Loading...
HomeMy WebLinkAboutNC0039594_Industrial User_20181128 /.<5.•,0*YrIT9 A ,UfCA` TOWN OF MAIDEN 11 ` 1 Wastewater Treatment Plant } 7'-'4.tdCUd VOdAtt� ,. -® }r 19 N. Main Ave • Maiden, NC 28650 Office (828) 428-5032 • Fax (828) 428-5606 RECEIVEDIDEN[!D\NR SEPREMBER 00 0000 NOV ? S 2018 Water Resp Permitting ect on PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Subject" Request to drop Industrial Pretreatment Permit Permit IUP#001 40 CFR Category 433 GKN Driveline Maiden, N.C. Vivien Zhong : I, am writing in response, to Industrial Pretreatment User, (IUP)#001 40 CFR Category 433 GKN Driveline,To request to drop there permit from the Town of Maiden, Pre Treatment Program and To also put the Town of Maiden Pre Treatment Program to inactive status. On 8/22/2018 I received A email from Mr. Lawrence Kearson stating that GKN had stopped discharge from the pre treatment Facilities located at 1848 GKN Way to the Town of Maiden Waste Water Treatment Plant. The stoppage is in preparation of the dismantling of the current system, and the installation of the new Evaporation unit that will treat the wastewater going forward. In regards Mr. Kearson also stated that they would be no quarterly sampling for the current quarter as required by permit, and the flow log will show discharge through 8/21/2018. I also requested him to continue to send me flow logs to keep On file and records through this process. Upon completion of this project, I have went back and done a Final walk through and inspection to assure that everything is accurate, and one hundred percent to my satisfactory. I see no for seen reason why GKN needs to be on a IUP permit for the Town of Maiden At this point and time, and I highly recommend and request to drop there permit status. If you have any questions at all in regards to this request please feel free to contact me at (828) 428-5032 or (828)-320-9728 or thedrick@maidennc.gov P.S I have enclosed a copy of GKN final inspection report. Sincerely, Timothy R Hedrick, ORC Town of Maiden, WWTP Wednesday,October 31, 2018 at 1:25:33 PM Eastern Daylight Time Subject: NWT Wastewater Treatment Date: Wednesday, August 22, 2018 at 11:21:56 AM Eastern Daylight Time From: Lawrence Kearson To: Tim Hedrick Tim, Today IUP 001 GKN has stopped discharge from the pretreatment facilities located at 1848 GKN Way to the Town of Maiden Waste Water Treatment Plant. This stoppage is in preparation of the dismantling of the current system and the installation of a new evaporation unit that will treat the wastewater going forward. The initial plan for this activity was slated for October 2018 however, I have been informed that the equipment supplier has moved our install ahead and as a result the demolition of the current system is under way. As a result there will be no quarterly sampling for the current quarter as required by the permit. The flow log will show discharge through August 21, 2018. If required GKN will continue to submit the monthly flow log for your records. Please contact me if any additional information is required. Lee Kearson I Environmental Manager IGKN ePowertrain 1848 GKN Way I Newton, NC 128658 Phone: +1 828-428-6458 lawrence.kearson@gkn.com This e-mail and any attachments transmitted with it contain information which is confidential,intended solely for the addressee(s)and which may also be privileged or exempt from disclosure under applicable law If you are not the addressee(s),or have received this e-mail in error,please notify the sender immediately,delete it from your system and do not copy,print,disclose or use any part of it or its attachments Internet communications are not guaranteed to be secure or free of any virus The GKN Group does not accept liability for any loss or damage arising in any way from changes to this e-mail or its attachments which may occur in transmission due to network,machine or software failure or manufacturer or operator error,or from unauthorised access or interference with Internet communications by any third party or from the transmission of any viruses Any opinion or other information in this e-mail or its attachments that does not relate to the business of the GKN Group or any part of it is personal to the sender and is not given or in any way endorsed by the GKN Group or any part of it We are committed to using and managing personal information responsibly and ethically Please see our privacy_policy-to find out more about how we will use your personal data Page 1 of 1 Name Of Industry: GKN DRIVELINE IUP# 001 Address Of Industry: 1848 GKN WAY NEWTON,NC,28658 IUP Expiration Date: 12/31/2021 Industry Representatives Title LEE KEARSON EHS COORDINATOR POTW Representatives TIM HEDRICK Title WWTP SUPERTINDENT Date Of Inspection: 11/07/2018 Time Of Inspection:RELO l ®SDNIDW am/pm Purpose of Inspection: Annual Y Other(Describe) NOV 2 8 2018 POTW to which IU discharges TOWN OF MAIDEN 0039594 NPDES# Water Resources Is SIU currently in SNC? NO If yes,for what? Permitting Section PART I - INITIAL INTERVIEW Has anything changed since the last inspection or IUP application in the following: COMMENTS Product YES Q NQ7 ,( Doabi °M o2O/7 Raw materials used YES TAl �'�"`UG+i�►� ��'� l� Manufacturing processes YES Or Categorical,if applicable YES/ Production rate YES(/I Number of employees YES Number of shifts YE� Comments: PART II - PLANT TOUR -Visit all areas where wastewater is generated or where there are drains to the POTW. Plant Tour Section A-PRODUCTION AND STORAGE AREAS OA)1. Are there floor drains in the production area? rr NO Where do they go? 3Ac - v 5 l 2. Are production areas diked,containey o otherwise constructed in such a way as to prevent harm to the WWTP, especially from spills or slugs? YES Or Co ments: IJ°t J7+'/c eoi, 3u - pCUNt 601 .40 &g,0 1;444,461,* cv/i L ifi CMJ he_ cor.t{ieote AJC) ppee *Jam_ lac +�s �w Sys wt, 3. Are there floor drains in the storage area?(YEY NO Where do they go? 514 71.0 •- e# 4. Are storage tanks and areas diked,contained,or otherwise constructed in such a way as to prevent harm to the WWTP,especially from spills or slugs? YES/NO Comments: S 6--• AS Igeov& 5. Are process and storage tanks and pipes labeled? CO r 6. How are off-spec raw materials,and products disposed of? ,ziog ?to Mp,v440. 1 Oi i2/5 sec ° P awe 7. When is the production area cleaned? 1R)' .96A-P74 V -9/ 8. Is t e w tteew ter�ffr m cleaning the production area discharged to the POTW? YE: /NO d(/o,� ceg 9. Whatn riirr"odess�astew are discharged to POTW? 7 /6-4' evt5/ e0470LG otC /744AJD S;.v4S Comments: PART II - Plant Tour Section B -PRETREATMENT SYSTEM / Ask the operator to describe pretreatment system. 5e1,4 ZS ritzy / 6�� 1. Does operator seem knowledgable about the system7. YFS NO Comments: J / a ,45D411` e, 5yMeM., ?ND 2-z Vee Wcct.- OR554wi2Ge( 2. Are all units operational? e71‘10 3. How often does operator/maintenance pers cheeck system? ,VAILy 4. Is there an operator for each shift? YES (NCY / _ 5. How and when is sludge disposed of?� Gc/Ar4 `5 pad /Ail� Vd,eUWrs, a� "�S ,J�s u/1'iG�e G 5� p4E W&L' - i s f(�qc d $� /�4Z'1k1/IT 7 €o I Foil p .pe ¢OSA L 6. Is there a schedule for preventative maintenance?4110 NO - /1/lft A/TeuCF 13 et{C.wa Goa&tu5 -10 3e;Rer- '1r�;mS S . Comments: PART II - Plant Tour Section C - SAMPLING POINT(S)AND FLOW MEASUREMENT (Collect a sample if desired.) � nn 1. Does an outside lab complete sampling?C _Y N O If yes,name of lab. 'I"A6c- f^F Jeyb‘-A(- 2. If industry completes sampling,ask the industry representative to describe sampling procedures. Comments: 3. Is flow measurement equipment operational 4WD NO Comments: 4. Is there a calibration log for the flow meter?WO 0 Comments: LOC: 2N VEC.EMPER._ Comments: PART III - EXIT INTERVIEW Review monitoring records and other SIU records required by IUP. 1. Are files well organized' O NO Comments: 2. Are sample collection/chain-of-custody forms filled out properly, YES O Comments: 3. Do results in files agree with reports sent to POTW?4i70 NO Comments: /./Az ? ,U 4A.7 } cf'sulfs SrAuCE ,44,6 - at, abm d` Ve to OPse-406 4. Who has authority to shut down production should a spill or slug discharge occur? Ally idec& s.g, mit ver. 5. How does SIU inform employees of whom to call at POTW in case of spill/slug? ZA1C zg1` If slug/spill plan is already required by POTW,review procedures. 6. Is SIU implementing slug/spill plan? YES/NO Comments: Comments: INSPECTION RESULTS Slug/Spill Control Plan Needed? YES/NO ---1--Comments,Required Or Recommended Actions: �,rc?vez'F';'vS < aop ` rex- ` ��R.u• e.t'f- ?cos F4t x)•, • c4?-/-4—et;r U Signature Of Inspector(s) //o7A0/7 Date: /(/5'7/2°! Date: