Loading...
HomeMy WebLinkAboutU-5892 Public Meeting Handout.pdfState Transportation Improvement Program (STIP) Prniect No. U-5892 Public Meeting fl�, NOR7H C �� ��i bs� � m � s9�, � GREENSBQRCi �FaT os rn�NB� Proposed Widening of U.S. 220 (Battleground Ave.) From Westridge Road to the Eastbound I-840 Ramps in Greensboro The N.C. Department of Transportation and the City of Greensboro propose to widen U.S. 220 (Battleground Avenue) from north of Westridge Road to the eastbound I-840 ramps in Greensboro. The existing roadway will be upgraded to a six-lane, median-divided road with a 5-foot wide sidewalk on both sides. Traditional intersections are proposed at New Garden Road, Brassfield Road, and Cotswold Avenue. Additional median breaks are proposed to allow left-turns at several other intersections. The purposes of the project are to address congestion now and through 2040, and to improve safety along Battleground Avenue. Widening the road will improve mobility along the corridor and is consistent with previous City transportation plans and the Greensboro Urban Area Metropolitan Planning Organization (MPO) Comprehensive Transportation Plan (June 2010). ��;�., ,a�;� ��1�,�,:r ' ::«u,s�e ,N,�ati�oiiai� � ii;�tar.y�Pa�" rk� • Traffic operations are expected to continue to worsen as trafFicvolumes increase and improvements are needed to accommodate these increases. • Past crash rates are higher than statewide average crash rates for similar roads (576.13 vs. 341.85 crashes per million vehicle miles traveled). Safety is a high priority for the City of Greensboro as part of their Vision Zero strategy. A median reduces potential conflicts between vehides. • The Future I-840 Loop (NCDOT Project U-2524C) is under construction. The interchange with U.S. 220 is anticipated to be open by early 2019. • Project U-5306B will improve the U.S. 220/Westridge Road intersection. Construction is expected to begin in spring 2019. • The City of Greensboro proposes to add a roundabout at the intersection of Cotswold Terrace and Old Battleground Avenue. Construction is anticipated to begin in spring 2019. � � November 13, 2018 Page 2 Widening of U.S. 220 (Project No. U-5892) From Westridge Road to the Eastbound I-840 Ramps The purpose of this public meeting is to provide information on the project and gather input from the public. You may submit written comments tonight by using the attached comment sheet. You may also submit comments via mail or email to Teresa Gresham (contact information below) no laterthan December7, 2018. Comments received will be taken into consideration as the project develops. U.S. 220 is currently 5lanes (2lanes in each direction with a centertwo-wayturn lane). The proposed project would widen U.S. 220 to 6 lanes (3 in each direction). A grassed median, in addition to improving safety, will accommodate separate turn bays into many of the side streets. Sidewalks will be added on both sides. � • Environmental document: Spring 2019 • Approved design: Fall 2019 • Begin right of way acquisition: Fiscal Year 2020 • Begin construction: Fiscal Year 2021 �. !if�� • Estimated project cost: $17.5 million Costs and schedule are according to the current 2018-2027 STIP and are preliminary and subject to change Stay Informed! Tonight's maps are on the project website: www.ncdot.gov/projects/us-220-widening-greensboro For questions or comments, contacts information is below (reference NCDOT Project U-5892). Teresa Gresham, P.E. Consultant Project Manager Kimley-Horn 421 Fayetteville Street, Suite 600 Raleigh, N.C. 27601 teresa.greshamC�kimley-horn.com (919) 677-2194 Jennifer Evans, P.E. NCDOT Project Manager NCDOT Division 7 P.O. Box 14996 Greensboro, NC 27415-4996 jenniferevansC�ncdot.gov (336) 487-0075 Connecting people, products, and p/aces safely and efficiently with customer focus, accountability and environmental sensitivity to enhance the economy and vitality of North Carolina. i � � � � � � 5 4.5 �� 1 l `1 i i 23' 11 11 11 2 4.5 5" w 5idewalk Travel Lane Travel Lane Travel Lane Median Travel Lane Travel Lane Travel Lane 5idewalk TITLE VI PUBLIC INVOLVEMENT FORM Completing this form is completely voluntary. You are not required to provide the information requested in order to participate in this meeting. Meeting Type: Open HousePublic Meeting Date: November 13, 2018 Location: Fellowship Presbyterian Church, 2005 New Crarden Road, C�eensboro TIP No.: U-5892 ProjectDescription:ProposedWideningofU.S.220 (BattlegroundAvenue)fromWestridgeRoadtothe EastboundI-840Ramps in Greensboro,NC In accordance wilh Title VI of 1he Civil Rights Act of 1964 and related authorities, the N.C. Departrnent of Transportation assures that no person(s) shall be excluded from participation in, denied ihe benefits of, or subjected to discrimination under any of ihe DeparfinenYs programs, policies, or activities, based on their race, color, national origin, disabiliiy, age, income, or gender. Completing this form helps meet our data collection and public involvement obligations under Title VI and NEPA, and will improve how we serve the public. Please place 1he completed form in ihe designated box on ihe sign-in table, hand it to an NCDOT oficial or mail it to the Environmental Analysis Uni� 1598 Mail ServiceCenter, Raleigh, NC 27699-1598. All forms will remain on file at 1he NCDOT as part of 1he public record. 7ip Code: Ge nde r: ❑ Male ❑ Female Street Name: Age: (i.e. Main Streefl ❑ I.ess than 18 ❑ 45-64 Total Household Income: ❑ 18-29 ❑ 65 andolder ❑ L,ess than $12,000 ❑ $47,000 — $69,999 ❑ 30-44 ❑ $12,000 —$19,999 ❑ $70,000 —$93,999 ❑ $20,000 — $30,999 ❑ $94,000 — $117,999 Have a Dis ability: ❑ Yes ❑ No ❑ $31,000 — $46,999 ❑ $118,000 or greater Race/Ethnicity: National Origin: (if bom outsidethe U.S.) ❑ White ❑ Mexican ❑ Black/AfricanAmerican ❑ CentralAmerican: ❑ Asian ❑ SouthAmerican: ❑ American Indian/AlaskanNative ❑ European: ❑ NativeHawaiian/PacificIslander ❑ Chinese ❑ Hispanic/Latino ❑ Vietnamese ❑ Other(please specify): ❑ Korean ❑ Other(please specify): How did you hear about ihis meeting? (newspaper advertisemen� flyer, andlor mailing) For more information regarding Ti�e VI or lhis reques� please contact ihe NCDOT Title VI Nondiscrimination Program at (919) 508-1808 or toll free at 1-800-522-0453, or by email at titleVl(a�ncdotgov. Thank you for your participation! 11 NCDOT- EnvironmentalAnalysis Unit Attn: Samantha Borges 1598 Mail Service Center Raleigh, NC 27699-1598 Public Meeting Comment Sheet Widening of U.S. 220 (Battleground Avenue): Project U-5892 Please clearly PRINT the information below. Name: Add ress: Email (optional): Phone: November 13, 2018 STIP Project No. U-5892 Please check all that apply: ❑ Resident near the corridor ❑ Interested community member ❑ Business representative (list business) Comments/Questions: Comments on the proposed U.S. 220 widening design: Comments on the proposed access to businesses and neighborhoods: Other comments: Please submit your completed comment sheet at the meefing or mail no later than December 7, 2018. PLACE STA M P HERE Teresa Gresham 421 Fayettevil le Street Suite 600 Raleigh, N.C. 27601 � �.,,, � , '�o, STIP Project No. U-5892 � Proposed Widening of U.S. 220 (Battleground Avenue) in Greensboro 9f� oe� FNT OF TP�Ng¢ FOLD HERE IL\» rr_��a HERE HERE