Loading...
HomeMy WebLinkAbout20170730 Ver 2_Nov 30 inspection_20181205Wetland Inspection Report Project Num: 20170730 Version: 2 Project Name: NCDOT - Winston Salem Northern Beltway Eastern County: ForsythSection (U-2579C) Location: NCDOT - Winston Salem Northern Beltway Eastern Section (U-2579C) Latitude: +36° 09' SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 11/30/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -80° 10' 11" Phone: Phone: 336-776-9703 page: 1 Site Number: 20170730 Inspection Date: 11/30/2018 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: Division 9 DEO, USACE and myself reviewed Sites 12 (temporary impacts for bridqe crossinq); 13 (temporary fill, wetland equalizer); 11 (constructed riffle), 7a (culvert outlet) and 3A (culvert outlet) to assess installation and other impacts. All Sites were in compliance and built to plans. page: 2