZED AND TEMPORARY CONSTRUCTION CROSSING IS REMOVED, DISMANTLE MIX CAN BE FOUND WITH EROSION 4' DOWNSTREAM COFFERDAM. THEN REMOVE UPSTREAM COFFERDAM, KEEP PUMP RUNNING DURING REMOVAL TO MAINTAIN STREAM FLOW. CONTROL DETAILS STREAM CROSSING (PUMP DIVERSION WITH EQUIPMENT CROSSING) (TSC) STREAMBANK STABILIZATION (TSC) PROPOSED GAS LINE SEWN -IN CONNECTION SLEEVE FOR PUMP DISCHARGE HOSE (OPTIONAL) A - 0" MIN. JUTE OF EQUAEROSION WITH WIRE BACKING SILT FENCE U-6" MIN. L CONTROL FABRIC ON BANKS / INSTALLED PER SPECIFICATIONS f INFRASTRUCTURE, PLLC NC LICENSE# P-1289 3 WILLIAM K. GUALTIERI g 09/21/2018 NORTH CAROLINA e SEAL 023464 ' PROFESSIONAL ENG/ARCH STAMP TYPICAL UTILITY LINE CREEK AND WETLANDS CROSSING (TSC, TWC) VARIES WITH GROUNDLINE J 10'MIN. SLOPE n• re.ew.n•v. - -+�` F .`• LNlr.rl - , .. N�"s� �r` -~ •�f - M{wp0 "A� fit w wa•la�w eRY •m wry �Y.1�'-. ,'' ' '....' 1 •amna w�Krw�'un a w rrfa ��� . .. A kTW ir! • .r� r � m-' * _ �.r cx.! I � � y—� n •. I1:7 �(�yyyy���� pYMd mWHNM "••=- - SKKK Lm& ri> au �• i "' .,a r wr II CIMNI16. 1ptlllMlpl /e1 °•�warr'r c Amorlon • .c iucel ew' _ mr gym, swM. o OPTIONAL LIFTING STRAPS _VARIES WITH GROUND LINE SLOPE 2'-0" MIN. + '5O'MIN. DISTANCE FROM STREAM � TOP OF BANK — STREAM PLAN VIEW 1 CURLEX CHANNEL APPLICATION DETAIL (TSC) NOTES: 1. SEDIMENT FILER BAGS SHOULD NOT BE PLACED WITHIN A JURISDICTIONAL WETLAND OR WITHIN 50 FEET OF A STABILIZED OUTLET, STREAM, OR OTHER NATURAL WATERS RESOURCE. 2. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 3. SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN SEDIMENT HAS ACCUMULATED TOY OF THE BAGS CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. 2'-0" MIN. SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE IIO- OR EXISTING VEGETATION SILT -SAVER DEWATER FILTER BAG 6"X15" 2"-3" PUMP 13"X15" PLOWABLE FILL � CONCRETE HECK DAM GEOTEXTILE FABRIC (TYPE III) UNDER AND COVERING ENTIRE 0'-6" PUMP FILTER BAG WOOD CHIP PAD a a j\\ j\\ \ j\\\/ "• SILT -SAVER SEDIMENT FILTER BAG SILT FENCE • a MIN..: 4'.0" 6" MIN MIN. GAS LINE MIN. WOOD CHIPS • ... ., ... .., .. ., .; ,. ... ... '. .'" '• -.'MIN.. OR EXISTINN G VEGETATION OR EXISTING SECTION A �2-0 a " GEOTEXTILE FABRIC (TYPE _AS B. 7 III) OR EXISTING NOTES:CONCRETE •3,000 PSI MINIMUM CONCRETE a VEGETATION COMPRESSIVE STRENGTH • ENCASEMENT WIDTH TO BE POURED THE WIDTH OF TRENCH WITH AMINIMUM OF d' ON EACH SIDE PIPE. 4,A„ MIN, L " < 6" MIN. � 2 . SECTIONN A-AA-A f INFRASTRUCTURE, PLLC NC LICENSE# P-1289 3 WILLIAM K. GUALTIERI g 09/21/2018 NORTH CAROLINA e SEAL 023464 ' PROFESSIONAL ENG/ARCH STAMP TYPICAL UTILITY LINE CREEK AND WETLANDS CROSSING (TSC, TWC) VARIES WITH GROUNDLINE J 10'MIN. SLOPE n• re.ew.n•v. - -+�` F .`• LNlr.rl - , .. N�"s� �r` -~ •�f - M{wp0 "A� fit w wa•la�w eRY •m wry �Y.1�'-. ,'' ' '....' 1 •amna w�Krw�'un a w rrfa ��� . .. A kTW ir! • .r� r � m-' * _ �.r cx.! I � � y—� n •. I1:7 �(�yyyy���� pYMd mWHNM "••=- - SKKK Lm& ri> au �• i "' .,a r wr II CIMNI16. 1ptlllMlpl /e1 °•�warr'r c Amorlon • .c iucel ew' _ mr gym, swM. o OPTIONAL LIFTING STRAPS _VARIES WITH GROUND LINE SLOPE 2'-0" MIN. + '5O'MIN. DISTANCE FROM STREAM � TOP OF BANK — STREAM PLAN VIEW 1 CURLEX CHANNEL APPLICATION DETAIL (TSC) NOTES: 1. SEDIMENT FILER BAGS SHOULD NOT BE PLACED WITHIN A JURISDICTIONAL WETLAND OR WITHIN 50 FEET OF A STABILIZED OUTLET, STREAM, OR OTHER NATURAL WATERS RESOURCE. 2. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 3. SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN SEDIMENT HAS ACCUMULATED TOY OF THE BAGS CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. 2'-0" MIN. SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE IIO- OR EXISTING VEGETATION SILT -SAVER DEWATER FILTER BAG 6"X15" 2"-3" PUMP 13"X15" 0'4" PUMP 13"X25" 0'-6" PUMP TYPICAL SEDIMENT FILTER BAG (TSC) (NOT TO SCALE) PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS AREA CODE 9335 DIE SIGNAT°REI INITIALS REGIONAL ral Piedmont LINE 446 - B E L E W S CREEK PIPELINE ACCOUNT NUMBER 0107000 ENGINEER PROJECTNUMBER 1626546 °rE SIGNATUREINmALS MGR TECH Natural Gas GENERAL EPSC DETAILS DRAWING BY JKC REC&STD STOKESDALE NC CHECKED BY CPD a uTUREnrvinus PRINCIPAL COPVRIG.OFFICHT 2014 E 4720 PIEDMOEDMONTNT ROWDRIVAL GAS ORP. f APPROVED BY WKG CORP. OF CHARLOTTE, NC 282100W DRIVE RESOURCE CENTER REIDSVILLE ENGINEER SHEET 86 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DRAWING NUMBER REVISION PNG- C - 446 - 0001087 0 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER SEDIMENT FILTER BAG 0'-6" MIN. VARIES 10'-0"50' MINIMUM EXISTING VEGETAT MINIMUM BUFFER GEOTEXTILE FILTER BAG FABRIC (TYPE III) ?y SILT FENCE + + WITH WIRE 6" MIN BACKING 2'MIN. TOP OF BANK USE WOOD CHIPS PAD TO LEVEL BAG FROM EXISTING G ROUNDLINE NATURAL GROUNDLINE STREAM FABRIC (TYPE III) OR EXISTINN G VEGETATION OR EXISTING SECTION A TYPICAL SEDIMENT FILTER BAG (TSC) (NOT TO SCALE) PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS AREA CODE 9335 DIE SIGNAT°REI INITIALS REGIONAL ral Piedmont LINE 446 - B E L E W S CREEK PIPELINE ACCOUNT NUMBER 0107000 ENGINEER PROJECTNUMBER 1626546 °rE SIGNATUREINmALS MGR TECH Natural Gas GENERAL EPSC DETAILS DRAWING BY JKC REC&STD STOKESDALE NC CHECKED BY CPD a uTUREnrvinus PRINCIPAL COPVRIG.OFFICHT 2014 E 4720 PIEDMOEDMONTNT ROWDRIVAL GAS ORP. f APPROVED BY WKG CORP. OF CHARLOTTE, NC 282100W DRIVE RESOURCE CENTER REIDSVILLE ENGINEER SHEET 86 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DRAWING NUMBER REVISION PNG- C - 446 - 0001087 0 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER SEE DETAIL SILT FENCE 1 I SEE DETAIL SILT FENCE LL WETLAND N T GENERAL NOTES: 1. NO WASTES, SPOILS, SOLIDS OR FILLS WILL BE PLACED WITHIN WETLANDS, WATERS OR RIPARIAN CONSTRUCTION ROAD CONSTRUCTION ROAD AREAS. rn WETLAND INSTALL SILT FENCE PRIOR TI . . TO AND FOLLOWING J L CONSTRUCTION r7 -MEN I 2. WETLAND CROSSINGS SHALL BE RESTORED TO ORIGINAL CONTOURS ONCE CONSTRUCTION IS COMPLETED. & TO RESTORE THE CORRIDOR IN WETLAND AREAS THE CONTACTOR WILL USE A NATIVE SEED MIX, WHICH WILL BE DISTRIBUTED WITH PLACEHOLDER SPECIES TO PROVIDE SOIL STABILIZATION UNTIL THE PERMANENT SEEDING GERMINATES AND BECOMES ESTABLISHED. THIS SEED MIX WILL BE COMPRISED TYPICAL PRE AND POST -CONSTRUCTION PLANVIEW OF SPECIES THAT ARE NATIVE TO THE COUNTY (WITh THE EXCEPTION OF THE PLACEHOLDER SPECIES. EASEMENT 4. REFER TO PLANS FOR PLACEMENT OF SILT FENCE 1 ALONG DISTURBED LIMITS. SEE DETAIL - - - - - SILT FENCE SEE 5. ADDITIONAL MEASURES MAY BE NECESSARY IN DETAIL ORDER TO PROTECT AFFECTED CREEKS AND rn WETLAND rn SILT WETLANDS. SPOIL PILE - T FECROSSING AND SPOIL 6 N TALLATIION OF PIPE SHAEXCAVATION FOR DLL BE CONDUCTED IN THE PILE SAME DAY TO THE FULLEST EXTENT PRACTICAL BENTONITE LL . - . . - BACKFILLING AND RESTORATION OF WETLANDS PLUG rn AS - S BENTONITE PLUG SHOULD OCCUR AS SOON AS PRACTICAL UPON COMPLETION OF PIPE INSTALLATION. 7 TREES WILL BE CUT AND STUMPS LEFT IN PLACE 8. TOPSOIL REMOVED FROM WETLANDS SHOULD BE KEPT SEPARATELY FROM OTHER TOPSOIL STOCKPILES AND REPLACED IN THE SAME AREA. USE SEED 129 SOUTHERN WETLAND MEADOW MIX FROM THE ROUND STONE NATIVE SEED COMPANY OR APPROVED EQUAL FOR FINAL STABILIZATION. SEE DETAIL SILT FENCE CORDUROY MATS, TIMBER WETLAND MATS OR TEMPORARY LL BRIDGING J L EASEMENT e TYPICAL WETLAND CROSSING DETAIL (TWC) / STREAM, TOP OF BANK \ \ 1 \GAS\ GAS PROP. GAS LINE G.1 C'S � PERMANENT EASEMENT S / GAS GqS \ / c \GAS\ 20' ZONE 2 BUFFER 3 1 / TEMPORARY BUFFER CONSTRUCTION EASEMENT J 3BUFFE 1 2BUFFE 2 BUFFER BUFFER e STREAM BUFFER DETAIL FLOVI SWALE OR OTHER SEDIMENT 8' MAX STANDARD FABRIC CONTROL DEVICE PLASTIC OR WIRE TIES. TEMP ARV E UI PMENT R SSING REVISION(S) DESCRIPTION BY NOTE: 6' MAX EXTRASTRENGTH 8. TOPSOIL REMOVED FROM WETLANDS SHOULD BE KEPT SEPARATELY FROM OTHER TOPSOIL STOCKPILES AND REPLACED IN THE SAME AREA. USE SEED 129 SOUTHERN WETLAND MEADOW MIX FROM THE ROUND STONE NATIVE SEED COMPANY OR APPROVED EQUAL FOR FINAL STABILIZATION. SEE DETAIL SILT FENCE CORDUROY MATS, TIMBER WETLAND MATS OR TEMPORARY LL BRIDGING J L EASEMENT e TYPICAL WETLAND CROSSING DETAIL (TWC) / STREAM, TOP OF BANK \ \ 1 \GAS\ GAS PROP. GAS LINE G.1 C'S � PERMANENT EASEMENT S / GAS GqS \ / c \GAS\ 20' ZONE 2 BUFFER 3 1 / TEMPORARY BUFFER CONSTRUCTION EASEMENT J 3BUFFE 1 2BUFFE 2 BUFFER BUFFER e STREAM BUFFER DETAIL FLOVI SUPPLY WATER TO WASH WHEELS IF NECESSARY 50' MIN. PLAN VIEW 2'-3" WASHED STONE 2:1 OR FLATTER ORIGINAL GRADE 6" MIN. FILTER FABRIC PIPE/CULVERT IF NECESSARY SECTION A CONSTRUCTION SPECIFICATIONS: 1. STONE SIZE - USE Z-3" WASHED STONE OR LARGER. 2. WIDTH -1T MIN. 3. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O.W. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WITH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS. 4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC R.O.W. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC R.O.W. MUST BE REMOVED IMMEDIATELY. 8 TYPICAL GRAVEL CONSTRUCTION ENTRANCE/EXIT (TICE) 3 0 K SWALE OR OTHER SEDIMENT 8' MAX STANDARD FABRIC CONTROL DEVICE PLASTIC OR WIRE TIES. WITH WIRE FENCE REVISION(S) DESCRIPTION BY NOTE: 6' MAX EXTRASTRENGTH A o CONSTRUCTSEDIMENTBARRIER FABRIC WITHOUT WIRE APPROVALS AND CHANNELIZE RUNOFF TO FENCE 1. SILT FENCE WITH WIRE BACKING IS USED TO INTERCEPT SEDIMENT TAPPING DEVICE 4 -MAX ON PONDING AREAS 2" MIN. r20'RMI .LL TOTAL WIDTH 32' MIN. 3 FROM SHEET FLOW ONLY. USE SILT FENCE WITH WIRE re Q ',f g K STREAMS, WETLANDS, PONDS, SPRINGS, OR OTHER 1 10/02N8 ISSUED FOR CONSTRUCTION REVISION JKC NATURAL WATER RESOURCES LOCATED WITHIN OR 12' MIN. NO MORE THAN 24" ADJACENT TO THE PROJECT RIGHT OF WAY. WIDTH z ENGINEER F w ��PIPE/CULVERT IF GROUND LEVEL NECESSARY BOTTOM OF WOVEN WIRE FENCE SUPPLY WATER TO WASH WHEELS IF NECESSARY 50' MIN. PLAN VIEW 2'-3" WASHED STONE 2:1 OR FLATTER ORIGINAL GRADE 6" MIN. FILTER FABRIC PIPE/CULVERT IF NECESSARY SECTION A CONSTRUCTION SPECIFICATIONS: 1. STONE SIZE - USE Z-3" WASHED STONE OR LARGER. 2. WIDTH -1T MIN. 3. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O.W. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WITH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS. 4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC R.O.W. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC R.O.W. MUST BE REMOVED IMMEDIATELY. 8 TYPICAL GRAVEL CONSTRUCTION ENTRANCE/EXIT (TICE) 3 0 K 2 1/4 WIRE MESH SEDIMENT CONTROL STONE OR SILT SOCK CONSTRUCTION SPECIFICATIONS: WATER FLOW- 1 FT MIN 76 • ALL TREES, BRUSH, STUMPS, OBSTRUCTIONS, AND OTHER OBJECTIONABLE MATERIAL SHOULD BE REMOVED AND DISPOSED OF SO AS NOT TO INTERFERE WITH THE PROPER FUNCTIONING OF THE SDIVERION. PO — —III—III— III I� I—III—III—II • THE DIVERSION SHOULD BE EXCAVATED OR SHAPED TO LINE, GRADE, AND CROSS SECTION AS -Iu=uI�II�T- —iii—ll�u flu-IT1-IT1-lil—lil DESIGNED TO MEET THE CRITERIA SPECIFIED HEREIN AND BE FREE OF IRREGULARITIES THAT WILL IMPEDE NORMAL FLOW. 1A WIRE MESH 2 FT • ALL FILLS SHOULD BE MACHINE COMPACTED AS NEEDED TO PREVENT UNEQUAL SETTLEMENT THAT IF STONE IS USED WOULD CAUSE DAMAGE IN THE COMPLETED DIVERSION. • ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHOULD BE SPREAD OR DISPOSED OF 1 FT MIN �--� 1 FT MIN STEEL POST - 2 FT DEPTH SO THAT IT WILL NOT INTERFERE WITH THE FUNCTIONING OF THE DIVERSION. NOTES: • PROVIDE SUFFICIENT ROOM AROUND THE DIVERSION TO PERMIT MACHINE REGARDING AND 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 12" SILT SOCK MAY ALSO BE USED. CLEANOUT. • DIVERSION CHANNELS SHOULD BE STABILIZED IN ACCORDANCE WITH DESIGNED PLANS AND 2. USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 1/4 INCH MESH OPENINGS. SPECIFICATIONS. J 3. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTING WIRE TO THEM. WIRE MESH (AND WOVEN WIRE FENCE BACKING) MAINTENANCE: TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST 6 PER POST. REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE IF NECESSARY. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS 4. SPACE POST A MAXIMUM 3FT. PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. 5. FOR INSTALLATION BETWEEN SECTIONS OF SILT FENCE, EXTEND SEDIMENT CONTROL STONE A MINIMUM OF 12" IN WIDTH ON EACH SIDE OF SPECIAL SEDIMENT CONTROL FENCE SECTION. a CLEAN WATER DIVERSION (CWD) (:i)SILT FENCE CHECK DAM (SFCD) y ENERGY LAND & PROPRIETARY A CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY S INFRASTRUCTURE, PLLC PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF 8' MAX STANDARD FABRIC INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PLASTIC OR WIRE TIES. WITH WIRE FENCE REVISION(S) DESCRIPTION BY CHK 6' MAX EXTRASTRENGTH NOTES: FABRIC WITHOUT WIRE APPROVALS FENCE 1. SILT FENCE WITH WIRE BACKING IS USED TO INTERCEPT WOVEN WIRE FENCE BACKING 4 -MAX ON PONDING AREAS 2" MIN. SMALL AMOUNTS OF SEDIMENT AND REDUCE VELOCITY TOTAL WIDTH 32' MIN. AREA CODE FROM SHEET FLOW ONLY. USE SILT FENCE WITH WIRE re sicwauasnainus BACKING UP -GRADIENT TO, AND ALONG THE PERIMETER OF g �. Jm rrF i1CY VI„ STREAMS, WETLANDS, PONDS, SPRINGS, OR OTHER 1 10/02N8 ISSUED FOR CONSTRUCTION REVISION JKC NATURAL WATER RESOURCES LOCATED WITHIN OR SILT FENCE WIITH WIRE BACKING NO MORE THAN 24" ADJACENT TO THE PROJECT RIGHT OF WAY. FABRIC TOTAL WIDTH 36" OF FABRIC ENGINEER ALLOWED ABOVE 2. THE MAXIMUM DRAINAGE AREA SIZE FOR CONTINUOUS SILT FENCE WITH BACKING SHALL BE 1 ACRE PER 150 LINEAR GROUND LEVEL FEET OF FENCE LENGTH. MAXIMUM SLOPE LENGTH BEHIND BOTTOM OF WOVEN WIRE FENCE EXISTING FENCE ON UPSLOPE SIDE SHALL BE 290 FEET (AS BACKING SHALL BE POSITIONED AT GROUND MEASURED ALONG GROUND SURFACE) THE BOTTOM OF THE TRENCH eGGas 3. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTENING WIRE TO THEM. WOVEN WIRE FENCE BACKING TO BE STEEL POST (TVP.) FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. B" MINBOTTOM OF 24" MIN. THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT . TRENCH LEAST SIX PER POST. STEEL POST (STD. "T" OR "U' SECTION) 4. FABRIC SHALL BE FASTENED SECURELY TO WOVEN WIRE f ANCHOR FENCE BACKING WITH THE TIES SPACED EVERY 24 INCHES POSITION POST/FABRIC (PLATES ALONG TOP AND MIDSECTION. ASSEMBLY AT VERTICAL TO A MAX 5" FROM 1 sG�,ruaE ar WKG THE VERTICAL (ANGLED TOWARD FLOW) PROFESSIONAL ENG/ARCH STAMP 5. STOP SILT FENCE AT PAVED CROSSINGS, USE �U,I''��G 2" MIN ALTERNATIVE MEASURE IF NECESSARY. SILT FENCE WITH WIRE BACKING FABRIC AND WOVEN WIRE FENCE BACKING TIEBACK BETWEEN FENCE 6. COORDINATE SILT FENCE PLACEMENT IN WATER QUALITY WKG 26" FABRIC POST AND ANCHOR STAKE BUFFERS TO MINIMIZE IMPACT. EXISTING GROUND 11 ABOVE GROUND TO BE NO. 8 (0.25") HOLLOW SECURE TO POST FLOW BRAIDED POLYPROPYLENE BY WRAPPING 111 7. DOT #50R #57 WASHED STONE WHEN FLOW WILL RUN ROPE WITH MINIMUM PARALLEL TO THE TOE OF THE FENCE. TENSILE STRENGTH OF 1,200 BACKFILL WITH COMPACTED SOILS" POUNDS MAINTENANCE: SILT FENCE WITH 111 MIN. 24" POST FLOW WIRE BACKING 1. INSPECT SEDIMENT FENCES A7 LEAST ONCE A WEEK AND ANCHOR SILT FENCE WITH WIRE 4 BELOW GROUND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS BACKING FABRIC 8" DEEP WITH 4" IMMEDIATELY. RUN -OUT LENGTH, COMPACT BACKFILL. 1111 IUI ANCHOR STAKE MIN. 18" EXISTING GROUND 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, LONG TO BE PLACED 12" TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT SECTIONAL VIEW INTO GROUND SILT FENCE TIEBACK PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT AIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TYPICAL SILT FENCE e (SF) L 3' FT WIRE MESH STONE OR SILT SOCK STEEL POST PLASTIC OR WIRE TIES 1/4 WIRE MESH SILT FENCE OR SILT FENCE WITH WIRE BACKING SEDIMENT CONTROL STONE OR SILT SOCK 2 1/4 WIRE MESH SEDIMENT CONTROL STONE OR SILT SOCK CONSTRUCTION SPECIFICATIONS: WATER FLOW- 1 FT MIN 76 • ALL TREES, BRUSH, STUMPS, OBSTRUCTIONS, AND OTHER OBJECTIONABLE MATERIAL SHOULD BE REMOVED AND DISPOSED OF SO AS NOT TO INTERFERE WITH THE PROPER FUNCTIONING OF THE SDIVERION. PO — —III—III— III I� I—III—III—II • THE DIVERSION SHOULD BE EXCAVATED OR SHAPED TO LINE, GRADE, AND CROSS SECTION AS -Iu=uI�II�T- —iii—ll�u flu-IT1-IT1-lil—lil DESIGNED TO MEET THE CRITERIA SPECIFIED HEREIN AND BE FREE OF IRREGULARITIES THAT WILL IMPEDE NORMAL FLOW. 1A WIRE MESH 2 FT • ALL FILLS SHOULD BE MACHINE COMPACTED AS NEEDED TO PREVENT UNEQUAL SETTLEMENT THAT IF STONE IS USED WOULD CAUSE DAMAGE IN THE COMPLETED DIVERSION. • ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHOULD BE SPREAD OR DISPOSED OF 1 FT MIN �--� 1 FT MIN STEEL POST - 2 FT DEPTH SO THAT IT WILL NOT INTERFERE WITH THE FUNCTIONING OF THE DIVERSION. NOTES: • PROVIDE SUFFICIENT ROOM AROUND THE DIVERSION TO PERMIT MACHINE REGARDING AND 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 12" SILT SOCK MAY ALSO BE USED. CLEANOUT. • DIVERSION CHANNELS SHOULD BE STABILIZED IN ACCORDANCE WITH DESIGNED PLANS AND 2. USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 1/4 INCH MESH OPENINGS. SPECIFICATIONS. J 3. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTING WIRE TO THEM. WIRE MESH (AND WOVEN WIRE FENCE BACKING) MAINTENANCE: TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST 6 PER POST. REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE IF NECESSARY. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS 4. SPACE POST A MAXIMUM 3FT. PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. 5. FOR INSTALLATION BETWEEN SECTIONS OF SILT FENCE, EXTEND SEDIMENT CONTROL STONE A MINIMUM OF 12" IN WIDTH ON EACH SIDE OF SPECIAL SEDIMENT CONTROL FENCE SECTION. a CLEAN WATER DIVERSION (CWD) (:i)SILT FENCE CHECK DAM (SFCD) y ENERGY LAND & PROPRIETARY A CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY S INFRASTRUCTURE, PLLC PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF NC LICENSE# P-1289 3 INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 � WILLIAM K. GUALTIERI NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 - B E L E W S CREEK PIPELINE 0 09121N8 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 re sicwauasnainus REGIONAL g �. Jm rrF i1CY VI„ 1 10/02N8 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 NORTH C NORTH CAROLINA ENGINEER I GENERAL E PSC DETAILS PROJECT NUMBER 1626546 D E slcruruaEiwmus MGR TECH g SEAL 023464 eGGas DRAWING BY JKC REG &STD STOKESDALE NC COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. f CHECKED BY SBH DATE sG�,ruaE ar WKG PRINCIPAL PROFESSIONAL ENG/ARCH STAMP 09/21/2018 �U,I''��G ENGINEER CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNG-G-446-0001008 SHEET 87 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DAWINGNUMBER REVISION PNG- C -446- 0001088 1 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER FIND., 61NI'll OF XO' i gnNL ./ —N, " ISE vuN!wm OF 5'-P' 13 HOr —11131E AT THE �_ORLI DF I—E OR IFMyEPoNro F1tlN'15 AHnCNN vPLNIC OEIIIIiILS 5/I EE L-ET'IL ]M a -L .,Iv Mor of sraPlc MEBIDD 'A' (NO iRENCR)� 1 — D° MOT RE a TV 7-11 —N—ET 11 IF I�CAH 5E EOEl EC & VII .r 5'-a" LFR TIE =rx:T '-`F TIE SL. rc. rPrti�s �� oEVNI�rNw g' nE[a wIL RILE rnax www .x - WE TO RdA''f 5TMLEN a �IWs Tv srArice, SFaNE'wEp. N• q,C, En ula ` aYEPLe sEE .i enNs cF sraw-es /' + � . . ?ETAIL 211 �SeAtlLbxFll, 6' O.G, / rnnveRL sD5 4EAu n�,nuP, � \ � y See Dt-rnlL B/I VFI. ARL PIIE w°wvM ,c r -o' SLOPE 7RENCMNG REr.WD Tr cF SL°°E ,. ,Th: 50TTCu nFF -E MEIFILIO 'B� 5 � WrgNATI°N, ," FC>1E • . CETAIL C(, i 90LP E TRE— AParwM. -14 FRER[H SLOPE WIAL r11 NO U £ I Eno SEAN OF RUNR DIERL V• �Ic iTAPIsc.E d e "MVW o "ET, 12" o,c. ALONG °LAr R elle THHRRCH F— ELANXEIS IeSLOPE R lEF UPS DVEA ooRNv -E HL—ETSIn . SHII •FI EL` I II S END ROLL OVERLAP x LF f INFRASTRUCTURE, PLLC NC LICENSE# P-1289 3 WILLIAM K. GUALTIERI g 09/21/2018 NORTH CAROLINA e SEAL 023464 PROFESSIONAL ENG/ARCH STAMP m' was , e^ oEEr� ILIWEf AAT A ALCNG \\ I R[WI v`F STAPLE£ BrUNkESLOPECLEVE m PR°TECT x RtlWS RF s 0-j, RffirRmi 6' 0.C. SIFP I ES qIF BOTTOM OF SLDPE TERMNATION Tl "+LE CURLEX SLOPE APPLICATION DETAIL (CX) VE��PNE QRP\Pol\NeSRENQN SRP I 1 F7-O� FVO� SEE CNPRj POSjS �Mp7`gEn�EE� tlWItlR R4W rF STWLfS, ef51X"a ECRRECT sTAP!e mT!ERN. snwLR osT+�LED INY° GCH 2EaNRE1 ME FTAPIE HIXPS Ea1H BUIMETS ro mE sTIL. ( NUM[ ARi=i ml£TI{ER STAPLE STAR LTi !U 5 ALE I r9URRET fPu£RLer. a° -I• 1 'T.PI£5 AME TI1EItLIDH RgTH 9LAHw ETS sm sm ONEYQAp SWLE DETAIL mel u 51ALE NOTFS. I. STALE AATIERNS ARE I -WENT cN SITE—II SEE ^.,RLEI STAPLE PATIDRY ®.NSE FOP OETNLS i E- I—M MAY RE OSED IN PUCE OF WRIE STAPLES SLOPE 4 DETAIL American _ Company s Barth Srie D1R[slon TEMPORARY MATTING IN CHANNEL (AMERICAN EXCELSIOR CURLEX I— FIBRENET OR ENGINEER APPROVED EQUIVALENT) MAINTENANCE: 1. INSPECT SEDIMENT INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY 1. USE SILT FENCE WITH J. HOOKS WHEN THE PIPELINE CONSTRUCTION 2, SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME TRANSVERSES A SLOPE GREATER THAN 10% AND SILT FENCE ALONG EITHER INEFFECTIVE, REPLACE IT PROMPTLY. SIDE ALONE IS NOT EFFECTIVE. 2. SILT FENCE SHOULD BE INSTALLED AND MAINTAINED PER SILT FENCE DETAIL 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. SLOPE SLOPE LENGTH BETWEEN HOOKS (FT) 4, REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO 10 TO 20% 100 GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY >20% 50 STABILIZED. @) B J—HOOK DETAIL (SFJ) 3' SOIL MATERIAL S�OpF RS/o WgTF�e\° A _ wq TFR BgRq�NF< eFRM , A� B Wq rFR eq C R , F�egRBERM e 1 I PLAN VIEW `2:1 SIDE SLOPE (3:1 SIDE SLOPE WHERE VEHICULAR TRAFFIC IS EXPECTED) SOIL MATERIAL MIN 9" LT FENCE FIBER BAFFLE (TYP) WOOD MULCH OR COMPOST TO 1/2 HEIGHT OF LOG MIN 2' INSTALL MIN 12" EXCELSIOR (PAM) APPLIED TO TOP SIDE OF WATTLE. PAM TO BE REAPPLIED TO WATTLE AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES. SEDIMENT PIT (6' X 3'W X 3'D) 18 -INCH FILTREXX COMPOST FILTER SOCK OR ENGINEER APPROVED EQUIVALENT (TYP) APPLY 4 OZ. EXCELSIOR (PAM) APPLIED TO TOP SIDE OF WATTLE AND 1-2 OZ OF PAM IN FRONT OF A WATTLE (SEE NOTE 3). SEDIMENT PIT FLOW _ 8" DIA. COMPOSTSOCK I AREA TO BE PROTECTED MULCH OR COMPOST FOR UNTRENCHED SOCKS 2" X 2" STAKES - SECTION AREA TO BE PROTECTED - SHEET FLOW COMPOST SOCK WORKAREA \\-TEMPORARY 12" EXCELSIOR' SPACING (FT) <5 125 TEMPOR WATTLE 10-20 75 20-33 WATER BAR MATTING IN OR APPROVED 25 CHANNEL EQUIVALENT k --W-6- --MI INSTALLCOIR FIBER BAFFLE CROSS SECTION B -B (AMERICAN MIDDLE OF SEDIMENT PIT EXCELSIOR CURLEX OR EQUIVALENT I SEDIMENT PIT PROFILE VIEW C -C SILT FENCE OUTLET DIVERSION SLOPE MAX 2% WATER BAR— BACKFILLED PIPE TRENCH ISOMETRIC VIEW WATER BAR SPACING SLOPE (%) SPACING (FT) <5 125 5-10 100 10-20 75 20-33 50 >33 25 WATER BAR NOTES 1. INSTALL WATER BARS ON SLOPES PER NCDEQ'S "RIGHT-OF-WAY DIVERSIONS (WATER BARS)" DETAIL ON SPACING. 2. CONSTRUCT WATER BARS OR COMPACTED EARTH. WATER BARS MUST BE A MINIMUM OF 18 -INCH MEASURED FROM CHANNEL BOTTOM TO TOP OF BERM. 3. INSTALL SEDIMENT PIT AT EACH OUTLET OF WATER BAR AND INSTALL A MINIMUM 12 -INCH EXCELSIOR WATTLE ON UPSTREAM SIDE WITH POLYACRYLAMIDES (PAM). PAM TO BE APPLIED TO TOP FRONT OF WATTLE. USE 2 -INCH BY 2 -INCH HARD WOODEN STAKES TO ANCHOR IN PLACE WITH A MINIMUM 2 -FT SPACING. 4. SILT FENCE OUTLETS SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER WHERE OUTLETS DISCHARGE OFFSITE. 5. SILT FENCE "J -HOOKS" SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER. SILT FENCE "J -HOOKS" SHALL BE SPACED BASED ON CONDITIONS IN THE FIELD. WATER BAR INSPECTION & MAINTENANCE 1. INSPECT WATER BARS AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR PERIOD. 2. MAKE ANY NECESSARY REPAIRS IMMEDIATELY. 3. REPLACE WATTLES AT SEDIMENT PITS AS NECESSARY AND REAPPLY POLYACRYLAMIDES (PAM) AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES. 4. KEEP WATER BAR FREE OF DEBRIS AND OBSTRUCTIONS. THE CONTRACTOR MAY NEED TO REDRESS OR RESHAPE WATER BARS PERIODICALLY THROUGHOUT THE PROJECT. 5. SEED AND MULCH PERMANENT WATER BARS FOLLOWING CONSTRUCTION. 6. REMOVE ACCUMULATED SEDIMENT FROM OUTLETS AND SEDIMENT PITS AS NECESSARY. „ TYPICAL SLOPE BREAKER (SB) UNTRENCHED INSTALLATION ,2 SILT SOCK INSTALLATION DETAIL (SS) (NOT TO SCALE) D=TRENCH BREAKER TO PIPE INVERT `SEE NOTE 2 SEE TABLE FOR TYPE OF PLUG SECTION VIEW E CLCVFi I IUIN REQUIRED SPACING (L) AND MATERIALS FOR TRENCH TRENCH SLOPE (%) L (FEET) BREAKER MATERIAL 5 TO 15 300 CLAY, BENTONITE, OR CONCRETE FILLED SACKS > 15 TO 30 200 CLAY, BENTONITE, OR CONCRETE FILLED SACKS > 30 100 CLAY, BENTONITE, OR CONCRETE FILLED SACKS CONSTRUCTION SEQUENCE NOTES PLAN 1. THE PREFERRED CONSTRUCTION MATERIAL FOR THE TRENCH BREAKERS IS SAND BAGS, WHICH ARE DURABLE YET FLEXIBLE AND WILL CONFORM TO THE GRADUAL SHIFTING OF THE PIPELINE AND BACKFILL. 2 IN AGRICULTURAL LANDS, TOP OF THE TRENCH BREAKER WILL NOT BE CLOSER THAN TWO FEET FROM THE RESTORED SURFACE. ,s TRENCH BREAKER DETAIL PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 446 - B E L E W S CREEK PIPELINE 09121118 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 re sICNATUREIwInus REGIONAL ral �ep�mwwF ACCOUNT NUMBER 0107000 ENGINEER � Biu aVJ1� ���a PROJECT NUMBER 1626546 DATE sICNATUREnNnus MGR TECH Natural Gas GENERAL E PSC DETAILS DRAWING BY JKC REC&STD STOKESDALE NC CHECKED BY SBH DATE sIGNTUREIINITI WKG PRINCIPAL COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. f APPROVED BY WKG 09/21/2018 WAIIII CORP. OFFICE 4720 CHARLOTTE, C NT 28210 W DRIVE RESOURCE CENTER REIDSVILLE ENGINEER CHARLOTTE, NC 28210 PNG-G-446-0001008 SHEET 88 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DRAWING NUMBER REVISION PNG- C - 446 - 0001089 0 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER GENERAL SEEDING REQUIREMENTS FOR UPLAND AREAS PERiNANENT UPLAND SEEDING SPECIFICATIONS SOIL AMEN DMENTS (TEMPORARY UPLAND SEE 01NGI COVERlCOMPAHTON CROPS APPLIGATIDk TYPEANVDRATE --OLMLEGMANIM MEDIUM MG N SPECIES LOCATION SEWAAp lLi^n1AUl4 OF USED! MFOlB 11CA NOUS SOAR NT1LGTgN 147E NOTEt lOLBIM REDLINE PER84 t RYE EARLY FAIL OR m- INrE AINCELWCONECPAS SPRING PENNINVON" LAWNS RENAWRE 93uES TREE ArxTrcn 5115 HR 7 GOOD GERMWATLDR. DIF! OFT ARRY1AlY.81 SY MOVING NETTING. ON ASPHALT L'I'B "' BR%REBEL NMTALLFSCUE Am Ilmu lylALLFESETME BROADCAST: 2004BJACRE PsgtlUC"0'" MATINK AWI ERY. AM LawwoRE TAODNGAT4WOALIACRE. SMAN12ML COAAMMOC ONDUSAALI GROIAG AGRICULTURAL DRIIl EEk Opp LBBIACRE Ips-Pgo TGAC 4WD LWACM AWNOMENFB WILL Bl 7ROIVJCAAT PROOR TO MACH 3alL BCA TAU SHE ILOE. TF5rEl O1i ATAMINIMIM on TA m1SIFSWAi LEMF.5151NC ELYMM CANAOP79S APPLYING FOy OR MIRCH, 2 04AMA[LR6TAFASCINGTA EAOWIRf✓AraPl AND SOIL AMENOMEHTS WILL BE SRCAOCA.'TT PRIOR TO APPLYING MR-Rpl. APPLY LIME THEgpEOLFgO RATE USE SPIMFTED HETI MU' LFiESS LNm GR'AT'ER 2 DUOBYSRAWAS PURPLE POP PRO>3»CAF�LLY AjaE7YATTUIFRIg51 REQUIEM A OWFFAeNT ST=O MIK. PASTAIREy PENNMFij01'r MARC lES118 TAU FEStllE BROADCAST OpL�rAC- PRODULTS'P OMATRIX TSAR AIULOO 94W 1901ACRE AIRY MULCH ON ROVING. NETTING, OR ASPHALT SEEO AND BOIL AMENCINNO TWILL BE FttiANTWS PNAYIIR AAA DRILLED: 25 LByACAE IMMORAL) AGAR 7.WOL3SFKRE TAOAMEM AODCRAL SMAtCOAIPSOi AMEITDNFM8INLL 8E 8R WtlC,487 PR1DF17O 45LOVAGRE I4Am LBSNACPS)ON BROADCAST PRIOR TO APIKY11I4D 1 SYMPHYOP.muM RLOSLNA APPLYING POµ DR ARAGE. 1 GUM(IBOUSSNim) TACJOFFSE MSKNRLWANCE ROPES.7,SSL ACTIVELY CULTIVATED PIEIA4 TYPICALLY DO NOT CmTWATEO AGRIMATORAL FGAV- SE ED AND SW I.AMFOIDME7NTBWC FIE R€-fYRALI> NrT3ROWTN IS NPFRUL4Y ACLVL2ATE R2RFFIy, R>:1sRTILI�AAIP MULFyV AWLICATION O: SOL AMEAnMtNrs WITHIN RIPARIAN AREAS sNALLBE EDNauNam ATAGRDNOMIC FNTRS AND SNAIL COMPLY WITH ALL UMEA APPUMA E FEDERAL, STATE AND LOCAL R1G11ATPDNS. SOL AMENDAtr-I1TS SNA LBE APPLIED IN A MANRER THAT MINIMISES QDWACT WTFN SU"ACE WATER, "PULD6 MOTAPPUC�E NOT APPLCAIMIE NOT APPLID4 NOT APPUCAOLF UIPIUM'$pEpF]CALLY� BY LANDS OWNETt SEED AND SOB AMENOIEMB Will- BE RLSEEDADYER SEED IF GAOWTIi S NOT RILY ADEOLPAM GROUND STAODLIATION SHALL ME PERFOWOED PER TIME FRAMES OMRIRED IN GLP LSUYL SEEDING SIREMCI171GS BRLMDCW PRIOR TO APPLYMG MIA CONTRACTORS MIR FRArrDt WOO=AR6AST PPFLY MULUH BY RDVUPO, NEM140, OR ASPHALT RFMAFAOER OF ROW WF+TTH 9DA'R M% Of 31 TALL FUCVf 10% PERENNIAL WAIMASS BRGIAD T'A103ABNIGRE VMOWIIE E,,MVCTS. MN,,,,NeX WLOt VWLWACRE TACKINGAT4ODGALMNFROSEEDAMaM •10% MG RID CLIT,ER pRWM: 100 LRWACFM ICPOE711ALj fGAI'I.I1W ti1RIF,.CAiA P 511,111 -ma QO'1FR LYIOHOOORML1W.FFNORT CONTRACTORS MIX MATTER'+N000® ARFASI: AEAAAFY']EF DFRDW WTIH15Wvg BO%FY 31 TALI FESCUE 10% PFUNNFAL RYEWSS BfPRILLIMIDILBS%m PIIOFR.E ProOUC15. WWMATRTX FW!,I.OWLBVACW SEEDAND SIDLAMENMIEATS WILL TR: •TI ,OM1 HLR •2ii AE0om PRILLEIk ]ppK �%1,+c$ (ILEDUIREOH FUROAOCAV PRIOR TO APRYIW FOAL S%VmtlC OYER PENNINGMN' SIOREMASTEA{51DFO ANDWOOM AREAS} SOIL GREYSTONE TALL FESCUE REMA*DER cf Row WITI F&M-1' I S% MONAWC BERMUDA ICow TOLERAFTI IRDADCAS7' EO ISSIAIME PROaUCTPFROPILEATERFN FC2,t: a,RwllWACT¢ BEEFED AND 831,AARETWA1p(T$YALL BE .251 1SFWMRM CLOYAI lDOAUW ORIIIRA AOIRYA@E I O<IIRLOI BHDADCOST PROAL IO APDL YPAP FGM. SS SMALL GRANS (NMFAT, CAILI RYE GRAIII, ECT. FOB TEMR7RARY (WHEAT.OATB, RYEC STASIU7A110TTI G1RDUN01 ITAHLIEATC H WALL BE POPPORNED PER *STABILIZATION AME FAAMW CDNRT OR AS OTHERWISE 910ERED FOR SAPE51' REASONS W FlPEuNE iWTALLRTION REONRES Wn&FtG, W A.CH WILL NO? BE APP PED HYANY AREA WHERE WELDING ACTTSMES ARE TO OCCUR ONCE WELOLWAOTMTIES HAVE BEEN COAPLEFFD, M UtjOH S1ULLLBE APN" Tu5u0rp ArI SOIL AMEN DAIENT$ IPFRMANENT UPLAND SEEDNC) STABILIZATION T ME FRAMES (EFFECTIVE AUC. 31 2011) NOTE AMENDMENT APPMOATgN RIFF tLAVAGWI SITEAREA DESu P c:N STAIDUZATIOH TIMEFRAME D OEFFLON5 FOLLOW 11ECOMLF MTIDFFH OF BOG IM511 GppUNp AGFMCLKLTUMI C IMFSTONE kaw FFAFIAEIER 0I1E5, SWALES DFNOHE; T DAYS NONE OR AT A MINIMUM APPLY 111YEAx1 FEA1L=. 1LOFRS ATIIESPEOMDRAM 1010.50 FERMLEM I.WI HR{E{OLLHITY MOAT DOW) ZONES ?DAYS NONE RWX'EN'Llfi>: IF %OKI$ARE /DOR LM WLENGTH AND RE-PgtTLIZE IF GROWTH IS NOT FULLY ADEQUATE.RESEED,RE-PERTKAZE AND MULCH IMMEGµTELV FULLOWINO EFMJSIDN OR SLovEi88'TEF.PER THAN T 1 FDAYS ARE NOT gTeEPER THAN M, 14 MYS ARE OTHER EINA40E ALLGM O IIFRNRTDN CgHfNIXLAKi RUNOFF AND BK19L ry DIF IRrnI M UPLAND AREAS EV ESTABLLSHKNG P9HNNNL YEGETATNE COIEL DUE To 5TW SLOPES PUSANT ON THIS MGWT,A FWDpp1 UCMLVAPFUED FLEAI6LF GADwrH MEGuM IPGAIO WILT BE REWIRED TD ESTARUSH PERMANENT VWITATION ON SAPS ,IM D --%M ALUM CAN BE SEEDED AND MU"F0 PURPOSE TO REDUCE Ey om AND AREAS RE SFDIAIENT NF D FROM DIDONOMI ARCM,OM Tp PFAMANFMLY D ALLO SUYH ANFASwA IE MOST ECO "ArlLAllmwk iQ ST1E RTNDFMIDry� Alyp 4L ON'5 SELEL^TTDN OF THE A1mT' APPROPNAT PUNT MAYEMIMS IEIU SMDwT RT DIv"wVR "N PIQUED NOT BE ATFEM7W ON SITE5 TItAT ARE IHYSTIIMAME DUE lb Cf(I551YE SOIL CUMRRC ON, 1NAPPROPMAP-SOL TWWRF- POOR DRHNAGF, CONCENRIAFLD CNEMiAAD MM.OR SlIfPNUSLF ROPE UNTIL MFASUAES HAYS LAN TALLER TO COLRE0 THESE PNCRLIAs, -0 MAINTAIN A GOOD STAND OF VEGETATICIN THE ROIL MUST MW UYATAM MINIMUM RppUINEMEXtS ASAGRtriY1NI ACORIA MEENLS^NG SELL GHE%+LR FMYE ?NESE ORDERER ENOUGH ME G009D f51LT AND CTAYH MAI ERIAL FO W INTAIN ADEERNAl E MOISTURE AAO OAA NENF SUPPLY TAYAMARGE WAFER CAPAOTY OF AT LFJAST .051NCHES WATER TO 1 INQIOFRO l • SJUICIFNT PEW %PROOF TO PFRMIT MOAT PENFOATION • SuPPOERT OEPMOF SOL TO PNOYIDE AN ADE.MIATE RODT Wkt THF OWMTO BOLE OR IMYIAALLABLE UNVEILS SUCH AS 4NRDPAA6 gIOmO'It 11 INLF115 m WIN, DUPT ON SLOPES STEEFER THAN t1 WHERE THE ADONIDN OF VAL Is HOT FEASIBLE A fAVaW-E mH RANGE FOR FLAT U WTH-USUALIY R,O-SLS. FREE FROM LARGE ROQTP• MAN04M STONES LARGE ODDSOT EARTFL OA TRASH OF ANY KIM.. ID-001"DSTONES MAY EE LEFT ON SLOPES MOM MAN 3:1 RTHEY ARE ME WOFO S.EEAU. IFANYOFIHFARENECRUIRMAXENOTAAET I.E,IFOWILI/G5CIL151VOCLNRSCDEN6E SHALLOW OR ACIDIC to KIS TION vtm7AADN - S Wvv, AMENDMENTS ARE REOUIREG. RIF. SOILCONDNONQ.0 DESCRIBED BELOW MAY BE NICSEFEGAL OR 2RNBRAAiL}, TON3DIl MAY BE APPu67. sEamRED PRENARATION INS1Au NiCL5SAW ME51ANC41 FRLWN ANOSEDIMFITARDN CONFFLOI PNACTM BUM 5WNNG ANLL COMPLETE GkhD WG ACCDkDMFE 10 THE APPROVED ROAN ALL 07,ER AMAN W RH MOPES PLATTER'THAN 't UME AND PLFTTUffiI FRFDS SHOULD µ DETLR"E➢ MY SMLTE£Tx OHIECTKYL"Y SAMPLE CAI101,15 AND INFOWARON SHEETS ARS AVAILARIE THROUGH CIXM]Y AGRICULTURAL MiNESIDN ELF ICES TLSTNAG 6 ALSO DONE BY COMMERCIAL LABDRATO*M WHEN SOIL T." RESULTSAIF HOF AMLANIM FOLLOW FATES SUGGESTED IN THE SEEING 5PECIFKATIONSTABLE6 APPLY UNAE AND FERTRIEOY EVENLY AND IRCORPORATS INFO IFR: TOP 4-5 INCJiESD SOIL AY MONS OR 01 HER SVEFMU YFAW. [PIRATE MAO MNtV ON I HE COM OUR WHEN USMNG A WORD SEEDER APPLY WAEAND FEMTlUZIA TO A ROUGH, FLOSS SURFACE RquGHRA RMIFACES PRgR TO SERDR4G COMPLETE SEEDBED PREPARATION P ORISMUNG UP LAAGELLLOS AND {IKON. INTO A SMOOTK UNROW AIRFAa LLCM LEA TWIN 5-11 TILL IN OR UPOU DU E59OD6 THAT TAH mLLwT [PATE; BRoMaLmF 56 INTO A FRE&KY L➢OSFNED SEEGIED TUU F RNs NOT BEEN SILTED 61Y1AIRFHL REFORM IM CPOIREO NEED FOR PFI MANEV/T SUOINO WHENEVER PCISQla LAEHRI6 Of NOW-CH[RRED SEED IS NSO wqui iD eY RAW. LARFLS tONFAN IMPWANF INFORMATION ON SED PURITY, 6WAPP MOTION, AND PIERCER? OF WOOD SNOT SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NC=U5 WEEDS DO NOT ACCEPT SEED "T014111W'PAOHIRTED' MP*ULFS W9D-%W. 0OOCUAr tFISUME SEED WITH THE RHQOBRIM MCTMA APPRORNATE TO THE SPECIES OF MLIME APPY SLE➢UMFGIWLT WITH A CTCIONL SLLOUL DRG'-rY SPRMIJER DILL C1+LFIPACO.M SLEOER OR HYDRO SEEDER ON A FIRK F#y1B1E SEUX90. WHiEN uSTNG A OIULL On CUMPAEKER SEEDER!, bLAME SMALL GRMFL' NO MORE ?1" Y INCH RFt*.. GRASSES AND LEGUMES NO MCME THAN VL INCH 6jNPQTN7!swQULD BE CAuPATED W THE FIELD FOA 111E DFSLRED SEFJVNG RATE WHEN USING BRORDO55T-SEEKING MEMOIRS, SUBDIVIDE ME AREA IWIQ'MDAKARIE SRYIDNS 00 UMFW.NEME AAwuw OF SM NiluW FOR OUN SECTION APPLT E HALF FHE SEED WHILE MOVING SAM AND FORTH ALILOSS TILE ARUL. MAKING A UM.FOW MTEERN• llAUN APPLY THE SECOND HALF IN THE SAME WAY, RIA MOVING AT RW ANGUS TO 111E POST mss MITI CH ALL PLANT GS IMMMATELYAFEEA SEEDIRS. WHEN MNG AGRILL OR ORPADOAST SFREACFR •. v.To LENGTH. 14 DAYS FK)IIE 71mm. IXCWTFOETERS AMP HOW ZONE$. HYDRA" SEEDING SURFACE AOUGHERWIS ES PARTICULARLY IMPORTANT WHEN HYDRAULICALLY SENTING, ASA RCIUCHENEP SLOK WILL PROVIDE SOME NARMA COWRASk FOR LIME, F1)(I1LNER FLEM LE GR4WLIN MEDIUM iOGM) AND NEW. THE SURIFACF SHOULD FRT BE COMPACT ID OR SALOOM TMRE SEE➢BER PRTPARATOm IS Nor NkNSAJNLA FPR HYDRAULIC SEEN NG op8m QNY SOL, CLuO& STONES AN a IRAEGULAR1Ag MIDI CAVITIES W WHICH SEEDS GN IO WF RATE OF FC A AMCATION CATION SHOULD VAIN' BY TYPE AND SHCUM ADHERE lO PCEEDING SREDHE!AITDNS TABLE IFA MACHINERY BREAKDOI414 OF 117 TO? HOURS OCCURS AM WIA MORE SLEW NO O% TAMIL BASED OH TIRE pAG1'OAROFi DIF TPR SLIAERI'AEMAFNING. rH6piWLOWMPENSATE PON, DAMAGE TQ SEED, BEYOND HQLAO, A FULL RATE OF NEW SEW MAY BE NEMRSAV. LIME IS NOT NDWAALLY ARVIN WITH A WDPA4UC;EEOE4 BSCAUSE R 6 ABRASME R CAN BE SLMJN GR BROADCAST ONTO 5T KPROM IN DB'C FORM- MAIWItHANO EME>�'AND OF VEGHATLCN CANNOI BE DETEWAINED NO All FULLY ESTWUS W UNDO SIM COVER HAS PEEN MAINTAINED FDA ONE FUU. YEAR FROM PIAWRNG INSPECF SFELTED AREAS FOR FAII URE AMC MARE NF MARY REPAIRS AMO RESFSQW#Ce* FMJ THF SAME SEASON, IF PgBSMLE REMUNNG AF ASTAND HAS INAMMMTE COVEY RE EVALUATE CHOICE OF PANT MATERIALS AND QUAINTFDES OF ME AND FERPOZ21= REESTAN4H THE STAND AFIg1 SEMIMSO PINATA ION OR OCR -SEED THE STAND. COR UCAPT SEEDING TEMPORARC. ALJNAL PEONS P THE TIME OF YEAR IS 4NOT APPROFgBAIE FOR PTIDAAHEIFt SEEDING. R VEWATIOH IHC.; TO ORM. WL MUST WE TESTED TO DETERMINE IF REJOIN OR NUTRIENT NIEL&ANG E S REP OWIR E FERFULEATON ON THE Tvw-k-DISTURBED SITE FULL ESTAOUSHMENT MAW REQUIRES ME-MFTl7j%POM IN THE SECOND 6AO'fA1VG SEASON. FINE TUR REQUIRES ANNUAL MAINTENANCE FMTULOATFON uff.SDIL TESM4 POSSIBLL LIR FDI LOW THE GJIaF211RE5 GWEN FOR THEW CIHC SEEIBNG MIXTURE SETmIkF9RORGTIDFAs E TSS -ARMS TFIAPORAAT IMOD ROW NFM SUDWIl 5WIPCAT"S SEEOLNR FNR NOTE SEEORNNG "'-IS ' O AO R�.DP6 UU`o ON RAN MEWS TIIT5E IIOCAl10RS MUE GENFAHW➢ AND FINIAL SEE WNILFITOas SH LE PLA" BY THE OYVNmoa RINSER EA wNONAANtAt IWIFLC tOR DURING CONST KUCCOY TEMPORARY UPLAND SEEDING 5PECIFICATiONS SOIL AMEN DMENTS (TEMPORARY UPLAND SEE 01NGI COVERlCOMPAHTON CROPS COMMON MAA! APPLICATION TYPIA%D MULGN, 1AIMPIEA OR SPECIES NATE AMEMDMEMT APPL10 11011 RATE LOCATION SEER EAIX RATE OJWMRQ SOAR NT1LGTgN 147E NOTEt lOLBIM REDLINE PER84 t RYE EARLY FAIL OR m- DB%'AERE) AINCELWCONECPAS SPRING YEAS$ TART OILS CUT. ArxTrcn 5115 HR 7 GOOD GERMWATLDR. DIF! OFT MROCERA RAMOSE BFLOYAVTCP MILLET SPRING.SuMME1I 70.50% WITH FRp^T. DOE$ RPT EASTERN GAMAGRASS E TOLERATE NQWING. APPLY RWLCH BY RCY94% NETFERIL OR MUGWRET,YIIAAE]p,RT+ONBGF GROIAG AGRICULTURAL 2DfA SLOPES .10fA ANNLHL RYE [VENN L71.RJAGAE MACH P-WHILT TACKING AT 400 QALhkORE SEED ILOE. TF5rEl O1i ATAMINIMIM on TA m1SIFSWAi LEMF.5151NC ELYMM CANAOP79S C4WADA YALE RTE 2 04AMA[LR6TAFASCINGTA EAOWIRf✓AraPl AND SOIL AMENOMEHTS WILL BE SRCAOCA.'TT PRIOR TO APPLYING MR-Rpl. APPLY LIME THEgpEOLFgO RATE INDMN WANEW 2 DUOBYSRAWAS PURPLE POP 1 AjaE7YATTUIFRIg51 OLI TENELY WEED RR10-10 FEFOILQflR 150 CDHF FLOWER 1 lill"NU5ANQ8TAGUUS TACK-FSANTAGV SEEO AND BOIL AMENCINNO TWILL BE FttiANTWS PNAYIIR AAA MAXIMWAN'5 SUNFLOWER 1 SLC m-0%TO *7N% ANNUALfm GPNN 45LOVAGRE I4Am LBSNACPS)ON BROADCAST PRIOR TO APIKY11I4D 1 SYMPHYOP.muM RLOSLNA HEA HIAASTER 1 GUM(IBOUSSNim) TACJOFFSE MSKNRLWANCE ROPES.7,SSL ANNUAL Rl'E GRAIN 45 LBSIACAE FGAV- SE ED AND SW I.AMFOIDME7NTBWC FIE R€-fYRALI> NrT3ROWTN IS NPFRUL4Y ACLVL2ATE R2RFFIy, R>:1sRTILI�AAIP MULFyV AWLICATION O: SOL AMEAnMtNrs WITHIN RIPARIAN AREAS sNALLBE EDNauNam ATAGRDNOMIC FNTRS AND SNAIL COMPLY WITH ALL UMEA APPUMA E FEDERAL, STATE AND LOCAL R1G11ATPDNS. SOL AMENDAtr-I1TS SNA LBE APPLIED IN A MANRER THAT MINIMISES QDWACT WTFN SU"ACE WATER, IIp00 L13sIALWq SRWDCJAST PRHCR Tq APpLY1NG Fpµ IM4F-DIATELY FOLLOWING EJpO9DN OR OFFING! DMIAOL DEFINITION CONTRry - i414OFF ANP EROSION ON O6nRL1E0 RIPARIAN AREAS M MAELa INF KIFRMI&L-Vff*TATIVE COVER WFFH NA -NE WARM SEER MU"O" 10 AMU EROSION AND DECREASE SEDIMENT YFND FROM Vill UNNO AREAL, AND TO PUMANMNLV STAIRUn SUCH ARIAS IN A MANNER )HAT 6 ECONOMICAL. ADAPTS TO SOT CONWECIFFM MID ALCI SSELEUCIR OF FILE MOST APAROPRNTE RAW MATERIALS EEEDBm REMEFRL Y�IZAAIFF I 9STAND OF PAPATWA VEGETATION, THE %OIL MM BE THE WCPSOA TFLK7 HAS MEN STOCKPILED UL MNG THE GRADING AND OWAVA-WN OPWATRkFS. FIRS TOP SOL SHOULAAW NAVE THESE OUTSTA • LNROWI{ Hml GFWN wISO.; AND CLA O MATERNL r0 MHN FAIN AcIECURIE MD6tuNE AND NUTRNHT SUPPLY CAYAILAIEL: WAFERIAPAOIY OF. Al LPM DS NTCNLS WATT1 TO 1 MCH CR SOIU. SUFFKOENT NMI SRACE 11) PERAATT BOOT MNFTRAMIN. • SUFFQW OWER OF RRL TO PROVIDE AN ADEQUATE ROOF ]-'ONE THE DEPM TO ROCK CNL IMPFAMEARLE LAVERS RPCH As HARDPAN; SFIWLO gE 171NOIR OA MORE, ERQFPf M SLOPES STEEPER T W W Z 1 V411511E THE AggmON OF SAIL 4 NOF FE,LSIRLz- • A FAVORABLE RK RANGE FOR PLANT 6MCANIH. USUALLY 60-83. • PEE FROM LARGE FOOT; BRANCHES 0-014K LANCE CLOGS OF EARTM DA TRASH OF: ANY CNO. COMAFID SONES MAY R LEPT CAI moPE;;TESFEk MAN 3;1 M THEY ARE TO BE HYD40 REELED a O ANL' CIL ALIM MENTSER E AAEMOi N14DWEY IF FFRTIUj SDI Uy OOP COAASL PEN;E. SF0 a TE)ON BANK fO E I WNTATgN - WATER- EAPPOCATKDH DF VENTIO AMpYpM OF BELOW MAEO, BENEFICIAL L ORP ERM03r RIOT OCCUR WOHLY Ip' OF iq OF SFEIA OR COME IN COWOAAT YArII WATFA RFE SOIL LDNIXDOANRS OLACIBF➢ BELOW ANY RE REHEFYAL OR PRFFEAAiXT. 1QPigl MAY N AW'hD. SRDWDPREPWTKW MT&L i�M05loH AN D SEDIMENTATION CONTROL Pm&:Pm5 upon wONG. NFD COmKm amoiNG ACCORDING TO THE Ar"mcO PLAN. ROUGHEN RIMIAN SURfACF5 BY 11MIN G. RA9M 14MMDVI NG, OR OTHER SWAOLE METHODS PRIOR 10 SETOING. COMPLETE SEEDED] PREPARATION RY BREAMAGO?LARGECIDDS AND RAKING LWTD A BADOM UN IFORM SURFAIS BROADCAST SEED INTO A FRESHLY LOOSENED SHORED TOUT HAS Na-- OEM SB SY RAI NFALL VMO SEED FOR WINE RIPARIAN SLIDING LANNftW, OF NON CERTIFIED SEED IS ASO REOIDIRM Ov LAW. LASFLsCOTAIN INIPMAM AIFORMATICIN ON SEED POwl Y. PRI NWIDN. ANO PREMa CN WOM SEEDS TiEEpS MUSE MEET STAR STNFDARD5 FPR CONIT2KT OF H0KR7l+s YYEEDS [ID FIO AQCM SEEP WIATAINIFG'PWOHIBREQ' ig10005 WEED BSEP APPLY SEED UNIFORMLY M HAND OR PERSCHIML EOUIR4L WITH A SRCUOCMT SPREADER SIMEW USNG NNAOADE:A.RJSEEDIAIG METNDu% SIIBONTM THE AREA WTO Wood ABLE SECTORS AND DETERMINE THE AMOUNT 00 SPEED N-MIJED FCMI EACH SECTION. APPLY VDI$FLLSF THE SEED WHOLE SIRING BACK AND FL414 Ai S THEAAEA MATING A LINEPOW PATfENk THEN APPLY THE SETLND NAL M ME SAMF WAY, RIOT MOVING AT RIfdRT"C'm TD TME RRSF TABS. INAR47101ANOE O:NERAUY. A STAND OF VEGEFATRIN CANNOT BE DMWNED TO RE fMf MASU514M UNM 5OL C17VER HAS RUN MAINTAINED FOR ONE FULL MEAN FROM PLANTING. INSPECT SEEDED AREAS FOR FAntmT AND MAS MCMARY REPASS AND p[STTrur•C: WTFMRN THE SAME SEASON, IF POSSIBLE RESEEDING- IF A STAND HAS INAOWUATE CCVR IWEVALUATE CHORD OF PANT MATERA14 RE KO EUSH THE STAND AFTER SEEpEEL VANENF AAIEON OR Om- SFOD THE STAND ftlOIXG SPBANGTgIFf SEE iheLtS FOR R,MARUUN MEAS SEIAXWS SPECIFICATIONS T415 CUSTOM= W-01NG Wwfifilf WAS MELCPC-D FOR TIPS PROACI V,, AND 1510 BE OBTAINED FNOIA MELLOW MARS FARMS ;919742-jNft pEF1NTTDEF 7DNFIIaLLENG RUNOFF AND EROSION ON DISTURBED WERAY D AREAS R• E5fABu0im PERENIAIAE YEGFTATYE COYER MPN NATIVE WMAN0 NEED- ME EED. PIILPpyI 1' vltc NAND NS ATASE nWl5 TYIELO OF OGT MOST A SIDERS AND TO THAI EFfTLY STATYgE SUCH AREAS wA MANNER T/Ur IS FLDIA}.IICAL ALNNTS TO SRE [PROF[FON; AN0 ALLIN,55E9ECn6N OF T. Rt05'F AFPA6PTUATE PLANT R41TEwALS �Bm AEfLIpRMBT¢ TO MNHTAIN A GOOD STAID OF W ALIO NVVEGETATION, HMEC THE 50K MK5T SIE THE 1gP598 THAT FIRS BEEN 5TOCKPILFD WRING THF [iU,GANG AND ELFEAyATR7Y OVERAraNTs TINTS TOP 501E SHOIiDALSO FN71VE THEE CIWDEAN' . FREE FROM LARGE ROOFS, LAANCHITF SFONES, LAMpE QlMSQ1EURTH, DATRASHOFANY ONO. FD PFmARAYIDN ALL N PKDT IN WFTANI-A MEMANWA. EWSLON AND SOXMENIAMN MNTROE PRACTICK 1E10PE5EEONTG AND NFTIAN GRAOLSTQ ORIGINALS CONTOURS AS MUCH AS PWICPCAALF i 14914 WETAND 5LIFFMFS RP msUMR RAIONO, MPRQWWG OR OTHER SUTABLE METHODS PRH39 TO SERINE CSWUETE SEEDBED PFIVAPATION BY 9NEAMNS UP LARGE CLODS AND AAOLING IN TO A SMOGIR UNIFORM SURFACE BRCMDCASFSQOM1p AFAEk13YLOO5ENED SEEDBED FIM F HAS NOT BEEN SOILED 8Y RAINFALL p ms USE rMlOMO;EEO FOR NATNE YATtAND SEEDING. AIDING OF fRON-CER IFIED SEED 15 ALSO RECuNRCu RY AW. LARELR"FAIN IMPORTANT INFORANTION OFF SEND PJNRT', GERMMTIOt4. AND PRLIMCE OR WOOL SEEDS SELLS MUST MEET STATE SIANOAADS NOR CONYEN) OF'POROUS w&,7S OO NO AMP' 510 COWTNNING'YR0y01 FED, NOMROLd WEED SLED. APPLY SED] UNODIDALY W HAND OR POLSONNE'L hQWK1111 WITH A BRDADCCIR SDIIEADEF. WINER USING BROADCAST -SEEDING METHCOS, SUBOMDE TF IE AREA INTO WORKABLE STCOONS ANC, DETERMAIE WNL AMQuNT Cf SE UD NEEDED fOR CREW+SECTION AFPLT ONE-HALF THE SEED WHILE MOV NG MQK MGD TORT"ACRIM IDLE AREA M"K A UNNOW PATTERN' THEN APPLY I HE SECOND FV UE IN THE SAME WAY-qLn MDA NEE AT FRGfII µ6[L4 TO THE FRET PASS SIOlf_O[APPIY h"CH IN WFTANDS DO NOT AM FT]ITItJER AIAIN1110INRNL4 M-09 T,A51AND OF VEIWAI ON CANNOT LE OMMMMED TO 6E FWIV EST MUSHED UNTIL SOISCOYEA T AA5 BLEFI VAIN IMINE) FOR ONE WILL YEAR FROM PANTING ,NSPKI SEEDED AREAS FIX FAILURE. AND MAKE NF4ESSLARY ROARS AND RESLEDING5 WITHIN THE SAME 5EASDN IF FDESIME 41' A STAN , HAS IHAOEQUATE COKER RFRVAWATE c4ov DIF PLANT MATERIALS. QlASTAINUyt THE STAND AMER SEEDBED PREPARATION OFF OVER- SEED THESTAND �ING'.DlGFICAT1E1N5 -��EHDNG SPECIFIC IrICHJS. FESCUE 15 PRONIBI TU1 IN WEtANO PAPAS NATIVE RIPARURN & WETLANO SEED NAIPM RIPARIAN & WETIAND aped COVERlCOMPAHTON CROPS COMMON MAA! GOVEFOCOMPANKDN CROPS NOTE'S SPECIES COMMON NAME SEASON NAL% NOTES $E'NF['FAFdIF CEREAL OR EARLY SPRING 30 LILVACTIE LXa s 3iTALL 611E NOrA 50ONG Wmm RTE OR FALL STROM A CDMPeTTFVR lOLBIM REDLINE PER84 t RYE EARLY FAIL OR m- SHORTER RYE' LAM ABOUT 2 AINCELWCONECPAS SPRING YEAS$ TART OILS CUT. ArxTrcn 5115 HR 7 GOOD GERMWATLDR. DIF! OFT MROCERA RAMOSE BFLOYAVTCP MILLET SPRING.SuMME1I 70.50% WITH FRp^T. DOE$ RPT EASTERN GAMAGRASS E TOLERATE NQWING. pEF1NTTDEF 7DNFIIaLLENG RUNOFF AND EROSION ON DISTURBED WERAY D AREAS R• E5fABu0im PERENIAIAE YEGFTATYE COYER MPN NATIVE WMAN0 NEED- ME EED. PIILPpyI 1' vltc NAND NS ATASE nWl5 TYIELO OF OGT MOST A SIDERS AND TO THAI EFfTLY STATYgE SUCH AREAS wA MANNER T/Ur IS FLDIA}.IICAL ALNNTS TO SRE [PROF[FON; AN0 ALLIN,55E9ECn6N OF T. Rt05'F AFPA6PTUATE PLANT R41TEwALS �Bm AEfLIpRMBT¢ TO MNHTAIN A GOOD STAID OF W ALIO NVVEGETATION, HMEC THE 50K MK5T SIE THE 1gP598 THAT FIRS BEEN 5TOCKPILFD WRING THF [iU,GANG AND ELFEAyATR7Y OVERAraNTs TINTS TOP 501E SHOIiDALSO FN71VE THEE CIWDEAN' . FREE FROM LARGE ROOFS, LAANCHITF SFONES, LAMpE QlMSQ1EURTH, DATRASHOFANY ONO. FD PFmARAYIDN ALL N PKDT IN WFTANI-A MEMANWA. EWSLON AND SOXMENIAMN MNTROE PRACTICK 1E10PE5EEONTG AND NFTIAN GRAOLSTQ ORIGINALS CONTOURS AS MUCH AS PWICPCAALF i 14914 WETAND 5LIFFMFS RP msUMR RAIONO, MPRQWWG OR OTHER SUTABLE METHODS PRH39 TO SERINE CSWUETE SEEDBED PFIVAPATION BY 9NEAMNS UP LARGE CLODS AND AAOLING IN TO A SMOGIR UNIFORM SURFACE BRCMDCASFSQOM1p AFAEk13YLOO5ENED SEEDBED FIM F HAS NOT BEEN SOILED 8Y RAINFALL p ms USE rMlOMO;EEO FOR NATNE YATtAND SEEDING. AIDING OF fRON-CER IFIED SEED 15 ALSO RECuNRCu RY AW. LARELR"FAIN IMPORTANT INFORANTION OFF SEND PJNRT', GERMMTIOt4. AND PRLIMCE OR WOOL SEEDS SELLS MUST MEET STATE SIANOAADS NOR CONYEN) OF'POROUS w&,7S OO NO AMP' 510 COWTNNING'YR0y01 FED, NOMROLd WEED SLED. APPLY SED] UNODIDALY W HAND OR POLSONNE'L hQWK1111 WITH A BRDADCCIR SDIIEADEF. WINER USING BROADCAST -SEEDING METHCOS, SUBOMDE TF IE AREA INTO WORKABLE STCOONS ANC, DETERMAIE WNL AMQuNT Cf SE UD NEEDED fOR CREW+SECTION AFPLT ONE-HALF THE SEED WHILE MOV NG MQK MGD TORT"ACRIM IDLE AREA M"K A UNNOW PATTERN' THEN APPLY I HE SECOND FV UE IN THE SAME WAY-qLn MDA NEE AT FRGfII µ6[L4 TO THE FRET PASS SIOlf_O[APPIY h"CH IN WFTANDS DO NOT AM FT]ITItJER AIAIN1110INRNL4 M-09 T,A51AND OF VEIWAI ON CANNOT LE OMMMMED TO 6E FWIV EST MUSHED UNTIL SOISCOYEA T AA5 BLEFI VAIN IMINE) FOR ONE WILL YEAR FROM PANTING ,NSPKI SEEDED AREAS FIX FAILURE. AND MAKE NF4ESSLARY ROARS AND RESLEDING5 WITHIN THE SAME 5EASDN IF FDESIME 41' A STAN , HAS IHAOEQUATE COKER RFRVAWATE c4ov DIF PLANT MATERIALS. QlASTAINUyt THE STAND AMER SEEDBED PREPARATION OFF OVER- SEED THESTAND �ING'.DlGFICAT1E1N5 -��EHDNG SPECIFIC IrICHJS. FESCUE 15 PRONIBI TU1 IN WEtANO PAPAS NATIVE RIPARURN & WETLANO SEED REEDING m ATU E COVERlCOMPAHTON CROPS COMMON MAA! SPFlhS COMAAOH NAME SEASON MOI NOTE'S 9CAMCEFUL£ CUREALOR FARLYSFRII'✓. 3p Ul%A P. GROWS B-A'TABL T NOTA BUSFAINI. YANTESImF OM FUS A COMPFDTM Lo"ALICAYYE FERENNIALID4 EARLYFALLOA 20 SON, E40R ER RYE; LASTS MOLTF2 50ONG YEAR?, CHET+ s1Ri OUT. AA'OROPOGON � WOO GEAMIRATIOFI; DEE OFF 6WCQID1 R4MOSE MOAN TOP MILLET STBNC SUMNRR aw% WITH FROST- DIPS NOT AINCELWCONECPAS TOLERATE MOWING. NATIVE RIPARIAN SEEDING SPECIFICATIONS REEDING m ATU E ! COMMON MAA! POPIOENTAGE OF MOt BRANDS RAAGRP,[L6 VIRGINIA A" IIYE 15 AGROF76 PTMIANAMS AUTUMN BENFGMZ 11 AVACUM VIRELATFA4 SWITCRGRASS I AA'OROPOGON � BIG®11EFTW 7 CONPOPSIf IAMCLOUFA AINCELWCONECPAS I REAMINFODA FARXA ArxTrcn 5115 HR 7 SORSHASFRGRK W rNAO INOIANGRASS F mpSAC11MOACrY2=Fs EASTERN GAMAGRASS E WHOENCTYRIUMSCDPARIUM LTTIFRULEgrW 5 AINCIIS EFFuSus SOI RUST A ACHIUMPARL EF01AHM DOMINION FARROW 3 OIDENS AAISSOTA E DENS 3 ELYMM CANAOP79S C4WADA YALE RTE 2 04AMA[LR6TAFASCINGTA PARIVDGE PEA 2 GAWARML PULCkFUA INDMN WANEW 2 DUOBYSRAWAS PURPLE POP 1 AjaE7YATTUIFRIg51 OLI TENELY WEED 1 FCACNALICEA FDRAI/REA CDHF FLOWER 1 lill"NU5ANQ8TAGUUS SWAMP suNFEUlmit I FttiANTWS PNAYIIR AAA MAXIMWAN'5 SUNFLOWER 1 Af(KM4FM PuNcTvA Siam"BEEBAGI T SENASLlidEGRPo1 YALOSONNA 1 SYMPHYOP.muM RLOSLNA HEA HIAASTER 1 VERepG FUy7ATA VILE YEMVAIN 1 NOT_ PEE RWOMMRNDEP AM"TNIN RATE FOR. THE pPARIN! SEER MXWRE ABOVE 6WLOS PER AMIE APFIY;EED AINjNRE EP DISTURBED UP AND NPAMAN AREAS EXTENDING 10-FUT BAA MAW IOILAWNDM MTY AWLICATION O: SOL AMEAnMtNrs WITHIN RIPARIAN AREAS sNALLBE EDNauNam ATAGRDNOMIC FNTRS AND SNAIL COMPLY WITH ALL UMEA APPUMA E FEDERAL, STATE AND LOCAL R1G11ATPDNS. SOL AMENDAtr-I1TS SNA LBE APPLIED IN A MANRER THAT MINIMISES QDWACT WTFN SU"ACE WATER, ARR.CM MULCH My IGT APP11Fif WDHM ERPAWAN ARIAS AS PEA THE GENERAL 5EMING SPK]RCAADHR MULON ISMEM PE ADDLED BR INLAND AADS. EIAtlTg4NM RLSEEDADYER SEED IF GAOWTIi S NOT RILY ADEOLPAM GROUND STAODLIATION SHALL ME PERFOWOED PER TIME FRAMES OMRIRED IN GLP LSUYL SEEDING SIREMCI171GS NATIVE: WI=FLAIR SEERSPEGIFiCAT10N8 REEDING m ATU E rEOES COMMON NAME PERCHNimE OF MRL ■ANICUM:PN�'p REDTOVPAARCa" M PAMQUWAWEFPS RFAIDD RANICGRA55 m FLYAN6YMGAUM VIRGINIA WILD WE 16 CAWILM1iW ILNIO I;HHLO'WDSIDGE E CAA4C4UPYRMAP YOp 3EE)a 7 CARD EX14ORM SQUARRw SEDGE 5 ALWCWFFFLtm SOFT RUSH I SAUR1.WTlj TIRMDCL UZORD5TAIL 2 AINPLLS [NEMESIS WGOLGRASS Z lWTOARIN COU15TWLAW NIM UDWBR 2 89AGNjAR157OL4 SHOWfIFICIOTf➢ 2 +NOIIC11l AKDSCA'MDS TRIMSOAV ROSEMAILOW 2 AAW! S TFNcfA PATI I FLUSH JKC MULSADF0Y9RIM GUM RIUuSEF lA>RAIOWN Rh7L�FPRAPMR NEWMILKIBONINFEP T DATE 09/21/2018 sIGruaElwn WKG W,9.IIII�G 100 IJOIe THE RECDMAIENIKiO APPTT[A1IIXY RA TE FOR RHE NLiWet75EED MI%tURE HIO'lE6Z7 TG .a .S. PNF ACHE APPLY SIED MKCIURE TOOWUR30 WRLIM'D, WENDING, 10 FEET LANDWARD. 5011- AMEIWOe,IENTS SENLAMMUMO116 ARE NOT m RE APPUOI IN WETIANO AREAS MULCH MULCH 15 NOF TO OE APPLIED IN WETLAND AREAS RNKN)ENANC4 rRESEkOlOVERSEE-IS=-S NOT FULL} ADEQUATE, GROUND STAGWATNON WAL BEE POPER RIME FRAMES OL MUCO IN GpYJGISEEDING SpEOFFEAAONS. ENERGY LAND & INFRASTRUCTURE, PLLC NC LICENSE# P-1289 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 WILLIAM K. GUALTIERI 09/21/2018 NORTH CAROLINA SEAL 023464 PROFESSIONAL ENG/ARCH STAMP NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS F%dmoM i1C VI„ Natural Gas COPVRIGHT2014PIEDMONTNATURALGASCORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, INC 28210 LINE 446 — B E L E W S CREEK PIPELINE GENERAL E PSC DETAILS STOKESDALE 1 NC RESOURCE CENTER REIDSVILLE 0 09121118 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 DATE slcwauasHinus n REGIONAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER 1626546 1626546 R E SIGNATUREINn- MGR TECH REC&STD DRAWING BY JKC CHECKED BY SgH DATE 09/21/2018 sIGruaElwn WKG W,9.IIII�G PRINCIPAL ENGINEER APPROVED BY WKG PNG-G-446-0001008 SHEET 89 OF 90 DWG SCALE: AS SHOWN DWG DATE 09/21/18 SUPERSEDED DRAWING NUMBER REVISION PNG- C - 446 - 0001090 0 PING -DISCIPLINE -RESOURCE CENTER -NUMBER HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY HDD is a common method used to install underground utilities through heavily developed areas, roadways, waterways, steep slopes, and environmentally sensitive areas to minimize the surface disturbance that traditional open -cut trenching methods typically require. HDD construction generally limits disturbances along project corridors which may result in a smaller environmental footprint. HDD operations have the potential to release drilling fluids into the surface and subsurface environments through nearby utilities, unconsolidated sediments, fractured bedrock and faulting or other local structural features. The drilling fluid typically will flow into the surrounding rock and sand and travel toward the ground surface. The drilling fluid, a bentonite slurry (other additives may be included as well), is used as a lubricant during the drilling of the bore hole, enabling the rock and soil cuttings from the drilling process to be carried back to a containment bay at the ground surface at the drilling site. It also builds a borehole mud cake or lining which can act as a seal to prevent migration of fluids either into or out of the borehole and enhance the stability and integrity of the bore hole. Bentonite is a non-toxic, naturally occurring clay commonly used for agricultural purposes such as decreasing water loss in ponds and soils. Other common additives include: Additives Functions Polymers Aids in maintaining borehole integrity; control of fluid loss; management of fluid viscosity; cuttings encapsulation; viscosifier, friction reduction and flocculant Clay Inhibitors / Surfactants Reduces swelling and sticking tendencies during drilling operations and down time; torque reduction Drilling Detergents Reduces surface tension and sticking tendency of clay cuttings; aids in prevention of bit balling and mud rings; torque reduction Pyrophosphates Dispersant; aids in thinning and reduction of flocculation in the drilling fluid; aids with bit balling Soda Ash Reduces hardness of make-up water; aids the yielding process Note that there is no hydraulic fracturing of shale for oil or gas production associated with this method of directional drilling on the site. The HDD bores should be designed to provide sufficient depth below water crossings and/or wetlands to reduce the risk of drilling fluid releasing into such features. While drilling, fluid seepage away from the borehole is most likely to occur near the bore entry and exit points where the drill head is shallow; although seepage can occur in any location along an HDD. This Horizontal Direction Drilling Contingency Plan (Plan) establishes operational procedures and responsibilities for the prevention, containment, reporting and cleanup of fluid loss incidents associated with an HDD project. Project drawings and specifications also provide details of the HDD portion of the project. The contractor responsible for the work must adhere to this Plan during the HDD process. Although HDD Contingency Plans are not routinely reviewed or commented upon by regulatory Page 1 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY agencies during project review and approval processes, such plans are often requested by regulatory agencies when Inadvertent Releases (IRs) occur. Therefore, the Plan and IR reports may come under regulatory review during regulatory visits, inspections or IR response actions. The specific objectives of this plan are to: 1. Minimize the potential for a drilling fluid release associated with HDD activities; 2. Protect environmentally sensitive areas; 3. Provide for the timely detection of drilling fluid releases; 4. Ensure an organized, timely, and efficient response in the event of a release of drilling fluid; and 5. Ensure appropriate notifications are made immediately to appropriate Duke Energy project and environmental support staff. Duke Energy will be responsible for notifications to appropriate regulatory agencies. Pre -Construction Measures Before any HDD commences, an environmental safety meeting will take place. This Plan will be discussed, questions answered and any potential conflicts reconciled. The Site Supervisor shall ensure a copy of this Plan is available (onsite) and accessible to all construction personnel. The Site Supervisor shall ensure all workers are properly trained and familiar with the necessary procedures for response to a drilling fluid release prior to commencement of drilling operations. Other best -management measures are listed below: 1. Anticipated drilling fluid mixtures descriptions are to be provided during the project review process, including all product Safety Data Sheets (SDSs) of commercial mud mixes and additives. All such SDSs shall be maintained at the project site. 2. Appropriate HDD drilling fluid spill response items (See Appendix A) shall be kept onsite and used if an IR of drilling fluid occurs. 3. Prior to construction, the work areas must be flagged and the environmental limits defined (wetland boundaries, setbacks, etc.). Erosion and sediment controls will be placed on downgradient sides of the drilling rig location and around the drilling fluid containment bays as a preventative measure against drilling fluids leaving the drill rig site. If the project has not necessitated the preparation of a formal Sediment & Erosion Control Plan, Best Management Plan (BMP) details for appropriate controls should be reviewed and considered from the Duke Energy Construction Stormwater Planning Manual (April 2017; Document GDLP-ENV-EVS-00006). Additional details regarding environmental sensitive areas and construction activities can be found in this document. Fluid Loss Response and Measures The response of the field crew to a drilling fluid loss shall be immediate and in accordance with procedures identified in this Plan. All appropriate emergency actions that do not pose additional threats to sensitive resources will be taken, as follows: 1. Containment bays will be in place at both the drill entry and exit points to prevent drilling fluid from leaving the drill rig site at the entry and exit points. Sufficient freeboard (two (2) feet) shall be maintained in all containment bays. Silt fences, Page 2 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY wattles, or other appropriate measures shall be placed along the downgradient boundaries of the drill rig site. 2. The viscosity, pressure and volume of drilling fluids will be closely observed by the drilling contractor during HDD activities to watch for indications of fluid loss or developing borehole conditions that could increase the likelihood of an Inadvertent Release. 3. Drilling operations will be halted by the drill rig operators immediately upon detection of a loss of circulation, a drop in drilling pressure or any other indicator of fluid loss. The loss of drilling fluid to the surface is typically greatest at shallow locations, typically near the entry and exit points of the HDD. 4. Characterization and documentation of any inadvertent release shall begin immediately. The Site Supervisor and Site Environmental Inspector shall be notified immediately. Once IR identification occurs, the Site Supervisor shall immediately notify Duke Energy Environmental support staff. Photographs, details of the release, location, volume released, receiving stream characteristics and other important information should be collected and reported immediately to the appropriate Duke Energy Environmental staff. Containment efforts in accordance with this Plan shall commence immediately but clean-up of drilling fluid IRs must wait until appropriate consultation and concurrence from Duke Energy Environmental support staff. 5. In the event of a loss of drilling fluid, the Site Supervisor and Site Environmental Inspector shall conduct an evaluation of the situation and direct recommended mitigation actions, based on the following guidelines of the severity of the fluid loss: a. If the loss of drilling fluid is minor, easily contained, has not reached the surface and is not threatening environmentally sensitive areas, drilling operations may resume after use of an approved leak stopping compound, redirection of the bore or alteration of drilling techniques as applicable based on site geological conditions and equipment or operator capabilities. b. If drilling fluid reaches the land surface, the area will be isolated with silt fence, wattles or similar measures to contain drilling fluid. i. A containment or relief bay may be installed on high ground to keep drilling fluid from reaching environmentally sensitive areas and removal will begin by vac -truck or hand tools. ii. In areas that cannot be reached by a vac -truck for drilling fluid removal, a tiered system of contained areas will relay drilling fluid to a location accessible by a vac -truck and removed. iii. If it is not possible to relay drilling fluid to a suitable location for removal by a vac -truck, drilling contractor workers will use hand tools and vacuums to remove the drilling fluid from contained areas. iv. Any material coming into contact with drilling fluids shall be removed to a depth where there are no visible signs of the spilled material, contained and properly disposed of, as required by Duke Energy policies. The drilling contractor shall be responsible for ensuring that the drilling fluid material is either properly disposed of at an approved Page 3 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY disposal facility or properly recycled in an approved manner. Contractor must provide Duke Energy with documented proof of disposal. c. If drilling fluid reaches the surface in surface waters or wetlands, the following actions will be initiated. i. For low volume, low flowing streams, a coffer dam (or equivalent) for containment will be installed downstream. ii. Photographs, details of the release, location, volume released, receiving stream characteristics and other important information should be collected and reported immediately to the appropriate Duke Energy Environmental staff. iii. For higher volume, larger flowing streams, a coffer dam (or equivalent) may be installed both upstream and downstream. Consideration should be given to use of bypass pumping to ensure no flooding or potential loss of containment. iv. Removal of drilling fluid released to high -ground will begin by appropriate equipment or hand tools immediately. If the fluid loss is widespread, the Site Supervisor may discuss the use of a vac -truck with Duke Energy Environmental staff. v. Due to potential adverse environmental impacts, no released material located within streams or wetlands shall be removed without prior discussion with Duke Energy Environmental support staff. vi. Duke Energy Environmental support staff will be responsible for any regulatory notifications. Response Close-out Procedures When the IR has been contained and cleaned up, response closeout activities will be conducted at the direction of the Site Supervisor and Site Environmental Inspector and shall include the following: 1. The recovered drilling fluid will either be recycled or hauled to an approved facility for disposal. Contractor shall provide Duke Energy Environmental support staff with documented proof of disposal. No recovered drilling fluids or materials will be discharged into streams, wetlands, storm drains or any other environmentally sensitive areas; 2. All spilled drilling fluid excavation and clean-up high ground sites will be returned to pre - project contours using clean fill, appropriate seeding activities, as necessary. Clean up to areas within wetlands, streams or other sensitive environmental areas will be on a site specific basis in consultation with Duke Energy Environmental support staff and regulatory agencies, if appropriate; and 3. All containment measures (wattles, straw bales, silt fences, etc.) will not be removed until the site is properly stabilized and such removal is authorized by Duke Energy Environmental support staff. Page 4 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY In addition to the HDD IR Documentation Form (See Appendix B) the Site Supervisor and Site Environmental Inspector shall record narrative details of drilling fluid losses or IRs in their daily log. The narratives shall include any notes or details regarding containment, characterization, cleanup or stabilization activities not otherwise captured from the HDD IR Documentation Form. Construction Re -start For small releases which do not reach surface waters, wetlands or other environmentally sensitive areas, drilling may continue if the release is promptly contained and cleaned up, and at least one member of the clean-up crew remains at the drilling fluid loss location throughout the remainder of the drilling of the bore. For all other releases which impact environmentally sensitive areas, construction activities will not restart without prior approval from Duke Energy Environmental staff. IRs into environmentally sensitive areas will require at least one member of the clean-up crew to remain at the drilling fluid loss location throughout the remainder of the drilling of the bore as well as having one member track with, or slightly behind, the drilling head to observe any signs of potential releases. Bore Abandonment Abandonment of the bore will only be considered when all efforts to control the drilling fluid loss within the existing HDD have failed or borehole conditions have deteriorated to the extent that completing the bore is infeasible. The borehole will be completely abandoned and a new location determined. Any borehole abandonment locations will be documented and shown on any as -built documents. The following steps will be implemented during abandonment of the borehole: 1. Determine the new location for the HDD crossing. 2. Insert casing, as necessary to remove the pilot string. 3. Pump a thick grout plug into the borehole to securely seal the abandoned borehole. Communications During an HDD Project Communications for routine aspects of an HDD should be between the HDD Contractor Site Supervisor and Duke Energy/Piedmont Project Manager. During IRs, the Duke Energy Environmental Support staff should be incorporated into such dialogs for guidance and concurrence on IR response actions. The Duke Energy Environmental Field Support staff will provide IR details to the Duke Energy Water Subject Matter Expert (SME) for consultation and determinations regarding regulatory notifications and response activities. The Duke Energy Water SME will consult with appropriate Duke Energy management representatives regarding verbal and/or written regulatory notifications and guidance for any response actions. Design consultant should also be integrated into the activities to benefit from experience or educational opportunities to improve or enhance HDD design or construction aspects. Page 5 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY Appendix A - HDD Drilling Fluid Spill Response Items Containment, response, and clean-up equipment will be readily available at the HDD site to assure a timely response to IRs. Equipment may include, but is not limited to: - shovels, push brooms, squeegees, trowels, pails and/or other appropriate hand tools - hay or straw bales, wattles and wooden stakes - silt fence, T -bar posts, post pounders - plastic sheeting or geotextile fabric - sediment/silt curtains, sand bags, absorbent booms or pads - pumps with sufficient suction & lifting heads; control & check valves and leak -free hoses - tanks for non -potable water and/or waste mixture storage - extra radio, cellular phone(s), batteries, flashlights, lanterns - wetland mats for worker foot -traffic into wetlands - wetland mats for equipment - earth moving equipment (backhoes, dozers, skid -steers, as appropriate) - standby generator(s), light plant, lights and towers, electrical cords - secondary containment for all on-site mobile equipment, fuel, lube or other chemical storage containers - vacuum truck (or on 24-hour call) - boat with oars or outboard motor (or on 24-hour call) - SDS sheets for all on-site materials Page 6 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY Appendix B - HDD Inadvertent Release Documentation Project Name/Number: Location/Address (Narrative description if necessary, project drawing #, station #, lat/long, GPS coordinates, etc.): Include County of incident Project type: Resource Center or Major Project? Site Supervisor / Contractor / Cell Phone Number: Reported By / Cell Phone Number: Release Date (mm/dd/yyyy): Release Time (hhmm): Estimated Impacted Area (Dimensions - length, width (ft) & depth (in.): Characterization (fluid type) and Estimated Release Volume (gallons) Estimated Duration of Release (min.): Potential or Actual Environmental Impacts (wetlands, waterbody (stream name if known), drainageways, or other areas within 100 feet of water): Contained To Permitted ROW? (Yes/No) Assessibility Requirements (4x4, equipment or worker access mats, hose length, etc): Proposed method of drilling fluid / waste recovery: Proposed waste material storage or disposal plan: Proposed disposal site for waste material: Photo Documentation (provide pre -cleanup photos of IR, upgradient, downgradient views, impact areas) Page 7 July 12, 2018 SAW -2018-00885 Determination of Jurisdiction: A. ® There are waters including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ® The jurisdictional areas, beginning at the western terminus of PNG Line 446 and extending west to existing Duke Energy — Belews Creek Steam Station infrastructure, have been identified under a previous action. Please reference the Approved Jurisdictional Determination issued 11/26/2018. Action ID: SAW -2018-00885. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 12/3/2018. Remarks: The updated maps showing the verified extent of potential waters of the US in the project area were submitted by Suzanne Herron (Energy Land & Infrastructure, PLLQ via e-mail on 10/5/2018. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=Dou=PKI, ou=USA, cn=BAIBAILEY.DAVID.E.1379283733736 Corps Regulatory Official: Date: 2018.12.0410:46:29-05'00' David E. Bailey Date of JD: 12/3/2018 Expiration Date of JD: Not applicable SAW -2018-00885 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Piedmont Natural Gas (Attn: Ned Dietrich) File Number: SAW -2018-00885 Date: 12/3/2018 Attached is: See Section below LAPPROVED PROFFERED PERMIT Standard Permit or Letter of ermission A RED PERMIT Standard Permit or Letter of ermission B DENIAL C JURISDICTIONAL DETERMINATION D INARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.gM.mil/Missions/CivilWorks/Reu� latoryProgramandPermits.asox or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the fixture. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section I1 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. SAW -2018-00885 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: David E. Bailey CESAD-PDO Raleigh Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 3331 Heritage Trade Drive, Suite 105 Atlanta, Georgia 30303-8801 Wake Forest, North Carolina 27587 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportum to participate in all site investi ations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Action ID Number: SAW -2018-00885 County: Guilford/Rockingham/Stokes Permittee: Piedmont Natural Gas (Attn: Ned Dietrich) Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline Date Verification Issued: 12/4/2018 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2 @usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date ATTACHMENT A PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): 12/3/2018 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Rahlff Ingle (fiat Cordy & Associates Ire,) 201 N. Front St., Suite 307, Wilmington, NC 28401 ringle@dialcordy.com (910) 228-0212 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: SAW -2018-00885 (Piedmont Natural Gas / Line 446 / Belews Creek Pipeline / Guilford / Rockingham / Stokes / commercial) D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Piedmont Natural Gas - Belews Creek Steam Plant Natural Gas Pipeline Project (-9 linear miles) (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: Guliford,Rockingham, Stokes City: Stokesdale/Walnut Cove Center coordinates of site (lat/long in degree decimal format): Lat. 36.258550° °N; Long. -79.986141° Universal Transverse Mercator: RLTA Name of nearest waterbody: UT to Haw River, Troublesome Creek and UTs, UTs to Little Hogans Creek, UTs to Hogans Creek, UTs to Belews Creek, Belews Lake and UTs Identify (estimate) amount of waters in the review area: Non -wetland waters: See attached table linear feet: 2000 width (ft) and/or -2 acres. Cowardin Class: Stream Flow: jTj011 F we 0 -0.5 acres. L2, R3, and R4, Perennial and Intermittent (seasonal) Cowardin Class: See attached table PFO and PEM Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E REVIEW PERFORMED FOR SITE EVALUATION APPLY): ❑ Office (Desk) Determination. Date: 0 Field Determination. Date(s): 8/1 and 8/2/2018 (CHECK ALL THAT SUPPORTING DATA, Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ✓❑ Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Aerial, soils, and topo maps (Dial Cordy & Assoc.) ❑f Data sheets prepared/submitted by or on behalf of the app ' nt/consultant. X Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters` study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data ❑ USGS 8 and 12 digit HUC maps ❑" U.S. Geological Survey map(s). Cite scale & quad name: Belews Lake, rMsboro,Summerfield 0 USDA Natural Resources Conservation Service Soil Survey. Citation: Guilford Rockingham, and Stokes Cos. ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMAIFIRM maps: ❑ 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) 0 Photographs: 0 Aerial (Name & Date): 2014 ESRI ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: 0 Other information (please specify): LiDAR (NC Floodmaps) or 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by BAI LEY.DAVI D.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVI D.E.1379283736 Date: 2018.12.03 15:30:30 -05'00' Signature and date of Regulatory Project Manager (REQUIRED) 4 Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) EEI- RALEIGH REGULATORY F1ELO OFFICE- 4 FFICE Site number Latitude Longitude (decimal (decimal degrees) degrees) Estimated amount of Type of aquatic resource Geographic authority to aquatic resource in (i.e., wetland vs. non- which the aquatic review area (acreage wetland waters) resource "may be" and linear feet, if subject (i.e., Section 404 applicable) or Section 10/404) Wetland 1 36.23992 -79.924568 359 sq. ft. Wetland Section 404 Wetland 2 36.23978 -79.9245 0 Wetland Section 404 Wetland 3 36.24365 -79.927788 2054 sq. ft. Wetland Section 404 Wetland 5 36.24825 -79.931566 8980 sq. ft. Wetland Section 404 Wetland 6/7 36.25035 -79.93672 37338 sq. ft. Wetland Section 404 Wetland 8/13 36.25417 -79.946897 0 Wetland Section 404 Wetland 9 36.25445 -79.947416 961 sq. ft. Wetland Section 404 Wetland 10/11 36.25468 -79.947597 1287 sq. ft. Wetland Section 404 Wetland 12 36.25474 -79.947852 3081 sq. ft. Wetland Section 404 Wetland 14 36.255 -79.948407 1232 sq. ft. Wetland Section 404 Wetland 15 36.25589 -79.950668 4058 sq. ft. Wetland Section 404 Wetland 16 36.25566 -79.950779 0 Wetland Section 404 Wetland 17 36.25879 -79.961443 0 Wetland Section 404 Wetland 18 36.25865 -79.961525 0 Wetland Section 404 Wetland 19 36.25824 -79.980174 0 Wetland Section 404 Wetland 20 36.25833 -79.978332 2097 sq. ft. Wetland Section 404 Wetland 21 36.25986 -79.995108 612 sq. ft. Wetland Section 404 Wetland 22/23 136.26088 -80.001207 0 Wetland Section 404 Wetland 26 36.27711 -80.049998 2509 sq. ft. Wetland Section 404 Wetland 27/28 36.26997 -80.017757 1727 sq. ft. Wetland Section 404 Wetland WV 36.2584 -79.978667 1000 sq. ft. Wetland Section 404 Wetland WY 36.25513 -79.948596 10 sq. ft. Wetland Section 404 Wetland WX 36.24005 -79.924695 1251 sq. ft. Wetland Section 404 Wetland WZ 36.25504 -79.948353 2000 sq. ft. Wetland Section 404 Stream 1 36.24004 -79.924779 143 linear feet Non -wetland Water Section 404 Stream 2/29 36.2483 -79.931976 101 linear feet Non -wetland Water Section 404 Stream 3 36.25033 -79.936895 224 linear feet Non -wetland Water Section 404 Stream 4 36.25041 -79.937119 130 linear feet Non -wetland Water Section 404 Stream 5 36.25057 -79.937382 109 linear feet Non -wetland Water Section 404 Stream 6 36.25224 -79.941856 140 linear feet Non -wetland Water Section 404 Stream 7/8 36.25468 -79.947666 510 linear feet Non -wetland Water Section 404 Stream 9 36.25566 -79.950583 0 Non -wetland Water Section 404 Stream 12 36.25913 -79.97225 171 linear feet Non -wetland Water Section 404 Stream 13 36.25897 -79.968865 104 linear feet Non -wetland Water Section 404 Stream 14 36.25897 -79.967678 152 linear feet Non -wetland Water Section 404 Stream 15 36.25895 -79.961585 0 Non -wetland Water Section 404 Stream 16 36.2584 -79.978667 54 linear feet Non -wetland Water Section 404 Stream 17 36.25832 -79.978432 61 linear feet Non -wetland Water Section 404 Stream 18 36.2585 -79.989043 51 linear feet Non -wetland Water Section 404 Stream 19 36.25867 -79.98992 131 linear feet Non -wetland Water Section 404 Stream 20/35 36.26036 -79.999276 159 linear feet Non -wetland Water Section 404 Stream 21 36.27286 -80.022007 105 linear feet Non -wetland Water Section 404 Stream 22 36.27025 -80.017581 0 Non -wetland Water Section 404 Stream 23 36.27051 -80.017923 0 Non -wetland Water Section 404 Stream 24 36.26648 -80.011548 0 Non -wetland Water Section 404 Stream 25 36.26526 -80.009779 113 linear feet Non -wetland Water Section 404 Stream 26 36.27515 -80.030273 122 linear feet Non -wetland Water Section 404 Stream 27 36.26689 -80.003619 0 Non -wetland Water Section 404 Stream 28 36.25817 -79.973361 0 Non -wetland Water Section 404 Stream 30 36.25853 -79.953405 0 Non -wetland Water Section 404 Stream 31 36.26179 -79.954757 146 linear feet Non -wetland Water Section 404 Stream 32 36.26151 -79.954914 6 linear feet Non -wetland Water Section 404 Stream 33 36.25974 -79.962679 133 linear feet Non -wetland Water Section 404 Stream 34 36.26152 -79.955965 103 linear feet Non -wetland Water Section 404 Stream SS 36.25506 -79.947981 0 Non -wetland Water Section 404 Stream SR 36.25652 -79.978834 30 linear feet Non -wetland Water Section 404 Pond 1 36.2555 -79.949844 0 Non -wetland Water Section 404 Pond 2 36.26683 -80.003056 0 Non -wetland Water Section 404 Pond 3 36.2601 -79.997822 0 Non -wetland Water Section 404 Pond 4 36.25839 -79.97916 7489 sq. ft. Non -wetland Water Section 404 Pond 5 36.25791 -79.97346 0 Non -wetland Water Section 404 Belews Lake 36.27623 -80.039101 127055 sq. ft. Non -wetland Water Section 404 X STREAM 1 WETLAND 2 WETLAND WX STREAM 40' TEMP DEPICTED IN GUILFORD / COUNTY SOIL / SURVEY - NO / FEATURE / PRESENT / I / EXISTING CULVERT \ / WETLAND 1 65' TEMP 60' PERM I � - I I Ccoso I I � Rom I I 1 tis I PROPOSED ALIGNMENT GRAPHIC SCALE (IN FEE 200 0 100 200 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 rev. 10/03/18 SHEET 3 OF 31 add non-jd stream / 40' / WET / STREAM DEPIC GUILFORD COU SOIL SURVEY - / FEATURE PRES It Piedmont PREPARED BY ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas lio� 1015 PASSPORT WAY; NORTH CAROLINA P-1 919-234-1974 WW W.E LI # -LLC.COM•LICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 4 OF 31 r 0 GRAPHIC SCALE (IN FEET) 0 100 200 400 1 inch = 200 ft. PREPARED BY Piedmont � ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL rs WETLAND 16 WETLAND 8/13 POND 1 WETLAND 12 ATREAM 9 STREAM 7/8 EXISTING WETLAND 14 CULVERT r � 60' PERM PROPOSED - - . — ALIGNMENT WETLAND \ \ 10/11 WETLAND 9 WETLAND .15 \ \ STREAM SS 140'TEMP \ \ WETLAND WY \ i % \ i\ WETLAND WZ 65' TEMP \ \ GRAPHIC SCALE (IN FEET) 00 -1 11 7 m m a \ 20 -AIM ..40 \ STREAM 30 60' PERM PROPOSED ALIGNMENT 30' ACCESS 40' TEMP ROAD EXISTING - CULVERT STREAM 32 - vo / v , STREAM 31 / / /Am / / / / O 1.09 cAPaP STREAM 34 \ GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 9 OF 31 PREPARED BY 0 Piedmont � ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WW W.E II-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL Y> / / /Am / / / / O 1.09 cAPaP STREAM 34 \ GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 9 OF 31 PREPARED BY 0 Piedmont � ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WW W.E II-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 10 OF 31 • GRAPHIC SCALE (IN FEET) 0 100 200 1 inch = 200 ft. 400 — — — — — — — — — — — — — — — — — s. 65' TEMP PREPARED BY Piedmont � ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL 0 GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP Piedmont Gas ' PREPARED BY: ENERGY LAND & INFRASTRUCTURE, PLLC 1015 PASSPORT WAY- NORTH CAROLINA 27 919-234-1974 P-1 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL DATE 05/10/18Natural SHEET 11 OF 31 NM GRAPHIC SCALE (IN FEET) 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 17 OF 31 4l! Piedmont Natural Gas PREPARED BY: ENERGY LAND & INFRASTRUCTURE, PLLC 1015 PASSPORT WAY- NORTH CAROLINA 27513 919-234-1974 • WWW.ELI-LLC.COM•LICENSE # P -12B9 Ir ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL y„uRCf ROAD. l \ \1 \ I/ 30' ACCESS 40' TEMP WETLAND 65' TEMP // / ROAD 27/28 / \\- STREAM 23 STREAM 22 \- PROPC 60' PERMi,,� ALIGN LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 21 OF 31 4l! Piedmont Natural Gas GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. --I- PREPARED BY: ENERGY LAND & INFRASTRUCTURE, PLLC 1015 PASSPORT WAY- NORTH CAROLINA 27513 919-234-1974 • WWW.ELI-LLC.COM•LICENSE # P -12B9 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 22 OF 31 PREPARED BY Piedmont � ENERGY LAND & INFRASTRUCTURE, PCLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA # P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 23 OF 31 Piedmont � PREPARED BY ENERGY LAND & INFRASTRUCTURE, PCLC r6lib Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA # P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 25 OF 31 I ._f�.d PREP RED BY Piedmont ENER6Y LAND & INFRASTRUCTURE, PLLC 1015 PASSPORT WAY- NORTH CAROLINA 27513 919-234-1974 - WWW.ELI-LLC.COM -LICENSE # P-1289 Natural Gas ENGINEERS - SURVEYORS - INFRASTRUCTURE ENVIRONMENTAL GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 26 OF 31 IN Piedmont PREPARED BY ENERGY LAND & INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL f r' GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 27 OF 31 IN Piedmont PREPARED BY ENERGY LAND & INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL at C) GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 28 OF 31 PREPARED BY Piedmont � ENERGY LAND b INFRASTRUCTURE, PLLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL 40' TEMP PROPOSED / \ ALIGNMENT / 60' PERM STREAM SR 30' ACCESS , ROAD GRAPHIC SCALE (IN FEET) 200 0 100 200 400 1 inch = 200 ft. LINE 446 BELEWS CREEK PIPELINE JURISDICTIONAL RESOURCES MAP DATE 05/10/18 SHEET 31 OF 31 I] / PREPARED BY Piedmont � ENERGY LAND b INFRASTRUCTURE, PCLC Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA 27513 P-1 919-234-1974 WWW.EII-IIC.COM•IICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL