HomeMy WebLinkAbout20170730 Ver 2_Nov 30 inspection_20181205Wetland Inspection Report
Project Num: 20170730 Version: 2
Project Name: NCDOT - Winston Salem Northern Beltway Eastern
County: ForsythSection (U-2579C)
Location: NCDOT - Winston Salem Northern Beltway Eastern Section (U-2579C)
Latitude: +36° 09'
SW Plan Location
Site Owner Name NC DOT Division 9
Inspection Date: 11/30/2018
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Title:
❑ Not Compliant
Status: Issued
Project Type: New Road/Highway
Region: Winston-Salem
Longitude: -80° 10' 11"
Phone:
Phone: 336-776-9703
page: 1
Site Number: 20170730
Inspection Date: 11/30/2018
Owner: Tippett, Lyndo
Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑
Are the culverts and/or filled areas installed properly? �❑❑❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑
Comment: Division 9 DEO, USACE and myself reviewed Sites 12 (temporary impacts for bridqe crossinq); 13
(temporary fill, wetland equalizer); 11 (constructed riffle), 7a (culvert outlet) and 3A (culvert outlet) to
assess installation and other impacts. All Sites were in compliance and built to plans.
page: 2